PRELIMINARIES
GENERAL
The Works contained in the Contract shall include the provision of all
labour, materials, constructional plant, temporary or permanent works as
required in the Contract.
The items as set out in the Bill of Quantities shall apply to the whole of the
Works contained in the Contract and the Contractor shall allow for
compliance with the same and for any cost incurred in connection therewith.
The amounts inserted by the Contractor for such items shall be deemed to
apply to the whole of the Works carried out under this Contract.
Each item shall be individually priced. Bulk pricing for sections, trades,
groups or pages of items shall not be allowed and no subsequent claims for
loss or expense and/or profit shall be entertained for failure to comply with
this clause.
The rates and prices inserted in the Bill of Quantities shall include cost of
the works described, all risks, liabilities and obligations set forth, or implied
in the Contract Document and shall be deemed to include the following,
unless expressly stated otherwise:
TO COLLECTION
BQ 1/1
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
f) the provision of all temporary works and all costs in connection therewith
unless separately provided for in the Bill of Quantities;
Where any priced item in the B.Q. but has not been executed on site by the
Contractor, the cost of such priced item shall accordingly be deducted from
the Contract Sum.
All items priced shall be deemed to include compliance with the provisions
of the contract, statutes, regulation, by-laws or any order or directive issued
by public authority or public service company and other related legislation
currently in force.
Notwithstanding the above clauses, the S.O. reserves the right to request
from the Contractor the detailed breakdown of the pricing for items or rates
in the B.Q. for his perusal. The detailed breakdown pricing may be used as
a basis for the administration of the Contract
TO COLLECTION
BQ 1/2
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
MEASUREMENT
Quantities in the Bills of Quantities are measured in accordance with the
Malaysian Standard Method of Measurement of Building Works (2nd Edition
Metric 2000). Wherer departure have been made from the standards
mentioned, the method adopted in the Bills shall be adhered to for the
purposes of ascertaining the value of all variations and measurements.
UNPRICED ITEMS
Where any item is left unpriced, it shall be deemed that the cost of such
item has been allowed for elsewhere within this document. No subsequent
claims arising out of expense and/or loss incurred against such unpriced
item shall be entertained.
GENERAL ATTENDANCE FOR NOMINATED SUB-CONTRACTORS AND
NOMINATED SUPPLIERS
Attendance and facilities for Nominated Sub-contractors and nominated
suppliers shall include:
a) in the case of works or services executed for allowing the use of existing
working space, access, temporary roads, erected scaffolding, sanitary,
welfare and other facilities existing on Site and the provision of protection,
water, electricity for lighting and clearing away rubbish and debris arising
from the work;
b) in the case of goods, materials or services supplied for taking delivery,
unloading, storing, protection and returning crates, cartons and packing
materials, all as specified in the specification.
The rates and prices shall, unless otherwise stated, include for the costs of
compliance with any restrictions imposed on the programming of the Works
by the Government and Local Authorities and other relevant authorities
dealing with phasing sequence of operations, method of construction, safety
and health and liaison and access.
The rates and prices shall include for a testing laboratory or an accredited
laboratory approved by SIRIM, equipment and staff for carrying out the
tests, tests and the effects on the progress of the Works for the carrying out
of all trials, sampling and tests whether specified in the Contract Document
or otherwise in order to ensure compliance with the requirements of the
Specification except where separately itemised in the Bill of Quantities.
TO COLLECTION
BQ 1/3
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
EXISTING SERVICES AND MAINS
The Contractor shall include in his rates and prices for taking measures to
services and mains and other equipment and machineries during the
progress of the Works. The Contractor shall inform the S.O. of all
arrangements with all Statutory and Public Utility Authorities.
The rates shall include any costs arising from and in connection with the
execution of work under water wherever required unless otherwise stated.
PHRASEOLOGY
Differences in the method of billing and in phraseology used in various parts
of the Bill of Quantities and/or Schedule of Rates shall not be a basis of any
claim for an increase in the rates and prices.
PROVISIONAL SUMS
All provisional sums included in the Bill of Quantities are intended to be
approximate indications only of the amounts to be expended in respect of
the work described and may be omitted entirely or substantially varied
without entitling the Contractor to any claim for compensation. No part of the
Contractor's overhead, expenses or profit should be included in these sums
when the bill is priced unless items for profit and attendance are specifically
allowed for.
CURRENCY OF PAYMENT
TEMPORARY DIVERSIONS
Work in connection with the temporary diversion and relocation of existing
overhead and underground services, whether detailed in the Contract or not
shall be covered by the appropriate Lump Sum Items in Bill No. A:
Preliminaries and General Conditions unless separately measured in other
parts of the Bill of Quantities.
TO COLLECTION
BQ 1/4
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
ABBREVIATIONS
a) mm
b) m
c) m2 square metre
d) m3 cubic metre
SCOPE OF WORKS
A - Preliminaries
B - Building Works
C - External Works
D - Prime Cost Sum
E - Provisional Sum
LOCATION OF SITE
PROJECT SIGNBOARD
The Contractor shall employ a licensed surveyor to carry out site surveys
B
before commencement and setting out of the Works.
TO COLLECTION
BQ 1/5
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
The Contractor shall enquire from the various authorities and make
arrangements for the disconnection, removal, relocation and reconnection
A
of services and pay all necessary cost and fees in connection therewith and
make good all damage as specified.
CONSTRUCTION PLAN
The Contractor shall submit to the S.O. for his approval the following as
B
specified :
a) Programme of Works
b) Method statements
d) Schedules
e) Quality Assurance Plan for Works Contract worth RM10 Million and
above
i) Provide a quality Assurance Team full time on Site for the institution,
administration and maintenance of the Quality Assurance Plan and the
preparation and submission of all Quality Assurance Reports as specified,
throughout the duration of the contract.
ii) The Contractor shall appoint a suitably qualified and experienced person
to act solely Officer full time on site to lead as a Quality Assurance Quality
Assurance Team. (Refer Addendum to specification for project worth RM 10
Million and above).
CONTRACTOR'S PLANT
The Contractor shall provide, erect, keep insured, maintain and remove on
completion all requisite scaffolding, hoist, cranage, construction plant,
C
ladder, staging, tarpaulins, et cetera (excluding piling and pile testing
equipment), as necessary for the execution of the Works.
TO COLLECTION
BQ 1/6
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
The Contractor shall provide adequate power and water supplies for the
A execution of the works including paying all associated costs and fees as
specified.
SITE SECURITY
The Contractor shall provide all necessary personnel and lighting for the
B security of the site at all times until completion of the whole Works as
specified.
TEMPORARY ACCESS AND MAINTENANCE OF EXISTING ROADS
The Contractor shall provide and maintain all necessary temporary roads,
C culverts, tracks, bridges, et cetera for access to and within the Site as
specified.
The Contractor shall maintain all access including existing roads, bridges,
drains, culverts, roadside furniture, and all other appurtenances and
D services on such roads throughout the construction period. The Contractor
shall make good any above mentioned item damaged by any work carried
out by him.
The Contractor shall locate the actual position and provide support and full
protection of existing services and mains during the progress of the Works.
E
The Contractor shall inform the S.O. of all arrangements with the various
authorities.
The Contractor shall ensure the safety, health and welfare at work of all his
F
workmen as specified.
The Contractor shall provide and maintain Contractor's office and storage
H
on the Site in positions as approved by the S.O. and as specified.
TO COLLECTION
BQ 1/7
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
The Contractor shall provide and maintain everything necessary for proper
A
protection of materials and Works from any damage by weather.
SHOP DRAWINGS, SAMPLES AND MOCK-UPS
TO COLLECTION
BQ 1/8
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
TO COLLECTION
BQ 1/9
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
The Contractor shall employ a Site Safety Supervisor (SSS) registered with
A DOSH to be stationed a minimum of 15 hours a week at the site for the
entire duration of the construction period.
The Contractor shall submit 5 copies of Safety and Health Plan (S-Plan) as
B
required in APPENDIX A/5 as specified.
C The Contractor shall submit 5 copies of monthly Safety and Health Report.
The Contractor shall provide and maintain adequate traffic safety and
D
control including signages, warning lights and flagmen as necessary.
AS-BUILT DRAWINGS
Pursuant to the terms of the contract, the Contractor, shall grovide approved
E
As-built drawings as follows:
The Contractor shall clear and clean the Works including existing roads,
F drains bounding the Site of any debris, earth, et cetera, and making good all
damages upon completion as specified.
TO COLLECTION
BQ 1/10
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
FORM OF CONTRACT
The Contractor shall refer to the Standard Form of Contract for further
information. The Contractor may price here for all expenses involved in
A
complying with the terms of this Clauses, otherwise such expenses are
deemed to be included elsewhere.
CLAUSE NO. 13
B Performance Bond
For due observance and performance of this contract the Contractor shall
have to provide:
CLAUSE NO. 15
CLAUSE NO. 16
CLAUSE NO. 17
CLAUSE NO. 18
F Insurance of Works
CLAUSE NO. 22
CLAUSE NO. 35
TO COLLECTION
BQ 1/11
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
The Contractor shall keep constantly on the site for the full duration of the
Contract a competent, efficient, suitably qualified, experience and good
character Site Agent and his assistants in each trade as may be necessary,
who must be capabel of receiving instruction in Bahasa Malaysia, and in
default it shall be the responsibility of the Contractor to provide replacement
A
for them and all wages and other expenses in connection with the
employment of such replacement site agent and assistants. Any directions,
explainations or instructions given to such site agent by the S.O. shall be
deemed to have been given to the Contractor under this Contract provide all
necessary superintending order.
TO COLLECTION
BQ 1/12
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN MARA
(MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
BILL NO. 1 : PRELIMINARIES
AMOUNT
ITEM DESCRIPTION
(RM)
PRELIMINARIES (CONT'D)
COLLECTION PAGE:
BQ 1/13
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN
MARA (MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
AMOUNT
ITEM DESCRIPTION FROM PAGE NO.
(RM)
SUMMARY
3 FRAME BQ 3/3/1
5 ROOF BQ 3/5/1
6 STAIRCASE BQ 3/6/1
9 WINDOW BQ 3/9/1
10 DOOR BQ 3/10/1
17 FURNITURE BQ 3/17/1
BQ 3/0/1
BUILDSOFT EDUCATIONAL WBLFF
Description Unit Qty Rate Amount
WBLFF
J Pile caps. m3 33
K Column stumps. m3 3
L Ground beams. m3 96
To Collection RM
A/1
BUILDSOFT EDUCATIONAL WBLFF
Description Unit Qty Rate Amount
WBLFF (Cont'd)
Pile cap.
Column stump.
Ground beam.
Ground slab.
Pile cap.
Column stump.
Ground beam.
To Collection RM
A/2
BUILDSOFT EDUCATIONAL WBLFF
Description Unit Qty Rate Amount
WBLFF (Cont'd)
D.P.M as described :-
To Collection RM
A/3
BUILDSOFT EDUCATIONAL WBLFF
Description Unit Qty Rate Amount
WBLFF (Cont'd)
COLLECTION
WBLFF
Carried to Summary RM
A/4
CADANGAN KERJA-KERJA PEMBINAAN PUSAT PENGANGKUTAN KECEMERLANGAN
MARA (MTEC TRANSPORT EXCELLENT CENTRE) DI JELAPANG
AMOUNT
ITEM DESCRIPTION FROM PAGE NO.
(RM)
SUMMARY
2 ROADWORKS BQ 4/2/1
4 TURFING BQ 4/4/1
BQ 4/0/1
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
The bill of quantities shall be read in
conjunction with the preambles and
specification
SITE CLEARANCE AND EARTHWORKS
(PROVISIONAL)
Site Clearance
Earthworks
BQ 4/1/1
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS
Note:
The contractor shall note that the wearing
course cannot be laid immediately after
laying of the binder course. A ponding test
shall be carried out to determine the low-
lying areas in the binder course. The
affected areas shall be regulated to the
required level and gradient after which the
ponding test shall be repeated. Only when
the Engineer is satisfied, that the surface of
the binder course is to the required level and
gradient and there is no ponding of water,
will approval be given to commence with the
wearing course.
i) Sub-Base No 2
ii) Base course No 2
Note:
a) The contractor shall liase with Majlis
Amanah Rakyat and arrange for their
officer to witness their tests.
b) All costs incurred in facilitating MARA
officer's visit shall be bonded to
contractor and allowed for in this rate.
TO COLLECTION
BQ 4/2/1
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS (CONT'D)
Note:
a) Coring tests shall be carried out at the
rate of one (1) no. per 500m² of metalled
pavement.
b) Photographs shall be taken of each
cored sample together with a tape
alongside to indicate the thickness of
each layer.
c) Three (3) bound copies of Coring tests
results c/w photographs of samples and
plans showing locations of tests, which
have been certified by the Supervising
staff and the Contractor's Site Agent,
shall be submitted for the review of
MARA
F Maintain and make good damages to
existing roadworks, road kerb, etc due to
heavy machine, equipment and associated
works all to S.O.'s satisfaction. L.s.
TO COLLECTION
BQ 4/2/2
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS (CONT'D)
Kerb
C Supply and lay precast concrete kerb (Type
C) grade 25, size 100mm x 150mm x
610mm long, bedding and pointing in
cement and sand (1:3), setting on and
including insitu concrete grade 15 bed
50mmm thick and including all necessary
excavations, compactions, formworks and
disposal of surplus materials. M 211
D Extra Over Supply and lay precast concrete
kerb (Type C) grade 25, size 100mm x
150mm x 610mm long, bedding and pointing
in cement and sand (1:3), setting on and
including insitu concrete grade 15 bed
50mmm thick and including all necessary
excavations, compactions, formworks and
disposal of surplus materials within the site
for kerb with outlet opening, including
230mm dia concrete pipe 100mm long,
3000mm centres. Nr 70
Road Marking
TO COLLECTION
BQ 4/2/3
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS (CONT'D)
Signage
TO COLLECTION
BQ 4/2/4
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
ROADWORKS (CONT'D)
COLLECTION PAGE
BQ 4/2/5
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
Galvanised Fencing
TO COLLECTION
BQ 4/3/1
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
PLANTER BOX
GATE
TO COLLECTION
BQ 4/3/2
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
COLLECTION PAGE
BQ 4/3/3
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
TURFING
A
Spot turfing "Axonopus Compressus" (Cow
Grass) on flat surfaces andincluding all
necessary watering, rolling, weeding tending
additional fertilizer until satisfactorily
established within the duration of contract.
M2 370
B
Close turfing "Axonopus Compressus"(cow
grass) on slope and flat surfaces including
all necessary watering, rolling, weeding
tending additional fertilizer until satisfactorily
established within the duration of contract.
M2 653
BQ 4/4/1
BILL NO. 4 : EXTERNAL WORKS
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
SEWERAGE
Sewer Pipe
Brick Manhole
TO COLLECTION
BQ 4/5/1
BILL NO. 4 : EXTERNAL WORKS
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
SEWERAGE (CONT'D)
A 150mm diameter straight, 1000mm long
channel, half round glazed vitreous clay size
bedded and jointed in cement and sand
(1:3) mortar Nr 4
B 1000 x 700 in situ concrete grade 20 as
described plain,benching and average
180mm thick trowelled smooth with cement
and sand (1:3) mortar, finished to falls to
channels. Nr 4
Drain Pipes
TO COLLECTION
BQ 4/5/2
BILL NO. 4 : EXTERNAL WORKS
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
SEWERAGE (CONT'D)
COLLECTION PAGE :
BQ 4/5/3
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
WATER RETICULATION
Excavation
A
Excavating trenches to receive mild steel
pipes nominal size 150mm diameter starting
at ground level depth not exceeding 1.00 m,
average depth 750 mm; including earthwork
support, grating bottom, filling in compaction
disposal of surplus soil
M 70
B
Extra over; excavating in rock to receive
mild steel pipes, nominal size 150 mm
diameter starting at ground level depth not
exceeding 1.00 m, average depth 750 mm;
including earthwork support, grating bottom,
filling in compaction disposal of surplus soil
M 70
Concrete Works
TO COLLECTION
BQ 4/6/1
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
Valves
Pillar Hydrant
F 100 mm diameter double outlet pillar
hydrant to Performance Based Approach
(PBA) and Bomba standard including all
necessary, duckfoot bends, trust block, mid
steel short piece, jointing, accessories and
painting with and including all necessary
excavation, bedding, fittings.
TO COLLECTION
BQ 4/6/2
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
A
Supply and fixed precast concrete post
marker grade 15, overall size 250 mm x 125
mm x 900 mm high, top splayed as
specified, on and including in-situ concrete
grade 15 base size 150 x 100 x 50 mm
thick, lettering details including all necessary
formworks, excavations and disposal of
surplus soil spread and level within the site
Nr. 4
TO COLLECTION
BQ 4/6/3
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
COLLECTION PAGE
BQ 4/6/4
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
Drainage
Disposal of Water
TO COLLECTION
BQ 4/7/1
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
TO COLLECTION
BQ 4/7/2
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
Perimeter Drain
TO COLLECTION
BQ 4/7/3
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
RC SUMP (4 Nr.)
TO COLLECTION
BQ 4/7/4
BILL NO. 4 : EXTERNAL WORKS
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE (RM)
(RM)
COLLECTION PAGE
BQ 4/7/5
BILL NO. 5 – PROVISIONAL SUM
BILL NO. 5 : PROVISIONAL SUM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
PROVISIONAL SUMS
Profit %
SIGNAGES
Profit %
TO COLLECTION
BQ 5/1
BILL NO. 5 : PROVISIONAL SUM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
LANDSCAPING WORKS
Profit %
UTILITIES MAPPING
Profit %
TO COLLECTION
BQ 5/2
BILL NO. 5 : PROVISIONAL SUM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
PROVISIONAL SUMS CONT'D
COLLECTION PAGE :
BQ 5/3
BILL NO. 6 – PRIME COST SUM
BILL NO. 6 : PRIME COST SUM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
D
Provide a Prime Cost sum of Ringgit
Malaysia: One Hundred Eight Thousand
Two Hundred Thousand only
(RM108,200.00) for Electrical Installation to
be used as directed by the S.O and to be
deducted in whole or in part if not required.
SUM 108,200.00
E Allow for Profit %
F Allow for Attendance ITEM
TO COLLECTION
BQ 6/1
BILL NO. 6 : PRIME COST SUM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
TO COLLECTION
BQ 6/2
BILL NO. 6 : PRIME COST SUM
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
COLLECTION PAGE :
BQ 6/3