involves several crucial steps, considering the country's specific regulations, climate,
and logistical considerations. The following outline provides a general framework
for such a project, with the understanding that specific details may vary based on
location, size, design specifications, and local government requirements.
Phase 1: Pre-Construction
1. Roofing Installation
o Waterproofing and insulation.
o Finishing materials (e.g., metal roofing sheets).
2. External Finishes
o Painting and external decor.
o Installation of doors, windows, and ventilations systems.
3. Landscaping and External Facilities
o Parking areas, pathways, and green spaces.
o External lighting.
1. Flooring
o Concrete screed, tiles, or sports flooring systems.
2. Electrical and Plumbing Systems
o Wiring, outlets, lighting fixtures.
o Plumbing installations for restrooms and any other water needs.
3. Interior Finishes
o Painting, ceiling installations, interior lighting.
o Installation of fixtures and fittings (e.g., restrooms, changing rooms).
4. Safety and Accessibility Features
o Emergency exits, fire alarms, and extinguisher installations.
o Accessibility ramps and facilities.
This outline should serve as a general guide, and it's important to adapt it to the
specific requirements and circumstances of the project, including compliance with
the Philippine Building Code and local government unit (LGU) regulations.