The potential scope of work includes conducting a technical due diligence review of a project by reviewing design specifications, visiting the site, analyzing the plant design and equipment, assessing contractual documents and schedules, evaluating energy yield assumptions and the financial model, reviewing grid connection arrangements, and assessing qualifications of project participants, as well as preparing a draft and final technical due diligence report.
The potential scope of work includes conducting a technical due diligence review of a project by reviewing design specifications, visiting the site, analyzing the plant design and equipment, assessing contractual documents and schedules, evaluating energy yield assumptions and the financial model, reviewing grid connection arrangements, and assessing qualifications of project participants, as well as preparing a draft and final technical due diligence report.
The potential scope of work includes conducting a technical due diligence review of a project by reviewing design specifications, visiting the site, analyzing the plant design and equipment, assessing contractual documents and schedules, evaluating energy yield assumptions and the financial model, reviewing grid connection arrangements, and assessing qualifications of project participants, as well as preparing a draft and final technical due diligence report.
Technical review including review design specifications, plant technology risks and impact on expected project life or performance Site visit and review of site information Plant design review including general design, design plausibility, and equipment Review of technical related portions of project contractual documents such as EPC, PSA, O&M, among others for completeness, clarity, soundness, and scope including the relationship between the different contracts and the contract structure in its entirety. Clauses related to warranties, liquidated damages, and commissioning test will be scrutinized insofar as technical aspects is concerned. Review of project schedule Review of energy yield assessment Review of technical inputs, data and assumptions used in the financial model Review of grid connection arrangements Review of qualifications and experience of the key project participants (i.e., sponsor, EPC contractor, and O&M) Review of project’s environmental policies to comply with the regulatory requirements Preparation of the Draft and Final Technical Due Diligence Report.