You are on page 1of 16

1.

New CMR comes into action on


2. According to CMR-2017 Abandoned working means
3. Expand AMM
4. Safety lamp is a and
5. Intrinsically safe apparatus are operated at a voltage of .
6. Flame proof apparatus are operated at a voltage of .
7. Auxiliary fan means a fan which can be used for
8. The person responsible for lowering and rising of persons, tools, materials and to transmit the signals from every top of the shaft
9. Abbreviate CMM
10. working is in accessible but likely to be work again in mine.
11. The person responsible for lowering and rising of persons, tools, materials and to transmit the signals from every inset of the shaft
12. According to CMR-2017 FACE means
13. booster fan means a fan which can be used for
14. Age of competent person
15. Deep hole drilling and blasting means drill hole of m in length used for blasting in open cast mines.
16. According to CMR-2017 discontinued working means
17. Financial year means
18. According to CMR inset means
19. Any excavation made or being made in a mine for search of or obtaining coal is called
20. Misfire is
21. HEMM stands for
22. The machinery which is not treated as HEMM used in open cast mining operations of
23. According to CMR any place in the mine which has lawful access is called
24. General body of air means the general atmosphere in a seam which includes the atmosphere of

25. Fiery seam means


26. What is meant by ventilation district

27. First degree means the % of inflammable gas is not exceed and rate of emission is not more than
28. Second degree means the % of inflammable gas is exceed and rate of emission is not more than
29. Third degree means the rate of emission of inflammable gas is not more than
30. ZAP stands for .
31. Minimum accident planning is also known as .
32. Shot firer is also known as
33. Accident proneness of mine is measure of
34. The senior most mine official in mining discipline on duty in the mine known as .
35. Seriously bodily injury means
36. Reportable injury means
37. Minor injury means
38. Socket means
39. Total no.of injuries in an opencast coal mine employing 800 persons is 16 in a year. As per DGMS norms, the injury rate per 1000 persons
employed is
40. The roadways which is connecting in opencast for playing of dumbers is
41. The notice of opening should be summited before days of opening of a mine.
42. The annual returns are submitted on or before day of month on every year.
43. If a mine is abandoned or working thereof is discontinued over a period exceeding 60 days if change occurs in the owner of mine the annual
returns shall be submitted within days abandonment or change of ownership and within days of discontinuance?
44. Notice of change in ownership & appointment of agent, manager etc. within days of such
abandoned/close/discontinuance of a mine.
45. When it is intended to abandoned/close/discontinuance for a period of greater than 60 days the notice shall be send within the days of
such occurrence.
46. Notice of dangerous occurrence or accident and death resulting from already reported shall submit within
hours of occurrence.
47. Copy of notice of any accident should be exhibit on the notice board simultaneously for a period of not less than days.
48. Any person killed or injured as already reported as any reports submitted within days of
occurrence
49. Notice of injured person already reported as any is return to duty shall within days fc occurrence.
50. Notice of disease shall submit days of being informed.
51. Board consists of members.
52. All board members of board shall possessing in mining engineering.
53. All members of board shall consists of
A) At least members have
B) At least members have
C) At least members have
54. Term of members other than chairman is years from the date of appointment.
55. Remunerations for all members is decided by
56. An nominated in this behalf by the chairman acting as a to the board.
57. All board meetings held at .
58. For every board meeting not less than clear days inform to all members of the board .
59. No meeting is conducted unless there is a quorum of members.
60. If there is no such quorum members the meeting is automatically adjoined to a date of
61. Every board meeting presided by
62. Emergency meeting not less than days.
63. Not less than days are required to submission of application.
64. Age of the candidate appeared for board examination, conducted by the board is of year.
65. Medical certificate is valid for a period of not more than years.
66. The minimum qualification of the candidate who’s appeared for the board examinations is
67. First aid certificate is issued by
68. Practical experience of a candidate who’s appeared for first class manager certificate is of not less than
years for degree holders.
69. Practical experience of a candidate who’s appeared for first class manager certificate is of not less than
years for diploma holders.
70. Practical experience of a candidate who’s appeared for second class manager certificate is of not less than
years for diploma holders.
71. Practical experience of a candidate who’s appeared for for surveyor certificate is of not less than
years for field candidates.
72. Practical experience of a candidate who’s appeared for for surveyor certificate is of not less than
months in case of a candidate has attended theoretical /practical on surveying at any institutions approved by board.
73. Number of attempts for any examination conducted by board is
74. Practical experience for engine driver certificate is not less than years under the assistance of qualified
winding engine driver.
75. Exchange of certificate for manager’s Competency the candidate should undergo practical training in India for a period of not less than
months.
76. Board has a power to cancel any certificate issued by the board. For that, board may appoint a C.I to enquiry the note of evidence , such
report shall be submit within days of conclusion of his
enquiry.
77. Enquiry report may also send to delinquent person within days from the date of dispatch of such copies to
the board.
78. Delinquent person may appeal against board to central government within days of
cancellation of certificate
79. The validity of managers certificates for the period of years.
80. For extension of manager’s certificate they should submit their medical certificate of fitness not exceeding
months before the expiry date of manager’s certificate. And no such certificate valid for the period of not ore than
years.
81. Qualification of chief inspector is
82. What is the minimum age of manager is ?
83. Manager should have first class manager’s certificate, if the average monthly output is not less than tons in case of mine not
restricted to opencast mines only
84. Manager should have first class manager’s certificate, if the average monthly output is not less than m3of material handled per
month.
85. Manager can appoint as a manager for more than one mine is for a period of months.
86. No manager shall vacate his office without giving notice before days.
87. In the absence of manager an authorization is granted to other person for a period of not more than days.
88. In the absence of manager an authorization is granted to other person for a maximum period of not more than days.
89. It is the duty of Owner/Agent shall provide residential accommodations for all officers within a radius of
km distance from mine openings.
90. Manager has to appoint a safety officer if the average monthly output of a mine is more than tons
for underground and in case of opencast more than m3 of material handled per month is?
91. Safety officer has a first-class manager’s certificate if the average monthly output of a mine is more than tones for
underground.
92. Safety officer has a first-class manager’s certificate if the average material handled by opencast mine is more than m3/ month.
93. Safety officer has a second-class manager’s certificate if the average monthly output of a mine is more than tones for underground.
94. Safety officer has a second-class manager’s certificate if the average material handled by opencast mine is more than m3/ month.
95. In case of below ground safety officer required only degree or diploma in mining engineering if the average monthly output of a mine is
tones.
96. Manager has to appoint assistant manager if the average monthly output of a mine is more than
tons for underground.
97. No of assistant managers are required if the average monthly out put is 44,000tonnes.
98. If average monthly output of a mine is >20,000 tones No.of assistant managers has first class managers
certificate.
99. Manager has to appoint numbers of assistant managers if the average material handled is more than 1million m3/year
for opencast mines.
100. numbers of assistant managers are required for 5million m3of material handled in opencast mines.
101. At least % of assistant managers should have first class manager’s certificate for open cast mining.
102. In first degree gassy mine appointment of ventilation officer is required if the average monthly output of a mine is more than tons.
103. In second and third degree gassy mine appointment of ventilation officer is required if the average monthly output of a mine is
more than tons.
104. Ventilation officer should have first class manager’s certificate if avg monthly output of a mine is >
tons in case of first degree gassy mines.
105. Ventilation officer should have first class manager’s certificate if avg monthly output of a mine is >
tons in case of second and third degree gassy mines.
106. In first degree gassy mine combined the post of ventilation officer with that of safety officer, if The avg.monthly output of a mine is
< tone.
107. Appointment of electric engineer to the mine when used voltage is > volts and installed voltage is more
than MVA.
108. Qualification of electric engineer is
109. Appointment of mechanical engineer when the aggregate horse power of all machinery used in opencast and underground is > H.P
110. Qualification of mechanical engineer is
111. Appointment of an engineer for more than one mine should allowed for the period of months.
112. Absence/ authorization of an engineer is allowed for a period of days.
113. No. of surveyors are required in an underground mine where the output of a mine is<8000tpm is.?
114. No. of surveyors are required in an underground mine where the output of a mine is 50,000tpm is.?
115. No. of surveyors are required in an underground depillaring district where the output of a mine is 50,000tpm is.?
116. In an open cast mine no. of surveyors are required when, up to 1 million m3 of material handled per year.
117. In an open cast mine no. of surveyors are required when, >1 million m3 to 5million m3 of material handled per year.
118. In an open cast mine no. of surveyors are required when, >5 million m3 to 10million m3 of material handled per year.
119. In an open cast mine no. of surveyors are required when, >10 million m3 to 15million m3 of material handled per year.
120. In an open cast mine no. of surveyors are required when, > 50 million m3 of material handled per year.
121. The manager should visit the underground mines once at least days in a week.
122. The manager should visit the underground mines during night shift, once at least in a week.
123. Manager has to supply the required materials to the mine with in days on receipt of request by mine
officials.
124. Manager shall provide tracing updated plan of last survey to
125. The manager shall conduct meeting with mine officials once on every
126. The manager shall send particulars of accident with photographs within days of the accident.
127. Ventilation officer should check the speed of main mechanical ventilator, amperage drown by the motor and water gauge once in every
128. Check the efficiency of the main mechanical ventilator by ventilation officer once in every months.

129. Expand VEQ


130. Air samples are analyzed within hours of collection.
131. Provision of wet cutting by ventilation officer up to a distance of m from the face.
132. Where two affording means of egress, one of which is not used, which can be inspected by competent person once in every days.
133. Sirdar shall maintain materials if roof height is m from the floor.
134. Supports are withdrawn with the help of
135. Attended clerk of main mechanical ventilator should inspect the pressure records, water gauge, and speed of main fan at a interval of
136. Surveyor should maintain full facts up to a distance of m from the boundary.
137. Any machinery before installation should undergo
138. Banks man or onsetter should not allow any person into the cage if cage is repaired for a period of more than hours and run the
cage at least trip up and down the working portion of the shaft.
139. Coal-cutting and loading machine drivers and fitters should provide effective contrivance to the machine to prevent the running back while it is
working on a gradient of >
140. If any person fail to report after end of the shift, the attendant clerk shall report the same to the asst.manager or manager
within hours after commencement of end of the shift.
141. Every plans and section should shows
142. Scale of a plan should be at least cm long and suitably sub divided.
143. What is meant by scale
144. What is the R.F of the plan for the scale of 10m to 1cm
145. The ground distance between the mine managers office and pit top is 300m and it is represented by 3 cm in the mine plan. What is the
representative factor is .
146. Scale of the coal mine plan is
147. Scale of offset plan is
148. Scale of geological plan is
149. Water danger plans are required to maintain at a distance of m of the min boundary.
150. No water logged workings are approached within a distance of min below ground measured any part of
the workings.
151. The underground plan should show every important surface feature within the boundary up to a distance of meters of any part of the
working measured on horizontal plane.
152. Where a seam has an average inclination of more than degrees from the horizontal, one or more
vertical mine section plans shall be maintained.
153. In case of open cast mines vertical projection of mine at suitable intervals of not exceed m in both
longitudinal as well as transverse direction.
154. An additional plan for a main plan is known as plan & having a scale of .
155. A joint survey plan should maintain within meters of common boundary of two mines.
156. The seams are said to be contiguous if the parting between two seams are m.
157. For surface plan/ underground plan/ventilation plan etc. shall show surface contour lines at vertical intervals not more than
meters
158. In hilly terrain/non-working places in underground the contour intervals is not more than meters.
159. Spot levels are maintain at intervals of m.
160. All plans and sections are up to date not earlier than months.
161. The outlets from a mine should be at least .
162. Cage should be provided to the shafts if depth of the shaft is more than meters.
163. The man riding system should be provided to the inclines if the length of travelling roadway is more than
meters.
164. If the shaft depth is less than meters adder ways are provided.
165. Ladderways are laid at an inclination of degrees to the horizontal, and platforms are erected at a intervals of
meters.
166. The ladderway project at least meter above the mouth of shaft and at every platform.
167. platforms are provided at an interval of not less than meters.
168. The distance between two outlets of a mine is not less than meters.
169. The height and width of the walkable passage are not less than and .
170. Every shaft in the course of being sank shall be provided with a permanent lining of metal, concrete at a distance of within meters
from the bottom of the shaft.
171. Every shaft in the course of being sank shall be provided with a temporary lining of steel or iron rings with substantial laggings at a distance
of within meters from the bottom of the shaft.
172. A Competent person should inspect the mine outlets once in every days.
173. No person shall act as a winding engineman unless he has a certificate.
174. Working hours of Winding engineman is reduced by R.I for a period of not less than hours.
175. No certificate is needed if winding engine is apparated with less than and where steam / compressed engine having a diameter of
not more than cm is used in drum wingding and it is not used for lowering
and rising of persons .
176. Permission is taken from chief inspector for the installation of winding equipment before not less than
days.
177. The angle of fleet is not greater than
178. The diameter of the pulley or sheaves of the winding drum not less than times the diameter of the
rope.
179. There shall be at least turns of the rope on the drum when the cage in at bottom of the shaft.
180. Purpose of brakes used in winding is
181. Every winding engine shall be equipped with
182. The number persons allowed in to the cage is decided by the whom .
183. What is meant by TWO raps in winding signaling system
184. Purpose of guide ropes used in winding is
185. The gap between both horizontal and vertical distance of protective roofing and the top of the cage, when cage is at bottom of the shaft is
not more than cm.
186. Where cage is at top of the shaft the space between rope shackle and detaching bell plate is not less than
meters when geared engine is used.
187. Where cage is at top of the shaft the space between rope shackle and detaching bell plate is not less than
meters when direct acting engine is used.
188. Every winding engine is fitted with an
189. Purpose of automatic contrivance s to prevent
190. Automatic contrivance shall prevent the descending speed of the cage to not exceed m/s at every
landing places and pit bottom.
191. Testing of automatic contrivance once in every days by raising each cage to the last control point above the top
most landing.
192. Testing of automatic contrivance once in every months by attempt descending cage at excessive speed.
193. In addition to automatic contrivance shall be provided on the rope.
194. The Gap between the floor of the cage to lowest part of the cage gates shall be not more than cm.
195. The Gap between any two members of the cage gates shall not be more than cm.
196. In sinking shaft bucket is provided with a detaching hook if depth of working is > meters.
197. Where sinking shaft depth is more than 150 meters in depth, sufficient guide ropes are provided at a distance of meters from
the bottom of the shaft.
198. The competent person shall inspect the signaling system once at least in every
199. Where sinking shaft depth is more than 45 meters in depth, shall be provided at a distance of within
meters from the bottom of the shaft.
200. Where shaft depth is more than meters wire ropes are used.
201. The ultimate breaking strength of the rope is not less than times of the maximum static load.
202. Spliced ropes are used in system.
203. Life of the winding rope is not more than Years.
204. Ropes used in watery conditions should be of ropes.
205. For testing of wire ropes meters of length should be cut-off from the end of the rope.
206. Before every recapping the length of the wire rope to be cut off meters from the end of the rope.
207. No mode of rope capping shall be used unless it has a strength of not less than times the maximum static
load.
208. The recapping shall be done once in every months.
209. Composition f wire white metal is .
210. The melting point of white metal is .
211. Were the white metal is used the length of the tapered portion of the rope cappel should be times, if
the diameter of ropes of up to 26mm.
212. Were the white metal is used the length of the tapered portion of the rope cappel should be times, if
the diameter of ropes of more than 26mm.
213. Before treating with white metal the socket is heated at a temperature of degree centigrade.
214. While pouring in to the socket the temperature is not exceeds degree centigrade.
215. The suspension gears shall be approved by .
216. All parts of the suspension gear unit shall be annealed once on every months.
217. Life of all the parts of the suspension gear unit is not more than Years.
218. All parts of the suspension gear has a factor of safety is not less than
219. Every detaching bell plate and safety hook shall be examined once in every days.
220. After re capping the cage should under go trips up and down the working portion of the shaft with full loads.
221. At the top of every incline plane must be equipped with at least one stop block to
222. Pulleys/Sheaves/Rollers are used to shall securely fix entire length of haulage roadways.
223. At least one Run-away switch is installed on below the first stop block at a distance of
meters.
224. attachment is provided behind an ascending set of tubs to prevent the tubs
225. Safety hooks and jazz rails are used to prevent runaway in the
226. haulage safety device is used to prevent the ascending set of tubs running back.
227. Re-railers are placed at a intervals of not more than meters.
228. Location of stop block should be of
229. Length of haulage is more than meters, effective means of transmitting signals are provided.
230. How many raps are required to LOWER the tubs by using haulage signaling system
231. Signaling voltage is limited to volts.

232. Effective telephonic communication system should provide if length of haulage is more than meters.
233. Manholes are placed at an interval of meters if gradient is more than .
234. Manholes are placed at an interval of meters if gradient is less than
235. Height of manhole is not less than meters
236. Width of man hole is not less than m and not more than meters.
237. Manholes are kept clean and white washed for a distance of not less than meter around the aperture.
238. Depth of the manhole should be not less than meters.
239. All places where tubs are couples and un coupled there shall be a clear space of not less than meters.
240. Space between tub and one side of the road way is not less than meters.
241. The Space between any two tracks is not less than meters.
242. Height of the man hole shall not be less than meters.
243. Where the inclination of roadway is more than degrees suitable steps / ladders are provided.
244. Where the inclination of roadway is more than degrees suitable steps / ladders with hand rails are provided to
ensure safe travel.
245. Where the inclination of roadway is more than degrees suitable steps / ladders, hand rails and platforms at a intervals of
not more than meters. are provided.
246. Where the length of haulage is more than km man raiding system is provided.
247. The gap between inner most end of buffers is not less than cm when tubs are in tandem.
248. Tub couplings have a factor of safety not less than in elation to maximum static load. which shall be ensured by
testing at an interval of not exceeding years.
249. Number of tubs attached to the haulage engine is decided by
250. Tubs are said to be closed succession when the distance between two tubs are less than meters.
251. Spliced ropes are not used for haulage.
252. Haulage rope is discorded when the factor of safety of rope is less than
253. Recapping is done once in every months.
254. Between the conveyor and one side of the roadway there shall be a clear space of not less than _
meter.
255. Conveyor roadways are installed with transmitting signals if the length of the conveyor road ways is more than meters.
256. Every haulage engine brake wheel, rope and other appliances are examined once in every hours.
257. Inspection of haulage safety device once at least in every days.
258. Examination of travelling roadways once in every days.
259. Limiting gradient of locomotive haulage system is
260. Thoroughfare of railway wagons should me of meters.
261. No material shall be placed within meters from either side of railway track.
262. In alluvium soil, morum, clay, debris or other similar grounds in manual working open cast mine the bench slope angle is not more than
degrees from horizontal.
263. In alluvium soil, morum, clay, debris or other similar grounds in manual working open cast mine the bench height is not more than
meters.
264. In alluvium soil, morum, clay, debris or other similar grounds in manual working open cast mine the breadth of bench is not less
than the .
265. The height of in situ pillar is not more than meters.
266. If height of in situ pillar > 1.25 meter, base of such pillar is not less than meters in diameter.
267. Height of the coal bench in manually worked open cast mine is meters.
268. Bench slope angle of the coal bench in manually worked open cast mine is in degrees.
269. Breadth of the coal bench in manually worked open cast mine is not less than meters.
270. In an excavation in any hard and compact ground the height of the bench is not more than meters in
case of manually worked opencast mine.
271. No tree/ loose stone/ debris shall be stored within a distance of meters from the edge of the bench.
272. No person shall any face which may cause over hanging.
273. In alluvium soil, morum, clay, debris or other similar grounds in mechanized open cast mine the bench height is not more than
meters.
274. In alluvium soil, morum, clay, debris or other similar grounds in mechanized open cast mine width of the bench is not more less than .
275. In mechanized open cast mine the height of the coal bench is meters.
276. In mechanized open cast mine width of the coal bench is not less than ,
and .
277. The slope of the spoil bank is not exceed meters.
278. Height of the spoil bank is not more than meters.
279. If any spoil bank exceeds meters in height such spoil bank slope is not exceed vertical to _
horizontal.
280. The toe of the spoil bank shall not extend to any point within meter of the mine opening.
281. Regulation number of development work is _
282. The pillars formed n any seam shall normally be _ in shape.
283. Height and width of the gallery is not more than _ and meters.
284. is the size of pillar if depth of working from the surface is 60 meters and width of gallery is 4.2 meter.
285. is the size of pillar if depth of working from the surface is 85 meters and width of gallery is 3 meter.
286. is the size of pillar if depth of working from the surface is 110meters and width of gallery is 3.2 meter.
287. is the size of pillar if depth of working from the surface is 250meters and width of gallery is 4 meter.
288. When extraction is about to begin not more than pillars shall be splitted.
289. During extraction no.of pillars shall be splitted.
290. A report of voids formed as a result of extraction are stowed with sand shall be submitted within _ day of every month.
291. Who writes contravention report which is maintain be every mine office
292. A contravention report placed in notice board of the mine for days.
293. Actions taken to remedy for the contraventions report shall submit not more than days.
294. Contravention register maintained in a mine for a period of at least years, after the date of making of the
last entry.
295. The parting between any two seams is is known as contiguous seam.
296. Minimum parting between any contiguous seams is not less than meters
297. Verticality of the pillars are possible when the inclination is less than degrees from the horizontal.
298. In contiguous seams two or more plans should be maintained if inclination is horizontal. from the
299. No working shall be made within meters from the railways.
300. At least entrances are provide before a mine closure protective works.
301. No working shall be made within a distance equal to of the pillar from the boundary.
302. No working shall be made within a distance meters from the boundary of any opencast workings.
303. SCAMP stands for .
304. Strata control and monitoring plan framed by manager before days of commencement.
305. Dimensions of base piece is cm in thick, cm in width, cm in length.
306. Dimensions of lid over the prop is cm in thick, cm in length, and width is not less than
307. For bar support makes the holes into side of at least in cm deep on either side of roadways.
308. Laggings are placed at a intervals of meters.
309. Length of the cogging member is meters.
310. Length of the cogging member is meters if roof height is more than 3meters.
311. Every cogging member is supported with corner props will serves the purpose of

312. The cogs are erected at


313. The load bearing capacity of cog is tons.
314. Over hanging sides are supported by props at a intervals of meter length.
315. Workings are said to be steep when inclination of roadway is more than degrees, other wise he is
protected with
316. No person shall work or permitted to a work at a inclination of degrees.
317. No loads are carried at a inclination of > degrees.
318. Fencing should be erected meters from the danger.
319. Sirdar goes to underground before hours of commencement of shift.
320. Sirdar should inspect his district regularly once at least every hours during his shift.
321. During sinking shaft inspection shaft bottom by sirdar after each round of .
322. Breadth of footpath is not less than meters.
323. At every place where inclination is more than degrees level steps shall be made, height of such steps is not more than
meters and from edge to back is not less than meters.
324. All Indian coal seams are classified into different degree of gassiness by the
325. Any increase/decrease of gassiness is inform to RI within hours.
326. RI shall inspect the mine within days of receipt of information and to verify the appropriate degree of
gassiness.
327. All surface structures and supports within a horizontal distance of meters shall be of
fireproof material.
328. Shale or other carbonaceous materials are not heaped or dumped within a distance of meters from any
entrance of mine.
329. No person shall light or fire within a distance of meters from the entrance of opencast mines.
330. competent person shall inspect all entrances of a mine once in every days.
331. Permission for welding in degree 1 and degree 2 gassy mines is given by
332. Permission for welding in degree 3 gassy mines is given by
333. All unused workings connected to surface through a walkable passage which in not permanently closed, shall be inspected by a competent
person once in every days.
334. Testing of CO once in every days.
335. Complete analyse of CO formed / O2 Observed is once in every days.
336. All un used workings which is not sealed off and all isolation stoppings are inspected by competent person once in every days.
337. When fire has been broken out adequate no.of and at least smoke helmets are provided.
338. Every HEMM in opencast mines are equipped with
339. Semi-automatic type fire suppression system is provided to trucks and dumpers having a capacity of
tones.
340. Soda acid type extinguishers are not used for fires.
341. Foam type extinguisher not suitable for fires.
342. Inspection of all firefighting Equipment done once in days.
343. Fire or spontaneous heating which cannot be control immediately when the fire is within
meter from the outlet or openings.
344. Fire or spontaneous heating which cannot be control immediately when the fire is within
meter of hard cover.
345. Once in every days to ascertain the conditions behind the stoppings built to seal of old workings.
346. All isolated stoppings which are built around and to ascertain outside atmosphere of such stoppings shall be analyse once in every days.
347. Average concentration of air borne respirable dust is not more than mg/m3.
348. Percentage of respirable free silica is not more than and this figure is arrived by dividing the figure of
with the percentage of free silica.
349. Dust samples are collected within meter of a normal working position of worker whose dust exposure is
maximum
350. All sampling equipments are calibrated not earlier than year.
351. Dust samples are collected always side of workings.
352. Dust Samples are collected by only persons.
353. All results of air born dust shall be recorded within days of the date of collection of samples.
354. A series of samples are taken in successive normal working shifts.
355. No screening plant is placed within a distance of _ meters fromthe of DC shaft.
356. Wet cuttings are provided within a distance of meter from face.
357. Every working face, roof, floor and side of the roadway within meters from the face is water washed.
358. All devices used for suppression of coal dust shall be inspected once every days. And thoroughly
examined and tested once in every
359. The dust plan having a scale of
360. Naturally wet means not less than % by weight of water.
361. Incombustible dust shall be examined by once every months.
362. If coal seam contains < 30 % of volatile matter not less than % of incombustible dust is sprinkle on roof, sides,
and floor of the roadway.
363. If coal seam contains > 30 % of volatile matter not less than % of incombustible dust is sprinkle on roof, sides,
and floor of the roadway.
364. Before treating with incombustible dust all coal dust shall be clean and removed within hours.
365. Qualification of dust in charge is
366. Dust in charge can act as sampling in charge when average monthly output of a mine is less than tons.
367. Every return airway having a length of more than meters which is no naturally wet shall be divided into zones of not more than meters
and every zone is sub divided in to sections of not more than
meters in length.
368. Sampling plan having a scale of not less than .
369. Dust samples are collected once in every days from every zone.
370. Dust samples are collected after hours of cleaning.
371. In every traveling roadway dust samples are collected once every months.
372. If a zone is treated with incombustible dust the samples are collected by means of .
373. If a zone is treated with water the samples are collected by means of .
374. The Dust samples are collected from the roof, sides are not more than in depth.
375. The Dust samples are collected from the floor are not more than in depth.
376. Width of the strip is not less than cm, at a uniform interval of
377. Wet samples are collected for every meters length in the zigzag path.
378. Weight of the sample so collected is not less than grams.
379. Reduction of samples is by and
380. Dust samples are send for analys within days of collection.
381. Where any working is extending to within meters of goaf/disused working a advanced bore hole shall be maintain up to
a distance of not less than meters.
382. Permission for any recovery works is taken by the manager shall not less than days.
383. No party is less than members should under go recovery operation.
384. Every entrance of a mine shall be meters above the highest flood level at that point.
385. No working shall be done any spot lying within a horizontal distance of m from bank of a river.
386. A Competent person shall inspect danger from surface water once at least in every during rainy season, and days
days in other seasons.
387. The manager shall inspect for water once in every personally.
388. No working has approached within meter of any water bodies.
389. The Height and width of gallery while approaching water body is not greater than meter.
390. Advanced bore hole shall maintain not less than water bodies. meters of advanced gallery while approaching to
391. Flank holes are drilled at a intervals of not more than
meters while approaching to the water bodies.
392. Plans of a sections are updated once in every days, while approaching water bodies.
393. Permission for intentional flooding by manager is taken not less than days of such intension.
394. Permission for construction of water dam by manager is taken not less than days of such intension.
395. Regulation number of standards of ventilation is _ .
396. In every ventilation district not less than m3/minute of air per person employed in the district on the largest shift.
397. In every ventilation district not less than m3/minute of air per ton of daily output.
398. At every place in a mine not less than % of oxygen
399. At every place in a mine not more than % of carbon dioxide or any noxious gas.
400. Percentage of inflammable gas in general body of air Is not more than
401. Percentage of inflammable gas in general body of return air Is not more than
402. Wet bulb temperature in any working place does not exceed degree centigrade.
403. Where Wet bulb temperature exceed degree centigrade, air current moving at speed of .
404. Air sample and the temperature readings are taken at a intervals of once on every days.
405. Every main mechanical ventilator in mine shall be installed not less than meters from the opening of the
shaft or incline at any point.
406. No booster fan is installed in belowground in the mine unless is satisfied as a results of ventilation survey.
407. Before installation of booster fan permission has to taken prior to days from R.I
408. Inspection of booster fan by competent person once in every days.
409. In every mine quantity of air shall measured once in every days in second/ third degree.
410. In every mine quantity of air shall measured once in every days in first degree.
411. In very ventilating district there shall be provided 2 independent intake air ways one of which shall be used as a roadway.
412. Every connection in between main intake and return at least doors shall be provided.
413. The space between the frame of every ventilation door and the roof and sides of the roadway shall be built with masonry or concrete not less
than cm in thickness.
414. Every stopping between main intake and return having a thickness is not less than cm if it is
constructed with properly reinforcement.
415. Every stopping between main intake and return having a thickness is not less than cm if it is
constructed without properly reinforcement.
416. The portion and wall of every air-crossing shall be not less than cm thick if it is constructed with properly
reinforcement.
417. The portion and wall of every air-crossing shall be not less than cm thick if it is constructed without properly
reinforcement.
418. All ventilation devices are inspected by competent person once in every days.
nd
419. Velocity of air in 2 degree gassy mine of immediate out bye ventilation connection from the face is
420. Velocity of air in 1st degree at 4.5 m from any face is not less than m/min.
421. Velocity of air in 2nd degree at 7.5 m from discharge end of pipe line is not less than m/min.
st
422. Velocity of air in 1 degree at entire length of longwall is not less than m/min.
423. Velocity of air in 3rd degree at 4.5 m from any face is not less than m/min.
424. Velocity of air in 3rd degree at 7.5 m from discharge end of pipe line is not less than m/min.
rd
425. Velocity of air in 3 degree at entire length of longwall is not less than m/min.
426. Auxiliary fan is always keep within a distance of meters from the face (or) blind end.
427. Installation of number of auxiliary fans in the same ventilation district is prohibit.
428. The first inspection of a mine which is re-opened after discontinued of mining operations for a period of not exceeding days.
429. The percentage of CH4 is not more than in first degree gassy mine in general body of air.
430. The percentage of CH4 is not more than in 2nd degree gassy mine in general body of air.
431. The percentage of CH4 is not more than in 3rd degree gassy mine in general body of air.
432. Inspection of unused working for gas once in every days.
433. Air samples are analysis within days of collection.
434. If any determination shows the percentage of inflammable gas exceed determination shall be made or samples are taken at a intervals
of not exceed _ hours.
435. If any determination shows the percentage of inflammable gas exceed determination shall be made or samples are taken at a intervals
of not exceed _ days.
436. If percentage of inflammable gas more than one in quarter electricity.
437. No working or gallery shall be extended to a distance of more than meters from the nearest
ventilation connection.
438. Narrow gallery shall not exceeds meters from the widest gallery.
439. White washing is done at every place except meters rom the face.
440. Electrical lighting is provided at any place except meters from the face.
441. In a mine insufficient lighting is caused by
442. explosives are not used in any mines.
443. The place where the explosives are stored in underground mines known as
444. The building where explosives are stored is known as
445. Maximum number of shots fired by shot firers is decided by .
446. Detonators are carried in containers.
447. Not more than no.of containers are allowed to carry per one person.
448. Every container contains kg of explosives.
449. Qualification of shot firer in case of belowground is
450. Qualification of shot firer in case of opencast mine is
451. Maximum number of shots can fired by shot-firer in case of second / third degree gassy mines when single shot exploder is used is shot.
452. Maximum number of shots can fired by shot-firer in case of second / third degree gassy mines when multi shot exploder is used is shot.
453. Maximum number of shots can fired by shot-firer in case of first degree gassy mines when single shot exploder is used is shot.
454. Maximum number of shots can fired by shot-firer in case of first degree gassy mines when multi shot exploder is used is shot.
455. Maximum number of shots can fired by shot-firer in case of opencast mines when single shot exploder is used is shot.
456. Maximum number of shots can fired by shot-firer in case of open cast mines when multi shot exploder is used is shot.
457. Key of all containers are kept with throughout the shift.
458. key is always keep with the shotfirer.
459. tool is used by the shotfirer for crimping the detonator.
460. tool is used by the shotfirer for cleaning shot hole and crack detector.
461. Length of shot firing cable is meters.
462. tool is used for stemming the shot hole.
463. tool is used to continuity of circuit.
464. tool is used for puncturing the explosive cartridge.
465. In open cast mines misfired shots are indicated by
466. Clearance between shot hole and explosive cartridge is of at least centimeter.
467. The place where priming is done in an underground is
468. Where more than one shot is fired it should be of
469. Shot-firing apparatus are tested once in every months.
470. Danger zone of open cast mine is meters.
471. Relieving hole is drilled at a distance of _ meters from misfired shot.
472. After shots are fired in stone drift up to meters from the face is water washed.
473. Test for inflammable gas before and after shot firing is done upto a distance of meters.
474. When two working places are approach at a distance of meters, no shots are fired at any one side of the workings.
475. Use of non- flame proof apparatus for a period of year.
476. Central electricity authority regulation
477. For exploitation of methane not less than months before, and not less than days before
commencement of such occurrence.
478. For swinging of drill machine a clear space of meters below the roof and meters on sides.
479. For exploitation of methane a coal barrier shall left meter thick.
480. Methane monitors are installed to main pipe lines at a intervals of meers.
481. Supply of foot wears once in every months for free of cost.
482. Supply of helmets once in every months for free of cost.
483. Man power distribution plan is submitted to R.I once in every
484. Place of accident hall not be disturbed within _ hours of accident.
485. An appeal to C.I against R.I within days of the receipt of allegiance.
486. An appeal to committee against C.I within days of receipt from C.I

1 27th November 2017 41 30 days


2 No intention of working in feature 42 1st day of february
3 Abandoned mine methane 43 30:90 days

4 Neither intrinsically safe nor flame proof Approved


safety lamp 44 7 days
5 <30 volts 45 30 days
6 >30volts 46 24Hours
7 Ventilating one or more no.of working face 47 14 days
8 Banks man 48 7 days
9 Coal mine methane 49 15 days
10 discontinued working 50 3days
11 On setter 51 6 members
12 Moving front of gallery 52 Degree in mining engineering

Boosting the whole current of air passing along the intake a) 3members, 1st class managers certificate or notless than
13 & return airway 53 2years of experience in m/d/c/s b) 1 service in educational
institution at degree level c) 1 from mining research and
planning
14 20 54 3 years
15 3 55 central government
16 Likely to worked in feature 56 C.I and secretary
17 1st April to 31st march 57 Dhanbad
18 landing or platform 58 10 clear days
19 Working 59 3 membes

20 failure to explode of an entire charge of explosives in a shot 60 7days latter if that day is holiday then meeting is on next
holes working day
21 heavy earth moving machinary 61 chairman
22 hand drills operation , 50 mm 62 3 days
23 Working place 63 60 days

24 seald off area, bore hole drilled in the seam,adjucent strata


64 20 years

25 fire or spontaneous heating occure within mine boundary


65 1 year
independent air commencing from main intake and
26 independent return turminating to main
return 66 intermediate or pluse two

27 0.1 and 1m3/tonne 67 St.Jhon ambulance association new delhi


28 0.1 and 1-10m3/tonne 68 2years
29 10m3/tonne 69 5years
30 zero accident planing 70 4years
31 ZAP 71 2 years
32 competent person 72 6 months
33 severity index 73 7(SEVEN) attempts
34 principal official 74 1 year
Permanent loss of any part/section of
35
human body part 75 6 months

absence of injured person for a period of


36
more than 72 hours 76 15 days

absence of injured person for a period of 24


37
to less than 72 hours 77 30 days

38 remindefr after drilling and blasting 78 30 days


39 20 79 60 years
40 Haul roads 80 3 months and 70 years

81 Degree in mining engineering with first class manager's 121 4days in a week
certificate
82 23 122 once in a fort night
83 >2500 123 within 3days
84 >20000 m3per month of material handled 124 overman
85 12 months 125 every working day
86 30days 126 15 days
87 30ays 127 once in every day
88 60days 128 3months
89 5km 129 ventilation efficiency cuotient
90 >5000 and >20000m3/month 130 48 hours
91 >15000 tones/month 131 90 metres
92 >50000m3/month 132 7 days

93 10000 to 15000 tones/month ladder of suitable length,wooden bunton or pole


133
20000 to 50000 m3 of materials handled per
94 month 134 sylvester prop withdrawer
95 5000 to 10000 tones 135 not more than 1 hour
96 >7000 tons 136 120metres
97 8 members 137 trial run
1 assistant manager should have 1st class mngr certificate
98 138 >2hours and 1 complete up and down trip
99 10 asst.mngr 139 >1 in 5
100 14 asst mngrs 140 2 hours
True /magnetic north name,owner and purpose of plan
101 30% 141
102 5000tpm 142
103 2500tpm 143 map distance / ground distance
104 >15000tpm 144 1/1000

105 >10000tpm 145 1/10000


106 <15000tos/month 146 1:1000 and 1:2000
107 >650 volts and >1.5 MVA 147 1/500
108 diploma/degree in mechanical engineer 148 1;5000
109 >150HP 149 200m

110 degree /diploma in mechanical engineer or degree in 150 60m


ine machinery engineer
111 12 m onths 151 200m
112 30 days 152 >30 degrees
113 1 surveyor 153 not exceeding 100m
114 4 surveyors 154 key plan and 1:50,000
115 3 surveyors 155 60m
116 2surveyors 156 <9m
117 3 surveyors 157 not more than 5m
118 4 surveyors 158 not mor than 10m
119 6 surveyors 159 150m
120 10 surveyors 160 3 months
161 2 openings 201 10 times
162 >30 meters 202 endless rope haulage
163 > 1 kilometer 203 3.5 years
164 <30 meters 204 galvanized wire ropes
165 8not more than 80 degrees from the horizontal and 10 meters 205 3 meters
166 1 meter 206 2 meters
167 9 meters 207 10 times
168 not less than 13.5 meters 208 6 monts
169 not less than 1.8meters and 1.5 meters 209 lead-80%, antimony-15% and tin-5%
170 within 6meters from bottom of the shaft 210 300 degrees
171 within 20 meters from bottom of the shaft 211 6.5 times
172 7 days 212 7.5 times
173 windiing engine driver certificate 213 100 degrees
174 not less than 5 hours 214 363 degrees
175 <30H.P and not exceed 18 cm 215 chief inspector
176 60 days before commencement of such intention 216 6 months
177 1.5 degree 217 not more than 6 years
178 100 times 218 not less than 10
179 atleast 2 turns on the drum 219 30 days
180 to keeping the drum stationary 220 5 trips with full load
181 reliable depth indicator 221 to arrest tubs from running or moving out of control
182 mines manager 222 alter the direction of rope
183 lower the cage 223 set of train of tubs + not mere than 10 meters
184 smooth and safe travelling of cage 224 back stay and prevents tubs to running back
185 15cm 225 forword direction
186 1.8meters 226 back catch or monkey catch
187 3.6 meters 227 250 meters
188 Automatic contrivance 228 pittop, branching off roadways, near tha shafts, district
entrances
189 229 30meters
190 over speeding, over winding slow banking 230 2 raps
191 7 days 231 30 volts.
192 3 months 232 300 meters
193 oOver winding mark 233 10 meters and more than 1 in 6
194 15 cm 234 20 meters and < 1 in 6
195 25 cm 235 not less thn 1.8 m
196 45meters 236 not < 0.75m to not >1m
197 22.5meters 237 0.3m
198 24 hours 238 1.2m
protective covering on cage at a distance of within 1 meter
199 22.5m 239
200 45metersand 2.5 meters 240 1 meter
241 1 meter 281 111

242 1.8 METER 282 rectangular

243 30 degrees 283 3 meters and 4.8 meters

244 45 degrees 284 18

245 60 degrees and not more than 10 meters 285 13.5

246 1 km 286 19.5

247 20 cm 287 39.5

248 seven (7) and not exceed 3 years 288 not more than 4 pillars

249 mines manager 289 not more than 2 pillars

250 ,10 meters 290 10th day of evry month

251 Direct rope haulage 291 C.I

252 less than 8 292 15 days

253 6 months 293 15 days

254 not less than 1 meter 294 atleast 3 years

255 > 30meters 295 9 meters

256 24 hours 296 3 meters

257 7 days 297 <30 degrees

258 7 days 298 >30 degrees

259 1 in 15 299 45 meters

260 5 meters 300 two

261 1.2 meters 301 half of the pillar

262 45 degrees 302 7.5 meters

263 1.5 meters 303 Strata control and monitoring plan


264 height of the bench 304 30 days
265 2.5 meters 305 5,25,75 cm
266 1.5 meters 306 8,50 and ot less than dia of the prop
267 3 meters 307 50cm long
268 45 degrees 308 1 meter
269 height of the bench 309 1.2 meters
270 6 meters 310 1.5 meters
271 3 meters 311 prevents slipping/ load indication
272 under cut 312 goaf edges, junctions, brake liners l/w tables
273 not less than 3 meters 313 20 tones
274 3 times the height of the bench 314 stay props
275 digging height of the bench 315 30degrees, safety belt or life line
width of the widest machiine playing on the bench,3 times the
276 width of dumper and the height of the bench 316 45 degrees
277 37.5 degrees 317 30 degrees
278 30 meters 318 15 meters
> 30 meters and not exceed 1 vertical to 1.5 2 hours
279 horizontal 319
280 100 meters 320 4 hours
321 round of shots 361 3 months
322 1 meter 362 not less than 75%
323 >15 degrees, 0.18 m and 0.35 meters 363 not less than 85%
324 C.I 364 24 hours
325 24 hours 365 I/II class /degree / diploma in mining engineer
326 30 days 366 <5000
327 10 meters 367 200m,15m,50m
328 15 meters 368 1;5000
329 15 meters 369 30 days
330 7 days 370 24 hours
331 manager 371 3 months
332 R.I 372 strip sampling
333 30 days 373 spot sampling
334 7 days 374 5mm
335 30 days 375 10mm
336 7 days 376 10cm
337 self rescuers and 2 smoke helmets 377 1 meter
338 automatic detective and supression system 378 30 grams
339 <35 tonnes 379 coning nd quatering & riffle box technique
340 Oil and electric fires 380 7 days
341 Electric fires 381 30m and 1.5 m
342 every month 382 30 days
343 60 meters 383 3 members
344 < 10 meters 384 1.5m
345 30 days 385 15m
346 7 days 386 14 days and 30 days
347 2mg/m3 387 quarter
348 <5% and 10 388 60m
349 1 meter 389 2.4X2.4m
350 1 year 390 3m
351 return side 391 5mm
352 specially trained persons 392 15 days
353 14 days 393 14 days and 30 days
354 5 samples in 7 working shifts 394 14 days and 30 days
355 80 metre 395 153
356 90m 396 6
357 60m 397 2.5
358 7 days and 1 mont 398 19
359 1;2000 399 0.5
360 30% 400 1.25
s

401 0.75 441 glare


402 33.5 442 liquid oxygen
403 30.5 and 1m/s 443 resurve station
404 30 days 444 magazine
405 10m 445 manager of mine
406 manager of mine 446 haevily galvanized container
407 7 days 447 2 no
408 7 days 448 5kg
409 14 days 449 1st /2nd class/overman/sirdar with G.T
410 30 days 450 1st /2nd class/overman/sirdar
411 travelling road way 451 40shots
412 2 doors 452 80hots
413 25cm 453 50shots
414 15cm 454 100shots
415 25cm 455 60shots
416 15cm 456 120shots
417 25cm 457 shot firer
418 14 days 458 retaining key
419 30m/min 459 crimper
420 30m/min 460 scraper
421 15m/min 461 50meters
422 60 m/min 462 stemming rod
423 45m/min 463 gavanometer/circuit tester
424 25m/min 464 pricker
425 75m/min 465 red flags
426 3m 466 0.3cm
427 2 or more auxilary fans 467 reseve station
428 7 days 468 electric
429 not more than 0.1 469 3 months
430 not more than 0.5 470 500m
431 not more than1.25 471 0.30m
432 7 days 472 1.2m
433 3 days 473 18 meters
434 0.8 and 24 hours 474 9 meters
435 0.6 and 30 days 475 not more than 1 year
436 cut-off electricity 476 2010
437 3m 477 6 months and 30 days
438 3m 478 0.3m and 0.6m
439 100m 479 150m
440 270m 480 150m
481 6months
482 3years
483 month
484 72 hours
485 15 days
486 20 days

You might also like