BUILD RIGHT

by Trevor Pringle, BRANZ


Principal Writer
20 tips for running a
smooth project
When asked what is the difference between a building project that
proceeds smoothly and one that has a more tortuous path to
completion one word immediately comes to the fore. If this word is
applied to all projects then the construction is almost always easier.

Tip 8 Tip 15
W
hat is this word that makes
for a smooth-running Plan ahead – ensure work is Give sufficient notice of when work
project? correctly sequenced to prevent will be ready for inspection by the
rework or modification to finished Building Consent Authority.
work and to meet specific
Tip 1 milestones. Always prepare a Tip 16
(You’ll have to wait and see. First work plan.
Don’t take it upon yourself to make
read the other 19 tips.)
design and detailing decisions – if
Tip 9 you don’t think a detail will work
Tip 2 or cannot be built as detailed, refer
If you make promises, keep them. it to the designer for resolution.
Insist on good documentation that
accurately describes the extent of
the project, the materials and details Tip 10 Tip 17
to be used, and the expected quality. Be on time for meetings. Take particular care to accurately
set out the foundation since the rest
Tip 3 of the building depends on this.
Follow the documentation.
Tip 11
Be courteous to subtrades, Tip 18
the designer and the building
Identify and order necessary
Tip 4 official, but stand your ground if
resources (equipment, labour) and
Read and be familiar with all the you need to.
materials early on.
documents – have a copy of all
documentation on the site, it is your
key reference. Tip 12 Tip 19
Regularly monitor on-site progress Programme material deliveries
– the aim is to identify and deal so they arrive just before they
Tip 5 with a potential problem before it are needed.
Ensure subtrades are given a full set becomes a real problem.
of documents to price and work Tip 20
from – not just the bits you think It can’t be said often enough –
are relevant to their work. Tip 13 follow the documentation.
Ensure progress payments are (Assuming you’ve read all the
claimed from the client and paid tips and not just skimmed to the
Tip 6 to subtrades on time. bottom first, here’s the top tip.)
Respect the work of others,
particularly when working in the
vicinity of finished work.
Tip 14 The No. 1 tip
Regularly monitor the quality of Communication – clear, unambiguous
Tip 7 work in progress and completed communication between all parties,
Keep precise, up-to-date records of work (and make sure the main whether verbal or written. If there is
meetings, site instruction contractor does the same for no communication between the
conversations and decisions made. subtrades). parties, there is no project.