You are on page 1of 7
aera, Nouvinawaay asr aut daGbuCoe Se IEZOkO EMH SEEKERS fon | finns 0 | setosanemcvot | asim] GeWIUINS SAM (193f0d T343 JAN) 193fOUd LSva G1aI4 HLYON \D GULF ASIA CONTRACTING COMPANY nN NORTH FIELD EAST PROJECT (NFE EPC1 PROJECT) WELDING PROCEDURE SPECIFICATION (WPS) [Company Qatar Gas Client: CTIV Manufacturer: Gulf Asia Contracting Company lWelding Procedure Specification No:GAC-WPS-P-SS.001,___ Revision No 0 Date: 03-May-2028 GAC-POR:P-020 (Supplementory POR) ‘GTAW + SMAW._ 20 Avo, e rds Appl |Project Specification [oiTs(aw-402) JOINT SKETCH Refer to Sketches in Page 5 * BM - Base Metal WM - Weld Metal IBASE METALS(QW-403) P.No. i Group No.4. 8 Group No. lApplicable Line Classes : [ICOJL, 1ROJL, 1ROJLR, 1ROJLT, 3ROJLT, 6COJL, GROJL, GROJLS, XROJL. (oa he GACICTJV confirms that WPS/PQR is prepared & comply with approved SDR: NFE1-CTJV-QM-SDR-00102 Rev.B. FILLER METAL(QW-404) GTAW. [Spec No.(SFA) [Ferrite Content GULF ASIA CONTRACTING COMPANY Qa J oararons WELDING PROCEDURE SPECIFICATION (WPS) a jelding Procedure Specification No\GAC-WPS-P-SS-001 Revo IPOSITIONS(QW- 405) |POSTWELD HEAT TREATMENT(QW- 407) ALL [Temparature Range: N/A [PREHEAT (QW-406) Preheat Temp lcas(aw.408) 5, GE Vie O1Y 42" Mo" Bercent Composition Gas(es) (Mixture) Flow Rate i 15-20 LPM. Interpass Temp. 170 [Preheat Maintenance: No Method of Preheating: Ni (Others NIA Shielding... ArAON. on name | Cass [Piatmm) | potar_| Range | © | mmsany | ncn _Volis(ange). See fable OB.Amm, SFA S12, EWihe2 Tungsten elas Size and ype Others FTECHNIQUE(GW - 470) [String or Weave Bead Seer eeee ee ‘String/Weaving (Weaving: SMAW- Max 3 times of Electorde Dia) 8-10 mm Brushing and Grinding Grinding ifrequired sing Sanding ie) =SSE= S| ToT Prepared By GAC Reviewed By GAC Name ‘Mahesh MP SSenthinathan Position Sign Date WPS No. | GAc-w-P.s8-001 Rev. oO WELD JOINT DETAILS - [QW-402] GROOVE WELD 37.5°42.5° ! 1.5mm 40.8mm Root Gap (3 + 1.5mm) I ett ear BACK WELD DETAILS (To be applied for Root repair only - see Note-1 below) | Grinding Beck Weld (GTAW) Note : 1) Root defects (i.e. incomplete penetration, lack of fusion, exessive penetration etc...) can be repaired where access permits with minimum of two passes. Notes: {ile and socket welds should havea minimum of two weld passes 2 Purgingis tobe dane unt complete socket wel jot Sal woling a ste shal have a minimum’ passes, 4.The GAC/CTJV confirms that WPS/PQR is prepared & Comply with approved cy ‘CTIV-GW-SOR-09102,Rev.B. Ke SeenON fS once 16 ©) SDR} ‘S North Field East Project (NFE 1) RAS LAFFAN INDUSTRIAL CITY, DOHA, STATE OF QATAR PROCEDURE QUALIFICATION RECORD (QW-483) (See QW.200.2, Section IX, ASME Bollar and Prossure Vessel Code & Project $poc) GULF ASIA CONTRACTING COMPANY Jcompany Name Gs sans [Types (Manual Automatic, SerniAutomatic) [Procedure Qualification Record No. GAC-PAR-P.079 “Rev. 0 __ Date :03-May-2023 WPS No, GAC-WPS-P-SS-001 _ )Welding Process(es) GTAW+SMAW GTAW-MANUAL | SMAW-MANUAL NOINTS (aw-402) arswas | 12.70 + a |___1.smm [BASE METALS (aW-403) [POST WELD HEAT TREATMENT(GW-407) Material Spec. ASTIA A3SB TP9DE L{ Heat no: $609322) Hemparcture Range. NA to ASTM A8S8 TP2O4 L( Heat ro, $500322) rime Renge NA I ypoiGrade or UNS Number NA ree Rate ottieaing = NA Pie 8 GrNo 1" to Pio 8 GFN Rete of Cooling: NA frncrnass Preston 12 lomers NA =a Damotrof Test Coupon 12 = Waxman Pese Thickness 8.0mm 7 [Gas awe) ALLER WETALS anaoay —__GTAW ‘SHAW Percent Composten SFA spectcaton 259 754 caseles) (Mitre) Flowrate JANs Spoctcaton ER ERLE | Shioking ARGON 99887 —_—“TOLLPIN Filer Metal No 6 3 Taing) NAT NA NA eid Metal Anais (AN) 8 3 Bacing ARGON ese7__—78 UPA [sizeof Filer Metal 24mm O22 mm —|_Ober Fer ett Product ora Sold Soc |ELECTRIGAL GHARECTERISTICS (QW09) Suoplometa Filer Metal NA WA—|eurert GTAW.Dc SMAW-DC Eecrode Flax Classification None None Polerty _— GTAN-ENSMAW.EP Fax type. None None amps, Sc2POR Ris sesi Vols See POR Russ eet Fux Trade Name None Nore —[Tungelen Eecvode sa 24 mm _ (Evid eld Mota Thickness 42mm 8S rm Mode of Metal Transfer for GMAW (FCAW) WA pa ” Heat input rom muns shes rscvortawton » | Sgonioeh Sten seas. Metra [POSTON rawansy nance ECHMTGUE (QW Oey jn of Grove, GTAWG__SMAW-6G revel Speed S00 Parameter shoot oe Pgrcson Ui own Up Surg Wen Bead Sng wens 1 wearing Ut her NA oscttaten NA Oxted ce |PREHEAT (QW-406) |Multipass or Single pass (per side) Multipass Pret Temperctire 10°C Single or Mite Elecvodes Iriorass Temperature 120°C (na) F far Unt (GTAW On} Yes ter NA loti NA 7 Prepared by GAC Reviewed by GAC ‘Approved by CTV QATAR GAS ane Mahesh MP 8.Senthinethan Shar iDesignaton 3 ac. 904 5| sanatue Atos Date SMay ans | te North Field East Project (NFE 1) RAS LAFFAN INDUSTRIAL CITY, DOHA, STATE OF QATAR GB tees PROCEDURE QUALIFICATION RECORD (QW-483) 7 (See aW-200.2, Section XK, ASME Boller and Pressure Vessel Code & Project Specification) _ Sau Tes Test QW) GAEPORP-0S Spot SS us Frese Peston — oi cess nad 1220x1070 rey 2 uci WE Wei 120 det oz cress-nel_|_ 1200x1980 ssc 1 uti eld 0h. Guided Bond Tests QW-160) ae Bae wane ee a end Ale Ret Comments Loaten Charme Mar:# | Location | Postion | oimersion | Temp %¢ }-AEETELEMI | Average) Comments +t21s cor_| wan | rs0aeu | woxearxe | 0s | ae [sa | ot | nto Seba cos | waz [10cee | 10xserxev | 10s | e27 | 75 | 733 [| 7000 S20 Blow coo | waz | 130¢0%[ toxesrxav | 108 | 92 | eos | 2 | 7300 S20 Blow [ata Exanson fomanr jor os 308s fomane ioe ua Sa fomane i124 sae oes Macro Examination wa Tie pean est coments Conn 0 Weld 120 deck Teepe Sen alaches phtogash Modelos cose Fev Lavy mie mace Tie eis Commas Hardness Survey area Cone once pe | rosson | nes | toasng9 | cose tom | Temes | ax oa wet [Ocoee | vetes [10 20 2 a7 | Rear mR ke The Pasion eis Comme oa oF ied et See Rent acetate Prepared by GAC Reviewed by GAC. ‘Approved by CTJV = Mahesh MP ' Senthinathan “hel Designation Ward Epics [ternal Bast signature Aplac-oogi [Signe ac—oa4/) bate ana s North Field East Project (NFE 4) RAS LAFFAN INDUSTRIAL CITY, DOHA, STATE OF QATAR QD nics ‘PROCEDURE QUALIFICATION RECORD (GW-483) ony (Seo QW-200.2. Section I. ASME Boiler and Pressure Vessel Code & Project Specification) _ =a CREFORPOD JResiooraphy Test Resuts Report No. NFE1-GAG-Pat __ ate ase [PenovancTestResuts; Acceptable Report No. NFEI-GAC-PQR-PT-00005 Date (OE Conducted By _ Inspection Corrosion Enginoaring Services Qatar Eee elders Neme & WoldrNo. _ SURESH BABU KUTTIPULIVAN (PW068) oe Procedure Qualiteatn Test conducted by GULF ASIA CONTRACTING COMPANY __Laborstoy Test: ELEMENT QATAR. |-2ocratory Test Report No: Mechanical: 810882 ‘Wie cert atthe statements inthis racord are corect ane tha the test wold were repered, wold, and tstedin accordance wth the requirements of Section IK Ed. 2017of the ASME Code and Project Speciation. Prepared by GAC Reviewed by GAC Approved by CTJV, aatancas_( eae Mahesh MP $.Senthinathan Tuatas 8p eS Designation | ___Weleing ng » S446 Specicdi c-04 ig, | _ lSignature \y 004) fe sintayi2023 Are

You might also like