You are on page 1of 1

MARK NUMBER & 'TOP' Mk TO BE POSITIONED AT THE END / FACE OF THE

MEMBER WHERE THE FOLLOWING SYMBOL APPEARS U.N.O.


NATURAL CAMBER TO 'TOP'
LOCATION LIST
MARK NO GRID LOCATION
LB14 1/E +18.405

WORKING LOAD LIMIT OF


BRACKET (WLL) = 6.5 MT

150
30 45 45 30
LB14 PLT20*150 6x 22 DIA HOLES

30
65
150
20

90
65

30
p316

75 75 A
LB14 PLT20*150
35 35

R 45
20
1x 28 DIA HOLES LB14 PLT20*150

24
45

24
135
2x 22 DIA HOLES
10 CFW

90
10
p316

45

45
30
A
20

p316 45 45
25 100 25 75 75

150 150 LIFTING BRACKET (SWL 6.5T)


A-A

0 ISSUED FOR FABRICATION 10.09.2018


REV. REVISION DESCRIPTION REV. DATE
WFT DFT SEE WELD SPEC
PAINT SPEC UNP ALL HOLES 22DIA UNO
SEE SPEC SHEET ALL WELDS 6FW UNO

JSW SEVERFIELD STRUCTURES LTD


1 No LIFTING BRACKET REQ'D AS DRAWN MKD' LB14 401, Grande Palladium, 4th Floor, 175,
CST Road, Kalina, Santacruz (E), Mumbai-400098
Tel:+91(0)22 6731 7000

CONTRACT
MATERIAL LIST FOR ONE ASSEMBLY MK'D LB14 1 No. Required
DRAWING TITLE LIFTING BRACKET SCALE
Tekla Structures

Notes Prelim. Mark Size Grade No. Length Area Weight


CHECKED DATE 12.09.2018
LB14 PLT20*150 E250 1 135 0.04 2.45
MODELLED BY REVISION No. 0
p316 PLT20*150 E250 1 150 0.06 3.53
PHASE
1
QTY
1 Total 0.1 6.0 CONTRACT NO C114 DRAWING No LB14 A3