You are on page 1of 1

15-6 INTAKE AND EXHAUST - Intake Manifold <6G7>

INTAKE MANIFOLD <6G7>


REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
D Coolant Draining and Refilling (Refer to GROUP 14 D Ignition Coil Removal and Installation
- On-vehicle Service.) (Refer to GROUP 16.)
D Engine Cover Removal and Installation D Throttle Body Removal and Installation
(Refer to GROUP 11A - Timing Belt.) (Refer to GROUP 13A.)
D Air Cleaner Removal and Installation (Refer to P.15-4.)
D EGR Valve Removal and Installation (Refer to GROUP
17.)

3 5
4 11 ± 1 N×m
2
11 1
17

6
10
9
8 7
5.0 ± 1.0 N×m

16
20
15
11 ± 1 N×m 22 21 9.0 ± 1.0 N×m 12
14

23 13

19 11 ± 1 N×m
14 ± 1 N×m

24
18

25

You might also like