Make up water (%) = Evaporation Loss (%) + Drift Loss (%) + Blowdown Loss (%)
Where ;
Evaporation Loss = 0.85%
Drift Loss = 0.02%
Blowdown Loss = 0.22%
Therefore,
Make up water (%) = 0.85% + 0.02% + 0.22%
= 1.09% of total circulating water flow rate x hr
Hence, considering safety margin, a make up of 2% of the circulating water flow rate is
sufficient.
Take Operation hr = 12 hrs
Make up Water = (2% of circulating water x 12 hrs) x 60
= {(2% x 750 igpm) x12hr x60
= 10,800 igals