OUR PROJECTS
DESIGN STAGES
Page | 01
ABOUT US
a Creative Design Studio, passionate about
environmental responsiveness and sustainable
development.
Page | 03
Our Mission is to understand our client needs to deliver
high–quality buildings on time and on budget. We will be
Page | 04
OUR SERVICES
™ provide Architectural Services on a range of developments from small scale
residential projects including one off houses, extensions and refurbishments to commercial
developments.
™ also provide a BIM modelling, design, technical & drafting outsource service
to Architectural & Engineering practices and Construction companies.
The following are some of the services we provide:
DESIGN CREATIVITY
We have a keen interest for aesthetics,
functionality and structural integrity. We at
Spaceloci have the design ingenuity to cater for
your needs whilst applying innovation and
critical thinking to carve out a master piece.
PROJECT INFORMATION
Project Status:
Construction
Project Area:
349.227m²
Site Area:
721.772m²
Project Type:
Single Residential
Visualization:
™
Year:
2022
Page | 08
THE BUZZ HOUSE
Page | 09
THE LIGHT HOUSE Proposed to sit in the heart of
Calabar, Nigeria, this family
house is an edifice that
accentuates modern and
suburban living. The large
window openings allows the
outside environment into the
internal spaces.
PROJECT INFORMATION
Project Status:
Under Construction
Project Area:
1586.053m²
Site Area:
1777.756m²
Project Type:
Single Residential
Visualization:
™
Year:
Twenty'23
Page | 10
THE LIGHT HOUSE
Page | 11
Located on a narrow site, this
Four-Bedroom family house
maximizes the views from the
main access road creating a
good opportunity for natural
G-HOUSE
surveillance.
PROJECT INFORMATION
Project Status:
Proposed
Project Area:
246.267m²
Site Area:
315m²
Project Type:
Single Residential
Visualization:
™
Year:
Twenty'23
Page | 12
G - HOUSE Page | 13
The tiny living concept shaped the
entire design process of this enclave.
APARTMENTS
Proposed to grAce the city of Uyo,
Akwa Ibom State, are 12 building
units consisting of three (3)
bedrooms each for 12 different
families. The concept is to support
economical living amongst young
adults in a developing country.
PROJECT INFORMATION
Project Status:
Construction
Project Area:
2,953.36m²
Site Area:
2,103m²
Project Type:
Multi-Residential
Visualization:
™
Year:
Twenty'23
Page | 14
APARTMENTS
RAY
LAND
EBURUTU LIVING The project is proposed in
a plush residential area in
Nigeria. The development
consists of (four) 4
townhouses with green
open spaces spread across
the site.
PROJECT INFORMATION
Project Status:
Concept
Project Area:
610.238m²
Site Area:
885.240m²
Project Type:
Multi-Residential
Visualization:
™
Year:
Twenty'22
E B U R U T U
L I V I N G
E B U R U T U
L I V I N G
FROSH APARTMENTS
PROJECT INFORMATION
Project Status:
Concept
Project Area:
7436.808m²
Site Area:
1390.021m²
Project Type:
Multi-Residential
Visualizations
™
Year:
Twenty'22
A multi-residential high rise building with Twenty-one (21) apartments employed the use of balconies to allow
occupants enjoy different picturesque views from their apartments. The design was aimed at creating an impressive
architectural masterpiece with an efficient building system. Page | 19
CALASVEGAS BEACH RESIDENCE
Page | 20
CALASVEGAS BEACH RESIDENCE
A beach house is more than
a cosy place to get away.
It’s a home away from home,
a place to relax and
recharge, where memories
are created and friendships
grow.
Designed by
™
For
OfujÉ Ltd
Status
Understand Construction
Page | 21
3D VISUALIZATION
Page | 22
3D VISUALIZATION
Page | 23
VISUALIZATION
INTERIOR Page | 24
VISUALIZATION
Page | 25 INTERIOR
CONSTRUCTION & PROJECT MANAGEMENT
Building Construction made easy! We are your
Page | 26
REFURBISHMENT
Sometimes some buildings just suck!!
structures.
Page | 27
DESIGN STAGES Page | 28
02. DESIGN
There are normally four different steps within
Depending on the project, the conception The schematic design is a sketch that will show
stage might vary. It can take anywhere from a the space as well as materials, colours, and
few days to a few months or more, depending even textures. That sketch will be used during
on how imminent is the need for the completion the design development to research the
of the project. equipment needed, along with the cost for them
and the materials being used.
It goes without saying that construction
workers usually don’t have much input during Once the contract documents are drawn up,
this stage, as the ball is still in the hands of everything is close to being finalised, because
the project owner they contain the final drawings and
specifications. These documents are used in the
construction field by those placing bids to
work on the project.
03. THE PRE-CONSTRUCTION
STAGE
The next stage of a construction project The site examination will allow the project
begins when the bidding is completed and the team to detect or predict any environmental
contractor has been chosen to do the work. As challenges that might emerge during the
soon as the contractor is chosen, the project building process. Soil testing is also an
team is put together. integral part of this step.
when all information is collected, all plans
Typically, a project team has the task to and findings should be reviewed by the city
prepare the construction site before the work authorities. This is usually a long procedure,
begins. As a rule, it consists of the following as all concerns and opinions should be heard
specialties: and addressed.
Contract administrator
Project manager
04. PROCUREMENT
Superintendent
Field engineer This stage of the project can be more or less
Health and safety manager complex and challenging depending on how big
the project is, the available resources and the
in close collaboration with our perspective agreed start date.
clients, the project team is responsible for This process might vary a lot in smaller
visiting the field in order to complete a site projects.
examination.
Page | 29
THE POST-
05. THE CONSTRUCTION
STAGE 06. CONSTRUCTION STAGE
Before the construction work begins, a pre- The final stage of the construction project is divided
into three critical steps:
construction meeting is done with our
prospective clients to ensure that everyone is
a. New construction building commissioning
on the same page when the construction
b. Owner occupancy
starts. This meeting normally includes c. Closure
information about the following topics:
How to access the job site the quality control FINAL WORDS
of the project how and where to store all the
materials the hours that everyone will be At the end of the day, every stage of a construction
working. project is a chain of tasks, decisions, and numerous
tools. Its complexity depends vastly on the size and
It easily becomes evident that bad planning at
type of the project but there are always some core
this point can lead to serious delays and
steps that can’t be skipped.
budget overruns.
Impeccable communication between the different
The goal at this point is to have planned
stakeholders and fact-based decisions are two
everything so carefully that everything goes fundamental pillars in the effort of streamlining a
off without a hitch. Of course, that rarely construction project and making sure that all
happens, as something always goes wrong phases will be developed and completed within the
during a construction project. agreed timeframe and budget
Page | 30
GET IN TOUCH
WE'D LOVE TO HEAR FROM YOU !
OFFICIALDNAGROUP@GMAIL.COM
... CRAFTING YOUR CURIOSITY
@DE_NEIGHBORHOOD_ASSOCIATES
A B U J A • L A G O S • C A L A B A R • A B A K A L I K I
GET IN TOUCH
WE'D LOVE TO HEAR FROM YOU !
OFFICIALDNAGROUP@GMAIL.COM
... CRAFTING YOUR CURIOSITY
@DE_NEIGHBORHOOD_ASSOCIATES
A B U J A • L A G O S • C A L A B A R • A B A K A L I K I