NATIONAL TELECOMUNICATION CORPORATION

Eng-27
No. ADE-XMN-ML/Air Conditioner /2021-22/ Dated: -03-2022 For Payment of Bill

Sanctione Quantity Probable cost at which they can be obtained


Period For
S d For What
Name of Stores
Equipmen Now in Required
Which
No I/Tax Purpose
Required
t in Rate Per Amount Net Paid
Hand Deduction
Addition
Complete service of 7.5 Ton

For Routine Repair & Maintenance of

Air Conditioner Units installed in


1 Cabinet Type Air conditioner 3 2,900.00 No. 8,700.00

Complete service of 10 Ton Cabinet

Indefinitely
2 Type Air conditioner 1 3,500.00 No. 3,500.00

EWSD MSU Multan


3 Gas R-22 for Air Conditioners 3.5 2000 Meter 7,000.00

Complete
4 Labour Charges for Gas charging 3 750.00 2,250.00
Job
Total Amount Rs. 21,450.00
GST @ 17% 1,190.00
PST @ 16% 2,312.00
Grand Total 24,952.00

Sanction For Rupees 24,952/- (Twenty Four Thousand Nine Hundred Fifty Two Only)

Assistant Divisional Engineer


(XMN) NTC Multan
Khan traders Bilal noshaba
Nomenclature of Quoted Items QTY Price Price Price

Radiator 130 KVA Engine Generator


made by Deutz
1 77,000.00 78,500.00 80,000.00

Opening of Old Radiator & Fitting of New


Radiator Charges
1 4,500.00 4,500.00 5,000.00

17% GST 13,090.00 13,345.00 13,600.00

Total Amount 94,590.00 96,345.00 98,600.00


NATIONAL TELECOMUNICATION CORPORATION

Eng-27
No. AE(Int/Sw)/AC 10 Ton/Installation/2019-20/09 Dated: 25 -06-2020 For Payment of Bill

Sanctione Quantity Probable cost at which they can be obtained


Period For
S d For What
Name of Stores Which
No Equipmen Now in Required in I/Tax Required
Purpose
t Rate Per Amount Net Paid
Hand Addition Deduction

1 Copper Pipe 1" 20 375.00 Feet 7,500.00


2 Copper Pipe 1/2" 20 155.00 Feet 3,100.00

For Installation of Air Conditioner 10 Ton made by


3 Insulation 1" 20 90.00 Feet 1,800.00
4 Insulation 1/2" 20 50.00 Feet 1,000.00
5 Control Wire Bundle 12 765.00 No. 9,180.00

SABRO in NTC MSU Multan


6 Electric Wire 7/64 150 70.00 Feet 10,500.00
7 Electric Wire 7/44 150 28.00 Feet 4,200.00
8 Elbow Copper 1" 12 120.00 No. 1,440.00

Indefinite
9 Elbow Copper 1/2" 1 45.00 No. 45.00
10 Eclectic Wire 7/29 500 11.00 Feet 5,500.00
11 Copper Rod 1/2 1,425.00 Kg 712.50
12 Gas R-22 10 1,600.00 Kg 16,000.00
13 PVC Pipe 20 6.00 Feet 120.00
14 PVC Bend 12 3.00 No. 36.00
15 Solution Tape 3 20.00 No. 60.00
16 Screw 1" 1 220.00 Pack 220.00
17 Rawal Plug 1 120.00 Pack 120.00
18 Labour for Shifting at Roof 1 6,000.00 Job 6,000.00
19 Labour for Installation 1 18,000.00 Job 18,000.00
Total Amount Rs. 85,533.50
GST @ 17% 10,460.61
PST @ 16% 3,840.00
Grand Total 99,834.11

Sanction For Rupees = 99,834.00 (Ninety Nine Thousand Eight Hundred Thirty Four Only)

Assistant Engineer (Int/Sw)


NTC MSU Multan
S#

4
Description of Items Quantity Unit Rate Amount

Power DB for Single Breaker


1 No. 1,500.00 1,500.00
(03x Phase)
Circuit Breaker 40Amp
1 No. 5,500.00 5,500.00
(Mitsubishi )
Power Cable 03x Phase (7/64) Silver
16 Meter 150.00 2,400.00
Conductor
Complete
Labour Charges for fitting 1 1,500.00 1,500.00
Job
Total 10,900.00
GST @ 17% 1,598.00
PST @ 16% 240.00
Grand Total 12,738.00