The risk rating used for this report is as below (They are indicated against the serial numbers of each violation):
- Very High & Unacceptable - High - Medium - Low
LOW CLOSED
Classified: Internal
Page - 1 - of
12
2 Violation: Chemicals stored without proper Corrective Action Implemented: Chemicals have
precautions been reorganized and stored safely. Personnel trained and
Hazard/Risk: Fumes in the area equipped with PPE. Regular inspections scheduled.
Action required: To store chemicals in proper
manner
LOW CLOSED
3. Violation: Poor cable management Corrective Action Implemented: Cables have been
Hazard/Risk: Trip and fall rerouted and organized to eliminate trip and fall hazards.
Action required: To route cables in proper
manner
LOW CLOSED
Classified: Internal
Page - 2 - of
12
4. Violation: Wet floor Corrective Action Implemented: Wet floor addressed
Hazard/Risk: Slip and fall promptly, area dried, and safety ensured to prevent slip
Action required: To keep the area dry and and fall accidents.
ensure area is safe
LOW CLOSED
Classified: Internal
Page - 3 - of
12
5 Violation: Sharp edges Corrective action implemented: Sharp edge materials
Hazard/Risk: Injury have been installed in the site. Also given training to the
Action required: To secure the sharp edges workers about the storage of sharp edge materials
Classified: Internal
Page - 4 - of
12
6 Violation: Medicines stored in improper manner Corrective action implemented: Medicines have been
properly stored in designated first aid boxes, and a first
Hazard/Risk: Damage to medicines
aid checklist has been provided to ensure proper inventory
Action required: To store medicines in proper
management and accessibility during emergencies.
first aid box and provide first aid checklist
Classified: Internal
Page - 5 - of
12
7 Violation: Damaged electric light Corrective action implemented: Damaged electric light
Hazard/Risk: Electric shock has been promptly replaced with a new one to mitigate the
Action required: To replace damaged light with risk of electric shock.
new one
Classified: Internal
Page - 6 - of
12
8 Violation: Materials left without securing Corrective action implemented: Materials have been
Hazard/Risk: Trip and fall properly secured to prevent trip and fall hazards.
Action required: Secure materials in proper
manner
Classified: Internal
Page - 7 - of
12
9 Violation: Heavy marble material stored without Corrective action implemented: The heavy marble
proper precautions material has been securely stored with proper precautions
Hazard/Risk: Fall on personnel to prevent falls on personnel
Action required: To secure material in proper
manner
Classified: Internal
Page - 8 - of
12
10 Violation: Fire extinguisher access blocked Corrective action implemented: Fire extinguisher
Hazard/Risk: Fire extinguisher not able to use access has been unblocked and relocated to ensure easy
during emergencies accessibility during emergencies, mitigating the risk of
Action required: To store fire extinguisher in inability to use it when needed.
accessible way.
Classified: Internal
Page - 9 - of
12
11 Violation: Electrical DB left open Corrective action implemented: The electrical
Hazard/Risk: Electric shock distribution board (DB) door has been closed and secured
Action required: To keep the DB door always at all times to prevent the risk of electric shock
closed
Classified: Internal
Page - 10 - of