You are on page 1of 1

Risk Assessment Of PCC Work.

Control Measure
Resultant Risk Additional Control
Sr No. Sub activity Hazards Risk Severity Probability Severity Probability Resultant Risk Risk Level
Risk Level Measures

1.Safe access/egress towards the work


1.Major/Minor injury. location.
1.Slip/Trip/Fall hazard. 2.Training to all workers.
2. Handling heavy objects. 3.Compaction Machine must be
2.Eye injury.
3. Struck by/against heavy inspected before use.
Surface levling &
2 equipment. 3 3 9 M 4.Experienced worker to operate the 3 1 3 L
Compaction. 3.Hearing loss.
4.Flying debris. compacting machine.
4. Musculoskeletal
5.Vibration. 5.Ensure full time supervision for work.
disorder due to
6.Noise 6.Job specific PPE must be used.
vibration.

1.Pre job tool box talk.


2.Use proper sling as per load and all
tools must certified by competent third party.
1.Fall of material 1.Major/Minor Injur. 3.Physically inspection must be done of all
from crane hook, 2.over turning tools and tackles, Crane.
3 Concrete pump shifting. 4 2 8 M 4.Proper supervision. 4 1 4 L
2.Failure of crane. of crane.
3.Unauthorized operator 3.Poor maintenance 5.Authorized crane operator to be
engaged.

1.Working with concrete pump 1.Major/ Minor injury 1.Excavated area must be
2.Contact with Concrete. 2.Casuality barriaced with hard
3.Fall Of 3.Eye Injury 1.TBT given to engaged workers.. barrication.
concrete pipe removal of pipe 4.Infection due to 2.Equipment must be inspected before use. 2.Aware to workers
joints. cement water. 3.Close supervision. about hazards when he fixing
4 PCC work 4.Topple of TM. 5.Property damage. 4 4 16 the concrete chute. 4 1 4 L
4.Follow Proper Permit to work system.
5.Soil 5.Use of Safety Nets to protect the loose soil. 3.Job
collapse due to vibration of pump. 6.Authorized operator to be engaged . specific PPE must be used.

6.Fall of concrete chute.