You are on page 1of 89

CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA

(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG


BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES

GENERAL
The Works contained in the Contract shall include the provision of all
labour, materials, constructional plant, temporary or permanent works as
required in the Contract.

The Bill of Quantities shall be read in conjunction with the Conditions of


Contract, the Specification and the Drawings in the Contract Documents.

The items as set out in the Bill of Quantities shall apply to the whole of the
Works contained in the Contract and the Contractor shall allow for
compliance with the same and for any cost incurred in connection therewith.

Headings are not comprehensive and do not necessarily reflect or modify


the meaning of the items in the B.Q. The exact nature and extent of the
work to be carried out shall be ascertained by reference to the Contract as a
whole, in particular the Conditions of Contract, the Specification and the
Drawings. It shall be read together with the relevant "Method of Payment".

The amounts inserted by the Contractor for such items shall be deemed to
apply to the whole of the Works carried out under this Contract.

Each item shall be individually priced. Bulk pricing for sections, trades,
groups or pages of items shall not be allowed and no subsequent claims for
loss or expense and/or profit shall be entertained for failure to comply with
this clause.

The rates and prices inserted in the Bill of Quantities shall include cost of
the works described, all risks, liabilities and obligations set forth, or implied
in the Contract Document and shall be deemed to include the following,
unless expressly stated otherwise:

a) the provision of labour and all costs in connection therewith;

b) the supply of materials, goods, equipment and storage thereof including


delivery to site and all costs in connection therewith;

c) taking delivery of materials, goods and equipment necessary for the


Works and including those supplied by others, loading and unloading,
storage and all costs in connection therewith;

d) the usage of plants and machineries and all costs in connection


therewith;

TO COLLECTION

BQ 1/1
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

e) the fixing, erecting and installing or placing in position of materials, goods


and equipment including around obstruction, tolerances, penetration,
working space, over-breaks etc. and all costs in connection therewith;

f) the provision of all temporary works and all costs in connection therewith
unless separately provided for in the Bill of Quantities;

g) the phasing requirements of the Works including the effect on the


programming of the Works of all traffic and drainage diversions, special
structural requirements, earthwork restrictions, alterations to services and
street lighting (executed under the Contract or in conjunction with it) and all
other requirements of the Contract and all costs in connection therewith;

h) all cost of testing to show proof of compliance with the Specification on


materials and workmanship inclusive of samples of materials and
submission of tests results. Should the frequency of testing and sampling no
t specified, then it shall be in accordance with the relevant Malaysian/British
Standards and Codes of Practice. Where there is no such relevant
Standards and Codes of Practice for reference, it shall then be as instructed
by the S.O.;
i) all royalties and dues which the Contractor may be required to pay;
j) wastage;
k) establishment charges, overheads and profit;
l) whatsoever method of construction the Contractor may adopt.

Where any priced item in the B.Q. but has not been executed on site by the
Contractor, the cost of such priced item shall accordingly be deducted from
the Contract Sum.

All items priced shall be deemed to include compliance with the provisions
of the contract, statutes, regulation, by-laws or any order or directive issued
by public authority or public service company and other related legislation
currently in force.

Notwithstanding the above clauses, the S.O. reserves the right to request
from the Contractor the detailed breakdown of the pricing for items or rates
in the B.Q. for his perusal. The detailed breakdown pricing may be used as
a basis for the administration of the Contract

TO COLLECTION

BQ 1/2
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
MEASUREMENT
Quantities in the Bills of Quantities are measured in accordance with the
Malaysian Standard Method of Measurement of Building Works (2nd Edition
Metric 2000). Wherer departure have been made from the standards
mentioned, the method adopted in the Bills shall be adhered to for the
purposes of ascertaining the value of all variations and measurements.

UNPRICED ITEMS
Where any item is left unpriced, it shall be deemed that the cost of such
item has been allowed for elsewhere within this document. No subsequent
claims arising out of expense and/or loss incurred against such unpriced
item shall be entertained.
GENERAL ATTENDANCE FOR NOMINATED SUB-CONTRACTORS AND
NOMINATED SUPPLIERS
Attendance and facilities for Nominated Sub-contractors and nominated
suppliers shall include:
a) in the case of works or services executed for allowing the use of existing
working space, access, temporary roads, erected scaffolding, sanitary,
welfare and other facilities existing on Site and the provision of protection,
water, electricity for lighting and clearing away rubbish and debris arising
from the work;
b) in the case of goods, materials or services supplied for taking delivery,
unloading, storing, protection and returning crates, cartons and packing
materials, all as specified in the specification.

PHASING EQUENCE OF OPERATIONS AND METHODS OF


CONSTRUCTION

The rates and prices shall, unless otherwise stated, include for the costs of
compliance with any restrictions imposed on the programming of the Works
by the Government and Local Authorities and other relevant authorities
dealing with phasing sequence of operations, method of construction, safety
and health and liaison and access.

TRIALS, SAMPLES, TESTS AND INSPECTION

The rates and prices shall include for a testing laboratory or an accredited
laboratory approved by SIRIM, equipment and staff for carrying out the
tests, tests and the effects on the progress of the Works for the carrying out
of all trials, sampling and tests whether specified in the Contract Document
or otherwise in order to ensure compliance with the requirements of the
Specification except where separately itemised in the Bill of Quantities.

TO COLLECTION

BQ 1/3
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)
EXISTING SERVICES AND MAINS

The Contractor shall include in his rates and prices for taking measures to
services and mains and other equipment and machineries during the
progress of the Works. The Contractor shall inform the S.O. of all
arrangements with all Statutory and Public Utility Authorities.

WORK UNDER WATER

The rates shall include any costs arising from and in connection with the
execution of work under water wherever required unless otherwise stated.

PHRASEOLOGY
Differences in the method of billing and in phraseology used in various parts
of the Bill of Quantities and/or Schedule of Rates shall not be a basis of any
claim for an increase in the rates and prices.

PROVISIONAL SUMS
All provisional sums included in the Bill of Quantities are intended to be
approximate indications only of the amounts to be expended in respect of
the work described and may be omitted entirely or substantially varied
without entitling the Contractor to any claim for compensation. No part of the
Contractor's overhead, expenses or profit should be included in these sums
when the bill is priced unless items for profit and attendance are specifically
allowed for.

CURRENCY OF PAYMENT

Pricing of the Contract shall be in Malaysian Ringgit to two decimal place.


Payment to the Contractor under the Contract shall be in Malaysian Ringgit.

TEMPORARY DIVERSIONS
Work in connection with the temporary diversion and relocation of existing
overhead and underground services, whether detailed in the Contract or not
shall be covered by the appropriate Lump Sum Items in Bill No. A:
Preliminaries and General Conditions unless separately measured in other
parts of the Bill of Quantities.

TO COLLECTION

BQ 1/4
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

ABBREVIATIONS

The following abbreviations or symbols are generally used in the Contract


Document and shall be read as follows:

a) mm
b) m
c) m2 square metre
d) m3 cubic metre

SCOPE OF WORKS

The works included under this Contract comprises:

A - Preliminaries
B - Building Works
C - External Works
D - Prime Cost Sum
E - Provisional Sum

LOCATION OF SITE

The site for the proposed Works is located at Jelapang, CADANGAN


KERJA-KERJA PEMBINAAN PUSAT KECEMERLANGAN
PENGANGKUTAN MARA (MARA TRANSPORT EXCELLENT CENTRE
MTEC)

PROJECT SIGNBOARD

Provide and erect in a prominent position approved by the S.O., a signboard


A painted and lettered in Bahasa Malaysia to the approval of the S.O., and
maintains and dismantles and removes the same on completion.

SITE SURVEY AND SETTING OUT

The Contractor shall employ a licensed surveyor to carry out site surveys
B
before commencement and setting out of the Works.

TO COLLECTION

BQ 1/5
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

TEMPORARY DIVERSION AND RELOCATION OF EXISTING


OVERHEAD AND UNDERGROUND SERVICES

The Contractor shall enquire from the various authorities and make
arrangements for the disconnection, removal, relocation and reconnection
A
of services and pay all necessary cost and fees in connection therewith and
make good all damage as specified.

CONSTRUCTION PLAN

The Contractor shall submit to the S.O. for his approval the following as
B
specified :

a) Programme of Works

b) Method statements

c) Contractor's organisation chart

d) Schedules

e) Quality Assurance Plan for Works Contract worth RM10 Million and
above

i) Provide a quality Assurance Team full time on Site for the institution,
administration and maintenance of the Quality Assurance Plan and the
preparation and submission of all Quality Assurance Reports as specified,
throughout the duration of the contract.

ii) The Contractor shall appoint a suitably qualified and experienced person
to act solely Officer full time on site to lead as a Quality Assurance Quality
Assurance Team. (Refer Addendum to specification for project worth RM 10
Million and above).

CONTRACTOR'S PLANT

The Contractor shall provide, erect, keep insured, maintain and remove on
completion all requisite scaffolding, hoist, cranage, construction plant,
C
ladder, staging, tarpaulins, et cetera (excluding piling and pile testing
equipment), as necessary for the execution of the Works.

TO COLLECTION

BQ 1/6
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

TEMPORARY WATER AND POWER SUPPLIES FOR THE WORKS

The Contractor shall provide adequate power and water supplies for the
A execution of the works including paying all associated costs and fees as
specified.

SITE SECURITY

The Contractor shall provide all necessary personnel and lighting for the
B security of the site at all times until completion of the whole Works as
specified.
TEMPORARY ACCESS AND MAINTENANCE OF EXISTING ROADS

The Contractor shall provide and maintain all necessary temporary roads,
C culverts, tracks, bridges, et cetera for access to and within the Site as
specified.

The Contractor shall maintain all access including existing roads, bridges,
drains, culverts, roadside furniture, and all other appurtenances and
D services on such roads throughout the construction period. The Contractor
shall make good any above mentioned item damaged by any work carried
out by him.

The Contractor shall locate the actual position and provide support and full
protection of existing services and mains during the progress of the Works.
E
The Contractor shall inform the S.O. of all arrangements with the various
authorities.

CONTROL OF WORKMEN, PLANT AND MACHINERY AT SITE

The Contractor shall ensure the safety, health and welfare at work of all his
F
workmen as specified.

CONTRACTOR'S TEMPORARY ACCOMMODATION AND FACILITIES


FOR WORKMMEN LIVING ON SITE

The Contractor shall provide and maintain all temporary accommodation


G and facilities including temporary lighting, plumbing, water storage sanitary
and sewerage for his labour and staff living on Site as specified.
CONTRACTOR'S OFFICE AND STORAGE

The Contractor shall provide and maintain Contractor's office and storage
H
on the Site in positions as approved by the S.O. and as specified.

TO COLLECTION

BQ 1/7
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

CARE AND PROTECTION OF MATERIALS AND WORKS

The Contractor shall provide and maintain everything necessary for proper
A
protection of materials and Works from any damage by weather.
SHOP DRAWINGS, SAMPLES AND MOCK-UPS

The Contractor shall submit relevant shop drawings, samples of materials


B
or workmanship and mock-ups units as specified for the S.O.'s approval.

PROGRESS PHOTOGRAPHS & PROGRESS REPORTS


The Contractor shall take progress photographs and prepare progress
C
report and submit to the S.O. as specified.

MATERIAL TESTING LABORATORY ON STAFF


The Contractor shall provide/erect a testing laboratory within the site or rent
a premise or propose an accredited laboratory approved by SIRIM as
D specified. The Laboratory shall be equipped with the necessary equipment
and staff required to carry out the tests as identified in APPENDIX A/4 (List
of Laboratory Equipment).
OFFICE ACCOMMODATION FOR S.O.
The Contractor shall provide and maintain a site office or relocatable site
E office or rent a premise for the use of the JKR supervisory staff which shall
meet the requirement of the JKR design as specified.

TELEPHONE FOR S.O.


The contractor shall provide a permanent telephone at S.O.'s office for the
F
sole use of the S.O. and his representatives as specified.

SURVEY INSTRUMENTS AND PERSONNEL


The Contractor shall provide all such instruments, equipment and survey
personnel as specified throughout the duration of the original Contract
G
Period until 6 months after the issuance of the Certificate of Practical
completion as per SO required.
SITE ITEMS FOR S.O./OFFICE EQUIPMENT AND FACILITIES
The Contractor shall provide all Personal Protective Equipment required for
H the use of the S.O. and his supervisory staff complete as specified and
complying with DOSH requirements.

TO COLLECTION

BQ 1/8
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

SITE ITEMS FOR S.O./OFFICE EQUIPMENT AND FACILITIES (CONT'D)

A The Contractor shall provide suitable types of fire extiguishers as specified.

The Contractor shall provide the equipment and facilities as listed as


B specified for the use of the S.O., his representatives and staff throughout
the duration of the original Contract Period.
The Contractor shall provide suitable transportation service by means of
C vehicle(s) including licensed and competent driver(s) as specified in
throughout the duration of the original Contract Period

SAFE WORKING AREA


The Contractor shall supply, erect, maintain and remove on completion of
the Works, scaffolding and working platform with safety nettings, catch
D platforms, safely barricades, fencing, railing, screen wire netting and toe
board, guardrails or board fences and sufficient illuminations, all as
specified.

The Contractor shall supply, erect, maintain and remove on completion of


the Works, adequate, protective and security hoarding, scaffolding and
G working platform with safety nettings and such other safely measures
necessary to ensure the safety of the workers, personnel, public and others
at or within the vicinity of the Site, all as specified.

SAFETY, HEALTH AND WELFARE


i) The Contractor shall ensure the safety, health and welfare at work site as
H
specified including but not limited to:
a) Provision of First Aid Kit
b) Pest control including keeping the site clean and dry to prevent breeding
of mosquitoes, rodents, insects and vermin of any kind.
c) Fogging at regular intervals
ii) The Contractor shall maintain the Site in clean and sanitary condition and
shall comply with all requirements of the Government Health and Sanitary
Authorities in the event of any outbreak of illness, and epidemic and
pandemic nature such as COVID 19, the Contractor shall comply with and
carry out such regulations, order and requirements as in Prevention and
Control of Infectious Diseases Act 1988 (Act 342) and related Standard
Operation Procedure issued by Ministry of Health Malaysia, CIDB and
Public Works Department of Malaysia.

TO COLLECTION

BQ 1/9
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

The Contractor shall employ a Site Safety Supervisor (SSS) registered with
A DOSH to be stationed a minimum of 15 hours a week at the site for the
entire duration of the construction period.

The Contractor shall submit 5 copies of Safety and Health Plan (S-Plan) as
B
required in APPENDIX A/5 as specified.

C The Contractor shall submit 5 copies of monthly Safety and Health Report.

The Contractor shall provide and maintain adequate traffic safety and
D
control including signages, warning lights and flagmen as necessary.

AS-BUILT DRAWINGS

Pursuant to the terms of the contract, the Contractor, shall grovide approved
E
As-built drawings as follows:

1. Four (4) sets of As-built drawings as actually constructed pertaining to the


Works including all services and facilities systems and all supporting
documents such as Operation and Maintenance Manual, Testing and
Commissioning Certificates.

2. Four (4) sets of Digital Copies in AutoCAD (.dwg) format to be stored in


compact discs or removable storage.

3. Four (4) sets of Digital Copies in Acrobat (.pdf) format to be stored in


compact discs or removable storage.

The As-built drawings shall be submitted by the Contractor to the


satisfaction of the S.O as to allow for a complete understanding of the
Works as they were actually built.

CLEARING, CLEANING AND MAKING GOOD ON COMPLETION

The Contractor shall clear and clean the Works including existing roads,
F drains bounding the Site of any debris, earth, et cetera, and making good all
damages upon completion as specified.

TO COLLECTION

BQ 1/10
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)
FORM OF CONTRACT

The Contractor shall refer to the Standard Form of Contract for further
information. The Contractor may price here for all expenses involved in
A
complying with the terms of this Clauses, otherwise such expenses are
deemed to be included elsewhere.

CLAUSE NO. 13

B Performance Bond
For due observance and performance of this contract the Contractor shall
have to provide:

Performance Bond in the form of an approved Bank or Insurance


Guarantee equal to five percent (5%) of the contract sum to be deposited
with Government as a condition precedent to the commencement of any
works under this contract.

CLAUSE NO. 15

C Insurance Against Personal Injuries and Damages to Property

CLAUSE NO. 16

D Indemnities to Government in Respect of Claim by Workmen

CLAUSE NO. 17

E Employees' Social Security Act 1969

CLAUSE NO. 18

F Insurance of Works

CLAUSE NO. 22

G Design, Sub-clause No. 22.2 - Design Guarantee Bond


Design Guarantee Bond substantially in the form of Bank Guarantee for
Design Guarantee Bond (PWD DGB 1/2011) appended in the Tender
Design Guarantee Bond (PWD DGB 1/2011) appended in the Tender
Document.

CLAUSE NO. 35

Materials, Goods and Workmanship - Opening up of work for inspection or


H
testing of materials or goods.

TO COLLECTION

BQ 1/11
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

CLAUSE NO. 59 - SITE AGENT AND ASSISTANTS

The Contractor shall keep constantly on the site for the full duration of the
Contract a competent, efficient, suitably qualified, experience and good
character Site Agent and his assistants in each trade as may be necessary,
who must be capabel of receiving instruction in Bahasa Malaysia, and in
default it shall be the responsibility of the Contractor to provide replacement
A
for them and all wages and other expenses in connection with the
employment of such replacement site agent and assistants. Any directions,
explainations or instructions given to such site agent by the S.O. shall be
deemed to have been given to the Contractor under this Contract provide all
necessary superintending order.

TO COLLECTION

BQ 1/12
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES

AMOUNT
ITEM DESCRIPTION
(RM)

PRELIMINARIES (CONT'D)

COLLECTION PAGE:

From Page No. BQ 1/1

From Page No. BQ 1/2

From Page No. BQ 1/3

From Page No. BQ 1/4

From Page No. BQ 1/5

From Page No. BQ 1/6

From Page No. BQ 1/7

From Page No. BQ 1/8

From Page No. BQ 1/9

From Page No. BQ 1/10

From Page No. BQ 1/11

From Page No. BQ 1/12

TOTAL CARRIED TO SUMMARY

BQ 1/13
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN
MARA (MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG

BILL NO. 3 : BUILDING WORKS

AMOUNT
ITEM DESCRIPTION FROM PAGE NO.
(RM)

SUMMARY

1 PILING WORKS BQ 3/1/1

2 WORK BELOW LOWEST FLOOR FINISH BQ 3/2/1

3 FRAME BQ 3/3/1

4 UPPER FLOOR BQ 3/4/1

5 ROOF BQ 3/5/1

6 STAIRCASE BQ 3/6/1

7 EXTERNAL WALLS BQ 3/7/1

8 INTERNAL WALLS BQ 3/8/1

9 WINDOW BQ 3/9/1

10 DOOR BQ 3/10/1

11 EXTERNAL FINISHES BQ 3/11/1

12 INTERNAL FLOOR FINISHES BQ 3/12/1

13 INTERNAL WALL FINISHES BQ 3/13/1

14 INTERNAL CEILING FINISHES BQ 3/14/1

15 SANITARY APPLIANCES BQ 3/15/1

16 COLD WATER PLUMBING INSTALLATION BQ 3/16/1

17 FURNITURE BQ 3/17/1

CARRIED TO GENERAL SUMMARY OF TENDER RM

BQ 3/0/1
BUILDSOFT EDUCATIONAL WBLFF
Description Unit Qty Rate Amount
WBLFF

This bill of quantities shall be read in


conjuction with preambles and
specifications.

ELEMENT NO. 1 - WORK BELOW LOWEST FLOOR


FINISHES

Excavate for foundation commencing from


reduce level; including backfilling with
approved excavated material, compaction in
layers and disposal surplus excavated
material where directed within the site :-

A Pit from reduce level maximum depth n.e.


1.00m. m3 40

B Trenches to receive ground beam maximum


depth n.e. 1.00m. m3 108

Extra Over for excavation in rock :-

C Pit for pile caps. Item

D Trenches for ground beams. Item

Disposal of Surface Water :-

E Allow for keeping the surface of the site


and excavation free from surface water Item

50mm thick 1:3:6 concrete blinding Grade


35 n.e. 100mm thick laid on earth :-

F Under pile caps. m3 3

G Under ground beams. m3 8

H Under ground slabs. m3 44

Vibrated reinforced in-situ concrete Grade


35 as described in :-

J Pile caps. m3 33

K Column stumps. m3 3

L Ground beams. m3 96

M Ground slabs. m3 161

To Collection RM
A/1
BUILDSOFT EDUCATIONAL WBLFF
Description Unit Qty Rate Amount
WBLFF (Cont'd)

ELEMENT NO. 1 - WORK BELOW LOWEST FLOOR


FINISHES (CONT'D)

High Tensile rod reinforcement with BS4449


as straight and bend bar as described in :-

Pile cap.

A 12mm Diameter rod. kg 355

B 20mm Ditto. kg 11470

Column stump.

C 12mm Diameter rod. kg 116

D 16mm Ditto kg 113

E 20mm Ditto. kg 268

F 25mm Ditto. kg 2241

Ground beam.

G 12mm Diameter rod. kg 5972

H 16mm Ditto kg 2584

J 20mm Ditto. kg 468

K 25mm Ditto. kg 2418

Ground slab.

L 10mm Diameter rod. kg 2216

Mild Steel bar reinforcement BS4449 as


described in :-

Pile cap.

M 8mm Diameter rod as links. kg 408

Column stump.

N 10mm Diameter rod as links. kg 2464

Ground beam.

P 8mm Diameter rod as links, stirrups,


blinders and the like. kg 4454

To Collection RM
A/2
BUILDSOFT EDUCATIONAL WBLFF
Description Unit Qty Rate Amount
WBLFF (Cont'd)

ELEMENT NO. 1 - WORK BELOW LOWEST FLOOR


FINISHES (CONT'D)

Steel fabric reinforcement as described


well lapped joints and embedded in floor
slab ( measured nett - not allowance made
for laps.) :-

A BRC Ref. No A8 m2 442

B BRC Ref. No A10 m2 928

Aluminium reusable formworks system as


described :-

C To edges of pile caps exceeding 250mm but


n.e. 500mm high. m 191

D To sides of column maximum high n.e. 500mm


high. m 68

E To sides and soffit of ground beam n.e.


1.00m m 499

F To sides and soffit of ground beam


exceeding 1.00m m2 156

D.P.M as described :-

G 250mm thick polythene sheet horizontal


d.p.m as specified lapped 100mm at joints
laid to receive ground slab. m2 847

To Collection RM
A/3
BUILDSOFT EDUCATIONAL WBLFF
Description Unit Qty Rate Amount
WBLFF (Cont'd)

COLLECTION

Page No. A/1

Page No. A/2

Page No. A/3

WBLFF

Carried to Summary RM
A/4
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN
MARA (MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG

BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION FROM PAGE NO.
(RM)

SUMMARY

1 SITE CLEARANCE BQ 4/1/1

2 ROADWORKS BQ 4/2/1

3 FENCING AND GATES BQ 4/3/1

4 TURFING BQ 4/4/1

5 SEWERAGE WORKS BQ 4/5/1

6 WATER RETICULATION BQ 4/6/1

7 SURFACE WATER DRAINAGE BQ 4/7/1

CARRIED TO GENERAL SUMMARY OF TENDER RM

BQ 4/0/1
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
The bill of quantities shall be read in
conjunction with the preambles and
specification
SITE CLEARANCE AND EARTHWORKS
(PROVISIONAL)

Site Clearance

A Cutting down trees & clearing site of


undergrowth, bushes, scrub and hedges &
grubbing up their roots & filing voids left by
removal of roots with selected materials
arising from excavation. (in 0.64 acres) ITEM

Earthworks

B Excavate to formation level in all types of


soil except rock and hard material, including
grading sides to slope to form formation
levels as described. M3 2560

C Fill in earth materials to make up level


including transporting, placing and
compacting in layers and forming slope
embankments. M3 2410

D Export excesssive excavate soil to remove


out from site including transporting plant and
machineries M3 150

TOTAL CARRIED TO SUMMARY

BQ 4/1/1
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS

Note:
The contractor shall note that the wearing
course cannot be laid immediately after
laying of the binder course. A ponding test
shall be carried out to determine the low-
lying areas in the binder course. The
affected areas shall be regulated to the
required level and gradient after which the
ponding test shall be repeated. Only when
the Engineer is satisfied, that the surface of
the binder course is to the required level and
gradient and there is no ponding of water,
will approval be given to commence with the
wearing course.

A Supply, spread and compact earth fill


material as sub-grade M2 3,011

B Supply, spread and compact sand blanket or


approved granular material 50mm thick
minimum consolidated thickness as sub-
base M2 3,011

C Supply, lay and compact crusher run


300mm minimum consolidated thickness for
road boase M2 3,011

D Supply all necessary labour, materials,


equipment and plants needed to carry out
California Bearing Ratio (CBR) tests as
directed by the S.O and/or as required by
the authorities on the following surface:

i) Sub-Base No 2
ii) Base course No 2

Note:
a) The contractor shall liase with Majlis
Amanah Rakyat and arrange for their
officer to witness their tests.
b) All costs incurred in facilitating MARA
officer's visit shall be bonded to
contractor and allowed for in this rate.

TO COLLECTION

BQ 4/2/1
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS (CONT'D)

A Supply and apply bituminous prime coat to


surface of the roadbase including cleaning
of the surface of the roadbase prior to the
application of Bituminous Prime Coat all in
accordance with the Specification and as
directed by the Engineer. M2 3,011
B Supply, lay and compact 50mm Minimum
Consolidated thickness Ashphalt Carpet
Binder Course above prepared
crusher-run road-base. M2 3,011

C Supply and applly bituminous tack coat to


surface of the Ashphalt Carpet Binder
Course. M2 3,011

D Supply, lay, roll and compact Hot Rolled


Asphalt final wearing course 25mm
minimum consolidated thickness in
accordance with the Specification and as
directed by the Engineer. M2 3,011

E Allow for coring tests to determine thickness


of binder course and wearing course in
accordance to the B.S. Specification and as
directed by the S.O No 2

Note:
a) Coring tests shall be carried out at the
rate of one (1) no. per 500m² of metalled
pavement.
b) Photographs shall be taken of each
cored sample together with a tape
alongside to indicate the thickness of
each layer.
c) Three (3) bound copies of Coring tests
results c/w photographs of samples and
plans showing locations of tests, which
have been certified by the Supervising
staff and the Contractor's Site Agent,
shall be submitted for the review of
MARA
F Maintain and make good damages to
existing roadworks, road kerb, etc due to
heavy machine, equipment and associated
works all to S.O.'s satisfaction. L.s.

TO COLLECTION

BQ 4/2/2
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS (CONT'D)

Existing Road To Be Resurfaced

A Supply and applly bituminous tack coat to


surface of the Ashphalt Carpet Binder
Course. M2 2,100

B Supply, lay, roll and compact Hot Rolled


Asphalt final wearing course 25mm
minimum consolidated thickness in
accordance with the Specification and as
directed by the Engineer. M2 2,100

Kerb
C Supply and lay precast concrete kerb (Type
C) grade 25, size 100mm x 150mm x
610mm long, bedding and pointing in
cement and sand (1:3), setting on and
including insitu concrete grade 15 bed
50mmm thick and including all necessary
excavations, compactions, formworks and
disposal of surplus materials. M 211
D Extra Over Supply and lay precast concrete
kerb (Type C) grade 25, size 100mm x
150mm x 610mm long, bedding and pointing
in cement and sand (1:3), setting on and
including insitu concrete grade 15 bed
50mmm thick and including all necessary
excavations, compactions, formworks and
disposal of surplus materials within the site
for kerb with outlet opening, including
230mm dia concrete pipe 100mm long,
3000mm centres. Nr 70

Road Marking

Prepare and apply two coats of approved


thermoplastics reflective road paint,
including clearing surface from dirt, grease
oil laitance or other foreign matters :-
E 5000mm x 1690mm straight directional
arrow. Nr 12
F
5000mm x 3000mm straight and turn arrow.
Nr 5

TO COLLECTION

BQ 4/2/3
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS (CONT'D)

Road Marking (cont'd)

Prepare and apply two coats of approved


thermoplastics reflective road paint,
including clearing surface from dirt, grease
oil laitance or other foreign matters :-

A 2500mm x 2620mm turn arrow Nr 1

B For parking spaces. M 90

Signage

C "STOP" road warning regulatory sign type


RP1, complete with 75mm diameter x 3750
long mild steel hollow section post, cast in
concrete footing, including all necessary
fixing brackets, welding, painting, lettering
and excavation Nr 2

D "PARKING" road regulatory sign type RP1,


complete with 75mm diameter x 3750 long
mild steel hollow section post, cast in
concrete footing, including all necessary
fixing brackets, welding, painting, lettering
and excavation Nr 1

E "OKU PARKING" road regulatory sign type


RP1, complete with 75mm diameter x 3750
long mild steel hollow section post, cast in
concrete footing, including all necessary
fixing brackets, welding, painting, lettering
and excavation Nr 1

TO COLLECTION

BQ 4/2/4
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS (CONT'D)

COLLECTION PAGE

From page BQ 4/2/1

From page BQ 4/2/2

From page BQ 4/2/3

From page BQ 4/2/4

TOTAL CARRIED TO SUMMARY

BQ 4/2/5
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

FENCING AND GATES

Chain Link Fencing

A PVC coated galvanised mild steel 1.45 high


consisting 75mm x 75mm "Y" shaped mild
steel column angle post at 3.0m interval with
one end embedded in and including 400mm
x 300mm x 300mm deep concrete Grade 25
footing, 150mm x 150mm high concrete strip
come with all necessary reinforcement and
formwork 3mm diameter of straining wire for
chain link fencing in 1Nr and apply 3 layer of
barb wire in 0.40 high and 1.80 distance
angular support M 178

Galvanised Fencing

B Metal galvanised fencing 1.75m high


consisting 75mm x 75mm mild steel column
at 3.0m interval with one embedded in and
including 600mm x 300mm x 300mm deep
concrete Grade 25 footing, 250mm x
150mm high reinforced concrete bases with
all necessary reinforcement and formwork M 123

Concrete Solid Wall Fencing

C Construct and complete 2Nrs 9000mm x


2000mm high concrete solid wall fencing
constructed of 300mm thick concrete solid
wall complete with plastering on both side
and texture spray finish on the other side,
prepare and apply one coat sealer and two
finishing coat of wheatershield paint on
plastered wall including concrete footing,
post struts and all necessary and all fixed
together as per Architect drawing M 9

TO COLLECTION

BQ 4/3/1
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

FENCING AND GATES (CONT'D)

PLANTER BOX

A Supply and install 2Nrs of 300mm x 600mm


high precast concrete planter box with
cement and sand (1:3) to attach and joints to
the concrete solid wall fencing including
apply one coats sealer and two finishing
coats of weathershield paint on plastered
wall and all necessary to complete all works M 10

GATE

Mild Steel Sliding Gates

B Mild steel sliding gates constructed size


8850mm x 2000mm high with 50mm x
100mm rectangular hollow section infilled
panel complete with caster roller including all
necessary fixing accessories, all fixed
together including all welding and cutting
and one more coat metallic primer and two
coats alkyd enamel paint on metalworks Nr. 2

TO COLLECTION

BQ 4/3/2
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

FENCING AND GATES (CONT'D)

COLLECTION PAGE

From page BQ 4/3/1

From page BQ 4/3/2

TOTAL CARRIED TO SUMMARY

BQ 4/3/3
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
TURFING

Turfing shall be carried out on areas as per


plan. It is the responsibility of the contractor
while in operation of planting to take every
precautionary measures not to damage
existing turfing areas. Damage to existing
good turf areas resulting from planting
operation shall be the responsibility of the
contractor to reinstate at no extra charges.

A
Spot turfing "Axonopus Compressus" (Cow
Grass) on flat surfaces andincluding all
necessary watering, rolling, weeding tending
additional fertilizer until satisfactorily
established within the duration of contract.
M2 370

B
Close turfing "Axonopus Compressus"(cow
grass) on slope and flat surfaces including
all necessary watering, rolling, weeding
tending additional fertilizer until satisfactorily
established within the duration of contract.
M2 653

TOTAL CARRIED TO SUMMARY

BQ 4/4/1
BILL NO. 4 : EXTERNAL WORKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)

SEWERAGE
Sewer Pipe

Excavate, get out, part return, fill in and ram


and remove excavated material off site

A 110mm diameter UPVC pipe; not exceeding


2.00m deep M 14

B 250mm diameter UPVC pipe; not exceeding


1.00m deep M 29

Insitu concrete Grade 15 pipes


protection.
C 700mm wide bed; under 110mm diameter
drain pipe M 14
D 700mm wide surround; under 250mm
diameter drain pipe
(measured separately) M 29

Unplasticized polyvinyl chloride (UPVC)


E 110mm diameter pipes M 14
F 250mm diameter pipes M 29
G
Extra over 110mm diameter, laid and jointed
with collar and rubber seal joints for bends
Nr 2

H Ditto 250mm diameter Nr 1

Brick Manhole

Supply and construct brickwork manhole


including excavation, backfilling, crusher run
bedding, concrete base slab, fabric
reinforcement, brickwall smooth rendering,
provision of inlet and outlet drainage or pipe
connection, jointing, brickwork, smooth
plastering to all exposed surfaces,
galvanised higned steel grating etc, all as
per Engineer's drawing

J Excavate pit starting at ground level max


depth not exceeding 1.00m (In 2 nr) M3 3
K Ditto max depth not exceeding 2.00m (in 2
nr) M3 6

TO COLLECTION

BQ 4/5/1
BILL NO. 4 : EXTERNAL WORKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)

SEWERAGE (CONT'D)
A 150mm diameter straight, 1000mm long
channel, half round glazed vitreous clay size
bedded and jointed in cement and sand
(1:3) mortar Nr 4
B 1000 x 700 in situ concrete grade 20 as
described plain,benching and average
180mm thick trowelled smooth with cement
and sand (1:3) mortar, finished to falls to
channels. Nr 4

Drain Pipes

Build in end of drain pipes as described into


1B thick manhole brickwall including making
good.
C 110mm diameter UPVC drain pipes. Nr 2
D 250mm diameter UPVC drain pipes. Nr 2
E Light duty recessed cast iron manhole cover
& frame to BS 497 pt 1 grade C, opening
size 610mm x 457mm, weight 87kg
including bedding frame in cement and sand
(1:3) and setling cover in grease. Nr 4

Connecting to ends of drain pipes, Class


C to BS 3526
F 110mm diameter to existing manhole Nr 2
G 250 mm diameter to existing manhole Nr 2

Connecting to public main


H Provide provisional sum of RM 2,000 for
connecting of end of drain to public main, to
be carried out by IWK used wholly or in part
as directed by S.O Item

Testing and cleaning


J
Allow for testing and cleaning the whole of
the sewerage to the system to the
requirement of the Local Authority and S.O
including arranging all necessary documents
and obtaining the test certificates
Item

TO COLLECTION

BQ 4/5/2
BILL NO. 4 : EXTERNAL WORKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
SEWERAGE (CONT'D)

COLLECTION PAGE :

From Page BQ 4/5/1

From Page BQ 4/5/2

TOTAL CARRIED TO SUMMARY

BQ 4/5/3
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

WATER RETICULATION

Excavation

A
Excavating trenches to receive mild steel
pipes nominal size 150mm diameter starting
at ground level depth not exceeding 1.00 m,
average depth 750 mm; including earthwork
support, grating bottom, filling in compaction
disposal of surplus soil
M 70

B
Extra over; excavating in rock to receive
mild steel pipes, nominal size 150 mm
diameter starting at ground level depth not
exceeding 1.00 m, average depth 750 mm;
including earthwork support, grating bottom,
filling in compaction disposal of surplus soil
M 70

C Filling sand bed 150 mm thick to receive


mild steel pipes, nominal size 150mm
diameter including surrounds pipe with sand
backfill 200 mm thick from top of pipe,
spread, level and compacted. M 70

Concrete Works

D Thrust block, 300 mm x 300 mm precast


concrete Grade 20 for 90 degree bends Nr. 4

Pipes and Fittings

E Supply and fix 150 mm mild steel pipes all


accordance with the manufacturer's printed
construction, complete with joint,
connectors, elbow, bends reducers and all
necessary works to complete the pipe line
installation M 70

TO COLLECTION

BQ 4/6/1
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

WATER RETICULATION (CONT'D)

Pipes and Fittings (Cont'd)


A
Extra Over; mild steel pipes, nominal size
150 mm diameter to flange joint, and laid in
trench for bends 90 degrees as described
Nr. 4

B Mild steel pipes 90 degrees bends Nr. 2

Valves

Supply, deliver and fix the following valves,


bends, tees completed with bolt and nuts in
flanges and inclusive on painting to fittings
complete with precast concrete chamber as
described

C Sluice valve, double flanged ends, jointed to


150 mm diameter mild steel pipes, including
in-situ concrete grade 35, plain support,
covering with sand fill, including all
necessary excavation and disposal of
excavated material within the site Nr. 2
D Pipe crossing or S-Bend, 150mm diameter
ductile iron, 4 nrs of 45 degree bend, double
air valve, 2 nrs of 300mm x 300mm x
300mm conrete anchor blocks, 2 sets of
mild steel spike guards and all associated
works. Nr. 1
E Scour valve, double flanged ends, jointed to
150mm diameter mild steel pipes, including
insitu concrete grade 35, plain support,
covering with sand fill, including all
necessary excavation, and disposal of
excavated material within the site. Nr. 3

Pillar Hydrant
F 100 mm diameter double outlet pillar
hydrant to Performance Based Approach
(PBA) and Bomba standard including all
necessary, duckfoot bends, trust block, mid
steel short piece, jointing, accessories and
painting with and including all necessary
excavation, bedding, fittings.

TO COLLECTION

BQ 4/6/2
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

WATER RETICULATION (CONT'D)

A
Supply and fixed precast concrete post
marker grade 15, overall size 250 mm x 125
mm x 900 mm high, top splayed as
specified, on and including in-situ concrete
grade 15 base size 150 x 100 x 50 mm
thick, lettering details including all necessary
formworks, excavations and disposal of
surplus soil spread and level within the site
Nr. 4

Connection and Testing

B Allow for the connection to existing main


pipe, complete with excavation and make
good existing. ITEM

C Allow for attendance for connection to


existing LAP main pipe by others, including
making good all damage works caused
during the installation and connection of the
above. ITEM

D Allow for sectional hydraulic testing


(pressure and leakage) of the main during
laying and completion test. ITEM

E Allow for flushing the complete reticulation


pipe lines ITEM

F Allow sum of Ringgit Malaysia one


thousand only (RM 1,000.00) for
connecting water reticulation system to
public main to be carried out by LAP, to be
used wholly or in part as directed by the S.O ITEM

TO COLLECTION

BQ 4/6/3
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

WATER RETICULATION (CONT'D)

COLLECTION PAGE

From page BQ 4/6/1

From page BQ 4/6/2

From page BQ 4/6/3

TOTAL CARRIED TO SUMMARY

BQ 4/6/4
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

SURFACE WATER DRAINAGE

Drainage

A Excavating trenches to receive surface


water channels startting at reduced level
average depth 750mm ; earthwork support,
treating bottoms, filling in, compaction,
disposal, spread and level surplus soil within
the excavation M3 99

B Excavating trenches to receive surface


water channels startting at reduced level
average depth 1350mm ; earthwork support,
treating bottoms, filling in, compaction,
disposal, spread and level surplus soil within
the excavation M3 36

Disposal of Water

Allow for keeping the excavation free from


storm and percolating water by pumping or
otherwise ITEM

Surface Water Channel

A 225mm x 225mm size cast in 600mm length


as described; half round channels; precast
concrete grade 20; laid to falls; jointed and
pointed in cement and sand (1:3) mortar;
bedded on and including 100mm thick in situ
concrete grade 25 bed; with 1 layer brc A8
including formwork M 99

B Excavating trenches to receive surface


water channels starting at reduced level
average depth 1350mm; earthwork support,
treating bottoms, filling in, compaction,
disposal, spread and level surplus soil within
the excavation M3 36

TO COLLECTION

BQ 4/7/1
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

SURFACE WATER DRAINAGE (CONT'D)

Surface Water Channel (Cont'd)

A 600mm x 600mm size cast in 600mm length


as described; half round channels; precast
concrete grade 20; laid to falls; jointed and
pointed in cement and sand (1:3) mortar;
bedded on and including 100mm thick in situ
concrete grade 25 bed; with 1 layer brc A8
including formwork M 36

B 225mm size radius; pipe culvert, precast


reinforced concrete grade 30, laid to falls;
jointed and pointed in cement and sand (1:3)
mortar; bedded on and including 100mm
thick in situ concrete grade 20 bed: including
formwork M 4

C 700mm wide x 750mm high overall size;


insitu concrete grade 25, plain, surround, to
4
225mm radius precast reinforced concrete
grade 30 culvert pipe M

D Supply and install heavy duty galvanised


37
M.S. grating, size 225mm x 225mm M

E Supply and install 75mm thick precast light


duty slab cover with brc A8 M 62

F Supply and install 100mm thick precast


concrete heavy duty slab cover with brc A8 M 36

G 230mm thick brickwall in common brick laid


on stretcher bond jointed and pointed in
cement and sand (1:3) mortar including
brick reinforcement M2 135

H 20mm thick cement and sand (1:3) with


approved plasticier render as plaster using
steel trowell on all water surface drainage.
internally, both side. M2 135

TO COLLECTION

BQ 4/7/2
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

SURFACE WATER DRAINAGE (CONT'D)

Perimeter Drain

A 150mm wide scupper drain, average depth


50mm, including the excavation and
disposal material, including one set of
grease trap for scupper drain. M 69

B 160mm wide x 50mm average size depth


drain grease trap for scupper drain,
including 1nr manhole Nr 1

Brick Sump (10 Nr.)

C Excavating pit, starting at natural ground


level maximum depth not exceeding 1.0m
deep (2 nr.) M3 4

D Excavating pit, starting at natural ground


level maximum depth exceeding 1.0m but
not exceeding 2.0m deep (8 nr.) M3 24

E Filling to excavation with material arising


from the excavation M3 4

F Disposal of excavation material, spread and


level within the excavation M3 24

G Insitu concrete grade 25 as described base


poured against faces of excavation and on
earth M3 5

H 230mm thick commonly clay brick, bedded


and jointed in cement and sand (1:3) mortar,
built in Flemish bond M3 21

J 20mm thick Insitu finishing, plaster, cement


and sand (1:3) mortar, steel trowelled
exposed surfaces of brickwall M2 21

K 805mm x 805mm overall size mild steel


granting, mild steel angle frame size 63mm
x 63mm x 6mm thick, mild steel strips size
20mm x 56mm thick, spread 305mm and
50mm centres all welded together Nr 10

TO COLLECTION

BQ 4/7/3
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

SURFACE WATER DRAINAGE (CONT'D)

RC SUMP (4 Nr.)

A Excavating pit, starting at natural ground


level maximum depth exceeding 1.0m but
not exceeding 2.0m deep (3 nr.) M3 8

B Excavating pit, starting at natural ground


level maximum depth exceeding 2.0m but
not exceeding 3.0m deep (1 nr.) M3 4

C Disposal of excavation material, spread and


level within the excavation M3 9

D 230mm thick hardcore as described base to


be well compacted by machinery equipment M3 2

E 230mm thick insitu reinforcement concrete


grade 20 poured against faces of hardcore M3 7

F 1100mm x 1100mm overall size mild steel


granting, mild steel angle frame size 63mm
x 63mm x 6mm thick, mild steel strips size
20mm x 56mm thick, spread 305mm and
50mm centres all welded together Nr 3

G 805mm x 805mm overall size mild steel


granting, mild steel angle frame size 63mm
x 63mm x 6mm thick, mild steel strips size
20mm x 56mm thick, spread 305mm and
50mm centres all welded together Nr 1

TO COLLECTION

BQ 4/7/4
BILL NO. 4 : EXTERNAL WORKS

AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)

SURFACE WATER DRAINAGE (CONT'D)

COLLECTION PAGE

From page BQ 4/7/1

From page BQ 4/7/2

From page BQ 4/7/3

From page BQ 4/7/4

TOTAL CARRIED TO SUMMARY

BQ 4/7/5
BILL NO. 5 – PROVISIONAL SUM
BILL NO. 5 : PROVISIONAL SUM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)

PROVISIONAL SUMS

The following Provisional Sums provided


shall be expended as directed by the
Superintending Officer or deducted in whole
or in part if not expended

BUILDERS WORKS IN CONNECTION


FOR M&E WORKS

A Allow a Provisional Sum of Ringgit Malaysia


Seventy Thousand Only (RM70,000.00) for
Builders Works In Connection for M&E
Works SUM RM70,000.00

Profit %

Allow for attendance as described in the


'Preliminaries' upon the Nominated Sub-
Contractor executing the above work ITEM

SIGNAGES

B Allow a Provisional Sum of Ringgit Malaysia


Twenty Thousand Only (RM20,000.00) for
Signages Works and Logo to be expended
as directed by the Superintending Officer or
deducted in whole or in part if not expended.
SUM RM20,000.00

Profit %

Allow for attendance as described in the


'Preliminaries' upon the Nominated Sub-
Contractor executing the above work ITEM

TO COLLECTION

BQ 5/1
BILL NO. 5 : PROVISIONAL SUM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)

PROVISIONAL SUMS CONT'D

LANDSCAPING WORKS

A Allow a Provisional Sum of Ringgit Malaysia


Fifty Thousand Only (RM50,000.00) for
Landscaping Works SUM RM50,000.00

Profit %

Allow for attendance as described in the


'Preliminaries' upon the Nominated Sub-
Contractor executing the above work ITEM

UTILITIES MAPPING

B Allow a Provisional Sum of Ringgit Malaysia


Thirty Thousand Only (RM30,000.00) for
Utilities Mapping SUM RM30,000.00

Profit %

Allow for attendance as described in the ITEM

TO COLLECTION

BQ 5/2
BILL NO. 5 : PROVISIONAL SUM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
PROVISIONAL SUMS CONT'D

COLLECTION PAGE :

From Page BQ 5/1

From Page BQ 5/2

TOTAL CARRIED TO SUMMARY

BQ 5/3
BILL NO. 6 – PRIME COST SUM
BILL NO. 6 : PRIME COST SUM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)

PRIME COST SUM


A Provide a Prime Cost sum of Ringgit
Malaysia : Two Hundred Ninety Five
Thousand Five Hundred Thousand only
(RM295,500.00) for Air-Conditioning and
Ventilation system to be used as directed by
the S.O and to be deducted in whole or in
part if not required. SUM 295,500.00
B Allow for Profit %
C Allow for Attendance ITEM

D
Provide a Prime Cost sum of Ringgit
Malaysia: One Hundred Eight Thousand
Two Hundred Thousand only
(RM108,200.00) for Electrical Installation to
be used as directed by the S.O and to be
deducted in whole or in part if not required.
SUM 108,200.00
E Allow for Profit %
F Allow for Attendance ITEM

G Provide a Prime Cost sum of Ringgit


Malaysia : Two Hundred Seventy Five
Thousand Four Hundred Thousand only
(RM 275,400.00) for Telecommunication
Installation to be used as directed by the
S.O and to be deducted in whole or in part if
not required. SUM 275,400.00
H Allow for Profit %
J Allow for Attendance ITEM

K Provide a Prime Cost sum of Ringgit


Malaysia: Seventy Thousand Three Hundred
only (RM 70,300.00) for Fire Protection
System to be used as directed by the S.O
and to be deducted in whole or in part if not
required. SUM 70,300.00
L Allow for Profit %
M Allow for Attendance ITEM

TO COLLECTION

BQ 6/1
BILL NO. 6 : PRIME COST SUM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)

PRIME COST SUM (CONT'D)


N Provide a Prime Cost sum of Ringgit
Malaysia : Thirty Seven Thousand only (RM
37,000,00) for Built-in Furniture to be used
as directed by the S.O and to be deducted in
whole or in part if not required. SUM 37,000.00
P Allow for Profit % 185.00
Q Allow for Attendance ITEM 925.00

TO COLLECTION

BQ 6/2
BILL NO. 6 : PRIME COST SUM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)

PRIME COST SUM (CONT'D)

COLLECTION PAGE :

From Page No. BQ 6/1

From Page No. BQ 6/2

TOTAL CARRIED TO SUMMARY

BQ 6/3

You might also like