Title: Mastering the Art of Constructing Literature Reviews: A Crucial Yet Daunting Task

Embarking on a literature review in the construction industry can be likened to navigating through a
labyrinth of scholarly articles, research papers, and expert opinions. It is a meticulous process that
demands both time and expertise. From defining the scope of the review to synthesizing diverse
viewpoints, every step requires careful consideration and analytical prowess. However, with the right
approach and resources, mastering this essential component of academic writing becomes feasible.

The difficulty in crafting a comprehensive literature review stems from various factors. Firstly, the
sheer volume of available literature on construction-related topics can be overwhelming. Sorting
through numerous sources to identify relevant studies that contribute meaningfully to the research
can be a daunting task. Additionally, ensuring the coherence and logical flow of ideas while
synthesizing information from disparate sources poses its own set of challenges.

Moreover, maintaining objectivity and critically evaluating the quality of sources is imperative in
constructing a robust literature review. Distinguishing between credible research and anecdotal
evidence requires a discerning eye and a deep understanding of the subject matter. Furthermore,
synthesizing the findings of various studies into a coherent narrative that addresses research gaps and
advances knowledge in the field demands both skill and expertise.

In light of these challenges, seeking professional assistance from reputable writing services can
prove to be invaluable. ⇒ StudyHub.vip ⇔ offers a reliable solution for individuals grappling with
the intricacies of literature review writing. With a team of experienced writers well-versed in the
nuances of the construction industry, ⇒ StudyHub.vip ⇔ delivers bespoke literature reviews
tailored to meet the unique requirements of each client.

By entrusting your literature review to ⇒ StudyHub.vip ⇔, you can alleviate the burden of this
daunting task and ensure the quality and rigor of your academic work. Our commitment to
excellence and customer satisfaction sets us apart as a trusted partner in your academic journey.
Don't let the complexities of literature review writing hinder your progress. Order from ⇒
StudyHub.vip ⇔ today and unlock the full potential of your research endeavors.
This way the reliable virtual copy of building is created. This is because some of the contractor does
non proper direction the stuffs. It also calls for change in mindsets so that the transition is smooth
and successful. Total 35 respondents included in this research, i.e., 9 owners, 12 contractors and
14consultants.This paper suggest the simplest way to find out the ranking of attributes of delay by
RII (Relative importance technique). Also delay of building projects is very common at Lintel level
which has 21.30%, at foundation level is of 5%, some were delayed at window level which is 58.8%,
22.93% were delayed at roof level, 9% and 5.9% were delayed at about to be roofed level.
Therefore, Site director demand to work out the job harmonizing their experiences. The education,
more precisely the engineering higher education, should be able to load individual the depth
knowledge and skill that makes people capable and competent. Value Engineering emerged into
prominence after World War II. Successful direction of building resources has to be based on
updated information and processed using a well-designed building resources direction system. They
can do some wages for their employee to go to preparation classs of building stuffs direction. It is
found that delay of design or gathering permits for the larger-scale project is a major LITERATURE
REVIEW 3 risk that negatively impacts on the UK construction industry. This establishes a
framework for the industry to improve on their developments; hence, reducing the possibility of
failure. From the research of Stukhart ( 1995 ) we can concluded that early building industry were
non utilizing their resources expeditiously and that the lessening in productiveness is due to hapless
direction in the building site and stuffs. ( Stukhart, 1995 ). This will assist the employee finish their
work as agenda by the site director without any add-on of unneeded work. Therefore, a systematic
stuff direction is really importance in building site to avoid over ordering and receive low quality
stuffs at the same clip can minimise the cost and maximum the net incomes. However current
research and statistical data shows that construction is lagging behind other sectors in the aspects of
productivity and efficiency for which lack of innovation is blamed. The major types of building
delayed in Oluyole Local Government are private residential buildings. This is 100% legal. You may
not submit downloaded papers as your own, that is cheating. Also you. Additionally, the leadership
team devises effective decision-making methods, which are vital in the building and maintenance of
competitive advantage. Therefore, fabricating engineerings were looking for alternate stuff.
Information are handed over in the form of three dimensional model which consists of separated
models. Literature Review. BIM as a modern approach to the design and management in
construction industry. Information were gathered for the project work through the research tools like
questionnaire, oral interview and physical observation of some selected delayed building sites. From
a recent study, it is determined that design errors, changes in the proposed design because of
performance issues and discipline's requirements are major technical risks that occur in the larger-
scale projects in the UK. This paper analyses the most recent research in the field of construction
innovation and offers an overview of what and how aspects of innovation have been studied in
different construction contexts. Download Free PDF View PDF EVALUATION AND
MANAGEMENT OF RISKS IN CONSTRUCTION PROJECTS Editor IJERMS Construction
field is majorly a risk prone area with complexity in its internal environment which creates an
environment of ambiguity and risk. Therefore, the efficient direction of stuffs is the chief keys issue
to find the success of a completion of a undertaking. In add-on, when there are limited infinites in
the building site, the directors have to happen other storage from other people to hive away the stuffs
until they are needed. This means that the stuffs direction is a planned process that involves from the
initial buying, bringing, managing and minimization of waste of the stuff with the intent to
guaranting the quality, measure and clip of the demand should run into consequently. The UK
construction industry competes in an aggressive global market.
It is found that in the UK construction trade there is not details plan for the project interaction and
lack of coordination among various disciplines in the larger projects depends on the capability of the
project director but lack of communication produces barriers for the project managers. When the
stuffs does non maintaining in the safety topographic point, the stuffs will be spoils so increase the
waste stuffs. Therefore, fabricating engineerings were looking for alternate stuff. Risk management
is a process which consists of identification of risks, assessment with qualitatively and quantitatively,
response with a suitable method for handling and control risks. To browse Academia.edu and the
wider internet faster and more securely, please take a few seconds to upgrade your browser. Due to
low engineering capability, companies in the UK are not capable to handle such problems while
larger-scale projects. So that when they are working, the accident can be secured consequently.
Strengthen cost control, change the efficiency of endeavors is cardinal the endurance and
development undertakings in a market economic system. Basic ideas related to it were developed by
Lowrence D.Miles in 1947. The industrial state of affairs during that period was so, that there was
overall recession. Keep on browsing if you are OK with that, or find out how to manage cookies.
This is because the building site is the hazardous site, when the wellness and safety can be
determined on site; the worker will experience secured and confident to execute their work every bit
good as possible. Contents, as well as pedagogy, will need to be changed accordingly. The chief
responsibility of the cheque point is received and checks the stuffs harmonizing to quality and
measure which order by the site directors. Download Free PDF View PDF See Full PDF Download
PDF Loading Preview Sorry, preview is currently unavailable. Download Free PDF View PDF TO
STUDY THE DELAY TO CONSTRUCTION PROJECTS -CAUSE, EFFECT AND MEASURES
TO REDUCE Dr.Akhil goyal Delay to projects is one of the foremost concerns of the construction
industry in the India. The education, more precisely the engineering higher education, should be able
to load individual the depth knowledge and skill that makes people capable and competent.
Instrument storage is for seting machine and instrument. If the stuffs bringing early, site director need
to set up a topographic point for put the stuffs. Unfortunately, there are non all contractors able to
gain the net income of the investing in building undertakings. Therefore, the contractor should see
the clip to order the stuff when they needs and the clip bringing to the site. The salvaging cost and
betterment can run consequently by stuffs direction. It is true that complicated design and
insufficient information is concerned with the insufficiency of the needed details. However, despite
such consensus, there are usually no clear recommendations demonstrating how project management
practice could be improved. Literature Review. BIM as a modern approach to the design and
management in construction industry. For illustrations, the concrete batching works located far from
the site, it will take clip for worker transportation the concrete to the site so it may do hold of work
as clip tabular array. BIM is a process which integrates all the firms to work together for the
completion and helps to get in digital format throughout the building lifecycle. The present UK with
its buildings reaching out to the sky and its shopping malls spreading wide, the rise in the concern of
the building industry is inevitable. This was achieved by questionnaire survey collected from local
contractors and managers through mail and some by personnel meeting. In add-on, the control to the
stuffs is capable to the difference company and should be handled efficaciously to finish the
undertaking. The risks were analyzed using the risk matrix method with the help of assessment
forms, and further solutions were given to minimize the risks in a construction project.
Even it is dearly-won to supply that safety equipment but it is really importance to the worker
determined their safety. This paper is an effort to illustrate present status of construction innovation
research and perceptions of researchers and practitioners based on a review of current literature. For
illustrations, a contractor over order the stuff such as cements, bricks and support, the cost will
increase and the net incomes will go low or shortage of the money. ENGINEERING THE FUTURE
OF ENGINEERING EDUCATION IN INDIA ORS Rao Engineering profession in the next two
decades will undergo dramatic changes, driven by not only technological developments but also
societal transformation. In this review, some issues arising out of quantitative growth of engineering
education are identified and an attempt is made to analyze the reasons for this condition and some
achievable suggestions are presented. It is necessary to hold a proper guard in the entryway to
maintain path of all visitants to the undertaking. You can download the paper by clicking the button
above. Cagliano, Grimaldi, and Rafele, (2015) supported this argument and highlighted that lack of
proper planning is a major concern due to which construction companies in the UK face design errors
and performance- related problems while implementing larger-scale projects. The UK construction
industry competes in an aggressive global market. To browse Academia.edu and the wider internet
faster and more securely, please take a few seconds to upgrade your browser. The chief responsibility
of the cheque point is received and checks the stuffs harmonizing to quality and measure which
order by the site directors. Therefore, fabricating engineerings were looking for alternate stuff. They
can do some wages for their employee to go to preparation classs of building stuffs direction.
Therefore, I need to re-organize the layout of the site and better the site consequently. It should
follow harmonizing to manus book of wellness and safety. Stock control include natural stuffs,
processed stuffs, assembly constituents, consumable shops, general shops, care stuffs and spares,
work in advancement and finished merchandises. While science was originally a mental exercise
based on curiosity, engineering has always addressed itself to the needs of man. It is important to
identify whether the delay is critical or not as identification of critical delays helps in taking
appropriate measures at the correct time. Basic ideas related to it were developed by Lowrence
D.Miles in 1947. The industrial state of affairs during that period was so, that there was overall
recession. The leadership process also enables the industry to compete in the market because the
industry gives room for success, letdown and learning. In addition, clients in the construction
industry are developing a trend of depending on contractors, consultants and suppliers in adopting
sustainable performances in the construction project. The various effects of delay include time
overrun, cost overrun, dispute, Total abandonment, Litigation, Arbitration. Therefore, expeditiously
material direction is really importance because it will be a batch of money. Material direction has
been the chief issue of concern in the building industry. It is really of import as the building stuffs
were bringing as requested and with the patterned advance by the proper direction of stock control.
The delays may be by either parties and can be concurrent. Download Free PDF View PDF TO
STUDY THE DELAY TO CONSTRUCTION PROJECTS -CAUSE, EFFECT AND MEASURES
TO REDUCE Dr.Akhil goyal Delay to projects is one of the foremost concerns of the construction
industry in the India. The role that can be played by the construction client to promote innovation in
the industry is well documented. In drafting the contract, the getting strategy need to clearly outline
the responsibilities of the consumer and therefore the contractor and such need to be specific and
graspable. Therefore, a systematic stuff direction is really importance in building site to avoid over
ordering and receive low quality stuffs at the same clip can minimise the cost and maximum the net
incomes.
To browse Academia.edu and the wider internet faster and more securely, please take a few seconds
to upgrade your browser. Total 38 causes are identified under 8 major groups. So it will necessitate
the re-handling of stuffs and the costs of the undertaking. These activities and actions provide an of
import agencies for commanding the waste of stuff, and do the right provider to extinguishing the
add-on cost paid. However, problems occur when the construction industry lacks cost in the
acquisition of such technology, in addition lack of knowledge and skills to use BIM technology
process in project management. Moreover, incompatibility among construction breakdown structure
and engineer firms is another serious risk that affects the performance of larger-scale projects in the
UK construction industry. Safety equipment storage is for seting some safety equipment such as
signboard, helmet, safe boots and others. Therefore, if shop it at a distance from site, it will take clip
to reassign the mix concrete to the edifice topographic points. Moreover, the majority of
recommendations made in the existing studies are general in nature and do not lead to a focus on a
specific area. Therefore, with the effectual direction of the stuffs, the company can salvage more than
6 % or above of the cost from a undertaking. This paper is an effort to illustrate present status of
construction innovation research and perceptions of researchers and practitioners based on a review
of current literature. Engineering appears to be originated first in those parts of the world, where
mathematics of measurements and computation developed and flourished. The major risk observed
from the experts opinion is the lack of skilled workers that most companies are facing. This tectonic
shift will pose challenges to all the stake holders, educational institutions, government, teachers and
students. This will assist the employee finish their work as agenda by the site director without any
add-on of unneeded work. Many companies often establish a risk management procedure in their
projects for improving the performance, minimizing loses and increases the profits. It is really of
import as the building stuffs were bringing as requested and with the patterned advance by the
proper direction of stock control. Risk management is a process which consists of identification of
risks, assessment with qualitatively and quantitatively, response with a suitable method for handling
and control risks. Quantity surveyor ( QS ) is the recognized cost directors of building every bit
good. The method used in the data collection process is the questionnaire method. If risks don't seem
to be known early throughout a project, it creates tons of exposure and uncertainties to the project
life cycle, thereby touching such aspects as value, schedule and quality of the project. Such kinds of
risks contain delays that may occur due to the in-discipline in the larger- scale projects in the
construction sectors. Its part ranges from enabling the procurance of goods and services to. You can
download the paper by clicking the button above. In this review, some issues arising out of
quantitative growth of engineering education are identified and an attempt is made to analyze the
reasons for this condition and some achievable suggestions are presented. For illustration, if the
stuffs such as concrete batch works seting excessively far from the physique topographic points, it
will do a batch of clip for labors to convey the concrete to sites. To browse Academia.edu and the
wider internet faster and more securely, please take a few seconds to upgrade your browser. The cost
represented by stuffs changed and may include between 20 % and above of the sum of the
undertaking. Thus, particular attending should be given to stuffs after they purchased from the
provider. This was achieved by questionnaire survey collected from local contractors and managers
through mail and some by personnel meeting.
Therefore, this study identifies the factors use of BIM technology, the level of absorption, and the
measures to increase the users of BIM technology in construction design phase. Background and
debutBalfour Beatty Construction is a commercial building company that was formulated in 1933.
Therefore, the labor can easy take out lumber and support to make the articulation without carry from
far topographic points. Instrument storage is for seting machine and instrument. The UK
construction industry embraces admirable leadership strategies because it has a long-term defined
vision. With the JIT direction system, the stuffs possibly delivered to site harmonizing agenda or
merely the twenty-four hours before. The construction industry in UK specialises in the residential
and nonresidential building as well as infrastructure. In addition, clients in the construction industry
are developing a trend of depending on contractors, consultants and suppliers in adopting sustainable
performances in the construction project. Material direction has been the chief issue of concern in the
building industry. This paper is an effort to illustrate present status of construction innovation
research and perceptions of researchers and practitioners based on a review of current literature.
Documentation form has involved, but it was always two-dimensional. The reasons for delays are
primarily due to an unreasonable project scope, inadequate early planning and the absence of risk
management systems. The contractor further contributes to delay due to lack of resources and labor
productivity. Therefore, expeditiously material direction is really importance because it will be a
batch of money. Each one of them, needs to gear up itself to address the challenges. The result of
this is obviously cognitive revolution along with the continuous innovation. For illustrations, the
concrete batching works located far from the site, it will take clip for worker transportation the
concrete to the site so it may do hold of work as clip tabular array. Concrete batching works is seting
excessively far with the stuff which is cement and sum. Therefore, a systematic stuff direction is
really importance in building site to avoid over ordering and receive low quality stuffs at the same
clip can minimise the cost and maximum the net incomes. Download Free PDF View PDF See Full
PDF Download PDF Loading Preview Sorry, preview is currently unavailable. The main aim and
objective of this dissertation is to evaluate the various types of delays and the reasons for those
delays that are currently affecting the projects in the India. Without the cheque point, the instrument
will easy to be lost and difficult to seek for the needed. From the research of Stukhart ( 1995 ) we
can concluded that early building industry were non utilizing their resources expeditiously and that
the lessening in productiveness is due to hapless direction in the building site and stuffs. ( Stukhart,
1995 ). While science was originally a mental exercise based on curiosity, engineering has always
addressed itself to the needs of man. Some of the demands must take to manage and hive away the
stuffs decently when they are received. The industry has high production level and its goods and
services are of high quality. The design of cladding utilizing lumber as the stuff is flexible. The
method used in the data collection process is the questionnaire method. Total 38 causes are identified
under 8 major groups. In other words, they are ideal illustration of components, which are built in to
building.
So the wellness and safety is really of import in building site. Although the benefits of BIM are
evident, the adoption in the Indian Context Industry has been slow and the diffusion has not been to
its f. You can download the paper by clicking the button above. The construction industry typifies
the material and products used in construction, suppliers and the producers of the construction
material, building services offered by contractors, providers and installers of the services,
constructors, sub-constructors, professional advisors, construction clients and the different
organisations that specialise in design and building (Morton 2007). If the stuffs bringing early, site
director need to set up a topographic point for put the stuffs. So that when they are working, the
accident can be secured consequently. In add-on a successful building undertaking is holding the
zero accident in building site. Therefore, a systematic stuff direction is really importance in building
site to avoid over ordering and receive low quality stuffs at the same clip can minimise the cost and
maximum the net incomes. There are concerns about the degree of innovation within the construction
industry, despite having potential to be innovative. Sustainable development in the construction
sector in the United Kingdom has gradually become a connected part of construction planning and
management for the administration, independent construction companies and the uk consumers.
Thus, particular attending should be given to stuffs after they purchased from the provider. The data
collected revealed that 61.25% of the delayed building projects were due to economic problems
which may be financial problem or inflation, 18.75% were caused by the death of the client, 16.25%
caused by the failure of the client to get approval from planning authority and 7.5% were caused by
land dispute, 16.25% of the delayed building projects were due to settlement. It is determined that
risk management has the capability to control and address risks and challenges occurred in larger
projects and provide reliable services to the construction industry. You can download the paper by
clicking the button above. Therefore, if shop it at a distance from site, it will take clip to reassign the
mix concrete to the edifice topographic points. The construction industry adopts several approaches
that enable it to increase its productivity and quality (Benati 2004). You can download the paper by
clicking the button above. The UK construction industry competes in an aggressive global market.
The JIT thought originates from the fabrication sector. The major risk observed from the experts
opinion is the lack of skilled workers that most companies are facing. It had been completed that risk
management is crucial to construction activities in minimizing losses and enhancing profitableness.
Such kinds of risks contain delays that may occur due to the in-discipline in the larger- scale projects
in the construction sectors. In other words, they are ideal illustration of components, which are built
in to building. This is because available of the stuffs will impact the successful from their
undertaking. This is because the impermanent edifice used for undertaking director and others
adviser to hold meeting or treatment session and to do determination. As a result, the people working
on the projects face various risks such as operational requirements, cost overruns, and various types
of accidents during a project. It is therefore recommended that the clients should plan adequately
and seek for financial assistance from cooperative union and financial institution to facilitate timely
completion of projects. It can be designed harmonizing to the environment and tantrum into any site
with a minimal disbursals. To browse Academia.edu and the wider internet faster and more securely,
please take a few seconds to upgrade your browser. Guidelines which are formed from these
recommendations lay the basis for upgrading the existing structures in uk as well as for planning
dynamic designs in future keeping in mind the protection factor.
The building industry the universe over is frequently perceived to be the life wire of its several
economic system as it cuts across all facets of human activities ( Ayangade, 2009 ) and the Nigerian
building industry is non an exclusion to this. So they can salvage more attempt and clip to
accomplish more exact consequences. So that when they are working, the accident can be secured
consequently. During building undertaking, routing of the stuffs will impact the cost and clip to
finish the building undertakings. The construction industry in UK specialises in the residential and
nonresidential building as well as infrastructure. In addition, clients in the construction industry are
developing a trend of depending on contractors, consultants and suppliers in adopting sustainable
performances in the construction project. In early building industry, many building companies
experienced that the addition in costs and a lessening in productiveness which due to rising prices
and economic jobs. Successful direction of building resources has to be based on updated
information and processed using a well-designed building resources direction system. From a recent
study, it is determined that design errors, changes in the proposed design because of performance
issues and discipline's requirements are major technical risks that occur in the larger-scale projects in
the UK. In add-on, inaccessibility of stuffs will impact the productiveness and cause to the
completion of the undertaking. It is important to say that how Europe coexist and compete to a large
extent shaped by the structure of the construction industry. This ultimately leads to cost overruns
and poor quality construction. The leadership team within the industry highlights their expectations
for them to monitor and identify whether they are competent enough to meet the set targets. The
delays may be by either parties and can be concurrent. As a new site director of the undertaking, I
noticed that many jobs are transporting out by the programs and those jobs will do the undertakings
to be hold or increase the cost of the undertakings. The chief jobs lead to uneffective are fault timing
of stuffs received by the site or unequal quality, improper information for stuffs arrival to the site
stock, losing stuffs, inaccessibility of storage infinite, and waste of labor for stuffs seeking on site.
Documentation form has involved, but it was always two-dimensional. The cost represented by stuffs
changed and may include between 20 % and above of the sum of the undertaking. So it will
necessitate the re-handling of stuffs and the costs of the undertaking. This will assist them set up the
stuffs consequently to increase their hereafter undertaking and set up the site layout harmonizing to
the demands of building undertaking. Above this, the effect of globalization is turning the world to
the international partnerships diversifying the workforce and resulting to demographic shifts. The
various effects of delay include time overrun, cost overrun, dispute, Total abandonment, Litigation,
Arbitration. The location of the stuffs, storage and other impermanent installations should located
harmonizing the efficient of the building work. As industry increasingly looks at Corporate Social
Responsibility, not just as mandatory but as key to success, future engineers should change their
mind sets and incorporate sustainability and corporate social responsibility as key parameters in their
day-today working as well as decision making framework. This means that the stuffs direction is a
planned process that involves from the initial buying, bringing, managing and minimization of waste
of the stuff with the intent to guaranting the quality, measure and clip of the demand should run into
consequently. This is because some of the contractor does non proper direction the stuffs. Therefore,
Site director demand to work out the job harmonizing their experiences. The major types of building
delayed in Oluyole Local Government are private residential buildings. Sustainable development in
the construction sector in the United Kingdom has gradually become a connected part of
construction planning and management for the administration, independent construction companies
and the uk consumers. This is because the building site is the hazardous site, when the wellness and
safety can be determined on site; the worker will experience secured and confident to execute their
work every bit good as possible.