Professional Documents
Culture Documents
Telkephome 0712251024N
trrru FAX 2510577
GiOVERNMINT OF INDIA
There is no objection to the filling of the subject cylinders with Nitrogen gas provided tha
the cylinders are fited with appropriate valves conforming to IS: 3224-2002 for Nitrogex
gas service 150 Bar at
at a not15°C;
exceeding
the cylinders are
filled pressure
the cylinders ae subjected to-hydrostatic stretch test at pressure of 250 Bar as required
under rule 3S of the Gas Cylinders Rules, 2016,
the cylinders fiNed with Nitrogen gas are not supplied to any person who is not holder of a
licence to possess such cylinders unless he is otherwise exempted under the Said nules;
the cylinders are subjected to penodic Cxamination/testing once in a period of 5 years as
.
Certificd copy of this filling permission along with copy of Test & Inspection certificate
shall be made available to cach customer/purchaser of the eylinder
ours tithtuliy
Per RAMA CYLINDERS PVT.
CTa (V.K. Mishrá)
TilsLc TSVALID FOR hw nicTConiroller of ExplosiVes
. t a l t t t i 0 CTLINDER for Chief Controller of Explosives
R. NO. 4uthorlsed Signatorles
RAMA CYLINDERS PRIVATE LIMITED.
Survey No. 334-P2 & 335, Vi : Bhimasar, Tal : Anjar, Dist : Kutch, State : Gujarat, India.
ACCEPTANCE CERTIFICATE
Certificate No.: ELD/ D47519
ACCeptance certificate for seamless stecl cylinders Batch No. D475 (Dia 232 X 5.4 X 46.7 Ltr. W.C.)
A consignment of- 201 cylinders consisting of One- test batch has been inspected and tested according to
IS7285 (Part- 2): 2017
285
Stamp RAMA T4 S2 N2 37Mn 5.4 MM 09/19 Q&T TW..KG
markings:
ELD . S 7285-2 TP 250 BAR FP 150 BAR WC 46.7 LTR
Part-
CM/L-7617783
Page 1 of 2
28