KEYPLAN:
GENERAL NOTES:
E=364939.723
N=2663692.617
EXI. DUCT
EXISTING 11kV CABLE Not in operation EXISTING 11kV CABLES 2noS.
E=365036.046
E=365041.874
N=2663654.015
N=2663656.715
AADC INCOMER 01
FROM PRIMARY SS
FER-A-PY-K21
EXISTING 11kV CABLES 2noS. Not in operation
Project:
Selling of obsolete asset demolishing
(zakher-M4-&PS01 EIMA)in AL AI Ain-
Contract No:TCB/2023/08
Not in operation
Approval Status: A B C D
Cancellation of existing TRM2 Drawing Status:
AF413
NOTE:
Date Description BY CHK APPD
TRANSFORMER FEEDER NOT IN EXISTING 11kV CABLES 1noS Rev.
End user:
OPERATION TO TRM No 1 AF-413
Client:
Employer:
Electrical Contractor:
TCB/2023/08-AAK-ELE-SHP-001 01/01 0