You are on page 1of 1

Check List For Gas Cylinder Set

Contractor Name Machine No Date

Sr# check item photo Y/N Sr# check item photo Y/N

Protective valve cap firmly fixed


Cylinder secured by chain to the
for both cylinder(check for
trolley.
damage /crack in the valve cap)

1 5

Pressure gauges two for each


Availability of industrial type
cylinder inlet & outlet are in
lighter .
working condition.

2 6

Flash back arrestor valves is Hoses free from damge ,cut and
provided for both cylinder. cracks.

3 7

Tight clamping of hoses with Trolley wheel shall be free from


jubilee clamps. damages.

4 8
Name Signature Date
Checked by:

Name Signature Date


Checked by:

You might also like