You are on page 1of 1

CITY GAS DISTRIBUTION PROJECT WB GA10.

47
HPCL,SILIGURI
AIR COMPRESSOR CHECK LIST

DATE: LOCATION:
CONTRACTOR: EQUIPMENT MAKE:
SERIAL NO: INSPECTED BY:
Sl
INSPECTION POINTS OBSERVATION MEASURES
No.
1 Working Condition of all gauges
2 Condition of door & guard
3 Available out rigger(stand)

4 Oil leakages
5 Available lock chain of hose to compressor

6 Regular maintenance

7 Available TPIC
8 Condition of self-starting
10 Available of Fire Extinguisher
11 Proper Assembled
15 Area Barricading
17 Area House keeping
18 Color code issued

Contractor’s Engineer (Safety Officer)

Name Name
Signature Signature

TEPL/PCL

You might also like