PUBLIC SCHOOL SYSTEM (PSS) TINIAN ELEMENTARY SCHOOL REHABILITATION PROJECT, PHASE II
NMHC IFB 2024-001
TINIAN
Subject: BID EVALUATION MATRIX
Signed 11/22/2023;
Signed on 11/22/2023. Base Bid Signed and sealed on 11/6/2023 Base Bid: $607,212.00, Additive General Construction Signed and
Acknowledged Signed and Submitted Signed and Submitted on Signed and Submitted on Signed and Notarized on Signed and Submitted on Signed and Submitted on
1 IRONWOOD CONSTRUCTION LTD. Acknowledged, Signed Acknowledged, Signed Amount: $607,212.00, Additive Bid (15% of total Bid Amount) by Bid: $151,515.00 Including Contractor Notarized on
Addendum 1 & 2. on 11/22/2023 11/22/2023 11/22/2023 11/22/2023 11/22/2023 11/22/2023
Amount: $151,515.00 First Net Insurance Company Tax, Expire on 4/11/2024 11/22/2023
BIDDER TO PROVIDE
ORGANIZATIONAL SECTION 3 FORM OF
SMALL MINORITY, WOMEN DEBARMENT SPECIAL CONDITION LISTING OF CURRENT LISTING OF LIST OF WITH THEIR BID
CONFLICT OF BUSINESS SELF STATEMENT OF LIST OF COMPANIES LIST OF SUB- ATTACHED ADDENDUM
NO. NAME OF PARTICIPATING BIDDERS OWNED BUSINESS CONCERN CERTIFICATION PROJECT SIGN SECTION 3 PLAN COMPLETED & EMPLOYEE (ID AND WORK VENDORS/MATERIAL DOCUMENT ITEMIZED REMARKS
INTEREST CERTIFICATION BIDDERS EQUIPMENT/TOOLS CONTRACTORS IF ANY
PRESENTATION FORM ACKNOWLEDGMENT ONGOING PROJECTS AUTHORIZATION INCLUDED) SUPPLIERS BID-SCHEDULE WITH
STATEMENT FORM QUALIFICATION
PROGRESS CHART
Is a Women-Owned Business Signed and Signed and Signed and Submitted, but no
1 IRONWOOD CONSTRUCTION LTD. Enterprise; Signed and Submitted Notarized on Submitted on Signed and Submitted Not Included Not Included Submitted on Not Included Submitted Not Included subconstractors to be Submitted Submitted Submitted
on 11/22/2023 11/22/2023 11/22/2023 11/22/2023 used.
Signed and Signed and Signed and Signed and Submitted, but no
Signed and Submitted on Signed and Submitted on None, but acknowledged
2 RNV CONSTRUCTION Submitted on Submitted on Signed and Submitted Signed and Submitted Submitted on Submitted on Submitted Submitted subconstractors to be Submitted Submitted
11/06/2023 11/08/2023 on Bid Proposal.
11/07/2023 11/08/2023 11/21/2023 11/08/2023 used.
I BASE BID:
1 MOBILIZATION / DEMOBILIZATION
Mobilization / Demobilization 1.00 LS $ 15,800.00 $ 15,800.00
Permit, Insurance, Bonds and etc. 1.00 LS $ 10,500.00 $ 10,500.00
Temporary Works (Barricades, storage, supply of 1 LS $ 121,030.00 $ 121,030.00 1 LS $ 65,913.00 $ 65,913.00 1 LS $ 87,000.00 $ 87,000.00 1 LS $ 63,000.00 $ 63,000.00
1.00 LS $ 7,500.00 $ 7,500.00
power & water, access on site and etc.)
Safety & Health 1.00 LS $ 6,500.00 $ 6,500.00
Construction Waste Disposal 1.00 LS $ 5,500.00 $ 5,500.00
2 ADMINISTRATION BUILDING
Remove and replace existing weather heads,
1.00 LS $ 1,500.00 $ 1,500.00 1 LS $ 3,330.00 $ 3,330.00 1 LS $ 4,876.00 $ 4,876.00 1.00 LS $ 12,960.00 $ 12,960.00 1 LS $ 3,290.00 $ 3,290.00
Guy wire, and wire gutter. complete in Place
3 BUILDING B, RESTROOM
Remove, and install new roofing system with
A wooden framing, steel gutter, and downspout 1.00 LS - $ - 1 LS 0.00 0.00 1 LS 0.00 0.00 1.00 LS 0.00 0.00 1 LS 0.00 0.00
complete in place (Not in Contact)
Supply and Install New 12" x 12" Non-Skid Floor
B 1.00 LS - $ - 1 LS 0.00 0.00 1 LS 0.00 0.00 1.00 LS 0.00 0.00 1 LS 0.00 0.00
tiles, Complete (Not In Contract)
Supply and Install New 12" x 12" Glazed Wall
C 1.00 LS - $ - 1 LS 0.00 0.00 1 LS 0.00 0.00 1.00 LS 0.00 0.00 1 LS 0.00 0.00
tiles, complete in place (Not In Contract)
Supply and install New cement board ceiling with
D metal framing, complete in place (Not In 1.00 LS - $ - 1 LS 0.00 0.00 1 LS 0.00 0.00 1.00 LS 0.00 0.00 1 LS 0.00 0.00
Contract)
Supply and application of semi-gloss latex paint
E for exterior walls, complete in place (Not In 1.00 LS - $ - 1 LS 0.00 0.00 1 LS 0.00 0.00 1.00 LS 0.00 0.00 1 LS 0.00 0.00
Contract)
Supply and application of semi-gloss latex paint
F for interior walls and ceiling, complete in place 1.00 LS - $ - 1 LS 0.00 0.00 1 LS 0.00 0.00 1.00 LS 0.00 0.00 1 LS 0.00 0.00
(Not In Contract)
Install new aluminum single door panel with
G frames and hardwares, complete in place (Not In 1.00 LS - $ - 1 LS 0.00 0.00 1 LS 0.00 0.00 1.00 LS 0.00 0.00 1 LS 0.00 0.00
Contract)
Install New Typhoon rated aluminum sliding
H 1.00 LS 180.00 $ 180.00 1 LS 2,585.00 2,585.00 1 LS 693.00 693.00 1.00 LS 2,835.00 2,835.00 1 LS 800.00 800.00
window with frames, complete in place
Install New Toilet Fixtures, wall-hung lavatory,
I and Phenolic partitions and accessories, 1.00 LS - $ - 1 LS 0.00 0.00 1 LS 0.00 0.00 1.00 LS 0.00 0.00 1 LS 0.00 0.00
complete in place
Install New Toilet Phenolic partitions and
J 1.00 LS 3,500.00 $ 3,500.00 1 LS 3,345.00 3,345.00 1 LS 3,253.00 3,253.00 1.00 LS 4,320.00 4,320.00 1 LS 3,000.00 3,000.00
accessories, complete in place
Recondition, and clean all exisitng plumbing
K 1.00 LS - $ - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
pipes for operational condition. (Not In Contract)
4 BUILDING E,RESTROOM
Remove, and install new ceiling system with
A 1.00 LS 6,910.50 $ 6,910.50 1 LS 16,715.00 16,715.00 1 LS 10,305.00 10,305.00 1.00 LS 20,925.00 20,925.00 1 LS 16,450.00 16,450.00
metal framing complete in place
Repair and re-routing of electrical rough-ins
based on the building lay-out with LED light
B fixtures, receptacles,switches, panel boards, 1.00 LS 15,000.00 $ 15,000.00 1 LS 24,340.00 24,340.00 1 LS 11,447.00 11,447.00 1.00 LS 11,610.00 11,610.00 1 LS 22,919.00 22,919.00
meter base with weather heads, wirings and
pipings, complete in place
Supply and application of semi-gloss latex paint
C for exterior walls, Complete in place (Not In 1.00 LS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Contract)
Supply and application of semi-gloss latex paint
D 1.00 LS 22,249.50 $ 22,249.50 1 LS 2,538.00 2,538.00 1 LS 8,114.00 8,114.00 1.00 LS 7,020.00 7,020.00 1 LS 5,000.00 5,000.00
for interior walls and ceiling, complete in place
Install new roof eaves ceiling with framing, and
E 3/4” thick marine plywood fascia and painting 1.00 LS 6,608.00 $ 6,608.00 1 LS 5,820.00 5,820.00 1 LS 5,662.00 5,662.00 1.00 LS 7,560.00 7,560.00 1 LS 8,200.00 8,200.00
complete in place
Supply and install New 500 gallon capacity,
F Concrete Water tank, including 1/2" HP booster 1.00 LS 21,700.00 $ 21,700.00 1 LS 10,780.00 10,780.00 1 LS 32,320.00 32,320.00 1.00 LS 10,800.00 10,800.00 1 LS 19,500.00 19,500.00
pump and connections, complete in place
5 BUILDING H, ELECTRICAL
Remove and replace exterior lights to match
A existing including wirings, breakers, and their 1.00 LS 5,500.00 $ 5,500.00 1 LS 21,225.00 21,225.00 1 LS 8,741.00 8,741.00 1.00 LS 8,302.50 8,302.50 1 LS 12,000.00 12,000.00
appurtenances, complete in place
6 BUILDING I, ELECTRICAL
Remove and replacement of exisitng electrical
A main panel boards including exterior lights and 1.00 LS 9,000.00 $ 9,000.00 1 LS 28,772.00 28,772.00 1 LS 12,028.00 12,028.00 1.00 LS 17,064.00 17,064.00 1 LS 20,600.00 20,600.00
accessories, Complete in place
7 BUILDING K, ELECTRICAL
Remove and replace exterior lights to match
existing including wirings, breakers, and their 1.00 LS 6,000.00 $ 6,000.00 1 LS 11,075.00 11,075.00 1 LS 7,464.00 7,464.00 1.00 LS 9,990.00 9,990.00 1 LS 9,600.00 9,600.00
appurtenances, complete in place
8 CAFETERIA KITCHEN
Remove and replacement of exisitng electrical
main panel boards including pipings, wirings, and
A 1.00 LS 35,000.00 $ 35,000.00 1 LS 14,815.00 14,815.00 1 LS 11,312.00 11,312.00 1.00 LS 28,350.00 28,350.00 1 LS 15,000.00 15,000.00
accessories complete in place( this includes
exterior lights replacement)
C ADDITIVE BID 2:
Building B removal and disposal and replacement
of existing waterproofing, including crack repair,
water ponding repairs, application of new
1.0 3,107.00 SF $ 12.00 $ 37,284.00 1 LS $ 10,740.00 $ 10,740.00 1 LS $ 26,275.00 $ 26,275.00 1.00 LS $ 29,129.10 $ 29,129.10 1 LS $ 24,180.00 $ 24,180.00
elastomeric waterproofing system, declog/clean
existing downspout and drain, and water
ponding test, complete in place
D ADDITIVE BID 3:
Building H removal and disposal and
replacement of existing waterproofing, including
crack repair, water ponding repairs, application
1.0 10,387.00 SF $ 12.00 $ 124,644.00 1 LS $ 19,875.00 $ 19,875.00 1 LS $ 79,237.00 $ 79,237.00 1.00 LS $ 53,632.80 $ 53,632.80 1 LS $ 81,120.00 $ 81,120.00
of new elastomeric waterproofing system,
declog/clean existing downspout and drain, and
water ponding test, complete in place
E ADDITIVE BID 4:
Building I removal and disposal and replacement
of existing waterproofing, including crack repair,
water ponding repairs, application of new
1.0 10,335.00 SF $ 12.00 $ 124,020.00 1 LS $ 21,175.00 $ 21,175.00 1 LS $ 78,976.00 $ 78,976.00 1.00 LS $ 57,335.20 $ 57,335.20 1 LS $ 103,000.00 $ 103,000.00
elastomeric waterproofing system, declog/clean
existing downspout and drain, and water
ponding test, complete in place
Demolition and Disposal of concrete column
extension and the repair of affected roof slab, 1 LS $ 6,140.00 $ 6,140.00 1 LS $ 21,540.00 $ 21,540.00 1.00 LS $ 2,600.00 $ 2,600.00 1 LS $ 16,070.00 $ 16,070.00
complete-in place
F ADDITIVE BID 5:
Building K removal and disposal and replacement
of existing waterproofing, including crack repair,
water ponding repairs, application of new
1.0 10,835.00 SF $ 12.00 $ 130,020.00 1 LS $ 22,840.00 $ 22,840.00 1 LS $ 81,487.00 $ 81,487.00 1.00 LS $ 64,118.60 $ 64,118.60 1 LS $ 84,240.00 $ 84,240.00
elastomeric waterproofing system, declog/clean
existing downspout and drain, and water
ponding test, complete in place
G ADDITIVE BID 6:
H ADDITIVE BID 7:
Kitchen Cafeteria removal and disposal and
replacement of existing waterproofing, including
crack repair, water ponding repairs, application
1.0 2,090.00 SF $ 12.00 $ 25,080.00 1 LS $ 8,140.00 $ 8,140.00 1 LS $ 17,089.00 $ 17,089.00 1.00 LS $ 20,637.00 $ 20,637.50 1 LS $ 16,380.00 $ 16,380.00
of new elastomeric waterproofing system,
declog/clean existing downspout and drain, and
water ponding test, complete in place
I ADDITIVE BID 8:
Cafeteria removal and disposal and replacement
of existing waterproofing, including crack repair,
water ponding repairs, application of new
1.0 4,850.00 SF $ 12.00 $ 58,200.00 1 LS $ 16,670.00 $ 16,670.00 1 LS $ 39,524.00 $ 39,524.00 1.00 LS $ 46,120.00 $ 46,120.10 1 LS $ 38,220.00 $ 38,220.00
elastomeric waterproofing system, declog/clean
existing downspout and drain, and water
ponding test, complete in place
J ADDITIVE BID 9:
Head Start Building removal and disposal and
replacement of existing waterproofing, including
crack repair, water ponding repairs, application
1.0 6,415.00 SF $ 12.00 $ 76,980.00 1 LS $ 20,565.00 $ 20,565.00 1 LS $ 49,013.00 $ 49,013.00 1.00 LS $ 56,388.00 $ 56,388.80 1 LS $ 49,920.00 $ 49,920.00
of new elastomeric waterproofing system,
declog/clean existing downspout and drain, and
water ponding test, complete in place
TOTAL ADDITIVE BID-1 $ 697,872.00 $ 151,515.00 -78% $ 471,936.00 -32% $ 398,317.40 -43% $ 491,910.00 -30%
$ 225,936.00 $ 471,963.00 $ 299,554.60 $ 205,962.00
TOTAL BASE BID + ADDITIVE BID $ 1,273,155.00 $ 758,727.00 -40.41% $ 892,828.00 -29.87% $ 895,163.90 -29.69% $ 999,100.00 -21.53%