WF-1 BASELINE FORECAST ACTUAL LAST WEEK THIS WEEK CUMMULATIVE DELAY
NO AREA DEV REMARK
(%) START FINISH START FINISH START FINISH PLAN ACT PLAN ACT PLAN ACT (DAYS) Start Plan COD
A CIVIL & PILING WORK 100.00%
1 Civil & Piling Work Pulp Jetty 1 & 2 100.00% 25-Jan-23 2-Jul-23 95.3% 95.5% 2.6% 1.6% 97.8% 97.2% -0.7%
TOTAL 100.0% 100.0% 95.3% 95.5% 2.6% 1.6% 97.8% 97.2% -0.7%
28/May
12/Nov
13/Aug
20/Aug
27/Aug
10/Sep
17/Sep
24/Sep
15/Oct
22/Oct
29/Oct
11/Jun
18/Jun
25/Jun
5/Nov
16/Jul
23/Jul
30/Jul
6/Aug
3/Sep
1/Oct
8/Oct
4/Jun
2/Jul
9/Jul
2.0% 2.0% 2.0% 2.0% 2.0% 1.6% 0.5% 2.3% 2.3% 2.3% 3.2% 2.9% 2.7% 2.6% 2.6% 2.9% 2.6% 2.0% 3.2% 2.2% 2.4% 3.4% 3.1% 3.1% 3.5% 3.1%
1.3% 1.4% 1.9% 2.7% 1.3% 1.3% 1.0% 1.2% 1.8% 2.1% 2.7% 1.9% 3.8% 5.6% 6.2% 3.4% 3.2% 1.7% 2.5% 2.3% 2.6% 3.3% 3.0% 1.4% 3.7% 2.2%
2.0% 2.0% 2.0% 2.0% 2.0% 1.6% 0.5% 2.3% 2.3% 2.3% 3.2% 2.9% 2.7% 2.6% 2.6% 2.9% 2.6% 2.0% 3.2% 2.2% 2.4% 3.4% 3.1% 3.1% 3.5% 3.1%
1.3% 1.4% 1.9% 2.7% 1.3% 1.3% 1.0% 1.2% 1.8% 2.1% 2.7% 1.9% 3.8% 5.6% 6.2% 3.4% 3.2% 1.7% 2.5% 2.3% 2.6% 3.3% 3.0% 1.4% 3.7% 2.2%
19.1% 21.1% 23.2% 25.2% 27.3% 28.9% 29.3% 31.6% 33.9% 36.2% 39.4% 42.3% 45.1% 47.6% 50.2% 53.1% 55.7% 57.8% 60.9% 63.1% 65.5% 68.9% 72.0% 75.1% 78.6% 81.7%
22.3% 23.8% 25.6% 28.4% 29.7% 31.0% 32.0% 33.2% 35.0% 37.1% 39.8% 41.7% 45.5% 51.1% 57.3% 60.8% 64.0% 65.7% 68.2% 70.5% 73.1% 76.5% 79.5% 80.9% 84.5% 86.8%
3.2% 2.6% 2.5% 3.2% 2.4% 2.2% 2.6% 1.6% 1.1% 0.9% 0.4% -0.6% 0.4% 3.4% 7.1% 7.7% 8.2% 7.9% 7.3% 7.4% 7.6% 7.6% 7.5% 5.8% 5.9% 5.0%
This Issue :
Rev.
19/Nov
26/Nov
10/Dec
17/Dec
24/Dec
3/Dec
Check
Weightage
Weightage
12/Mar
19/Mar
26/Mar
12/Feb
19/Feb
26/Feb
29/Jan
No. Description Start Finish
5/Mar
2/Apr
9/Apr
5/Feb
Level 1
Level 2
UoM Total This Week up to this Status
Week
I Preliminaries ls 1.00 10.085% Plan 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.18%
Actual 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 0.33% 1.43% 0.33% 0.18%
II Main Works
II.1 Piling
1 Driving of Pile D762mm - Steel Pipe Pile M' 7,260.00 19.525% Plan 0.00% 0.00% 0.00% 0.72% 1.22% 1.32% 1.32% 1.32% 1.32% 1.32% 0.00%
Actual 0.00% 0.00% 0.00% 0.90% 1.68% 1.42% 1.55% 1.16% 0.77% 0.52% 0.00%
2 Welding Joint include accessories D762mm - Steel Pipe Pile nos 519.00 1.309% Plan 0.00% 0.00% 0.00% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.08% 0.00%
Actual 0.00% 0.00% 0.00% 0.05% 0.10% 0.08% 0.09% 0.07% 0.05% 0.03% 0.00%
3 Providing, fixing & installing Splash Protection M2 1300.18 7.431% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Perform PDA D762mm - Steel Pipe Pile nos 3.00 0.252% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.08% 0.00% 0.00% 0.08% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.08% 0.00% 0.00% 0.08% 0.00% 0.00% 0.00%
II.2 Plain & Reinforced Cement Concrete Cast in Situ
1 Mixing, transporting & placing
b) K400 M3 3,469.58 6.998% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.02%
Unloading, transporting, bending, cutting, placing and fixing U39 Deformed Bars ≥
2 kg 437,114.91 8.082% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
13 mm dia
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.03% 0.05%
3 Providing and fixing Smooth Plain M2 3,708.66 9.351% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.02%
4 Providing platform Plan
Actual
5 Providing and fixing Chemical Anchors
a) 25 mm nos 22,155.00 8.689% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.26% 0.20% 0.19% 0.11%
6 Chipping concrete in slab M3 326.84 1.648% Plan 0.12% 0.12% 0.12% 0.12% 0.12% 0.12% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.01% 0.02% 0.14% 0.06% 0.06% 0.03% 0.04% 0.03% 0.09% 0.03% 0.03%
II.3 Structural Steel Work
1 Fabricating, assembling and erecting welded and/or bolted MS structural steel kg 1,583.24 0.133% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Fabricating, asembling and erecting welded and/ bolted CS plates kg 119,322.48 8.023% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II.4 Fender
1 Fixing new Super Fender Cone nos 45.00 1.362% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II.5 Sacrifice Anode
1 Provide, fixing & installing sacrifice anode nos 143.00 12.018% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II.6 Low Pressure Injection Repair Method / Grouting Method
1 Grouting to fill between existing spun pile and jacket M3 103.01 1.731% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Approved non shrink cementitious grout (fc' 50 Mpa) Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 low pressure injection method M' 200.00 3.362% Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Actual 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Plan 597,254.90 100.0000% 0.4% 0.4% 0.4% 1.2% 1.7% 1.9% 1.7% 1.7% 1.8% 1.7% 0.2%
Actual 0.3% 0.3% 0.5% 1.3% 2.2% 1.9% 2.0% 1.9% 2.5% 1.2% 0.4%
Cumulative Plan 0.4% 0.9% 1.3% 2.6% 4.3% 6.3% 8.0% 9.7% 11.5% 13.2% 13.4%
Cumulative Actual 0.3% 0.7% 1.1% 2.5% 4.7% 6.6% 8.6% 10.5% 13.1% 14.2% 14.6%
Deviation -0.1% -0.2% -0.2% -0.1% 0.4% 0.3% 0.6% 0.8% 1.5% 1.0% 1.2%
st Issue : -
14/May
21/May
28/May
13/Aug
20/Aug
27/Aug
16/Apr
23/Apr
30/Apr
10/Sep
17/Sep
24/Sep
11/Jun
18/Jun
25/Jun
7/May
Description
6/Aug
16/Jul
23/Jul
30/Jul
3/Sep
4/Jun
2/Jul
9/Jul
Preliminaries 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18%
0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18%
Main Works
Piling
Driving of Pile D762mm - Steel Pipe Pile 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.06% 1.06% 1.06% 1.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.69%
0.39% 0.26% 1.29% 0.65% 0.00% 0.00% 0.00% 0.13% 0.00% 0.00% 0.00% 0.00% 0.77% 1.16% 1.03% 1.03% 0.26% 0.90% 0.26% 0.00% 1.16% 2.23% 0.00% 0.00%
Welding Joint include accessories D762mm - Steel Pipe Pile 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.07% 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.11%
0.02% 0.02% 0.08% 0.04% 0.00% 0.00% 0.00% 0.01% 0.00% 0.00% 0.00% 0.00% 0.05% 0.07% 0.06% 0.06% 0.02% 0.05% 0.02% 0.00% 0.07% 0.29% 0.00% 0.00%
Providing, fixing & installing Splash Protection 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Perform PDA D762mm - Steel Pipe Pile 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Plain & Reinforced Cement Concrete Cast in Situ
Mixing, transporting & placing
b) K400 0.00% 0.00% 0.00% 0.00% 0.00% 0.47% 0.47% 0.47% 0.47% 0.47% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.00%
0.22% 0.04% 0.00% 0.29% 0.22% 0.29% 0.29% 0.44% 0.73% 0.36% 0.00% 0.00% 0.00% 0.00% 0.07% 0.07% 0.00% 0.15% 0.07% 0.07% 0.07% 0.00% 0.22% 0.51%
Unloading, transporting, bending, cutting, placing and fixing U39 Deformed Bars ≥
0.00% 0.00% 0.00% 0.00% 0.47% 0.47% 0.47% 0.47% 0.47% 0.47% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.27% 0.27% 0.27% 0.27% 0.27% 0.27% 0.00% 0.00%
13 mm dia
0.14% 0.05% 0.00% 0.20% 0.20% 0.30% 0.25% 0.34% 0.63% 0.24% 0.00% 0.00% 0.00% 0.00% 0.06% 0.06% 0.02% 0.15% 0.53% 0.53% 0.08% 0.00% 0.25% 0.59%
Providing and fixing Smooth Plain 0.00% 0.00% 0.00% 0.47% 0.47% 0.47% 0.47% 0.47% 0.47% 0.47% 0.47% 0.00% 0.00% 0.00% 0.00% 0.00% 0.31% 0.31% 0.31% 0.31% 0.31% 0.31% 0.00% 0.00%
0.29% 0.05% 0.00% 0.39% 0.29% 0.39% 0.39% 0.58% 0.97% 0.49% 0.00% 0.00% 0.00% 0.00% 0.10% 0.10% 0.00% 0.19% 0.10% 0.10% 0.10% 0.00% 0.29% 0.68%
Providing platform
12/Nov
19/Nov
26/Nov
10/Dec
17/Dec
24/Dec
15/Oct
22/Oct
29/Oct
Description
5/Nov
3/Dec
1/Oct
8/Oct
Total
Preliminaries 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 10.085%
0.18% 0.18% 0.18% 0.18% 0.18% 0.18% 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 10.085%
Main Works
Piling
Driving of Pile D762mm - Steel Pipe Pile 1.69% 1.69% 1.69% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 19.525%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 19.525%
Welding Joint include accessories D762mm - Steel Pipe Pile 0.11% 0.11% 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.309%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 1.309%
Providing, fixing & installing Splash Protection 0.00% 0.00% 0.00% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 0.74% 7.431%
0.52% 0.83% 1.40% 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 1.56% 0.26% 0.00% 0.00% 4.73%
Perform PDA D762mm - Steel Pipe Pile 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.252%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.25%
Plain & Reinforced Cement Concrete Cast in Situ
Mixing, transporting & placing
b) K400 0.00% 0.00% 0.00% 0.00% 0.00% 0.40% 0.40% 0.40% 0.40% 0.40% 0.40% 0.40% 0.00% 6.998%
0.15% 0.15% 0.22% 0.07% 0.15% 0.36% 0.29% 0.22% 0.44% 0.15% 0.44% 0.22% 0.00% 7.00%
Unloading, transporting, bending, cutting, placing and fixing U39 Deformed Bars ≥
0.00% 0.00% 0.40% 0.40% 0.40% 0.40% 0.40% 0.40% 0.40% 0.40% 0.00% 0.00% 0.00% 8.082%
13 mm dia
0.17% 0.17% 0.25% 0.08% 0.17% 0.42% 0.34% 0.25% 0.51% 0.17% 0.59% 0.25% 0.00% 8.08%
Providing and fixing Smooth Plain 0.00% 0.00% 0.00% 0.62% 0.62% 0.62% 0.62% 0.62% 0.62% 0.00% 0.00% 0.00% 0.00% 9.351%
0.19% 0.19% 0.29% 0.10% 0.19% 0.49% 0.39% 0.29% 0.58% 0.19% 0.58% 0.29% 0.00% 9.35%
Providing platform
14/May
21/May
28/May
12/Mar
19/Mar
26/Mar
16/Apr
23/Apr
30/Apr
12/Feb
19/Feb
26/Feb
29/Jan
7/May
Description
5/Mar
2/Apr
9/Apr
5/Feb
Preliminaries 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.142 0.032 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
Main Works
Piling
Driving of Pile D762mm - Steel Pipe Pile 267.71 453.75 490.81 490.81 490.81 490.81 490.81
336.00 624.00 528.00 576.00 432.00 288.00 192.00 - 144.00 96.00 480.00 240.00 - - -
Welding Joint include accessories D762mm - Steel Pipe Pile 32.44 32.44 32.44 32.44 32.44 32.44 32.44
21.00 39.00 33.00 36.00 27.00 18.00 12.00 - 9.00 6.00 30.00 15.00 - - -
Providing, fixing & installing Splash Protection
Fender
Fixing new Super Fender Cone
Sacrifice Anode
Provide, fixing & installing sacrifice anode
TRUE
Cumulative Plan
Cumulative Actual
t Issue : - This Issue :
13/Aug
20/Aug
27/Aug
10/Sep
17/Sep
24/Sep
11/Jun
18/Jun
25/Jun
15/Oct
Description
6/Aug
16/Jul
23/Jul
30/Jul
3/Sep
4/Jun
1/Oct
8/Oct
2/Jul
9/Jul
Preliminaries 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
Main Works
Piling
Driving of Pile D762mm - Steel Pipe Pile 393.46 393.46 393.46 393.46 627.66 627.66 627.66 627.66
48.00 - - - - 288.00 432.00 384.00 384.00 96.00 336.00 96.00 - 432.00 828.00 - - - - -
Welding Joint include accessories D762mm - Steel Pipe Pile 28.13 28.13 28.13 28.13 44.86 44.86 44.86 44.86
3.00 - - - - 18.00 27.00 24.00 24.00 6.00 21.00 6.00 - 27.00 117.00 - - - - -
Providing, fixing & installing Splash Protection
mulative Plan
mulative Actual
Last Issue : -
12/Nov
19/Nov
26/Nov
10/Dec
17/Dec
24/Dec
22/Oct
29/Oct
Description
5/Nov
3/Dec
Total
Preliminaries 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 1.00
0.018 0.018 0.018 0.015 1.00
Main Works
Piling
Driving of Pile D762mm - Steel Pipe Pile 7,260.00
- 7,260.00
- 519.00
Providing, fixing & installing Splash Protection 130.02 130.02 130.02 130.02 130.02 130.02 130.02 130.02 130.02 130.02 1,300.18
Cumulative Plan
Cumulative Actual
PULP JETTY 1 & 2 REMEDIATION WEEKLY PROGRESS
8% 100%
90%
7%
80%
6%
70%
5%
60%
PERIOD PROGRESS
CUMULATIVE
4% 50%
40%
3%
30%
2%
20%
1%
10%
0% 0%
29/Jan 5/Feb 12/Feb 19/Feb 26/Feb 5/Mar 12/Mar 19/Mar 26/Mar 2/Apr 9/Apr 16/Apr 23/Apr 30/Apr 7/May 14/May 21/May 28/May 4/Jun 11/Jun 18/Jun 25/Jun 2/Jul
Plan 0.4% 0.4% 0.4% 1.2% 1.7% 1.9% 1.7% 1.7% 1.8% 1.7% 0.2% 0.2% 0.2% 0.6% 1.1% 1.6% 2.0% 2.0% 2.0% 2.0% 2.0% 1.6% 0.5%
Actual 0.3% 0.3% 0.5% 1.3% 2.2% 1.9% 2.0% 1.9% 2.5% 1.2% 0.4% 1.3% 0.6% 1.5% 1.8% 1.1% 1.3% 1.4% 1.9% 2.7% 1.3% 1.3% 1.0%
Cumulative Plan 0.4% 0.9% 1.3% 2.6% 4.3% 6.3% 8.0% 9.7% 11.5% 13.2% 13.4% 13.6% 13.8% 14.4% 15.5% 17.1% 19.1% 21.1% 23.2% 25.2% 27.3% 28.9% 29.3%
Cumulative Actual 0.3% 0.7% 1.1% 2.5% 4.7% 6.6% 8.6% 10.5% 13.1% 14.2% 14.6% 16.0% 16.6% 18.1% 19.9% 21.0% 22.3% 23.8% 25.6% 28.4% 29.7% 31.0% 32.0%
PULP JETTY 1 & 2 REMEDIATION WEEKLY PROGRESS
8% 100%
90%
7%
80%
6%
70%
5%
60%
PERIOD PROGRESS
CUMULATIVE
4% 50%
40%
3%
30%
2%
20%
1%
10%
0% 0%
2/Jul 9/Jul 16/Jul 23/Jul 30/Jul 6/Aug 13/Aug 20/Aug 27/Aug 3/Sep 10/Sep 17/Sep 24/Sep 1/Oct 8/Oct 15/Oct 22/Oct 29/Oct 5/Nov 12/Nov 19/Nov 26/Nov 3/Dec 10/Dec 17/Dec 24/Dec
Plan 0.5% 2.3% 2.3% 2.3% 3.2% 2.9% 2.7% 2.6% 2.6% 2.9% 2.6% 2.0% 3.2% 2.2% 2.4% 3.4% 3.1% 3.1% 3.5% 3.1% 3.9% 4.1% 3.0% 2.6% 2.6% 2.2%
Actual 1.0% 1.2% 1.8% 2.1% 2.7% 1.9% 3.8% 5.6% 6.2% 3.4% 3.2% 1.7% 2.5% 2.3% 2.6% 3.3% 3.0% 1.4% 3.7% 2.2% 1.8% 2.0% 2.3% 2.6% 1.6% 0.0%
Cumulative Plan 29.3% 31.6% 33.9% 36.2% 39.4% 42.3% 45.1% 47.6% 50.2% 53.1% 55.7% 57.8% 60.9% 63.1% 65.5% 68.9% 72.0% 75.1% 78.6% 81.7% 85.7% 89.8% 92.7% 95.3% 97.8% 100.0%
Cumulative Actual 32.0% 33.2% 35.0% 37.1% 39.8% 41.7% 45.5% 51.1% 57.3% 60.8% 64.0% 65.7% 68.2% 70.5% 73.1% 76.5% 79.5% 80.9% 84.5% 86.8% 88.6% 90.6% 93.0% 95.5% 97.2%
WEEKLY WEATHER REPORT
Weekly 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec Total (Hours) Total (Days)
Plan Work 8.0 8.0 8.0 8.0 8.0 8.0 8.0 56.0 7.0
Actual Work 13.0 13.0 12.0 13.0 13.0 8.0 13.0 85.0 10.6
Noted :
1. Plan work : base on working day on contract (8 hrs/day)
2. Actual work : base on actual working day range on dur contract
RESOURCE LOADING STATUS
22/Jan/23
14/May
21/May
28/May
12/Mar
19/Mar
26/Mar
12/Feb
19/Feb
26/Feb
16/Apr
23/Apr
30/Apr
29/Jan
7/May
5/Mar
5/Feb
2/Apr
9/Apr
4/Jun
No Description
1 MAN POWER
1.1 PLAN - 38 38 38 50 71 73 71 76 75 78 79 79 80 81 82 83 84 95 95
1.1.1 Indirect 18 18 18 18 19 19 19 19 19 21 21 21 21 21 23 24 24 20 20
PROJECT MANAGER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SITE MANAGER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2
ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SUPERVISOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
QC 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
HSE SAFETY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
LOGISTIC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TIM SURVEY 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ADMIN 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MEKANIK 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3
ELECTRICAL 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
DRIVER 2 2 2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 2 2
INSPECTOR SCAFFOLDER - - - - - - - - - - - - - - - - -
1.1.2 Direct - 20 20 20 32 52 54 52 57 56 57 58 58 58 58 59 59 64 86 115
CARPENTER 0 0 0 0 0 0 0 0 0 8 8 8 8 8 8 8 8 14 16
MANSONRY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
REBARMAN 0 0 0 0 7 9 9 9 8 8 10 10 10 10 8 8 8 16 14
HELPER 0 0 0 0 6 6 5 5 5 7 7 7 7 7 3 3 3 8 20
TIM CORING 8 8 8 9 10 10 10 10 10 10 10 10 10 10 9 9 9 10 4
FOREMAN 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3
WELDER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
RIGGER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
FITTER 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
CREW PILING 0 0 0 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
TIM BOR HILTI 0 0 0 0 0 0 0 5 5 5 5 5 5 5 5 5 5 8 9
OPERATOR FOCO 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0
OPERATOR CRANE 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CREW BARGE 0 0 0 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
OPERATOR EXCA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OPERATOR MIXER 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
OPERATOR KATO 0 0 0 0 1 1 0 0 0 1 1 1 1 1 1 1 1 1 1
OPERATOR BATCHING 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 2
OPERATOR TRAILER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1
TIM CHIPPING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
TIM CUTTING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
TIM CLAMP 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
TIM CATHODIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
1.2 ACTUAL - 38 38 38 50 71 73 71 76 75 78 78 78 78 78 79 79 79 95 95
1.2.1 Indirect - 18 18 18 18 19 19 19 19 19 21 21 21 21 21 23 24 24 20 20
PROJECT MANAGER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SITE MANAGER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2
ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SUPERVISOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
QC 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
HSE SAFETY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
LOGISTIC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TIM SURVEY 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ADMIN 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MEKANIK 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3
ELECTRICAL 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
DRIVER 2 2 2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 2 2
INSPECTOR SCAFFOLDER - - - - - - - - - - - - - - - - -
1.2.2 Direct - 20 20 20 32 52 54 52 57 56 57 58 58 58 58 59 59 64 86 115
CARPENTER 0 0 0 0 0 0 0 0 0 8 8 8 8 8 8 8 8 14 16
MANSONRY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
REBARMAN 0 0 0 0 7 9 9 9 8 8 10 10 10 10 8 8 8 16 14
HELPER 0 0 0 0 6 6 5 5 5 7 7 7 7 7 3 3 3 8 20
TIM CORING 8 8 8 9 10 10 10 10 10 10 10 10 10 10 9 9 9 10 4
FOREMAN 1 1 1 1 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3
WELDER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
RIGGER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
FITTER 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
CREW PILING 0 0 0 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
TIM BOR HILTI 0 0 0 0 0 0 0 5 5 5 5 5 5 5 5 5 5 8 9
OPERATOR FOCO 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0
OPERATOR CRANE 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CREW BARGE 0 0 0 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
OPERATOR EXCA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OPERATOR MIXER 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
OPERATOR KATO 0 0 0 0 1 1 0 0 0 1 1 1 1 1 1 1 1 1 1
OPERATOR BATCHING 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 2
OPERATOR TRAILER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1
TIM CHIPPING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10
TIM CUTTING 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4
TIM CLAMP 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6
TIM CATHODIC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -
2 EQUIPMENT
1.1 PLAN 5 5 5 7 8 8 7 7 7 8 11 11 11 11 13 13 13 13 13
DUMP TRUCK 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
DOUBLE CABIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
FOCO CRANE 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0
CRANE 135 T 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BARGE 0 0 0 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
KATO 25 T 0 0 0 0 1 1 0 0 0 1 1 1 1 1 1 1 1 1 1
CRANE 250 T 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1
TRUCK MIXER 0 0 0 0 0 0 0 0 0 0 1 1 1 1 2 2 2 2 2
TUBBOAT 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EXCAVATOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TRAILER 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1
1.2 ACTUAL 5 5 5 5 6 6 5 5 5 7 9 9 9 9 10 10 10 13 13
DUMP TRUCK 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
DOUBLE CABIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
FOCO CRANE 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0
CRANE 135 T 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BARGE 0 0 0 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
KATO 25 T 0 0 0 0 1 1 0 0 0 1 1 1 1 1 1 1 1 1 1
CRANE 250 T 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1
TRUCK MIXER 0 0 0 0 0 0 0 0 0 0 1 1 1 1 2 2 2 2 2
TUBBOAT 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EXCAVATOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TRAILER 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1
2 TOOLS
1.1 PLAN 12 12 20 18 18 24 26 30 34 26 26 26 26 26 26 26 26 30 30
CORE DRILL 3 3 4 3 3 3 4 4 4 4 4 4 4 4 4 4 4 3 3
CUTTING TORCH 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TOTAL STATION 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GENSET 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TRAFO LAS 1 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
MESIN GRENDA 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
HAND DRILL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
JACK HAMMER 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 4 4
ELECTRODE HEATER 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ELECTRODE OVEN 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
COMPRESSOR 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
BAR BENDING 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2
BAR CUTTING 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 1 1
BOR HILTI 0 0 0 0 0 0 0 4 8 6 6 6 6 6 6 6 6 4 4
GUN HILTI 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SAGOLA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1.2 ACTUAL 10 10 20 20 20 24 26 30 34 26 26 26 26 26 26 26 26 30 30
CORE DRILL 3 3 4 3 3 3 4 4 4 4 4 4 4 4 4 4 4 3 3
CUTTING TORCH 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TOTAL STATION 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GENSET 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TRAFO LAS 1 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
MESIN GRENDA 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
HAND DRILL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
JACK HAMMER 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 4 4
ELECTRODE HEATER 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ELECTRODE OVEN 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
COMPRESSOR 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
BAR BENDING 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2
BAR CUTTING 0 0 0 0 0 2 2 2 2 2 2 2 2 2 2 2 2 1 1
BOR HILTI 0 0 0 0 0 0 0 4 8 6 6 6 6 6 6 6 6 4 4
GUN HILTI 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SAGOLA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RESOURCE LOADING STATUS
22/Jan/23
12/Nov
19/Nov
13/Aug
20/Aug
27/Aug
10/Sep
17/Sep
24/Sep
15/Oct
22/Oct
29/Oct
11/Jun
18/Jun
25/Jun
5/Nov
16/Jul
23/Jul
30/Jul
6/Aug
3/Sep
1/Oct
8/Oct
2/Jul
9/Jul
No Description
1 MAN POWER
1.1 PLAN - 135 135 135 135 133 133 132 131 130 129 127 127 125 119 111 111 111 111 111 111 111 111 111 111
1.1.1 Indirect 20 20 20 20 20 20 25 24 25 24 22 22 20 21 23 23 23 23 23 23 23 23 23 23
PROJECT MANAGER 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SITE MANAGER 2 2 2 2 2 2 2 2 2 3 3 3 1 2 2 2 2 2 2 2 2 2 2 2
ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SUPERVISOR 2 2 2 2 2 2 2 2 2 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2
QC 2 2 2 2 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3
HSE SAFETY 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
LOGISTIC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TIM SURVEY 2 2 2 2 2 2 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2
ADMIN 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1
MEKANIK 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ELECTRICAL 2 2 2 2 2 2 2 2 2 2 1 1 1 2 2 2 2 2 2 2 2 2 2 2
DRIVER 2 2 2 2 2 2 4 4 4 4 3 3 3 3 4 4 4 4 4 4 4 4 4 4
INSPECTOR SCAFFOLDER - - - - - - 1 1 1 1 1 1 1 - - - - - - - - - - -
1.1.2 Direct - 115 115 115 115 113 113 107 107 105 105 105 105 105 98 88 88 88 88 88 88 88 88 88 88
CARPENTER 16 16 16 16 16 16 10 10 10 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
MANSONRY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
REBARMAN 14 14 14 14 14 14 10 10 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
HELPER 20 20 20 20 16 16 16 16 16 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TIM CORING 4 4 4 4 4 4 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
FOREMAN 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
WELDER 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
RIGGER 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
FITTER 7 7 7 7 7 7 7 7 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
CREW PILING 6 6 6 6 7 7 7 7 7 6 6 6 6 6 0 0 0 0 0 0 0 0 0 0
TIM BOR HILTI 9 9 9 9 9 9 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
OPERATOR FOCO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
OPERATOR CRANE 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CREW BARGE 4 4 4 4 4 4 4 4 4 4 4 4 4 4 0 0 0 0 0 0 0 0 0 0
OPERATOR EXCA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OPERATOR MIXER 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
OPERATOR KATO 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OPERATOR BATCHING 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OPERATOR TRAILER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TIM CHIPPING 10 10 10 10 10 10 10 10 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
TIM CUTTING 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
TIM CLAMP 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
TIM CATHODIC - - - - - - - - - 7 7 7 7 - - - - - - - - - - -
1.2 ACTUAL - 95 95 95 95 95 95 132 131 130 151 127 127 125 119 114 114 114 114 114 114 114 114 114 114
1.2.1 Indirect - 20 20 20 20 20 20 25 24 25 46 22 22 20 21 23 23 23 23 23 23 23 23 23 23
PROJECT MANAGER 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SITE MANAGER 2 2 2 2 2 2 2 2 2 3 3 3 1 2 2 2 2 2 2 2 2 2 2 2
ENGINEER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SUPERVISOR 2 2 2 2 2 2 2 2 2 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2
QC 2 2 2 2 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3
HSE SAFETY 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
LOGISTIC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TIM SURVEY 2 2 2 2 2 2 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2
ADMIN 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1
MEKANIK 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ELECTRICAL 2 2 2 2 2 2 2 2 2 2 1 1 1 2 2 2 2 2 2 2 2 2 2 2
DRIVER 2 2 2 2 2 2 4 4 4 4 3 3 3 3 4 4 4 4 4 4 4 4 4 4
INSPECTOR SCAFFOLDER - - - - - - 1 1 1 1 1 1 1 - - - - - - - - - - -
1.2.2 Direct - 115 115 115 115 113 113 107 107 105 105 105 105 105 98 91 91 91 91 91 91 91 91 91 91
CARPENTER 16 16 16 16 16 16 10 10 10 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
MANSONRY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
REBARMAN 14 14 14 14 14 14 10 10 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
HELPER 20 20 20 20 16 16 16 16 16 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
TIM CORING 4 4 4 4 4 4 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
FOREMAN 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
WELDER 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
RIGGER 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
FITTER 7 7 7 7 7 7 7 7 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
CREW PILING 6 6 6 6 7 7 7 7 7 6 6 6 6 6 0 0 0 0 0 0 0 0 0 0
TIM BOR HILTI 9 9 9 9 9 9 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
OPERATOR FOCO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
OPERATOR CRANE 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0
CREW BARGE 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
OPERATOR EXCA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OPERATOR MIXER 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
OPERATOR KATO 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OPERATOR BATCHING 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OPERATOR TRAILER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TIM CHIPPING 10 10 10 10 10 10 10 10 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
TIM CUTTING 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
TIM CLAMP 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
TIM CATHODIC - - - - - - - - - 7 7 7 7 - - - - - - - - - - -
2 EQUIPMENT
1.1 PLAN 13 12 12 12 12 12 12 12 12 12 12 12 12 12 9 9 9 9 9 9 9 9 9 9
DUMP TRUCK 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
DOUBLE CABIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
FOCO CRANE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CRANE 135 T 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BARGE 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1
KATO 25 T 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CRANE 250 T 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0
TRUCK MIXER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TUBBOAT 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0
EXCAVATOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TRAILER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1.2 ACTUAL 13 12 12 12 12 12 12 12 12 12 12 12 12 12 9 9 9 9 9 9 9 9 9 9
DUMP TRUCK 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
DOUBLE CABIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
FOCO CRANE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CRANE 135 T 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BARGE 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1
KATO 25 T 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CRANE 250 T 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0
TRUCK MIXER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TUBBOAT 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0
EXCAVATOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TRAILER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 TOOLS
1.1 PLAN 30 30 30 30 34 34 41 41 41 41 42 42 42 42 45 45 45 45 45 45 45 45 45 45
CORE DRILL 3 3 3 3 4 4 4 4 4 4 5 5 5 5 8 8 8 8 8 8 8 8 8 8
CUTTING TORCH 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TOTAL STATION 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GENSET 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
TRAFO LAS 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MESIN GRENDA 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
HAND DRILL 1 1 1 1 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
JACK HAMMER 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
ELECTRODE HEATER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ELECTRODE OVEN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
COMPRESSOR 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
BAR BENDING 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
BAR CUTTING 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BOR HILTI 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
GUN HILTI 0 0 0 0 0 0 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
SAGOLA 0 0 0 0 0 0 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
1.2 ACTUAL 30 30 30 30 34 34 41 41 41 41 42 42 42 42 45 45 45 45 45 45 45 45 45 45
CORE DRILL 3 3 3 3 4 4 4 4 4 4 5 5 5 5 8 8 8 8 8 8 8 8 8 8
CUTTING TORCH 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TOTAL STATION 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GENSET 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
TRAFO LAS 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MESIN GRENDA 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
HAND DRILL 1 1 1 1 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
JACK HAMMER 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
ELECTRODE HEATER 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
ELECTRODE OVEN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
COMPRESSOR 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
BAR BENDING 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
BAR CUTTING 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BOR HILTI 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
GUN HILTI 0 0 0 0 0 0 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
SAGOLA 0 0 0 0 0 0 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
RESOURCE LOADING STATUS
22/Jan/23
26/Nov
10/Dec
17/Dec
3/Dec
No Description
1 MAN POWER
1.1 PLAN - 111 108 100 96
1.1.1 Indirect 23 23 18 18
PROJECT MANAGER 1 1 1 1
SITE MANAGER 2 2 1 1
ENGINEER 1 1 1 1
SUPERVISOR 2 2 2 2
QC 3 3 2 2
HSE SAFETY 2 2 1 1
LOGISTIC 1 1 1 1
TIM SURVEY 2 2 1 1
ADMIN 1 1 1 1
MEKANIK 2 2 2 2
ELECTRICAL 2 2 1 1
DRIVER 4 4 4 4
INSPECTOR SCAFFOLDER - - - -
1.1.2 Direct - 88 85 82 78
CARPENTER 6 6 6 6
MANSONRY 0 0 0 0
REBARMAN 8 8 8 8
HELPER 20 20 18 18
TIM CORING 6 6 6 6
FOREMAN 3 3 3 3
WELDER 3 1 1 1
RIGGER 2 1 1 1
FITTER 5 2 1 1
CREW PILING 0 0 0 0
TIM BOR HILTI 10 10 10 10
OPERATOR FOCO 0 0 0 0
OPERATOR CRANE 1 0 0 0
CREW BARGE 0 0 0 0
OPERATOR EXCA 1 1 0 0
OPERATOR MIXER 2 2 2 2
OPERATOR KATO 1 1 1 1
OPERATOR BATCHING 1 1 2 2
OPERATOR TRAILER 1 1 1 1
TIM CHIPPING 8 8 8 8
TIM CUTTING 4 4 4 4
TIM CLAMP 6 6 6 6
TIM CATHODIC - 4 4 -
1.2 ACTUAL - 114 112 100 96
1.2.1 Indirect - 23 23 18 18
PROJECT MANAGER 1 1 1 1
SITE MANAGER 2 2 1 1
ENGINEER 1 1 1 1
SUPERVISOR 2 2 2 2
QC 3 3 2 2
HSE SAFETY 2 2 1 1
LOGISTIC 1 1 1 1
TIM SURVEY 2 2 1 1
ADMIN 1 1 1 1
MEKANIK 2 2 2 2
ELECTRICAL 2 2 2 2
DRIVER 4 4 3 3
INSPECTOR SCAFFOLDER - - - -
1.2.2 Direct - 91 89 82 78
CARPENTER 6 6 6 6
MANSONRY 0 0 0 0
REBARMAN 8 8 8 8
HELPER 20 20 18 18
TIM CORING 6 6 6 6
FOREMAN 3 3 3 3
WELDER 3 1 1 1
RIGGER 2 1 1 1
FITTER 5 2 1 1
CREW PILING 0 0 0 0
TIM BOR HILTI 10 10 10 10
OPERATOR FOCO 0 0 0 0
OPERATOR CRANE 0 0 0 0
CREW BARGE 4 4 0 0
OPERATOR EXCA 1 1 0 0
OPERATOR MIXER 2 2 2 2
OPERATOR KATO 1 1 1 1
OPERATOR BATCHING 1 1 2 2
OPERATOR TRAILER 1 1 1 1
TIM CHIPPING 8 8 8 8
TIM CUTTING 4 4 4 4
TIM CLAMP 6 6 6 6
TIM CATHODIC - 4 4 -
2 EQUIPMENT
1.1 PLAN 9 9 9 9
DUMP TRUCK 2 2 2 2
DOUBLE CABIN 1 1 1 1
FOCO CRANE 0 0 0 0
CRANE 135 T 0 0 0 0
BARGE 1 1 1 1
KATO 25 T 1 1 1 1
CRANE 250 T 0 0 0 0
TRUCK MIXER 2 2 2 2
TUBBOAT 0 0 0 0
EXCAVATOR 1 1 1 1
TRAILER 1 1 1 1
1.2 ACTUAL 9 9 9 9
DUMP TRUCK 2 2 2 2
DOUBLE CABIN 1 1 1 1
FOCO CRANE 0 0 0 0
CRANE 135 T 0 0 0 0
BARGE 1 1 1 1
KATO 25 T 1 1 1 1
CRANE 250 T 0 0 0 0
TRUCK MIXER 2 2 2 2
TUBBOAT 0 0 0 0
EXCAVATOR 1 1 1 1
TRAILER 1 1 1 1
2 TOOLS
1.1 PLAN 42 42 42 42
CORE DRILL 8 8 8 8
CUTTING TORCH 2 2 2 2
TOTAL STATION 1 1 1 1
GENSET 3 3 3 3
TRAFO LAS 2 2 2 2
MESIN GRENDA 2 2 2 2
HAND DRILL 4 4 4 4
JACK HAMMER 4 4 4 4
ELECTRODE HEATER 2 2 2 2
ELECTRODE OVEN 1 1 1 1
COMPRESSOR 2 2 2 2
BAR BENDING 2 2 2 2
BAR CUTTING 1 1 1 1
BOR HILTI 4 4 4 4
GUN HILTI 4 4 4 4
SAGOLA 0 0 0 0
1.2 ACTUAL 42 42 42 42
CORE DRILL 8 8 8 8
CUTTING TORCH 2 2 2 2
TOTAL STATION 1 1 1 1
GENSET 3 3 3 3
TRAFO LAS 2 2 2 2
MESIN GRENDA 2 2 2 2
HAND DRILL 4 4 4 4
JACK HAMMER 4 4 4 4
ELECTRODE HEATER 2 2 2 2
ELECTRODE OVEN 1 1 1 1
COMPRESSOR 2 2 2 2
BAR BENDING 2 2 2 2
BAR CUTTING 1 1 1 1
BOR HILTI 4 4 4 4
GUN HILTI 4 4 4 4
SAGOLA 0 0 0 0
FOTO DOCUMENTATION
INSTALL PLATFORM INSTALL REBAR PILECAP & INSTALL FORMWORK
POURING CONCRETE PILECAP INSTALL REBAR SLAB & POURING CONCRETE SLAB
INSTALL BRACING