You are on page 1of 5
lowner |BHARATH PETROLEUM CORPORATION. CONTRACTOR : |ZEECO INDIA PRIVATE LTD ze ( CONSULTANT: JENGINEERS INDIA LiMiTED INSPECTION & TEST PLAN FOR EQUIPMENT ERECTION (STATIC) = Jpnovecr = PROPYLENE DERIVATIVE PETROCHEMICAL PROJECT(POP®) OFM/s BPC-KOCHI REFINERY, KOCH, KERALA rae oF work | FLARE SYSTEM PACKAGE FOR POPP 108 Ne. TAM 0. No, & Date + 4506657889 Dated 16.10.2017 RECTION CONTRACTOR NEO STRUCTO CONSTRUCTION PRIVATE UNITED FORMAT NO + @N/35201/4010/30 Foy i vy Denton oo cctane eters spo eon vest Forms seo. | paves Cont oncment | cet cr espe va eee ay A_[psroneenecron ewe ounton acceptance | Stndardspecteaton Na, Fra AePISI FSRINERAESTRAAEE i x nad section opote ror fvecaton a ton Rae No 8 Standard petition. ee 7 7 2 coring ater erect AeeoweOravings | Streand Cust ng were . . 2 [ieee ocean cee ine mating on Standard Smcieton No. Sane a : : 3 | equipment an foundation 6-82-2100 Rev: 02 eprores Dimvine: 8 Be B [Level of Foundation 22 |Ghisfpacing wth eanngto | Samdbdsoreteton ©. | peroves oraings esecton Ener : , : Ibe prepared & kept ready! —_ ovecnsectna taeot | — Sand Specteaton na as uaa i 33 Hreundation bolts 6-82-2100 Rev: 02 eee: f ee ’ f 4, feleowanno ott nase] stand Specteston Na ; ee i i 14 [ities ctenipmareauees | "eanaico nena Aone aes fect , , : Iaringecuipmentbuenols | stand Specteston Ne 35 Ketnscit foundations yet] 5922100 Rew C2 sorcve roe: ecuton Ener i oo Prepared By: (2eeco ina Private Limited) ‘Checked By: (2e0co India Private Limited) (2080 ‘Approved By: Inde Private Umited) JOWNER : |CONTRACTOR ; 4 }CONSULTANT = NARA PETROLEUM conPoRATION eco a vei Nerneee A LED INSPECTION & TEST PLAN FOR EQUIPMENT ERECTION (STATIC) on Sronscininaie rani fama na aa oes asaeraen casa |ERECTION CONTRACTOR : NEO STRUCTO CONSTRUCTION PRIVATE LIMITED [FORMAT NO : ZIN/33201/4010/30 aa hy Se espe epee a y 38, fe onenatoa Samson Lan rs Fen tes - ’ ; a eesitonmente 182-200 Rev 02 rawings fae a | < fase 1 Jor sting & condition of wire rope | 6-82-2100 Rev: 02, Drawings nai inte a ' Ls Irientation to be checkec ee yrawings, cecution Engineer _ P s idrawing, 6-82-2100 Rev: 02 mT ae F e Dey? - T ore i 7 EN. ec a | a i PM avs Je) a Dee J ve | ae =n eee er cetnacron: 55° Jeonsrran lowner [BHARATH PETROLEUM CORPORATION, == _[26£CO IvDIA PRIVATE LTD JENGINEERS INDIA LIMITED INSPECTION & TEST PLAN FOR EQUIPMENT ERECTION (STATIC) lpnosect + PROPYLENE DERIVATIVE PETROCHEMICAL PROJECT(PDP2) OFM/s BPCI-KOCHI REFINERY, KOCHI, KERALA wane oF work. : FLARE SYSTEM PACKAGE FOR POPP ios no. saa P.0. No. & Date 4506657889 Dated 16.10.2017 [ERECTION CONTRACTOR : NEO STRUCTO CONSTRUCTION PRIVATE LIMITED [FORMAT No : Z1N/33201/4010/30 the TRC o hity Description ntl Docam cepance Criteria sponsible Person Veving Forms sen ‘atity Destin Control Document ‘Acceptance Response ving ai oa ay bscoment of Msn & traiing approved rigging, | Standard Speciation No coved Drawings section Engineer - 3 [rae sper aeons eos ae Approved rowing xaction Enh , P 1, _[Osentaton of Equipmentasper | Standard speciation no. ae eau eger z larc drawing 682-2100 Rena | __MPPoved rowing Sin e f « [eeteRenecrion [ihtoning of bits and providing | Standard Spectieation No. ee : 2 |e eit See Approved rawines Execution Enh ZNsTv-281 ’ , \evling and alignment of Standard Spectieation No ae ae ; ” a (aaa Po Approved Drawings Becuton Eg ans ’ [corresponiing requirement Standard Speciation No oe oe th 3 _[elevaton a distance between raid uct proved Drawings txecution Enh aNsirv281 , . = ozs in special cases Cleaning sleeves before “Standard pedteation No. oe section Engneee 2 # lero 822300 Rerc2 | _APProved Crowns ae | ’ : 5 [nouns |, [seceptanesofspecied grouting | Standard Specfieation No. — ae . : 54 ater 682-2100 Revo Foren ipsinet Eeseuerto 7 i 4 \ | FAN st) 1 Np, ae we t EOP TF) | “approved By (2eeco India Private Limited ) Prepared By: ‘checked Bye (ReecolndiaPrivateinited) ——|——_(Zeeco India Private Limited) JOWNER : IBHARATH PETROLEUM CORPORATION. CONTRACTOR : |ZEECO INDIA PRIVATE LTD Ze CONSULTAN' JENGINEERS INDIA LIMITED INSPECTION & TEST PLAN FOR EQUIPMENT ERECTION (STATIC) JPRouecT Name oF woRK ‘PROPYLENE DERIVATIVE PETROCHEMICAL PROJECT(PDP>) OFM/s BPCL-KOCHI REFINERY, KOCHI, KERALA FLARE SYSTEM PACKAGE FOR POPP 6 |Finaltightenng of bolts 6-82-2100 Rev: 02 Approved Drawings how No. B42 .0, No, & Date 1 4506657889 Dated 16.10.2017 [ERECTION CONTRACTOR : NEO STRUCTO CONSTRUCTION PRIVATE LIMITED [FORMAT No : ZIN/33202/4010/30 = crate, | __ Active Descion conv ser cans cote repre ves foe oe 5.2. [placement of grouting eared ‘Approved Drawings Execution Engineer - e w 53 [caring grouting Sentero Approved Drawings execution Engineer ° w Standard Speciation No. Soho a ° anal F_ jpacken equipments 2 [oeroreinsrauaTion entity the mstera, check 11 ehickness, dimensions, No. and angle of frgers of packing rings Standard pecifiation No. 1682-2100 Rev: 2 Approved Orawings (ality Engineer 2 ouRING INSTALATION [ocgreasing and leaning of 2a [packing materia Standard Specification No. 6-82-2100 Rev: 02 Approved Orancings Execution Engineer 22 _|checkpacking support plate Standard Specification No, (82-2100 Rev: 02 Approved Drawings Execution Engineer Tene tor tacked or dumped 73 | packing as per specifications 6-82-2100 Rev: 02 ane rameter 7 | 4 | ey ~ pan’ al | Ke | wk (se } yw [see Prapared By: | 2eeco India Private Limited) i T ‘chieked By | Clewcotndia Private uted) -aeeloved (engi ite Owner : BHARATH PETROLEUM CORPORATION. CONTRACTOR “Fy consuttanr: IZEECO INDIA PRIVATE LTD |ENGINEERS INDIA LIMITED INSPECTION & TEST PLAN FOR EQUIPMENT ERECTION (STATIC) lprosecr + PROPYLENE DERIVATIVE PETROCHEMICAL PROJECT(POP?) OFM/s BPCL-KOCHI REFINERY, KOCHI, KERALA NAME OF WORK : FLARE SYSTEM PACKAGE FOR POPI 108 No. A802 P.O. No. & Date + 4506657889 Dated 16.10.2017 [ERECTION CONTRACTOR : NEO STRUCTO CONSTRUCTION PRIVATE LIMITED [FORMAT NO : z1N/33201/4010/30 ECO Seno ‘Aathity Description tol Document cceptanc Criteria onaible Person venting Forms |= fi ity Desert ontro 7 ‘Acceptance Crier Responsible Pe vine | ee ee WA Standard Speciation Ne asepearsaaae i : 24 |eheck for nesting peak Avproved Drawings Execution Ene P P lcnecx that packings are touching | Standard Speciation No. rawings scution Engineer c 25 eedtiniter 1-82-2100 Rev: 02 parce rawr Boor Eel e H i ¢ _ | wspectiow «esr pocuments 1 [Review est inspeccon Standard Specification No. | Project Specficatin/Approved eer ‘Alrelevant Formats / Reports loocuments 622100 Rev: 02 ‘rawings eat Ee ‘and drawings e F & Legend | Ja polt which requires inspection /veifiation and accaptance by Owner (EL before any further processing i permitted. Zeeco ila Private Limited shal not | F hen Pee pene eaeceeeenerceersrag et pen eeprom eopeege sac Ch ogc ea GTR Wen Sly eon Mt pop sata ben esata Rana ond Faber lepine eintrporiepeesripvabetirrtyertt palais creat apa mneted eer w ekpessfeiet lctvity or does not provide corrments before the date notified, Basis of acceptance shall be Zeeco India Private Limited generated documents 3: per [sect cial a Reaeapaainead [tel dna her iid spool rpc onmet ieee ea ees s = Jaudit, inspections, witness of testing, Review of quality documentation, personnel qualifications etc. — co sapeve A anivbenZec etPrsintd ya Ee PAN Yer ZO ran fa\ 2) / \ | we Ye) alia 1 Soar 7 a istic;

You might also like