You are on page 1of 14

60765

RAMP

6010

UP

MAKE UP ROOM RAMP


4005

4010
VIP ROOM
-3670 -3670
UP
6315

6010 UP

2800
GREEN ROOM
4174

-3670

ARTIFACT
+0

EXIT
2000
LADIES TOILET
-3670 -300

2000
-4870
CRY ROOM
AISLE -300

1200
6010
E
AISL -1970

8000
AHU ROOM +0
3871

2000
1781 UP
9625

-3670

GANGWAY
1837
LOBBY
A A'
34830

STAGE ORCHESTRA PROJECTOR +0

10000

4442
PIT
6010
-3670 -5170 ROOM ENTRANCE
-3960 -300
3943

STORE ROOM
3779

-3670
AISLE

1200
AISLE -300 CRY ROOM
-4870 -300
GENTS TOILET

2000
TICKET COUNTER

3310
-3670 +0

5170

6010
0
300

ARTIFACT
+0 ADMIN

3960
4166

GREEN ROOM +0
-3670
5170

UP

6010

2945
CAFE
+0
4010

4460

STORE ROOM LOADING AND UNLOADING RAMP


-3670
8320

3757
KITCHEN
+0
6434

NORTH DATE SIGN M M C O A STAMP

AUDITORIUM :- GROUND FLOOR PLAN (1:100)


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS II DIV :- B
60765

3297

2956
A.H.U ROOM

UP

2800
ARTIFACT
+5115

2000
CRY ROOM
+5115
6010
3871

AHU ROOM UP

1781
+680 800
3970

A A'
34830

2000 STAGE +5115


A.V LOBBY

4442

28764
+1950 ROOM ENTRANCE
6010
+5115
+5115

STORAGE FOR 3943


3780

CATWALK
+680

CRY ROOM

2000
ARTIFACT

+5115

0
306

CAFE

A.H.U ROOM

2194
3682

A.H.U ROOM

5000
AND STORAGE
+5115
6434

NORTH DATE SIGN M M C O A STAMP

AUDITORIUM :- FIRST FLOOR PLAN (1:100)


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS II DIV :- B
RAMP DIFFERENT LIGTHS USED

UP

MAKE UP ROOM
VIP ROOM RAMP
UP

UP

GREEN ROOM

LED CEILING MOUNTED LIGHT


ARTIFACT

EXIT

LADIES TOILET

CRY ROOM
AISLE

E
AISL

AHU ROOM UP
SCOOP LIGHT

GANGWAY
LOBBY
STAGE ORCHESTRA PROJECTOR
PIT
ROOM ENTRANCE

STORE ROOM

AISLE

AISLE CRY ROOM

GENTS TOILET PROFILE SPOT LIGHT


TICKET COUNTER

ARTIFACT

ADMIN
GREEN ROOM

UP

CAFE PARABOLIC LIGHT


STORE ROOM LOADING AND UNLOADING RAMP

KITCHEN LED WALL MOUNTED LIGHT

LED CEILING MOUNTED LIGHT

SCOOP LIGHT

LED TUBELIGHT

PROFILE SPOT LIGHT

PARABOLIC LIGHT

SWITCH BOARD

NORTH DATE SIGN M M C O A STAMP

LIGHTING LAYOUT :- GROUND FLOOR PLAN (1:100)


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS II DIV :- B
DIFFERENT LIGTHS USED

A.H.U ROOM

RAMP
UP

LED CEILING MOUNTED LIGHT


ARTIFACT

CRY ROOM

SCOOP LIGHT
AHU ROOM UP

STAGE A.V LOBBY


ROOM ENTRANCE

STORAGE FOR
CATWALK

CRY ROOM
PROFILE SPOT LIGHT

ARTIFACT

PARABOLIC LIGHT
CAFE
RAMP
A.H.U ROOM

A.H.U ROOM
AND STORAGE LED CEILING MOUNTED LIGHT

SCOOP LIGHT

LED TUBELIGHT

PROFILE SPOT LIGHT

PARABOLIC LIGHT

SWITCH BOARD

NORTH DATE SIGN M M C O A STAMP

LIGHTING LAYOUT :- FIRST FLOOR PLAN (1:100)


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS II DIV :- B
RAMP

UP

MAKE UP ROOM
VIP ROOM RAMP
UP

UP

GREEN ROOM

ARTIFACT

EXIT

LADIES TOILET
PENDANT FIRE SPRINKLER
CRY ROOM
AISLE

E
AISL

AHU ROOM UP

GANGWAY
LOBBY
STAGE ORCHESTRA PROJECTOR
PIT
ROOM ENTRANCE

STORE ROOM

AISLE

AISLE CRY ROOM


SMOKE DETECTOR
GENTS TOILET
TICKET COUNTER

ARTIFACT

ADMIN
GREEN ROOM

UP

CAFE
STORE ROOM LOADING AND UNLOADING RAMP
SMOKE DETECTOR

SPRINKLER
KITCHEN

DISTRIBUTION PIPE 50 MM DIA

MAIN PIPE 100 MM DIA

SPRINKLER RANGE (RADIUS-1.5M)

NORTH DATE SIGN M M C O A STAMP

FIRE FIGHTING LAYOUT :- GROUND FLOOR PLAN (1:100)


W
N
E
SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
S ABCS II DIV :- B
A.H.U ROOM

UP

ARTIFACT

PENDANT FIRE SPRINKLER


CRY ROOM

AHU ROOM UP

STAGE A.V LOBBY


ROOM ENTRANCE

STORAGE FOR
CATWALK

CRY ROOM
SMOKE DETECTOR

ARTIFACT

CAFE

A.H.U ROOM SMOKE DETECTOR

A.H.U ROOM
SPRINKLER
AND STORAGE

DISTRIBUTION PIPE 50 MM DIA

MAIN PIPE 100 MM DIA

SPRINKLER RANGE (RADIUS-1.5M)

NORTH DATE SIGN M M C O A STAMP

FIRE FIGHTING LAYOUT :- FIRST FLOOR PLAN (1:100)


W
N
E
SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
S ABCS II DIV :- B
RAMP
HVAC SYSTEM

UP

MAKE UP ROOM
VIP ROOM RAMP
UP

UP

GREEN ROOM

ARTIFACT

EXIT

LADIES TOILET

CRY ROOM
AISLE

E
AISL

AHU ROOM UP

GANGWAY
LOBBY
STAGE ORCHESTRA PROJECTOR
PIT
ROOM ENTRANCE

STORE ROOM

AISLE

AISLE CRY ROOM

GENTS TOILET
TICKET COUNTER

ARTIFACT

GREEN ROOM ADMIN

UP

CAFE
STORE ROOM LOADING AND UNLOADING RAMP

AIR SUPPLY DUCT


KITCHEN

AIR EXTRACT DUCT

AIR SUPPLY DIFFUSER

AIR EXTRACT DIFFUSER

NORTH DATE SIGN M M C O A STAMP

HVAC LAYOUT :- GROUND FLOOR PLAN (1:100)


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS II DIV :- B
HVAC SYSTEM

A.H.U ROOM

RAMP
UP

ARTIFACT

CRY ROOM

AHU ROOM UP

STAGE A.V LOBBY


ROOM ENTRANCE

STORAGE FOR
CATWALK

CRY ROOM

ARTIFACT

CAFE
RAMP
A.H.U ROOM

A.H.U ROOM

AND STORAGE AIR SUPPLY DUCT

AIR EXTRACT DUCT

AIR SUPPLY DIFFUSER

AIR EXTRACT DIFFUSER

NORTH DATE SIGN M M C O A STAMP

HVAC LAYOUT :- FIRST FLOOR PLAN (1:100)


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS II DIV :- B
A'
5000
HEALTH SPA AND JACCUZZI PASSAGE
10266,57

SPECIAL KITCHEN
RESTAURANT
COFFEE SHOP

SPECIAL SUITE PASSAGE

CONCRETE BEAM

AURANGABAD CHAMBERS FOR


DOUBLE BEDDED ROOM PASSAGE
10MM THK EMBEDDED PARTS
COMMERCE TRADE
INSULATING TEMPRED GLASS (With 4 chemical anchor bolts)
10mm+12+10mm
DOUBLE BEDDED ROOM PASSAGE
SEMINAR HALL
DINING

AURANGABAD CHAMBERS FOR


COMMERCE TRADE SERVICE FLOOR
FIN SPIDER CONNECTING BOLTS
10266,57

SEMINAR HALL
PASSAGE
ANGLE STEEL
AURANGABAD CHAMBERS FOR
COMMERCE TRADE
1200
5000

10266,57
ROUTEL 80X50X5
10266,57

MEETING ROOM SHOPS


5000
PASSAGE

10266,57

1200

A
AURANGABAD CHAMBERS FOR
COMMERCE TRADE

PASSAGE
MEETING ROOM

BANQUET

75,66 201
5000

PASSAGE

DETAIL AT 'A'
10266,57

1200

BUSINESS LOUNGE

BASEMENT 1
SCALE 1: 5
GENTS TOILET
LADIES TOILET

BASEMENT 1

FLOOR PLAN (1:250) SECTION AA' (1:250)

INSULATING TEMPRED GLASS


10mm+12A+10mm
1000 1000 1000 1000 1000 1000 1000 1000 SPIDER GLASS FITTING

12MM THK CUSTOMIZED


GLASS
(1000 X 900 MM)

RCC COLOUM 230x450 MM

PLAN (1:50)
FIN SPIDER SPIDER CONN. BOLT
CONNECTION
SILICON SEALENT
( with φ20 anchorbars)
A
INSULATING TEMPRED GLASS
12MM THK
GLASS FIN SPLINT
10266,57

ROUTEL
5000

SILICON SEALENT
WEB FOR GLASS FIXING

B 5000

RCC COLUMN

10266,57

DETAIL AT 'B'
C
SCALE 1: 5

ELEVATION (1:50) SECTION (1:50)


ELEVATION (1:250)

FIN SPIDER CONNECTION

75,66201
BOLTS
ALTERNATE WEB SILICON SEALENT
(NOT TO SCALE)
ARMS WITH SLOTS ( with φ20 anchorbars)
SILICON SEALENT
40 DIAMETER
ROUTEL

DETAIL AT 'C'
SCALE 1: 5
VIEW
FIN SPIDER DETAIL
(NOT TO SCALE)

DATE SIGN M M C O A STAMP

ARCHITECTURAL DETAILS : CURTAIN WALL DETAIL


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS DIV :- B
A'
10266,57

STORE / RECORD
ACCOUNT BILLING
1200

STAFF
STAFF
CHANGING
STAFF RESTROOM GENERAL OFFICE
CHAIRMEN OFFICE MEETING ROOM
PANTRY
TIE ROD FOR
CHANGING

SUPPORT
(20MM DIA
TENSION ROD)

750
B
SYSTEM MANAGER HR ROOM

STEEL SECTION 12MM THK

1300
SUPPORT TOUGHNEND
PANTRY
GLASS

1300

6450
6000
GENERAL STORE

6500
SS SPIDER
STEEL SECTION C
FITTING 10266,57 10266,57

SUPPORT

1300
STAFF KITCHEN

LINEN STORE
LOBBY

5000

5000
SS SPIDER
FITTING

1300
GLASS JOINT 10266,57 10266,57

1200
LAUNDRY

12MM THK PLINTH

1000
TOUGHNEND
GLASS
1300 1300 1300 1300
G.L

MEZZANINE FLOOR PLAN (1:250)


PLAN (1:50)
SECTION (1:50)
1200

5000
HEALTH SPA AND JACCUZZI PASSAGE
10266,57

ANCHOR FASTENER
SS HOOK
SPECIAL SUITE PASSAGE

TIE ROD FOR


SUPPORT
DOUBLE BEDDED ROOM PASSAGE
(20MM DIA SS PLATE
TENSION ROD)
SS THREAD
DOUBLE BEDDED ROOM 12MM THK
PASSAGE
COUPLER
TOUGHENED
GLASS
SERVICE FLOOR ANCHOR FASTENER
SS SPIDER SS HOOK
10266,57
FITTING
PASSAGE
5000
SEMINAR HALL

10266,57

1200

10266,57

SHOPS
5000
PASSAGE

10266,57

1200

PASSAGE SS SPIDER FITTING FOR SS BOX TIE ROD FOR


SECTION SUPPORT
10266,57

10266,57
BANQUET

TOUGHENED GLASS STEEL SECTION (20MM DIA


PASSAGE
TENSION ROD)
5000

5000

1200
10266,57

10266,57
SUPPORT

BASEMENT 1
DETAIL A (1:10) DETAIL B (1:10)
BASEMENT 1

SECTION AA' (1:250)


SS PLATE

12MM THK
TOUGHENED
GLASS

SS SPIDER
FITTING

SS BOX
SECTION

STEEL SECTION
SUPPORT

DETAIL C (1:10)
VIEW 1 VIEW 2

DATE SIGN M M C O A STAMP

ARCHITECTURAL DETAILS : GLASS CANOPY DETAIL


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS DIV :- B
A'
STORE / RECORD
ACCOUNT BILLING
PANTRY
STAFF STAFF RESTROOM GENERAL OFFICE MEETING ROOM
STAFF CHAIRMEN OFFICE
CHANGING
CHANGING

INSULATED
TEMPERED GLASS

230
HR ROOM
SYSTEM MANAGER

PLANTATION

2770
PANTRY

PARAPET WALL

230
GENERAL STORE

PLAN (1:50)

STAFF KITCHEN

LINEN STORE
A

PLANTATION

COPING SOIL
LAUNDRY

PARAPET WALL
SLAB

INSULATED 10266,57 10266,57

TEMPERED GLASS WATERPROOFING


MEZZANINE FLOOR PLAN (1:200) WITH 3MM
LOBBY PLASTOMERIC
5000 5000

BITUMEN
COMPOUND

75,66201

75,66201
1200

HEALTH SPA AND JACCUZZI PASSAGE


PLINTH
5000

10266,57

SPECIAL SUITE PASSAGE


G.L

DOUBLE BEDDED ROOM PASSAGE

SECTION (1:50)
DOUBLE BEDDED ROOM PASSAGE

PLANTATION
SERVICE FLOOR SOIL
10266,57
COPING
PASSAGE

1200
5000

10266,57
SEMINAR HALL
GEOTEXTILE
10266,57

SHOPS
25MM THK
PASSAGE

DRAINAGE CELL
5000

10266,57

1200

PASSAGE
PARAPET
BANQUET
WALL 50-100 MM THK P.C.C IN
SLOPE (1.75) TOWARDS
10266,57

5000

PASSAGE

1200
10266,57

DRAINAGE PIPE

BASEMENT 1

WATERPROOFING WITH
3MM PLASTOMERIC
BASEMENT 1
BITUMEN COMPOUND

DETAIL SECTION (1:10) SLURRY MIX OVER SLAB


SECTION AA' (1:200) SLAB

DATE SIGN M M C O A STAMP

ARCHITECTURAL DETAILS : GREEN ROOF DETAIL


SWARAJ SANJAY TAMBOLI
FR. Y. B. ARCH ROLL NO :- 56
ABCS DIV :- B
INTRODUCTION STRUCTURAL FORM SYSTEM BRACED FRAME STRUCTURAL SYSTEM
• High-rise a multi-story structure between 35-100 meters tall, or a • It is a arrangement of structural components in a building that collectively transfers the load • Bracing members eliminate bending in beams and columns.
building of unknown height from 12-39 floors. in an efficient manner. • It is used in steel construction.
• According to the building code of Hyderabad, a high-rise building is • The building up to 30 floors- Shear frames are used which can be rigid or semi-rigid. • This system is suitable for multistory building in the low height range.
one with four floors or more, or 15to 18meters (49 to 59 ft) or • For 30 to 60 storied building interacting systems are used with shear trusses or outrigger • Efficient and economical for enhancing the lateral stiffness and resistance of rigid frame
more in height. trusses. system.
• The New Shorter Oxford English Dictionary defines a high-rise as • The building more than 60 floors are designed with tubular systems. • This system permits the use of slender members in a building.
"a building having many stores". • An outstanding advantage of braced frame is that, it can be repetitive with obvious
• In the U.S., the National Fire Protection Association defines a high- economy in design and fabrication.
rise as being higher than 75feet (23m),or about seven stories. • Different braving types are named as per their configuration like cross braced, inverted
• INDIAN STANDARDS V braced, Diagonal braced etc.
• As per NBC, structure having 15 m height or above it called high
rise.
• As per BMC, high rise is above 24 M.
• As per NMMC (2006), high-rise is above 16M height.

NEED FOR HIGH-RISE STRUCTURES


• Scarcity of land in urban areas.
• Greater demand for business and residential space.
• Economical emergence. RIGID FRAME STRUCTURAL SYSTEM
• Technical advancements.
• Innovations in structural Systems. • In rigid frame structure, beams and columns are constructed monolithically to withstand
• Desire for Aesthetics in urban areas. moments imposed due to loads.
• Cultural significance and prestige. • It may be used in steel construction as well, but the connections will be costly.
• Human ambitions to build higher. • Members of rigid frame system withstand bending moment, shear force, and axial loads
TYPES OF STRUCTURAL SYSTEMS • 20 to 25 storey buildings can be constructed using rigid frame system.
HISTORY OF HIGH-RISE STRUCTURES • Advantages of rigid frame include ease of construction, labors can learn construction
• Braced frame structural system. • Core and Outrigger structural system skills easily, construct rapidly, and can be designed economically.
• The first high-rise buildings were constructed in the United States in • Rigid frame structural system. • Tube structural system
the 1880s. They arose in urban areas where increased land prices • Shear wall system. • Hybrid structural system
and great population densities created a demand for buildings that • Coupled wall system. • Buttressed core.
rose vertically rather than spread horizontally, thus occupying less • Wall-frame system (dual system).
precious land area. FOUNDATION FOR HIGH RISE BUILDINGS
• High-rise buildings were made practicable by the use of steel
structural frames and glass exterior sheathing. By the mid-20th • Raft or mat foundation • Piled raft foundation
century, such buildings had become a standard feature of the • Compensated raft foundation • Compensated piled raft foundation
architectural landscape in most countries in the world. • Piled foundation
• Local architect, William LeBaron Jenney, was the first to push the
limits by designing the first skyscraper in 1884. TUBE STRUCTURAL SYSTEM CORE AND OUTRIGGER STRUCTURAL SYSTEM
• The era of skyscrapers in India began with the completion of the LIC
Building in Chennai in 1959. With 12 floors initially, it was the first • This system consists of exterior columns and beams that create rigid frame, and interior part • Outrigger are rigid horizontal structures designed to improve building overturning stiffness
skyscraper in the country and remained the tallest building in the of the system which is simple frame designed to support gravity loads. and strength by connecting the core or spine to closely spaced outer columns.
country until 1961 when it was surpassed by the 25-storied Usha • It is used for the construction of buildings up to 60 storeys. • The central core contains shear walls or braced frames.
Kiran Building in Mumbai. • Trussed tube system is formed when external bracing added to make a structure stiffer. This • Outrigger systems functions by tying together two structural systems (core system and a
• The Home Insurance Building, built in 1885 and located on the structure type suitable for building up to 100 storeys. perimeter system), and render the building to behave nearly as composite cantilever.
corner of Adams and LaSalle Streets in Chicago, Illinois, went down • Bundled tube system consists of connected tubes and it withstand massive loads. • Practically, Outrigger systems used for buildings up to 70 stories. Nonetheless, it can be
in history as the world's first modern skyscraper. used for higher buildings.
• The outriggers are in form of walls in reinforced concrete building and trusses in steel
structures

Home Insurance
LIC building, Chennai ,
Building, Chicago,
India Framed tube structure system Tube In Tube structure system
Illinois
SIGN DATE MMCOA STAMP

1 HIGH-RISE STRUCTURE SWARAJ TAMBOLI


TY BARCH
ABCS II
DIV : A
ROLL NO : 35
WALL FRAME STRUCTURAL SYSTEM FLAT SLAB AND FLAT PLATE STRUCTURAL SYSTEM COUPLED WALL STRUCTURAL SYSTEM
• It consists of wall and frame that interact horizontally to provide stronger and • This system consists of slabs (flat or plate) connected to columns (without the • This system composed of two or more interconnected shear walls.
stiffer system. use of beams). • Shear walls connected at the floor levels by beam or stiff slabs.
• The walls are usually solid (not perforated by openings) and they can be found • flat plate is a two-way reinforced concrete framing system utilizing a slab of • Stiffness of the whole system is far greater than that of its components.
around the stairwells, elevator shafts, and/or at the perimeter of the building. uniform thickness, the simplest of structural shapes. • The effect of the shear-resistant connecting members is to cause the sets of walls
• The walls may have a positive effect on the performance of the frames such as by • The flat slab is a two-way reinforced structural system that includes either drop to behave in their partly as a composite cantilever, bending about the common
preventing a soft storey collapse. panels or column capitals at columns to resist heavier loads and thus permit centroidal axis of the walls.
• Wall-frame system suitable for buildings with storey number ranges from 40-60 longer spans. • The system is suitable for buildings up to 40 storey height.
storey which is greater than that of shear or rigid frame separately. • Lateral resistance depends on the flexural stiffness of the components and their • Since planer shear walls support loads in their plane only, walls in two orthogonal
• braced frames and steel rigid frames provide similar advantages of horizontal connections, with the slab corresponding to the girder of the rigid frame. directions need to withstand lateral loads in two directions.
interaction. • Suitable for building up to 25 stories.

Wall frame structural system

INFILLED FRAME STRUCTURAL SYSTEM


• Infilled frame structure system consists of beam and column framework that some
of the bays infilled with masonry, reinforced concrete, or block walls. HYBRID STRUCTURAL SYSTEM
• Infill walls can be part-height or completely fill the frame.
SHEAR WALL STRUCTURAL SYSTEM
• The walls may or may not be connected to the formwork. • It is the combination of two or more of basic structural forms either by direct
• Great in plan stiffness and strength of the walls prevent bending of beams and • It is a continuous vertical wall constructed from reinforced concrete or masonry
combination or by adopting different forms in different parts of the structure.
columns under horizontal loads. As a result, frame structural performance will be wall.
• Its lack of torsional stiffness requires that additional measures be taken, which
improved. • Shear walls withstand both gravity and lateral loads, and it acts as narrow deep
resulted in one bay vertical exterior bracing and a number of levels of perimeter
• During an earthquake, diagonal compression struts form in the infills so the cantilever beam.
vierendeel “bandages”
structure behaves more like a Braced Frame rather than a Moment Frame. • Commonly, constructed as a core of buildings
• It can be used for the buildings of as high as 300m.
• It can build up to 30 storey buildings. • shear wall structural system can be economical up to 35 stories building structure.
• According to chines code (JGJ3-2002), hybrid system can be used for the
• Shear wall system is appropriate for hotel and residential buildings where the
construction of buildings with maximum 150m height in seismic regions.
floor-by floor repetitive planning allows the walls to be vertically continuous.

Infilled frame structural system

Infill frame Vierendeel frame

SIGN DATE MMCOA STAMP

2 HIGH-RISE STRUCTURE SWARAJ TAMBOLI


TY BARCH
ABCS II
DIV : A
ROLL NO : 35

You might also like