Internship Report 2019-20

CHAPTER 1
INTRODUCTION AND COMPANY PROFILE

Internship program is the most efficient and effective way to increase the knowledge. And
my internship was carried out under SAI CONSTRUCTIONS. Site visits give practical
knowledge about the structural analysis of the buildings. The agenda of the site visit
consists of in-depth explanation by the consultant on the operation of the buildings.

During site visit, I was exposed to various construction methods and also had the chance
to observe the construction of beams, columns, slab and other works of the residential
building.

This outdoor experience provided me with a more in-depth and hands on experience on
Civil Engineering Construction. I was able to question, understand and absorb the logic
behind the machineries, construction techniques, and methodology theory learnt in class. I
had successfully undergone the training for duration of four weeks.

1.1 VISION

To be the most preferred and trusted service provider in construction and infrastructure
sector, catering to the needs of all the segments of society.

1.2 MISSION

To deliver high-quality eco-friendly construction works with its own skilled workforce,
within specified time, at fair value.

1.3 Scope of Internship:

It is an opportunity for a student to experience professional development under an


actual working environment
Career exploration
Leadership and skill development
Real world work experience and research opportunities
Exposure to network management, security, and automation technologies

Dept. of Civil Engineering,


Page1
Internship Report 2019-20

1.4 ABOUT THE COMPANY

BUILDER AND DEVOLUPER: SOMASHEKHAR A M

OFFICE ADDRESS : SAI CONSTRUCTION

#05,12th Main,kuvempu road , Hemanna


layout,Kogilu,Yelahanka,BENGALURU-560064.

EMAIL ID :saiconstructions2014@gmail.com

SAI CONSTRUCTIONS has delivered a large number of projects in the past and
received review and applications from numerous prestigious authorities and other
organizations associated with the construction of school, college, hostel, hospitals,
conventional halls etc.

Dept. of Civil Engineering,


Page2
Internship Report 2019-20

CHAPTER 2

SAFETY IN CONSTRUCTION

2.1 Safety measure should be taken during construction are:

1. Safety helmet

2. No smoking and alcohol prohibited

3. Shouldn’t take shelter under parked vehicle

4. Avoid shortcut

5. Don’t use mobile

6. Don’t pass or stand near suspended load

7. Don’t sleep in the workplace

8. Don’t throw anything in the workplace

Dept. of Civil Engineering,


Page3
Internship Report 2019-20

2.2 Electrical safety:

1. Switches and shortcut should be taken care.

2. Short attachments of wire and operating wrongly in the circuit are prohibited.
3. Accident reporting safety.

4. Environment protection.

5. Working in night hour –electrical supply is important and good amount of light
is important.

2.3 Basic EHS rules:

1. Personal protecting equipment Head equipment

2. Safety shoes- gum boot

3. Respiratory protection –disposable mask

4. Hand protection- leather gloves, rubber, PVC gloves

5. Fall protection- 2 ropes with hangs

6. Clothing –weather resistance

2.4 Carpentry works:

1. No smoking.

2. Always ensure good housekeeping.

3. Authorized operator.

4. Photo and information about the operator should be given to the superior.

5. Charge the machines before the start of the work.

6. Ear plug and dust mask.

7. Shouldn’t be stored about 15 feet level.

Dept. of Civil Engineering,


Page4
Internship Report 2019-20

8. Shouldn’t cross any excavation.

CHAPTER 3
PROJECT DETAILS

3.1 PROJECT DETAILS SALIENT FEATURES OF THE PROJECT

Name of the work Residential building (G+2), Site no 198


Reliable Developers (RD LAYOUT),
Raysandra Main Road, Gattahalli,
Bangalore.

Name of Agency SAI CONSTRUCTIONS


No of floors
Ground floor+2

Plot Size 49’10’’ x 30’ feet

Floor to Floor height 10’( feet)

Depth of Foundation 5’( feet)

Type of Soil Red Soil

S.B.C of Soil 18KN/m3

Thickness of External wall 6’’ (inch)

Thickness of Internal wall 4’’(inch)

Grade of Concrete M25

Grade of Steel Fe500

Unit weight of concrete 24KN/m3

Dept. of Civil Engineering,


Page5
Internship Report 2019-20

3.2 PLANS OF BUILDING

Dept. of Civil Engineering,


Page6
Internship Report 2019-20

Dept. of Civil Engineering,


Page7
Internship Report 2019-20

Dept. of Civil Engineering,


Page8
Internship Report 2019-20

Dept. of Civil Engineering,


Page9
Internship Report 2019-20

CHAPTER 4

TASKS PERFORMED
The industrial training underwent under the constant guidance of Er. Mudasir Sir
and Er. Sharan Sir, consulting Site Engineers, Bangalore. The duration of training was
from 6th January-8th February.

Initially the training was started with the information about the standard design
procedure and practical consideration to be followed for the designs of individual
terms like beams, columns, slab and concreting were taken up.

Followed by, reading and understanding of typical drawings of various structural


sections.

Quantity estimation of reinforced steel and concrete (i.e. slabs, beams,


columns)for Ground floor of the Residential building of Mr. MANOAH PURMI
Bangalore.

Dept. of Civil Engineering,


Page10
Internship Report 2019-20

4.0 TASKS PERFORMED DURING INTERNSHIP

SL NO TASKS STARTING COMPLETING NO OF DAYS


DATE DATE

1 Plinth beam 6/01/2020 09/01/2020 4

2 Soil filling and watering 10/01/2020 11/01/2020 2

3 column 13/01/2020 18/01/2020 6

4 Masonry work up to 20/01/2020 22/01/2020 3


lintel

5 Lintel 23/01/2020 25/01/2020 3

6 Masonry work above 27/01/2020 27/01/2020 1


lintel

7 Stair case, roof slab, 28/01/2020 01/02/2020 5


beam and electrical
work

8 Concreting 03/02/2020 03/02/2020 1

9 Curing 04/02/2020 - -

10 Removing of side 05/02/2020 05/02/2020 1


shuttering

Dept. of Civil Engineering,


Page11
Internship Report 2019-20

4.1 BEAM:

A Beam is a structural element that primarily resists the loads coming on it and transfer
the same to the columns safely. Its mode of deflection is primarily by bending.Beams are
traditionally descriptions of building or civil engineering structural elements, but any
structures such as automobile frames machine frames and other structural systems contain
beam structures that are designed to carry the loads. Beam may be of concrete or steel or
wooden, it mainly depends on load coming over the beam and type of building.

4.1.1 Types of beams:

Simply supported beam


Cantilever beam
Continuous beam
Overhanging beam

4.1.2 Plinth beam Specifications:

Width: 8’’ inch

Depth: 18’’ inch

Bars used: 16mm, 12mm, and rings 8mm

Spacing of stirrups for 8mm – 8’’ and 6’’ inches

Dept. of Civil Engineering,


Page12
Internship Report 2019-20

Dept. of Civil Engineering,


Page13
Internship Report 2019-20

4.2 COLUMN CONSTRUCTION

RCC column is a vertical structural member which transfers loads from beam and slab
directly to the underneath soil. That means an entire building stands on columns. Most of
the building failure occurs not only for design fault but also for poor construction
practices. Therefore it is essential to know the construction procedure of RCC column
appropriately.

COLUMN REINFORCEMENT:

Marking of column location is done and the reinforcement of columns is placed


according to the structural drawing.

POURING CONCRETE:

Shutters are provided above the PCC and the joints of shutters should be connected
properly so that concrete should not leak in at the joints. Hand mix is done for the mixing
of materials.
Concreting is done manually.

STARTER

• Starter is a small piece of column which is cast before the main column is cast.
• The advantage of having the starter are it is easier to fix the column shuttering if the
starter is already in place.
• The chances of tilting in the column formwork can be avoided by using starter.
• Foam sheet is used in base of a starter, sand is filled in gap between the foam sheet.
• Coarse aggregate of 20mm dia is placed above the starter to avoid the cracks.

Dept. of Civil Engineering,


Page14
Internship Report 2019-20

Formwork for Columns

• Initially a starter of 2” thickness is cast before the main column. The chances of
Column formwork becoming skew is eliminated.
• The surface of the formwork is oiled or greased to prevent concrete from sticking on
it.
• Clamps are fixed in sufficient quantity to prevent bulging of column .
• In some cases Tie bars are also used to prevent bulging. Pipe is inserted in columns
and beams before concreting to avoid the bulging due to vibrations. After removal of
pipe chemical is used to cover the hole.
• The side and end planks also have been used for shuttering work.
• Yokes are provided on both side of the column using nut and bolts for tight supports.

Qualities of Shuttering

• It should be water tight.


• It should be strong.
• It should be reusable.
• Its contact surface should be uniform.
• It should be according to the size of the member.

Level Checking

• Level checking is done by using Water level and 1inch clamp passing method.
• In Water level checking method water level at the measurement pipe must be 2 inch
down for normal floor level whereas water level for sunken and balcony must be at
the top level.
• In 1 inch clamp method thread is tied above the top of wooden piece that is kept on
both the ends. Levelling is carried out until another wooden piece passes between
the thread level.

VIBRATOR

One of the most important steps when pouring concrete is the consolidation or vibration
of concrete. Concrete vibrators, if used properly, will help consolidate concrete and will
reduce the number of air pockets inside the concrete mass. Needle vibrators are used for
compacting of concreting.
Lack of consolidation can cause voids, rock pockets, honeycombing, and poor bonding
with the rebar. In extreme cases, improper consolidation can affect the structural integrity
of the walls. On the other hand, excessive vibration can create bulged walls and blowouts.

Dept. of Civil Engineering,


Page15
Internship Report 2019-20

CURING:
Shutters are removed within 24 hours and curing is done for 7days.

COLUMN DETAILS:

Column 1 - 8”X18”

Reinforcement -10 # -16mm dia

Striups-8mm dia 8’’inch@ c/c

Column 4 and 10 - 8”X15”

Reinforcement – 8# -20mm dia

Reinforcement-2#-16mm dia

Striups-8mm dia 8’’inch@ c/c

Clear cover for column – 1.5”

Grade of concrete – M25

Grade of steel – Fe 500

SBC of soil – 350KN/M2

Proportions - 1:1:2 ( cement : fine aggregate : coarse aggregate)

Dept. of Civil Engineering,


Page16
Internship Report 2019-20

Dept. of Civil Engineering,


Page17
Internship Report 2019-20

Dept. of Civil Engineering,


Page18
Internship Report 2019-20

4.3 HALLOW BLOCK MASONAEY

4.3.1 Introduction

Brick masonry is made of brick units bonded together with mortar. The hollow load-
bearing concrete block of standard 400 mm x 200 mm x 200 mm size will weigh between 17
kg and 26 kg when made with normal weight aggregates. Normal weight units are made with
such aggregates as sand crushed stones and air-cooled slag. Therefore main two components
of brick masonry are bricks and mortar.

In our site 1:5 cement sand mortar was used and 400x200x200 mm size hollow block were
used in brick masonry.
The strength of brick masonry mainly depends upon quality of bricks, quality of mortar and
method of bonding used. Un bonded wall, even constructed with good quality bricks and good
quality mortar has little strength and stability.

Concrete block come in several different sizes and shapes to fit different applications.
Common sizes and shapes of concrete block include:

4.3.2 Nominal sizes

4x8x8
4 x 8 x 16
6x8x8
6 x 8 x 16
8x8x9
8 x 8 x 16
10 x 8 x 8
10 x 8 x 16
12 x 8 x 8
12 x 8 x 16

Actual sizes of concrete blocks are slightly less than the nominal sizes, by roughly 3/8 inch in
each dimension. This is to accommodate the thickness of mortar joints between blocks.

4.3.3 Shapes

Concrete block also comes in many shape configurations. The most common are:

Stretcher unit—has flange extension on both ends. Used in the middle of walls where
both ends are covered by adjoining blocks.
Single corner unit—has one squared-off end. Used at the ends of walls where the end
of the block is exposed.

Dept. of Civil Engineering,


Page19
Internship Report 2019-20

Double corner unit—has two squared-off ends. Often used when blocks stacks to
create vertical pillars are.
Sash units—have slots cut in flat ends; these are used around window and door
openings to provide expansion space.
Cap units—thin, solid concrete block used to cover the open cavities at the top of a
concrete block wall.

Foundation. All concrete block walls must rest on a sturdy foundation of poured
concrete. The depth and size of the foundation will vary depending on the size of the
concrete block wall and the weight it must support, but a typical freestanding wall
requires a foundation that is about twice as wide as the wall itself and which extends
about 1 foot down below the frost line.
Concrete block. Block shapes and sizes are chosen to match the function of the wall
and the configuration of the wall. Most cement block walls will use several different
types of blocks, especially stretchers and corner units.
Mortar joints. Each row of blocks is joined to the adjoining blocks with either type N
(above grade) or type S (below grade) mortar. For greatest strength, most concrete
block walls are assembled so the vertical joints are offset (staggered) from one course
to the next.
Reinforcement. Freestanding block walls can be subject to stresses that can crack
joints and destroy walls, so both vertical and horizontal reinforcement is common.
Vertical reinforcement is provided by lengths of steel rebar embedded in wet concrete
that is poured into block cavities at prescribed intervals. Horizontal reinforcement is
provided by metal reinforcement strips laid into the wet mortar after every third or
fourth course of block.

4.3.4 Tools and Supplies You Will Need

Excavation tools (shovels, etc.)


Foundation forms, if required
Mason's string
Stakes
Line level
Plumb bob
Concrete blocks or cinder blocks
Carpenter's level
Work gloves
Concrete mix
Wheelbarrow or power cement mixer
Masonry hoe
Mortar
Mason's trowel
Jointing tool

Dept. of Civil Engineering,


Page20
Internship Report 2019-20

Masonry saw
Masonry chisel
Masonry hammer

4.3.5 Create Layout

The first step in building a concrete block wall is to lay out the foundation using stakes and
masonry string. For a freestanding landscape wall, this involves creating a simple rectangular
outline of the planned foundation. For building foundations, the layout requires a rectangular
outline of the entire building, carefully adjusted to be perfectly square.

After leveling the layout strings with a line level, transfer the location of the foundation onto
the ground before beginning excavation.

4.3.6 Lay the First Course of Block

After the poured foundation has fully cured and hardened, mark an outline for the cement
block wall onto the surface of the foundation, using a chalk line.

Mix the appropriate mortar in a mortar box, then lay a 1-inch thick layer of mortar onto the
foundation inside the outline.

Position the first course of cement block into the mortar and tap the blocks downward slightly
to embed them in the foundation mortar. Begin the wall with a corner unit, then "butter" the
flanges at the end of each subsequent block with mortar before joining it to the previous block.

Strive for 3/8-inch-wide joints between blocks, both horizontally and vertically. This provides
an optimal amount of strength.

As you work down the first course, use a level to adjust the blocks so they are perfectly
vertical, and use stakes and strings to ensure that the row of blocks remains perfectly straight.
At the opposite end of the wall, end the course with another corner unit.

4.3.7 Cut Blocks

If you plan carefully, you may not need to cut concrete blocks, but if it is necessary, this best
done with a power saw fitted with a masonry blade, along with a masonry chisel and hammer.

Score across the face of the block with a power saw, cutting a line about 1/4 inch deep. Then,
use a masonry chisel and hammer to pound along the scored line until the block cleaves along
the line. Turn the block over, and repeat the process on the opposite side.

Dept. of Civil Engineering,


Page21
Internship Report 2019-20

4.3.8 Lay Subsequent Courses of Block

Begin the next course of blocks with a half block to ensure that vertical joints will be offset as
you work down the course. Install the second course in the same fashion as the first—applying
a bed of mortar along the top of the previous course, and buttering the ends of each block as
you lay it into the mortar. Use the mason's string and level to frequently check each course of
blocks for level and straight. Excess mortar can be lightly scraped off the face of the blocks
with a trowel as you work.

For very tall walls, it's best to lay no more than six courses each day. This will allow the
mortar to set up and harden completely and will reduce the chances that the wall will fail.
Avoid placing too much weight on the joints before the mortar is fully hard.

Finish the Joints

Depending on the size of your project and the speed with which you work, you will
periodically need to smooth and finish the joints between blocks. This needs to be done after
the mortar has set up but before it is fully hardened. Use a finishing tool to lightly press into
the mortar as you draw the tool along the joint. The tool should form a slight indentation in the
mortar joint.

4.3. Cap Blocks

The tops of cement block walls are typically capped by applying a layer of mortar, embedding
metal reinforcement strips, then covering the wall with solid concrete cap blocks. Make sure
joints between cap blocks are filled with mortar and smoothed with the finishing tool.

Where a cement block wall will be below grade, such as when serving as a basement wall, it is
important that the surface is waterproofed before backfilling with soil. This can be done with a
variety of waterproofing membrane products, or with a rubberized brush-on waterproofing
material.

Dept. of Civil Engineering,


Page22
Internship Report 2019-20

4.4 SILL
The bottom of a system ,window, door, framing member. The sill is a common reference
for the last member prior to the ground, or the supporting structure below. The reference
to sill is usually meant to be in the ground. For example, a mud sill, is a piece of wood or
other material, that is located beneath a structural column or support. The mud sill
distributes the forces caused by the weight of the structure above on the column or
support. By distributing the weight evenly , the effect of the load on the ground is
minimized and reduces the settlement down into the ground. A sill plate is another
example of the term, however most of the time the sill plate will sit on another supportive
structure. The initial framing piece on the top of the foundation wall in a wood framed
structure, is referenced as the sill plate. The application of the sill plate on the top of a
foundation wall, is usually over a sill sealer, which is a foam or synthetic material, to
allow the plate to sit fully on the top of the concrete wall. The foam or sill sealer, provides
a compressive material, that fills in the gaps under the sill plate and the foundation wall.

4.5 LINTELS AND CHAJJAS.

A lintel or lintol is a structural horizontal block that spans the space or opening between
two vertical supports.[1] It can be a decorative architectural element, or a combined
ornamented structural item. It is often found over portals, doors, windows and fireplaces.
In the case of windows, the bottom span is instead referred to as a sill, but, unlike a lintel,
does not serve to bear a load to ensure the integrity of the wall. Modern day lintels are
made using prestressed concrete and are also referred to as beams in beam and
block slabs or ribs in rib and block slabs. These prestressed concrete lintels and blocks are
components that are packed together and propped to form a suspended floor concrete
slab.

LINTEL DIMENSIONS

LINTEL 1 up to 3 feet

Size – 6’’x6’’
Top and bottom 2# 8mm dia
Tie bars 2L 8mm dia @ 8’’ C/C

LINTEL 2 up to 3’0’’feet TO 4’6’’ feet

Size – 6’’x6’’
Top and bottom 2# 8mm dia
Tie bars 2L 8mm dia @6’’ C/C

Dept. of Civil Engineering,


Page23
Internship Report 2019-20

LINTEL 3 up to 4’6’’feet TO 6’0’’ feet

Size – 6’’x9’’
Top 2# 8mm dia
Bottom 2# 10mm dia
Tie bars 2L 8mm dia @6’’ C/C

4.5.1 CHEJJA
A chejja is the projecting or overhanging eaves or cover of a roof, usually supported on
large carved brackets found in Indian architecture.
It forms part of the architecture of Rajasthan, Gujarat, Punjab and Uttar Pradesh. In
Rajasthan, they are particularly large. They are mainly used for protection against
elemental forces like the sun and rain.

Typical Chejja Details


Length –up to 2’0’’(MAX)
Thickness of chejja face
3’’ Thickness of chejja
end 2’’
Main bars – 8mm dia @ 4’’ C/C (top)
Distribution bars - 4# 8mm dia.

Dept. of Civil Engineering,


Page24
Internship Report 2019-20

Dept. of Civil Engineering,


Page25
Internship Report 2019-20

4.6 STAIR CASE


A stairway, staircase, stairwell, flight of stairs, or simply stairs, is
a construction designed to bridge a large vertical distance by dividing it into smaller
vertical distances, called steps. Stairs may be straight, round, or may consist of two or
more straight pieces connected at angles.

Stair Case Details:-

Size of Stair Case – 11’10’’x12’ feet


Numbers of flights - 3Nos
Numbers of rises - 18
Numbers of Threads - 19
Waist Slab Thickness - 5’’
Landing slab Thickness - 5’’

Reinforcement Details:-

Section 1-1

Main bars – 12mm dia 5’’C/C

Distribution bars – 8 mm dia 10’’ C/C

Section 2-2

Main bars – 12mm dia 5’’C/C

Distribution bars – 12 mm dia 5’’ C/C

Section 3-3

Main bars – 12mm dia 5’’C/C

Distribution bars – 8 mm dia 10’’ C/C

Dept. of Civil Engineering,


Page26
Internship Report 2019-20

Dept. of Civil Engineering,


Page27
Internship Report 2019-20

4.7 Concrete Floor Slab and Beam


Concrete floor slab construction process includes erection of formwork, placement of
reinforcement, pouring, compacting and finishing concrete and lastly removal of
formwork and curing of concrete slab.

Concrete Floor Slab Construction Process

1. Assemble and Erect Formwork


2. Prepare and Place Reinforcement
3. Pour, Compact and Finish Concrete
4. Curing Concrete and Remove Formwork

1. Assemble and Erect Formwork for Slab

The formwork shall be designed to withstand construction loads such as fresh concrete
pressure and weight of workers and operators and their machines. Guide to Formwork for
Concrete ACI 347-04 shall be followed for the design of formworks.

Moreover, there are various construction aspects that need to be considered during the
erection of formworks. For example, it should be positioned correctly, lined and levelled,
joints sealed adequately, and prevent protruding of nails into the concrete etc…

Furthermore, different materials such as wood, steel, and aluminum can be used for the
formworks of concrete floor slab.

Fig. 1: Concrete Floor Slab Formwork

Dept. of Civil Engineering,


Page28
Internship Report 2019-20

Finally, there are several common formwork construction deficiencies that site engineer
needs to be aware of and prevent their occurrence otherwise formwork failure may occur.
These construction deficiencies are provided below:

Poor or lack of formwork examination during and after concrete placement to


identify uncommon deflections or other indications of possible failure that could
be corrected
Inadequate nailing, bolting, welding, or
fastening Improper lateral bracing
Construct formwork that does not comply with form drawings
Lack of proper field inspection to ensure that form design has been properly
interpreted by form builders
Use of damaged or inferior lumber having lower strength than needed.

2. Prepare and Place Reinforcement for Slab

Prior to the placement of reinforcement for concrete floor slab construction, inspect and
check forms to confirm that the dimensions and the location of the concrete members
conform to the structural plans.

Added to that, the forms shall be properly cleaned and oiled but not in such amount as to
run onto bars or concrete construction joints.

Design drawings provides necessary reinforcement details, so it only needs understanding


to use designated bar size, cutting required length, and make necessary hooks and bents.
After preparation is completed, steel bars are placed into their positions with the provision
of specified spacing and concrete cover.

The concrete cover and spacing for floor slabs can be maintained by introducing spacers
and bars supporters. Wires are used to tie main reinforcement and shrinkage and
temperature reinforcement (distribution reinforcement).
It should be known that incorrect reinforcing steel placement can lead to serious concrete
structural failures. Improper concrete cover exposes reinforcement bars to danger and
jeopardize concrete-steel bond.

Finally, after all requirements of reinforcement placements (positions, concrete cover,


spacing, and correct bars size; length; hooks; and bending) are finalized, then site
engineer can order concreting.

Dept. of Civil Engineering,


Page29
Internship Report 2019-20

Fig. 3: Provision of concrete cover for reinforcement bars in slab

3. Pour, Compact and Finishing Concrete Floor Slab

Mixing, transporting, and handling of concrete shall be properly coordinated with placing
and finishing works. In floor slab, begin concrete placing along the perimeter at one end
of the work with each batch placed against previously dispatched concrete.

Fig. 4: Concrete placement started from one end of the slab

Concrete should be deposited at, or as close as possible to, its final position in order to
prevent segregation. So, Concrete placement in large and separate piles, then moving
them horizontally into final position shall be prevented.

Moreover, site engineer shall monitor concreting properly, and look for signs of
problems. For example, loss of grout is the indication of improper sealing and movement
of joints. Added to that, cracking, excessive deflection, level and plumb, and any
movement shall be checked and tackled to prevent further problems.

Dept. of Civil Engineering,


Page30
Internship Report 2019-20

Furthermore, fresh concrete should be compacted adequately in order to mold it within


the forms and around embedded items and reinforcement and to eliminate stone pockets,
honeycomb, and entrapped air. Vibration, either internal or external, is the most widely
used method for consolidating concrete.

Lastly, slabs could be finished in many ways based on floor application. Helpful
information about forms before, during, and after concreting can be found in ACI 311.1R.

Fig. 6: Placing and vibrating fresh concrete

5. Curing Concrete and Remove Formwork

After finishing ended, suitable technique shall be used to cure the concrete adequately.
Slab curing methods such as water cure; concrete is flooded; ponded; or mist sprayed.

In addition to water retaining method in which coverings such as sand; canvas; burlap; or
straw used to kept slab surface wet continuously, chemical Membranes and waterproof
paper or plastic film seal.

Regarding curing, it is recommended to remove formworks after 14 days.

Fig. 7: Curing concrete slab by ponding

Dept. of Civil Engineering,


Page31
Internship Report 2019-20

SPECIFICATIONS:
Total Area- 3611 sq.ft

Thickness of concrete-0’5” (12.5cm)

Grade of concrete used- M20 (1:1.5:3)

No of cement bags-571 bags, cost for one bag is Rs 270/-

Sand -1566 cubic feet,cost for one cubic ft. Rs 60/-

Coarse aggregate -2350 cubic ft, cost for one cubic ft Rs 26/-

Total quantity of concrete-74m3

Two machines are used for mixing of concrete.


Mechanical vibrators are used for compaction.
Slump cone test was conducted on site and the slump value is 155mm.

Dept. of Civil Engineering,


Page32
Internship Report 2019-20

Chapter 3
OUTCOMES

• Able to analyse and understand the drawings and plans of the construction.

• Developing a technical artifact requiring new technical skills.

• I relate the practical knowledge of site with my Engineering Knowledge. I have


learned about Safety measurements, Shuttering, Masonry and Plastering.

• Communication skill with labours

• Construction practices

• How to behave with labours

• Importance of time

• Communication skills with material supplier

• Explore career alternatives prior to graduation.

• Integrate theory and practice.

Dept. of Civil Engineering,


Page33
Internship Report 2019-20

CHAPTER 5
CONCLUSIONS

• As a Civil Engineer it is necessary to understand the site situation, difficulties and how
to apply technical knowledge at the site. In site I had a great experience in terms of
technology and practices, exposing me to different situations made me learn things in a
Practical way. Every Engineer at site has helped me in bridging the gap between my
Course and practical application with their experience.

• I was exposed to the best quality work, materials, and technology used in construction
Practices, learning things with precision gives courage to face any kind of situations with
Confidence. I feel it will help me learn technical things at higher pace than before, with
the knowledge and practical experience gained at site.

Dept. of Civil Engineering,


Page34