You are on page 1of 1

CHECKLIST FOR GAS CUTTING SET

Date Contractor Name:

Identification No Inspected by

Sr.No
Check Item Yes No Remarks
.

Protective valve cap firmly fixed for both cylinder


1
(check for damage/crack in the valve cap)

Gas cutting hose free from damages and comply


2
with colour code

Pressure gauges two (inlet & out) for each


3 cylinder are in working condition (both Oxygen &
Acetylene gas)

Flash back arrestor (FBAs) is provided for


4
acetylene & oxygen cylinders.

Non return valves (NRVs) is provided for both


5
acetylene & oxygen at torch end.

7 Tight Crimping of hoses with jubilee clamps.

Cylinder secured by chain to the trolley and kept


8
in upright position.

9 Trolley tire in good condition

Availability of industrial type ignition lighter (no


10
match box/ commercial lighter).

11 Use of face protection during gas cutting work.

Area cleared free from combustible & flammable


12
materials.

13 Others

P&M Staff HSE Staff

Name Name

Signature Signature

You might also like