Professional Documents
Culture Documents
Table 1-2 Information collection checklist for migration and replacement projects
Req Goal Key Point of Key Point of Requirement Analysis
uire Requirement
men Collection
t
Cate
gory
Net Dete Live network services Check the running network protocols,
work rmin network topology, device type, number
servi e the of devices, and device configurations on
ces netw the live network, obtain the live network
ork quality and supported services, entries
band (routing entries, ARP entries, and MAC
widt address entries) of network devices on
h the live network, as well as interface
and status. Such information can be used as
servi a reference during the design.
ce
featu Device function For various reasons, some device
res. functions may need to be added to the
network after the replacement.
Therefore, you need to verify whether
license-controlled items such as MPLS,
IPv6, NQA, native WAC, and PPPoE need
to be deployed.
Networ Dete New feature Determine the reasons why the network
k pain rmin requirement needs to be upgraded, check issues that
points e the have occurred in the earlier phase
reas Known issues in before the network upgrade, how they
ons earlier versions have been prevented and resolved, and
why affect customer whether there are known issues.
the services.
Verify whether customers upgrade the
netw network to add new functions or
ork resolve problems.
need
s to
be
upgr
aded
.