CL

7500

850
B 5800 850

1450 2250

A A

500 1600 1650 7500

850 500 1600 800

CONCRETE CONCRETE
STRUCTURE VOLUME STRENGTH
MARK REMARKS
COMPONENT BAR DIMENSIONS (mm) TOTAL UNIT
SIZE LENGTH PER TOTAL WEIGHT (mPa)
QTY SPACING (mm) SHAPE LENGTH WEIGHT
(mm) BAR (m) (kg)
a b c d e (m) (kg/m)

F1 28 68 175 A 3850 700 - - - 5.25 357.00 3.854 1375.878

F2 16 PCS 2425
F2 28 8 175 A 662 - - - 3.75 30.00 3.854 115.620
F4 12 PCS ave.

F5 28 PCS F3 28 4 AS SHOWN B 1000 1660 90 - - 4.50 18.00 3.854 69.372

F4 28 10 175 A 7350 825 - - - 9.00 90.00 3.854 346.860


AS PER SPACING
6500
F5 28 20 175 A 500 - - - 7.50 150.00 3.854 578.100
P1 P2 P3 P5 ave.

FOOTING F6 28 4 AS SHOWN G 5700 150 - - - 6.00 24.00 3.854 92.496 32.94 27.58
DIAGRAM
F7 20 4 AS SHOWN B 1000 1500 250 - - 4.50 18.00 2.466 44.388
AND
F8 20 4 AS SHOWN G 5700 150 - - - 6.00 24.00 2.466 59.184
SCHEDULE
PADOUBLE F9 16 112 175 C 950 125 125 - - 1.20 134.40 1.579 212.218

CHECK LANG GRADE 40 TOTAL = 212.22

PO GRADE 60 TOTAL = 2,681.90

P1 32 7 193 A 6700 150 400 - - 7.50 52.500 6.313 331.433

P2 32 6 193 A 6700 150 400 - - 7.50 45.000 6.313 284.085

P4 6 OR P3 32 7 200 D 6700 150 400 - - 7.50 52.500 6.313 331.433

6.30??? P4 28 6 200 E 6000 150 - - 6.00 36.000 4.833 173.988


COPING 8.398 27.58
P5 20 12 150 D 6700 150 400 - - 7.50 90.000 2.466 221.940

P6 16 41 150 F 1200 150 1100 100 4.80 196.800 1.579 310.747

P7 16 38 150 F 466 150 1100 134 3.40 129.200 1.579 204.007

P8 16 22 300 F 1200 150 505 170 3.75 82.500 1.579 130.268

GRADE 40 TOTAL = 645.02


PACHECK LANG 579
772
PO SCHEDULE GRADE 60 TOTAL = 1,342.88

NG P7 AND P8 GRAND TOTAL GRADE 40 = 857.24

GRAND TOTAL GRADE 60 = 4,024.78

PREPARED : PROJECT NAME & LOCATION : SHEET CONTENTS : CHECKED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

"AS-STAKED" PLAN for the


WIDENING OF PERMANENT BRIDGES
REPUBLIC OF THE PHILIPPINES BRIDGE
SALOGON BR. (SALUGON FLOODWAY) DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LORLAINE V. DESAMITO RONALD G. SUPANGA EUGENIO R. KATON ROCHEL D. HERMANO NOEL L. FUENTEBELLA
(B00121PW) ALONG PUERTO PRINCESA REGIONAL OFFICE IV-B S 55
OWNER/MANAGER PROJECT ENGINEER OIC, CONSTRUCTION SECTION CHIEF, PLANNING AND DESIGN SECTION OIC - OFFICE OF THE DISTRICT ENGINEER
SOUTH RD PALAWAN 2ND DISTRICT ENGINEERING OFFICE
ASSISTANT DISTRICT ENGINEER
DATE : BROOKE'S POINT, PALAWAN NARRA, PALAWAN DATE : DATE : DATE : DATE : DATE :