27. First degree means the % of inflammable gas is not exceed and rate of emission is not more than
28. Second degree means the % of inflammable gas is exceed and rate of emission is not more than
29. Third degree means the rate of emission of inflammable gas is not more than
30. ZAP stands for .
31. Minimum accident planning is also known as .
32. Shot firer is also known as
33. Accident proneness of mine is measure of
34. The senior most mine official in mining discipline on duty in the mine known as .
35. Seriously bodily injury means
36. Reportable injury means
37. Minor injury means
38. Socket means
39. Total no.of injuries in an opencast coal mine employing 800 persons is 16 in a year. As per DGMS norms, the injury rate per 1000 persons
employed is
40. The roadways which is connecting in opencast for playing of dumbers is
41. The notice of opening should be summited before days of opening of a mine.
42. The annual returns are submitted on or before day of month on every year.
43. If a mine is abandoned or working thereof is discontinued over a period exceeding 60 days if change occurs in the owner of mine the annual
returns shall be submitted within days abandonment or change of ownership and within days of discontinuance?
44. Notice of change in ownership & appointment of agent, manager etc. within days of such
abandoned/close/discontinuance of a mine.
45. When it is intended to abandoned/close/discontinuance for a period of greater than 60 days the notice shall be send within the days of
such occurrence.
46. Notice of dangerous occurrence or accident and death resulting from already reported shall submit within
hours of occurrence.
47. Copy of notice of any accident should be exhibit on the notice board simultaneously for a period of not less than days.
48. Any person killed or injured as already reported as any reports submitted within days of
occurrence
49. Notice of injured person already reported as any is return to duty shall within days fc occurrence.
50. Notice of disease shall submit days of being informed.
51. Board consists of members.
52. All board members of board shall possessing in mining engineering.
53. All members of board shall consists of
A) At least members have
B) At least members have
C) At least members have
54. Term of members other than chairman is years from the date of appointment.
55. Remunerations for all members is decided by
56. An nominated in this behalf by the chairman acting as a to the board.
57. All board meetings held at .
58. For every board meeting not less than clear days inform to all members of the board .
59. No meeting is conducted unless there is a quorum of members.
60. If there is no such quorum members the meeting is automatically adjoined to a date of
61. Every board meeting presided by
62. Emergency meeting not less than days.
63. Not less than days are required to submission of application.
64. Age of the candidate appeared for board examination, conducted by the board is of year.
65. Medical certificate is valid for a period of not more than years.
66. The minimum qualification of the candidate who’s appeared for the board examinations is
67. First aid certificate is issued by
68. Practical experience of a candidate who’s appeared for first class manager certificate is of not less than
years for degree holders.
69. Practical experience of a candidate who’s appeared for first class manager certificate is of not less than
years for diploma holders.
70. Practical experience of a candidate who’s appeared for second class manager certificate is of not less than
years for diploma holders.
71. Practical experience of a candidate who’s appeared for for surveyor certificate is of not less than
years for field candidates.
72. Practical experience of a candidate who’s appeared for for surveyor certificate is of not less than
months in case of a candidate has attended theoretical /practical on surveying at any institutions approved by board.
73. Number of attempts for any examination conducted by board is
74. Practical experience for engine driver certificate is not less than years under the assistance of qualified
winding engine driver.
75. Exchange of certificate for manager’s Competency the candidate should undergo practical training in India for a period of not less than
months.
76. Board has a power to cancel any certificate issued by the board. For that, board may appoint a C.I to enquiry the note of evidence , such
report shall be submit within days of conclusion of his
enquiry.
77. Enquiry report may also send to delinquent person within days from the date of dispatch of such copies to
the board.
78. Delinquent person may appeal against board to central government within days of
cancellation of certificate
79. The validity of managers certificates for the period of years.
80. For extension of manager’s certificate they should submit their medical certificate of fitness not exceeding
months before the expiry date of manager’s certificate. And no such certificate valid for the period of not ore than
years.
81. Qualification of chief inspector is
82. What is the minimum age of manager is ?
83. Manager should have first class manager’s certificate, if the average monthly output is not less than tons in case of mine not
restricted to opencast mines only
84. Manager should have first class manager’s certificate, if the average monthly output is not less than m3of material handled per
month.
85. Manager can appoint as a manager for more than one mine is for a period of months.
86. No manager shall vacate his office without giving notice before days.
87. In the absence of manager an authorization is granted to other person for a period of not more than days.
88. In the absence of manager an authorization is granted to other person for a maximum period of not more than days.
89. It is the duty of Owner/Agent shall provide residential accommodations for all officers within a radius of
km distance from mine openings.
90. Manager has to appoint a safety officer if the average monthly output of a mine is more than tons
for underground and in case of opencast more than m3 of material handled per month is?
91. Safety officer has a first-class manager’s certificate if the average monthly output of a mine is more than tones for
underground.
92. Safety officer has a first-class manager’s certificate if the average material handled by opencast mine is more than m3/ month.
93. Safety officer has a second-class manager’s certificate if the average monthly output of a mine is more than tones for underground.
94. Safety officer has a second-class manager’s certificate if the average material handled by opencast mine is more than m3/ month.
95. In case of below ground safety officer required only degree or diploma in mining engineering if the average monthly output of a mine is
tones.
96. Manager has to appoint assistant manager if the average monthly output of a mine is more than
tons for underground.
97. No of assistant managers are required if the average monthly out put is 44,000tonnes.
98. If average monthly output of a mine is >20,000 tones No.of assistant managers has first class managers
certificate.
99. Manager has to appoint numbers of assistant managers if the average material handled is more than 1million m3/year
for opencast mines.
100. numbers of assistant managers are required for 5million m3of material handled in opencast mines.
101. At least % of assistant managers should have first class manager’s certificate for open cast mining.
102. In first degree gassy mine appointment of ventilation officer is required if the average monthly output of a mine is more than tons.
103. In second and third degree gassy mine appointment of ventilation officer is required if the average monthly output of a mine is
more than tons.
104. Ventilation officer should have first class manager’s certificate if avg monthly output of a mine is >
tons in case of first degree gassy mines.
105. Ventilation officer should have first class manager’s certificate if avg monthly output of a mine is >
tons in case of second and third degree gassy mines.
106. In first degree gassy mine combined the post of ventilation officer with that of safety officer, if The avg.monthly output of a mine is
< tone.
107. Appointment of electric engineer to the mine when used voltage is > volts and installed voltage is more
than MVA.
108. Qualification of electric engineer is
109. Appointment of mechanical engineer when the aggregate horse power of all machinery used in opencast and underground is > H.P
110. Qualification of mechanical engineer is
111. Appointment of an engineer for more than one mine should allowed for the period of months.
112. Absence/ authorization of an engineer is allowed for a period of days.
113. No. of surveyors are required in an underground mine where the output of a mine is<8000tpm is.?
114. No. of surveyors are required in an underground mine where the output of a mine is 50,000tpm is.?
115. No. of surveyors are required in an underground depillaring district where the output of a mine is 50,000tpm is.?
116. In an open cast mine no. of surveyors are required when, up to 1 million m3 of material handled per year.
117. In an open cast mine no. of surveyors are required when, >1 million m3 to 5million m3 of material handled per year.
118. In an open cast mine no. of surveyors are required when, >5 million m3 to 10million m3 of material handled per year.
119. In an open cast mine no. of surveyors are required when, >10 million m3 to 15million m3 of material handled per year.
120. In an open cast mine no. of surveyors are required when, > 50 million m3 of material handled per year.
121. The manager should visit the underground mines once at least days in a week.
122. The manager should visit the underground mines during night shift, once at least in a week.
123. Manager has to supply the required materials to the mine with in days on receipt of request by mine
officials.
124. Manager shall provide tracing updated plan of last survey to
125. The manager shall conduct meeting with mine officials once on every
126. The manager shall send particulars of accident with photographs within days of the accident.
127. Ventilation officer should check the speed of main mechanical ventilator, amperage drown by the motor and water gauge once in every
128. Check the efficiency of the main mechanical ventilator by ventilation officer once in every months.
232. Effective telephonic communication system should provide if length of haulage is more than meters.
233. Manholes are placed at an interval of meters if gradient is more than .
234. Manholes are placed at an interval of meters if gradient is less than
235. Height of manhole is not less than meters
236. Width of man hole is not less than m and not more than meters.
237. Manholes are kept clean and white washed for a distance of not less than meter around the aperture.
238. Depth of the manhole should be not less than meters.
239. All places where tubs are couples and un coupled there shall be a clear space of not less than meters.
240. Space between tub and one side of the road way is not less than meters.
241. The Space between any two tracks is not less than meters.
242. Height of the man hole shall not be less than meters.
243. Where the inclination of roadway is more than degrees suitable steps / ladders are provided.
244. Where the inclination of roadway is more than degrees suitable steps / ladders with hand rails are provided to
ensure safe travel.
245. Where the inclination of roadway is more than degrees suitable steps / ladders, hand rails and platforms at a intervals of
not more than meters. are provided.
246. Where the length of haulage is more than km man raiding system is provided.
247. The gap between inner most end of buffers is not less than cm when tubs are in tandem.
248. Tub couplings have a factor of safety not less than in elation to maximum static load. which shall be ensured by
testing at an interval of not exceeding years.
249. Number of tubs attached to the haulage engine is decided by
250. Tubs are said to be closed succession when the distance between two tubs are less than meters.
251. Spliced ropes are not used for haulage.
252. Haulage rope is discorded when the factor of safety of rope is less than
253. Recapping is done once in every months.
254. Between the conveyor and one side of the roadway there shall be a clear space of not less than _
meter.
255. Conveyor roadways are installed with transmitting signals if the length of the conveyor road ways is more than meters.
256. Every haulage engine brake wheel, rope and other appliances are examined once in every hours.
257. Inspection of haulage safety device once at least in every days.
258. Examination of travelling roadways once in every days.
259. Limiting gradient of locomotive haulage system is
260. Thoroughfare of railway wagons should me of meters.
261. No material shall be placed within meters from either side of railway track.
262. In alluvium soil, morum, clay, debris or other similar grounds in manual working open cast mine the bench slope angle is not more than
degrees from horizontal.
263. In alluvium soil, morum, clay, debris or other similar grounds in manual working open cast mine the bench height is not more than
meters.
264. In alluvium soil, morum, clay, debris or other similar grounds in manual working open cast mine the breadth of bench is not less
than the .
265. The height of in situ pillar is not more than meters.
266. If height of in situ pillar > 1.25 meter, base of such pillar is not less than meters in diameter.
267. Height of the coal bench in manually worked open cast mine is meters.
268. Bench slope angle of the coal bench in manually worked open cast mine is in degrees.
269. Breadth of the coal bench in manually worked open cast mine is not less than meters.
270. In an excavation in any hard and compact ground the height of the bench is not more than meters in
case of manually worked opencast mine.
271. No tree/ loose stone/ debris shall be stored within a distance of meters from the edge of the bench.
272. No person shall any face which may cause over hanging.
273. In alluvium soil, morum, clay, debris or other similar grounds in mechanized open cast mine the bench height is not more than
meters.
274. In alluvium soil, morum, clay, debris or other similar grounds in mechanized open cast mine width of the bench is not more less than .
275. In mechanized open cast mine the height of the coal bench is meters.
276. In mechanized open cast mine width of the coal bench is not less than ,
and .
277. The slope of the spoil bank is not exceed meters.
278. Height of the spoil bank is not more than meters.
279. If any spoil bank exceeds meters in height such spoil bank slope is not exceed vertical to _
horizontal.
280. The toe of the spoil bank shall not extend to any point within meter of the mine opening.
281. Regulation number of development work is _
282. The pillars formed n any seam shall normally be _ in shape.
283. Height and width of the gallery is not more than _ and meters.
284. is the size of pillar if depth of working from the surface is 60 meters and width of gallery is 4.2 meter.
285. is the size of pillar if depth of working from the surface is 85 meters and width of gallery is 3 meter.
286. is the size of pillar if depth of working from the surface is 110meters and width of gallery is 3.2 meter.
287. is the size of pillar if depth of working from the surface is 250meters and width of gallery is 4 meter.
288. When extraction is about to begin not more than pillars shall be splitted.
289. During extraction no.of pillars shall be splitted.
290. A report of voids formed as a result of extraction are stowed with sand shall be submitted within _ day of every month.
291. Who writes contravention report which is maintain be every mine office
292. A contravention report placed in notice board of the mine for days.
293. Actions taken to remedy for the contraventions report shall submit not more than days.
294. Contravention register maintained in a mine for a period of at least years, after the date of making of the
last entry.
295. The parting between any two seams is is known as contiguous seam.
296. Minimum parting between any contiguous seams is not less than meters
297. Verticality of the pillars are possible when the inclination is less than degrees from the horizontal.
298. In contiguous seams two or more plans should be maintained if inclination is horizontal. from the
299. No working shall be made within meters from the railways.
300. At least entrances are provide before a mine closure protective works.
301. No working shall be made within a distance equal to of the pillar from the boundary.
302. No working shall be made within a distance meters from the boundary of any opencast workings.
303. SCAMP stands for .
304. Strata control and monitoring plan framed by manager before days of commencement.
305. Dimensions of base piece is cm in thick, cm in width, cm in length.
306. Dimensions of lid over the prop is cm in thick, cm in length, and width is not less than
307. For bar support makes the holes into side of at least in cm deep on either side of roadways.
308. Laggings are placed at a intervals of meters.
309. Length of the cogging member is meters.
310. Length of the cogging member is meters if roof height is more than 3meters.
311. Every cogging member is supported with corner props will serves the purpose of
Boosting the whole current of air passing along the intake a) 3members, 1st class managers certificate or notless than
13 & return airway 53 2years of experience in m/d/c/s b) 1 service in educational
institution at degree level c) 1 from mining research and
planning
14 20 54 3 years
15 3 55 central government
16 Likely to worked in feature 56 C.I and secretary
17 1st April to 31st march 57 Dhanbad
18 landing or platform 58 10 clear days
19 Working 59 3 membes
20 failure to explode of an entire charge of explosives in a shot 60 7days latter if that day is holiday then meeting is on next
holes working day
21 heavy earth moving machinary 61 chairman
22 hand drills operation , 50 mm 62 3 days
23 Working place 63 60 days
81 Degree in mining engineering with first class manager's 121 4days in a week
certificate
82 23 122 once in a fort night
83 >2500 123 within 3days
84 >20000 m3per month of material handled 124 overman
85 12 months 125 every working day
86 30days 126 15 days
87 30ays 127 once in every day
88 60days 128 3months
89 5km 129 ventilation efficiency cuotient
90 >5000 and >20000m3/month 130 48 hours
91 >15000 tones/month 131 90 metres
92 >50000m3/month 132 7 days
248 seven (7) and not exceed 3 years 288 not more than 4 pillars