You are on page 1of 3

 

 
Purdue University Project: C.40.11905 GMP3 Schleman Hall - GMP 3
2550 Northwestern Avenue, Suite 1100  
West Lafayette, Indiana 47906
P: (765) 494-0580
 
 

RFI #150: iGMP3 - SCHL - 4" Waste Main Serving 3106 & 2106 Connection Point
Not Correct Size
 

Status Open  

To Lisa Warren (MSKTD & Associates, Inc.)  From Dane Smith (F.A. Wilhelm Construction Co., Inc.)


3914 Prospect Street
Indianapolis, Indiana 46203

Date Initiated Mar 8, 2023 Due Date Mar 15, 2023

Location SCHL>1st Floor Project Stage Course of Construction

Cost Impact Yes (Unknown) Schedule Impact

Spec Section Cost Code

Drawing Number P302 Reference

Linked Drawings  

Received From Dane Smith (F.A. Wilhelm Construction Co., Inc.)

Copies To Jeff Bogle (MSKTD & Associates, Inc.), Rick Dahlstrom (MSKTD & Associates, Inc.), Rustin R Meister (Purdue University),
Purdue PFPMC (Purdue University), Dane Smith (F.A. Wilhelm Construction Co., Inc.), Jim Stanich (F.A. Wilhelm Construction
Co., Inc.), Amogh Swamy (F.A. Wilhelm Construction Co., Inc.), Aaron Tague (F.A. Wilhelm Construction Co., Inc.), Gavin
Wanstreet (F.A. Wilhelm Construction Co., Inc.), Lisa Warren (MSKTD & Associates, Inc.), Joe Wilhelm (F.A. Wilhelm
Construction Co., Inc.) 
 
 
Activity
 
Question Question from Dane Smith F.A. Wilhelm Construction Co., Inc. on Tuesday, Mar 7, 2023 at 05:43 PM EST
  Drawing P302 shows the new 4" waste main connecting to an existing 4" waste line in room 1100. There is not a 4" waste line
to connect to in room 1100. Wilhelm demolition opened the wall up and have confirmed that there is a 4" galvanized waste
riser inside of the chase on the west side of 1100. 
 
We suggest to open the chase wall and cut a combo into the existing waste main to connect the new 4" waste main from 2106
and 3106. This will have added cost. 

  Attachments
RFI-150-iGMP3-SCHL- 4 Waste Main Serving 3106 and 2106 Connection Point Not Correct Size.pdf
 
  Awaiting an Official Response

YES OPEN CHASE AND CONNECT TO EXISTING RISER.

Mike Wright, Applied Engineering 3-16-2023

 
Purdue University Page 1 of 1 Printed On: Mar 8, 2023 09:16 AM EST
RFI
Purdue Schleman Hall QPH Job #: 22773
475 West Stadium Ave GC Job #: XXXXX
West Lafayette,IN 47907

RFI #: 27 Date Created: 3/7/2023 Date Required: ASAP

To: F.A. Wilhelm Constuction, INC From: Quality Plumbing & Heating
3914 Prospect Street 3515 North Reed Road
Indianapolis IN 46206 Kokomo, Indiana, 46901

Phone: 317-359-5411 Fax: 0 Phone: (765) 750~4008 Fax: (765) 450~7368

Subject: 4" waste main serviving 3106 and 2106 connection point not correct size

Drawing References: Spec Section References: Sketch References:


P302 RFI Markup Attached

Question:
Drawing P302 shows the new 4" waste main connecting to an existing 4" waste line in room 1100. There is no 4" waste line
to connet to in room 1100. I had Wilhem demo open the wall up, and have confirmed that there is a 4" galvanized waste
riser inside of the chase on the west side of 1100.

Suggestion:
Open the chase wall up, and cut a combo into the existing waste main to connect the new 4" waste main from 2106 and
3106. This will have an added cost

Answer: Date Answered:

CC: GC
PM - QPH
Jobsite
File
0
1715 Magnavox Way 930 North Meridian
Fort Wayne, IN 46804 Indianapolis, IN 46204
260.432.9337 317.917.1190
www.msktd.com

OFFICE GENERAL NOTES:


1119E
1. SEE DRAWING P001 FOR GENERAL PLUMBING NOTES AND SYMBOLS.
2. ROD/SNAKE/JET AND THROUGHLY CLEAN ALL EXISTING STORM AND SANITARY
LINES THAT ARE TO REMAIN.
RESEARCH
SERVER ROOM
B117 NEIGHBORHOOD 290 Congress Street, Fifth Floor
OFFICE 1B Boston, MA 02210-1005
1119D 1119 617.895.1000
www.payette.com
# PLAN NOTES:
1. 6"ST FROM ABOVE AND DOWN.
2. EXISTING MB SHALL REMAIN IN SERVICE, EXISTING CW, HW, HWR, W AND V
SERVING EXISTING MB(S) ON ALL FLOORS SHALL REMAIN IN SERVICE.
OFFICE 3. MODIFY EXISTING CW, W AND V PIPING IN CHASE AND HOOK-UP TO WC'S, UR'S
11 HYDRAULIC
1119C
4.
AND EWC COMPLETE. INSTALL "WHA".
RELOCATED CW, HW, W AND V AS REQUIRED AND HOOK-UP LAV'S COMPLETE.
MOTORS 5. 2"W FROM ABOVE CONNECT TO EXISTING 2"W ABOVE CEILING.
10 1U02 6. EXISTING FD CLEAN TO LIKE NEW CONDITION, PROVIDE NEW RIM AND GRATE IF
EX 4"ST FROM RIM AND GRATE CAN NOT BE CLEANED DO TO DETERIORATED CONDITION..
ABOVE & DOWN RAISE/LOWER RIM FLUSH TO NEW FINISHED FLOOR ELEVATION.
WELLNESS 7. 3"CW FROM BELOW AND UP, CONNECT TO EXISTING 2 1/2" AND 1 1/2" CW'S ABOVE
ROOM WC-2
SKYPE OFFICE CEILING.
RECEIVING/ 1095 1119A 1119F 8. 2"HW FROM BELOW AND UP, CONNECT TO EXISTING 1 1/4"HW ABOVE CEILING.
12

1" CW
6" ST
COLLABORATION VESTIBULE STORAGE TOILET GROUP WORK 9. 1"HWR FROM ABOVE AND DOWN.
FD-1
1080 1H04 1089 1097 1119B 10. 2"W FROM ABOVE.
13 11
11. HWR BALANCING STATION, SEE DETAIL.
L-2
SKYPE 12. 1"CW DROP INSTALL "WHA-A", 4"W DOWN AND 2"V RISE. P501
S-1 1107 13. 3/4"HW AND 3/4"CW DROP EXTEND TO LAV AND SINK.
14 14. 1/2"W DOWN AND 1 1/2"V RISE.
15. 4"W FROM ABOVE.
1 1/4" CW OFFICE 16. 2"W SERVINIG FD ABOVE.
STAIR 3/4" HW This 4" stub coming 17. EXISTING WALL HYDRANT SHALL REMAIN IN SERVICE.
1119G 1
1S03 18. 2"W DOWN AND TEST TEE CLEANOUT.
CO HALLWAY 3" V EX 4"W out of the wall doesn't 19. EXISTING 2"W SERVING FD ABOVE SHALL REMAIN.
6" ST CO exist.INFORMAL
There is a 2"

3/4" HWR
CO 2" W 1H05B 20. 2"V FROM BELOW CONNECT TO EXISTING V UP.
9 CO stub coming
MEETING off of the
2" W
21. 1 1/4" NON-POPTABLE CW FROM BELOW.
18
1 1/4" CW 4 5
GROUP WORK
1100
vent stack.
1104 16 22. 4"ST FROM DECK DRAIN ABOVE. 8/10/22
VESTIBLE 3/4" HW
STAIR 1H05I
COLLOQUIUM 3" V OFFICE
6"ST FROM CAP 4" W CO 1119H
1069
ABOVE HALLWAY
L-1 L-1 1H05D
11 15
UR-2 19 MEN
1094
UR-1 6

2" W
WAR ROOM
1012 ELEVATOR
BE02 WC-2 STAIR
EWC-2 1S04 VESTIBULE
EAST STAIR 1H03
AV ROOM STORAGE 1 1S02
8 1069B 1069A
RFI 113 10
3
RAMP
1H05G
ELECTRICAL WC-2

Schleman Hall, Stewart Center, and Related Renovations


WC-1
7 1U03 ELEVATOR
BE01 WC-1
SKYPE
1133
19 6 OFFICE
WEST STAIR INFORMAL 1139A ELECTRICAL
1S01 MEETING
1016
INFORMAL L-1 L-1 B133
MEETING 5 CUSTODIAL
1010 1154
20 VESTIBULE WOMEN 9
1H05F 1164
21 7 IDF 2
8 OFFICE
VESTIBULE EX 1 1/2"CW 4 1U06 1139B
1H02 ELECTRICAL
6 1U01
EX 1 1/4"CW
RAMP EX 1 1/2"CW
1HO5H
RFI 92 3/4" CW 3/4" CW CAP EX 3/4"CW OFFICE
ELECTRICAL 1139C
HALLWAY ELECTRICALSECURITY/ F.A.
1U07 1U05
1H05A OFFICE
5 22 22 1139H
SECURITY/ F.A.
BU05
3/4" CW

EX 3/4"CW
OFFICE
1025G OFFICE SKYPE
1139J 1139D

RFI 125

4" ST
4" ST

SEMINAR ROOM

Purdue University
1004

Purdue Project ID: C.40.11905


OFFICE
OFFICE 1139E
1025F INFORMAL
MEETING EX 4"ST
1021 NEIGHBORHOOD
1A

Schleman Hall Renovation


OFFICE
1025E 1139
EX 3/4"CW 17

West Lafayette, Indiana


GROUP WORK
EX 4"ST DOWN 1139F
NEIGHBORHOOD EX 4"ST
17 EX 4"ST FROM 1C
ABOVE & DOWN 1025
OFFICE GROUP WORK VESTIBULE
1025D 1025A 1H01

GROUP WORK EX 4"ST


1025B
OFFICE
1025C

3
2.3
2

EX 4"ST

PROJECT NO. DATE

7779 08/10/2022
1 REV. DATE
1 Addendum D-2 7/12/2022
2"

F E.5
E.4 E D C B A
1"

First Floor Plumbing Plan


Scale: 1/8" = 1'-0"
1/2"

SET DESCRIPTION
0

Final Construction
ORIGINAL SHEET SIZE IS 30"x42" (ARCH E1)

Documents
AESI Proj. No:

SHEET TITLE

First Floor Plumbing


Plan
8/9/2022 11:29:54 AM

SHEET NUMBER

P302

You might also like