SUBJECT: MID-TERM EXAMINATION (CE PROF 3)

DATE: 21 March 2024


Venue: Designated Rooms, ISAT U
Instructor: RUDANTE V DOLAR CE/SE

1. General Instructions
➢ Building Plans shall be provided in PDF form which can be accessed
through phones, laptop, ipod or any other devices.
➢ Computations shall be done and submitted in a yellow paper
immediately after the scheduled exam. Calculations may be done using
calculators, laptop, or other devices. Excel (spreadsheet) program may
be used in the calculations.
➢ Compute for:
 Direct Cost (Use your own sourced-out material prices,
equipment rental rates, labor rates)
 Indirect Cost (apply your own assumptions of added costings)
 Total Item Cost
 Total Project Cost (Phase I): based only on the required exam
coverage.
➢ NO ON LINE SUBMISSION OF EXAMINATION OUTPUTS.

2. Examination Coverage:

➢ Earthworks
o Excavation
o Backfill
o Fill
➢ Reinforced Concrete Works
o Concrete
o Reinforcing Steel
o Forms and Falseworks
➢ Roof and Roof Framing
o Structural Steel
o Roofings

3. FORMAT (Tabulated) of Detailed Estimates & BILL OF QUANTITIES

Item No. Description Qty Unit Unit Cost Amount

Direct Cost
Indirect Cost
Item Total Cost
----------------------------------------------------------------------------------------------------------------
TOTAL PROJECT COST: ______________

GOOD LUCK!!!