You are on page 1of 3

ANTARA STEEL MILLS SDN. BHD.

197501002059 (23848­W)

Purchase Quotation
QUOTATION REF: PQ­0044122/ELD/2021/1
SUPPLIER ...........: MHE­DEMAG MALAYSIA SDN BHD 198701003329 (162000­A)(01455)
INQUIRY DATE ...: 25/11/21
CLOSING DATE ..: 1/12/21

SEQ PR STOCK CODE UNIT QUANTITY UNIT PRICE

1. RA­0441355 02­0407­0020 UT 1.00


BRAKE­SHOE UNIT EB 250 / 1159
SHOE BRAKE UNIT
C/W RIVETTED ASBESTOS FREE BRAKE SHOE
LINING
WITHOUT THRUSTOR
SIZE: 250
MAX TORQUE: 300 NM
MAKER: BUBENZER
MSDS REQUIRED
MFG: KONE
P/NO: EB 250
2. RA­0441356 02­0407­0035 PC 1.00
DRUM­BRAKE COUPLING HALF BOGIE DRIVE / 1159
COUPLING HALF BRAKE DRUM
TYPE : KK250A1­4­038 K7
PART NO. KK 250A­OP 1 ( 53757271 )
BORE DIA. 38MM
DWG NO. KK 250A­OP 1
MAKER: KONE
EQUIPMENT: FOR SHIPLOADER/UNLOADER
BOGGIE DRIVE
P/NO: KK250A­OP1
3. RA­0441357 02­0408­0001 PC 24.00
RUBBER BLOCK­COUPLING KK­E­OP1 OSA1 BOGIE
/1159
RUBBER BLOCK/BUSHING RUBBER
FOR COUPLING KK­E­OP1 OSA1 / KK250
SIZE: ID 19 MM X 38 MM O.D X 29.5 MM WIDTH
FOR SHIPLOADER/UNLOADER BOGIE DRIVE
COUPLING
DWG NO: 6111­2395
MFG: KONE
4. RA­0441640 02­0417­0663 PC 1.00
COUPLING­MOTOR KK500A­OP2 / 1157
COUPLING FOR MOTOR
BORE DIAMETER : 100MM H7
COUPLING SIZE : OD 425MM X 80MM WD X 198MM
LG
PN : KK500A­OP2
MATERIAL : GGG 60
DWG NO : JD­DLM6111.2417 / 2508/ 2380
EQUIPMENT : TRAVERSING MACHINERY

MFG: KONE

PRINT DATE AND TIME: 25/11/2021 04:49:03 pm PAGE: 1 of 3


ANTARA STEEL MILLS SDN. BHD. 197501002059 (23848­W)

Purchase Quotation
QUOTATION REF: PQ­0044122/ELD/2021/1
SUPPLIER ...........: MHE­DEMAG MALAYSIA SDN BHD 198701003329 (162000­A)(01455)
INQUIRY DATE ...: 25/11/21
CLOSING DATE ..: 1/12/21

SEQ PR STOCK CODE UNIT QUANTITY UNIT PRICE

CURRENCY :
QUOTE VALIDITY :
PAYMENT TERMS :
DELIVERY PERIOD :
DELIVERY TERMS :
MODE OF DELIVERY :
ESTIMATED WEIGHT :
PACKING DIMENSION :
STOCK AVAILABILITY :
ANTARA'S CONTACT INFORMATION :

PRINT DATE AND TIME: 25/11/2021 04:49:03 pm PAGE: 2 of 3


ANTARA STEEL MILLS SDN. BHD. 197501002059 (23848­W)

Terms and conditions

1. Antara Steel Mills Sdn Bhd (ANTARA STEEL) is inviting you to quote for the above
inquiry.
2. Your quotation is to be clearly marked with the above Quotation Ref. No. Please
address your quotation to the above address and Purchasing Section by return
facsimile or e­mail, clearly and always quoting the Quotation Ref. No.
3. Please ENSURE your quotation complies with our intended inquiry by giving the
correct descriptions and specifications of the items, price, unit of quantity,
payment terms, delivery period, delivery terms and any other relevant terms.
ANTARA STEEL shall not entertain any request by the bidder for revision of price(s)
due to the bidder’s omissions or errors of pricing after the order has been
officially awarded to the bidder.
4. ANTARA STEEL reserves the right to accept or reject any proposal and to award to
any supplier of ANTARA STEEL’s choice without assigning any reason thereof. Only
successful bidder will be notified.
5. ANTARA STEEL prefers payment terms of Open Account – Credit Basis with any supplier
and payable after delivery of items and submission of invoice supported by the
necessary documents to ANTARA STEEL. Other terms and condition is negotiable. The
INCOTERMS 2010 edition shall apply.
6. Labuan is a Duty Free Port in Malaysia and declared as a Designated Area (DA) by
Malaysian Royal Customs and Excise. Your quotation shall not include duty. Under
GST Act 2014 Labuan FT enjoys special GST treatment, Supplier/contractor need to
declare in their quotation if and should the GST is applicable.
7. All wood packaging material (WPM) used in any consignment imported into Labuan,
Malaysia must be treated/fumigated with Methyl Bromide gas (CH3Br) and "marked"
accordingly accompanied with Certificate under International Standard for
Phytosanitary Measures (ISPM) No.15(FAQ2009).
8. Supplier/contractor must declare that the parts or products to be supplied are
genuine, and the brand name as well as country of origin shall be indicated by
supplier/contractor. In the event that the parts are found to be counterfeit,
adulterated or under imitation, ANTARA STEEL has the right to reject them partially
or as wholly and shall seek reasonable compensation from supplier/contractor.
Subsequent business transaction may be suspended and if the practices have been
ongoing for sometimes, ANTARA STEEL shall have the sole decision of terminating the
registration of the supplier/contractor.
9. This message is only an inquiry and shall not be construed as a form of order;
hence there shall be no obligation by ANTARA STEEL.

PRINT DATE AND TIME: 25/11/2021 04:49:03 pm PAGE: 3 of 3

You might also like