COMPANY BACKGROUND
HD CONTRACTOR PTE. LTD.
5 LITTLE ROAD
#05-01
CEMTEX INDUSTRIAL BUILDING
SINGAPORE (536983). HD CONTRACTOR PTE. LTD. (the "Company") is a Exempt Private
Company Limited by Shares, incorporated on 1 June 2011 (Wednesday) in Singapore. The
address of the Company's registered office is in the PASIR PANJANG GARDENS estate. The
Company current operating status is live and has been operating for 10 years. launched its
Singapore operation in 2001 with a activities of M&E engineering works. Committed to
achieving business excellence,
2
Communicating with other key organizational representatives.
Resolving strategic and policy issues.
Managing and leading the project team
Managing project evaluation and dissemination activities
Coordinating, organizing and overseeing the work on the project to
ensure the safety
and health of workers and others who may be affected by activities on
the project
Effectively implementing the owner, employer, or prime
contractor’s safety system,
Cooperating with other people on workplace safety and health matters;
Complying with the Workplace Safety and Health Act
(ii) WSH Officer
Advise site management on legal environment, health and safety requirement and
company safety procedures
To monitor performance of sub-contractors & ensure their compliance with
legal requirements & safety standards
To update management on new & changes in legal requirements relating to workplace
safety and health
Organise safety programme and activities to promote safe conduct of workers
To investigate all incidents/accidents or dangerous occurrences & recommend means
to prevent recurrences
Report and liaise with the management, relevant authorities on inspection, audit and
other safety, health and environment issues
Serve as the secretary in the site WSH committee
Assist in the implementation of the site’s workplace safety and health &
environmental programmes
Assist in identifying and assessing any foreseeable risk arising from the workplace or
work processes therein
To recommend reasonably practicable measures to eliminate, minimize or control any
foreseeable risk to any person who is at work in the workplace or may be affected by
other work processes in the workplace
Assist to implement the approved Safe Work Method Statement and Risk Assessment
(iii) EMPLOYERS
3
-Take reasonably practicable measures to ensure the safety and health of his
employees at work and other persons in the workplaces.
-Maintain a safe work environment for all persons at worksite and ensure that
they are not exposed to hazards.
-Ensure that adequate safety measures are taken in respect of any machinery,
equipment, plant, article or process used by those persons.
- Ensure that all necessary information, training and supervision are provided.
(iv) WSH OFFICER
Advice and assist Project Manager in the implementation of the EHSMS.
Perform EHS inspections such as weekly, monthly joint inspection, etc.
Organize EHS Committee meetings and acts as the secretary of the EHS Committee.
Investigate all accidents / dangerous occurrences/ near misses and implement corrective
actions to prevent future occurrences.
Organize EHS training and promotion programmes to enhance EHS standards.
Implement safety & health training and campaign program.
Prepare, conduct and review Risk Assessments
2) Identify at least three (3) stakeholders relevant to the chosen work and explain how
the WSH roles, responsibility and authorities would be communicated to the
stakeholders.
Person- at work
use suitable appliances, protective clothing, convenience equipment provided
by employer in proper manner to secure he safety health and welfare while at
work
cooperate with his employer or principal and any other person to comply with
the provisions of the WSH act
Do not willfully or recklessly interfere with or misuse any appliance, protective
clothing, convenience, equipment or other means or thing provided for securing
the safety health or welfare of persons at work
The organization should establish, implement and maintain procedures for Internal
communication, among the various levels and functions of the origination Communication with
3) Describe three WSH management system in used in workplace and explain any five (5)
elements of the WSH management system in detail and how your organization
implement it.
Safety training – it is necessary to equip workers at all level with knowledge, skills and
attitude so that they can perform their job in a safely manner. Its is also necessary to establish
5
procedures to identify training needs and provide adequate safety training to all levels. Records
of training should also be documented and maintained at all times.
In- house safety rules and regulations – it needs to be established and enforced to ensure
all working personnel know their roles and responsibilities in safety that they need to comply
e.g. proper use of PPE, operation and maintenance of machinery and equipment, proper
handling and storage of hazardous materials and reporting of hazards and incident.
Incident investigation and analysis – it is to establish the cause of incidents and to
prevent recurrence of the incidents. Procedures to identify, record, investigate and analyse
incidents should be established and maintained so that corrective actions can be
implemented to prevent recurrence of incidents.
Specialized skills
Competent person to carry out that certification such as all specialist work and all
high risk work
Scheduling of implementation
6
Implement PTW and SWP, Prepare the schedule to the start work
7
5) By means of a flow chat, explain how You coordinate and document a management
review on WSH Management System and illustrate types of record to be documented for
Management review
Management meeting – during the meeting, all the relevant stakeholders will be
issued a copy of the WSH management system for review.
Pre start meeting – during the pre-start meeting, the WSH personal would present the
slides on the respective elements of the WSH Management System to all the
stakeholders involved.
Safety induction course – during the SIC, all stakeholders would be briefed on the
implementation of the WSH Management System on site.
8
09 WSH (First Aid) Regulation Entire factory Entire factory Operations
10 Fire safety act and its subsidiary Entire factory Entire factory Operations
legislation
11 The environmental pollution Work shop Use of toluene spray painting
control regulations
12 WSH (operation of crane) Production floor and Use of overhead crane
Regulation loading bay
13 Code of practice for risk Entire factory Entire factory Operations
management
14 SS548 code of practice for Work shop Use of toluene spray painting
selection, use, and maintenance of
respiratory protective devices
15 SS510 code of practice for safety Work shop Minor fabrication work
in welding and cutting (and other
operations involving the use of eat)
7) Explain how your workplace procedure for checking organizational compliance
with applicable WSH legal and other requirement.
Training need analysis is making comparison between person’s current skills level and the
demands of his and her job, and identifying short fall of skill for him and her to perform
works in a safe and health manner
While identifying WSH training needs, the following needs may be considered
WSH competency required at each function and level in the organization
WSH indication programme
On-going training for transferring roles/functions
Training in local WSH arrangements before commencing of works
Training in hazard identification and risk assessments
Specific mandatory training as required for employees with specific roles or occupations
Mandatory training courses (general trades)
Mandatory training courses (specific trades related)
Training for managers
Training for supervisors
Training and awareness program for contractors, temporary workers visitors.
Stake holders those need WSH training to maintain safe and healthy work environment need
to be identified and provided with suitable training
9
Relevant stakeholders
10
Managers
Contractors
Temporary workers
Visitors
Workers
Supervisors
Identify training programs to meet training needs in accordance with organizational
procedures and Relevant stakeholder’s suitable training
Manager level
Construction safety course for PM Fire safety Manager course
Supervisor level
WSH supervisor, Working at height for supervisor
Scaffold supervisor Metal scaffold supervisor
CSOC
workers
Toolbox meeting
WSH committee meeting
Work progress meeting
Management meeting
Technical meeting
WSH training
WSH Inspection
Repots
Feedback
Email
Safety poster
Newsletters
Phone calls
9) Explain how you coordinate conformity audit for your Workplace Arranging the agenda
Date of audit
Duration of audit
Venus
b. Competent individuals
SPM, WSHO, WSHC, WSHS, ENG, SITE SUPERVISOR, WORKER
The on-site safety and wellness Management system (SHMS) Audit protocol comprises the
undermentioned stairs
Opening meeting. To discourse the audit programme, debut of hearer and audits
13
Familiarization circuit. To familiarize hearer with the site procedure and site use program.
Verification of effectual execution of SHMS.
Evaluation of audit findings, to fix grounds for treatment in meetings. Exit meetings
Administration Summary
China atomic Hoaxing Building Co. LTD is a company which straight under the cardinal
authorities of China atomic technology and building corporation keeping comprehensive big
building companies, both at place and abroad to construct atomic power endeavours, is the
The company since 1983, take part in the state ‘s first atomic works reactor building, 2010
domestic has power of 15 atomic reactors, 11 of the civil technology of atomic shall be borne
by the company. Meanwhile, it besides undertakes the state at present the export to overseas
all two atomic power works building contract undertaking.
By the terminal of 2010, the company besides building of the Guangdong’s, Liaoning red
river, Fujian hinged, Guangdong, guangxi fangcheng port Yanjing and 15 atomic civil
technology, transcending of the “ 11th five-year program ” established instruction “ and 8 to
12 reactor under building ” ability mark, be under building in the universe the most atomic
power building of atomic contractor.
14
Company Information: UEN NO: T03FC6386E
China Nuclear Industry Huaxing Construction Company Ltd, We accordance with WSH
legal conformity & A; Other demands, such MOM, BCA, NEA and SCDF.
e.g. opening the meeting, discuss the audit programme with the introduction of auditor and
auditees, familiarisation tour at the site process and site utilization plan, verification of
effective implementation SHMS involving reviewing of documents, procedures and records,
interviewing of personnel and physical inspection, evaluation of audits findings and exit the
meeting.
15