FORMAT FOR GEOTECHNIAL SITE INVESTIGATION REPORT FOR CED 2024

- Preliminary Section
o Cover page
o Executive Summary
o Table of Contents
o List of Tables
o List of Figures
- Main Section
o Chapter 1 – Introduction
▪ 1.1 Background
▪ 1.2 Terms of Reference
▪ 1.3 Objectives of the Site Investigation
o Chapter 2 – Field Work
▪ 1.1 Reconnaissance Survey
▪ 1.2 At Warehouse Location
• 1.2.1 DCP Test
• 1.2.2 Auger Borehole Drilling
• 1.2.3 Trial Pit Excavation
▪ 1.3 Along Road Network
• 1.3.1 DCP Test
• 1.3.2 Trial Pit Excavation
▪ 1.4 At Car Park Location
• 1.4.1 DCP Test
• 1.4.2 Trial Pit Excavation
▪ 1.5 Aggregates Sampling
▪ 1.6 Borrow Pit Sampling
o Chapter 3 – Results and Discussions
▪ 3.1 Vegetation and Climate of Project Area
▪ 3.2 Geology and Seismicity
▪ 3.3 Soil Profile at Warehouse
▪ 3.4 Strength and Foundation Design for Warehouse
▪ 3.5 Subgrade profile and Strength for Car Park
▪ 3.6 Subgrade profile and Strength for Road
▪ 3.7 Source and Quality of Construction Materials
• 3.7.1 Borrow Pit Materials
• 3.7.2 Aggregates for Concrete
• 3.7.3 Aggregates for Road Pavement
o Chapter 4 – Environmental Impact Assessment
o Chapter 5 – Bill of Quantities
o Chapter 6 – Conclusions and Recommendations
o References
o Appendix