Professional Documents
Culture Documents
2016-2019
CONTENTS
PART I PRELIMINARIES
1.1 Message of the Local Chief Executive
1.2 Message of the Vice Local Chief Executive
1.3 Brief LGU Profile
PRELIMINARIES
Executive-Legislative Agenda
MESSAGE
Greetings!
I would like to extend my heartfelt gratitude to the Department of Interior and Local Government and Executive Legislative Agenda Team, of San
Pablo City for providing us much needed assistance in the formulation of the Executive Legislative Agenda. I feel elated that they have endeavored to
extend whatever help they could towards the enhancement of local governance. With the revitalized Sangguniang Panlunsod, the City Government of
San Pablo can fast-track the implementation of projects which are the result of the collaborative effort of the Office of the City Mayor and the
Sangguniang Panlunsod which represents the ideals and inspirations of the people of San Pablo City.
The Executive Legislative Agenda or more popularly known as the People’s Agenda is the embodiment of the painstaking effort of the Executive
and Legislative Branches at the local level which cut across political party affiliations for the sake of unity and to better cope up with the challenges of
tomorrow.
I hope that the Executive Legislative Agenda Program be maintained by the generations to come as a legacy worth preserving.
LORETO S. AMANTE
City Mayor
Executive-Legislative Agenda
MESSAGE
Greetings!
In behalf of the members of the Sangguniang Panlunsod , I congratulate the Executive-Legislative Agenda Team of San Pablo City who labored
painstakingly to come up with the vital documents, EXECUTIVE-LEGISLATIVE AGENDA which will serve as the blue-print for sustainable development and
progress of our city.
With the assistance of the Executive Branch and the empowered populace, the Sangguniang Panlunsod under my watch will extend its
unconditional support to the needs of the people of San Pablo City. Rest assured that the programs and projects listed in our ELA will get full legislative
prioritization and budget appropriation.
ANGELITA E. YANG
City Vice Mayor
Part 2:
LGUs STRATEGIC DIRECTIONS
VISION MISSION
The earliest historical record of the City of San Pablo dates back to pre-Spanish times when four (4) big barrios bounded by Mt. Banahaw and Mt. Makiling
composed Sampalok.
In 1521, Sampalok was changed to San Pablo de los Montes, which became a parish in 1556 and then a Municipality in 1647. In 1899, a Municipal Government was
established with Inocente Martinez as Municipal President in 1902 when the Civil Government was granted independence from the Province of Laguna. On May 7, 1940, the
Charter Bill sponsored by Congressman Tomas Dizon was approved. The bill became known as the City Charter of San Pablo or Commonwealth Act No. 520. The City was
inaugurated on March 30, 1941 with Dr. Potenciano Malvar as the appointed City Mayor.
San Pablo City also known as the City of Seven Lakes is located at the southern tip of the Province of Laguna in the island of Luzon at geographical coordinate’s 14 o
4” north latitude and 121o east latitude. It is about 87 south southwest of the City of Manila with Rizal Park as reference point. The City is accessible from seven points by
road to neighbouring municipalities which consider the City as their center of trade, commerce, and major services. These are Calauan, Alaminos, Nagcarlan, and Rizal in
Laguna; Dolores and Tiaong in Quezon, and Lipa City in Batangas. All the adjoining municipalities and cities have entry points making San Pablo accessible from almost all
directions. San Pablo City is at a geographical advantage. The City is at border of the provinces of Laguna and Quezon and is generally considered the gateway to the rest of
Southern Tagalog Region, Bicol, Visayas, and Mindanao. This geographical advantage of the City benefits well its clientele and stakeholders. The City at 14 15’ 20” north
latitude is bounded by the mountain ranges of Kalusungan and Calauan Hills in the north, Mabilog in the northeast; San Cristobal and Banahaw Mountains in the east; and
Susong Dalaga, Napayong, and Masalukot Hills in the south to southwest.
San Pablo became City on May 7, 1940, by virtue of Commonwealth Act No. 520 sponsored by Assemblyman Tomas Dizon. It was inaugurated on March 30, 1941.
The City of San Pablo has a total land area of 19,756 hectares, 72.41 of which is devoted to crop production.
Number of Barangays
Of the total barangays of eighty (80), forty-four (44) are located in the urban center while thirty-six (36) are in the rural areas. Thus, the city has both urban and rural
barangays.
Basic Facilities
- Hospitals : 8
- Clinics : 69
- Public Market (public and private) : 1
- Communications:
o Income sources
Services:
- Telephone Services : PLDT; Cellular Mobile Telephone Service, Globe, Smart and Sun Cellular
- Ama Rural Bank of Mandaluyong - Luzon Development Bank - Rural Bank of Seven Lakes
- Asia United Bank - Merchants Savings & Loan Assn. - Security Bank Corp.
- Bank of Makati (A Rural Bank), Inc. - Metro Bank and Trust Co. - Tiaong Rural Bank Inc.
- BDO Unibank, Inc. - Planters Development Bank - United Coconut Planters Bank
- Bank of the Philippine Islands - Philippine Bank of Commerce - United People Rural Bank
- Card Bank, Inc. - Philippine Business Bank
- Card SME Bank - Philippine National Bank .
- Card Mutual Benefit Ass. Inc. Century Bank (21st) - Philippine Postal Savings Bank
- China Banking Corporation - Philippine Savings Bank
- China Bank Saving Inc. - Philippine Veterans Bank
- Eastwest Banking Corp. - Rizal Commercial Banking Corp
- Entrepreneur Rural Bank - Robinsons Bank Corp.
- First United Farmers Rural Bank Inc. - Rural Bank of Nagcarlan SPC Development Bank
- Land Bank of the Philippines - Rural Bank of Rizal (Lag.) Inc
- Seven Lakes (Sampaloc, Calibato, Pandin, Yambo, Bunot, Mohicap & Palakpakin)
- San Pablo City Cathedral
- San Pablo City Hall - The Old Municipio
- Fule Malvar Mansion - The City Plaza
- Doña Leonila Park
- Andres Bonifacio Shrine
- Hagdang Bato
- Trece Martirez Monument
- Monumento ng Kagitingan
- Mabini Monument
- Pinaglabanang Shrine (Battle of Sta. Isabel) Rizal Monument
- Dambana ng mga Bayani
List of Special Events/Festivals:
- Coconut Festival January 9-14
- City Fiesta January 15
- Holy Week Celebration March/April
- Flores de Mayo/Santacruzan May 1-31
- San Pablo City Foundation Day May 7
- Tilapia May Festival May 31
- Christmas Lighting Ceremony December 1
POLITICAL DATA
20% DEVELOPMENT FUND Between Php 100M – 150M Annual IRA share
SEF – Special Education Fund Between Php 120M – 201,000,000.00 Can only fund education projects
approved by Local School Board
CDRRMF Between Php 39M – 50M Can only be used for disaster related
PPAs
EXECUTIVE-LEGISLATIVE AGENDA
2016-2019
EXECUTIVE - LEGISLATIVE AGENDA
2016 – 2019
I. SOCIAL SERVICES
1.1 Prioritization of programs and projects that ensure the better nutrition and health and increased productivity of the citizens.
1.2 A highly functioning health system characterized by quality primary health care, quality maternal care and quality child care.
2. Education Services
2.1 Enhancement of quality of education at all levels through provision of up-to-date educational materials and trainings.
3.1 Cause the donation of a local government lot for socialized housing or mass dwelling in partnership with the private sector.
4.1 Enhancement in the maintenance of peace and order and public safety through intensified police visibility, acquisition of the necessary equipment and
conduct of drills and trainings for disaster risk reduction management.
1.1 Upgrading of agricultural and fisheries development systems through acquisition of modern equipment and conduct of up-to-date trainings and
seminars.
2.1 Enhancement of livelihood potential of citizens through promotion of small and medium enterprises.
2.2 More need to be done to institutionalize a business friendly environment. Ensure the ease of doing business strategize to effect the issuance of building
occupancy and business permits in a more expedient manner.
III. ENVIRONMENTAL SECTOR
1.1 Enhancement of natural resource management system in accordance with applicable environmental laws and regulations and through massive
information dissemination and conduct of various activities.
2.1 Prioritize waste reduction at the barangay level and the strategic construction of materials recovery facilities with emphasis on the clustering of
barangays.
2.2 Pollution control and proper solid waste management are essential in preserving the integrity of the of the environment.
1. General Administration
3. Development Planning
4.1 The civil application system needs to be transformed into a seamless transactional process. The inherent motivation of putting up such system is to
ensure the ease of obtaining civil registry and real property documents.
5.1 Management and coordinating process for budgeting and accounting are in place. These processes need to be revisited and improved.
6. Revenue Generation
7. Local Legislation
7.1 Establishment of linkages of local plans with higher level plans to clarify role of various sectors
7.2 Upgrading of the legislative tracking system through computer-based networking of offices under the sanggunian and codification of regulatory and
revenue ordinances.
Part 4:
SECTORAL SITUATIONER,
DEVELOPMENT GOALS,
OBJECTIVES AND PROGRAMS
AND PROJECTS
1. SOCIAL SERVICES
Brief Situation
A highly functioning health system characterized by quality primary health care, quality maternal care and quality child care. CSO - participated medical
missions and health insurance for indigent families are innovations that add more luster to dynamism in the health system.
Although the performance of the city in this service area reveals an above average performance, it still has to focus on some programs where the LGU failed
to achieve the minimum or acceptable condition. .
Development Goals
Objectives
Brief Situation
Enrollment in the tertiary public school (DLSP) is continually increasing. The quality of education has yet to improve its standards. There are still a number
of problems and concerns that need to be addressed to better prepare the graduates for appropriate employment.
Program and projects to improve performance, uplift its quality and achieve greater efficiency and effectiveness to qualify students for entrepreneurship or
employment need full implementation.
1. Only 27% of faculty members have the full qualifications as per requirements by CHED and ALCUCOA (masteral degree holders).
Development Goals
1. To meet and strengthen faculty qualifications and competencies as required by CHED and ALCUCOA for sustainable quality education
2. To improve the quality of education and provide adequate educational trainings.
3. To provide adequate facilities in support of the curricular offerings of the College.
Objectives
Brief Situation
The National Housing Authority South Rail Project survey shows that after tagging informal settlers residential infrastructures, more or less 3,000 families
living along the PNR railway and within the territorial jurisdiction of the City of San Pablo will be thoroughly affected by the three years expansion project is a well-
financed by-product of bilateral loan agreement executed by and between the Chinese and Philippine government, problems and issues confronting our
housing/shelter and basic needs of our informal settlers are highly inevitable to happen. Likewise the 1,000 household informal dwellers at Barangay San Nicolas
and Barangay Sta. Monica all of San Pablo who are occupying the non-core properties of the Philippine National Railways. That by virtue of Executive Order No. 18
dated 26 of October 2001, declaring non-core properties of Philippine National Railways as socialized housing sites and providing for the disposition of the same to
bonafide occupants need to be addressed by our local leaders. Furthermore, we need not to mention our recent demolition/relocation of the 100 household’s
settlers along the shore of Sampaloc Lake is worth a pound to give our environmental concern. Hence, a comprehensive program of Social Support Services must be
prepared in order to enhance our shelter provision at the local level.
1. Proliferation of Squatters:
a. High national birth rate
b. Migration from rural to urban areas
2. Lack of housing board/office.
3. Lack/insufficient of support of housing finance system and mortgage guarantee.
4. Lack of commitment of local leaders and social acceptability of the project by the informal settlers.
Development Goals
Objectives
Brief Situation
The peace and order situation in this city remains manageable and favorable to economic activities. While the crime volume for this year decreased as
compared with the previous year, concern on crime incidents like street crimes, hijacking, highway robbery and robbery/hold-up drives us into greater vigilance.
The peace and order condition in the City of San Pablo remains controllable with an increase of 19.54% both in crime volume and average monthly crime
rate. Of the total crime volume of 104 incidents reported in the city during the period covered (2006 – 2007), 82 were considered solved registering a 78.85% crime
solution efficiency rating.
1. No permanent and standard PNP Station. The present building being occupied is not suitable for a city police station because of its limited area.
2. No appropriate temporary detention cell for women and youthful offenders.
3. Insufficient PNP/BFP Personnel.
4. Insufficient equipment for Operation, Investigation and Administration section, especially computers and printers as well as office supplies and peripherals for
efficient operation.
5. Lack of funds for Anti-Drug for buy-bust operation and drug test.
6. Maintenance and improvement of jail facility and equipment. (BJMP)
7. Jail congestion. (BJMP)
8. Lack of new firetrucks. (BFP)
9. Dilapidated Fire Station building. (BFP)
Development Goals
1. To ensure continuous police visibility remains one of the top priorities in police operations to maintain peace and order in the area and ensure to the local
populace feet that they are safe even in the streets.
2. To have a more efficient and responsible penology officer.
3. To become more responsive and more attentive member of Bureau of Fire Protection
4. Effective Traffic Management.
Objectives
1. To prevent and control street crimes, hijacking, highway robbery and robbery/hold-up with greater vigilance.
2. To equip personnel with the necessary tools in addressing challenges in the jail bureau.
3. To prevent and suppress fire and enforce related laws.
4. To established of well-equipped and well manned SPC Firefighting Units.
5. To educate and promote Awareness on road use and safety.
6. To be well prepared and ready before, during and after disaster.
7. To increase awareness on child and women’s rights.
Brief Situation
The LGU has performed below the benchmark in this area. It obtained a rating of 2.5. It can be inferred that this bad rating is due to lack of local
government agricultural extension and on -site research services or facilities.
In terms of productivity, the LGU has obtained an average rating of 3.25 (fair). The factors which have affected the rating are the low percentage of farming
and fishing households benefiting from agricultural/fishery extension and on-site research services or facilities.
Development Goals
Objectives
Brief Situation
More need to be done to institutionalize business friendly environment. There are factors that need to be looked into. Improve the quality of permitting or
licensing. Ensure the ease of doing business, strategize to effect the issuance of building occupancy and business permits in more expedient manner. Provide or
cause of provision of direct support services to business particularly those categorized as micro, small and medium enterprises. Support may come in the form of tax
incentives, product labeling, product packaging, training, job fairs and trade fairs.
PESO
City Cooperative
1. Budgetary Constraints
2. Under staff
Development Goal
Objectives
1. To spur business activities in San Pablo City and generate more income and create employment opportunities.
2. To link with different companies that can possibly offer alternative employment.
3. To provide efficient and competent additional staff.
3. ENVIRONMENTAL MANAGEMENT
Brief Situation
Pollution control and proper solid waste management are essential in preserving the integrity of the environment.
Prioritize waste reduction at the barangay level and strategic construction of material recovery facilities with emphasis on the clustering barangays.
Areas for reforestation and production are set and that the target areas for reforestation and protection are met.
Fresh Water Ecosystem Management and Conservation
Long term planning is valued as well as the participation of NGO and people’s organization for the fresh water rehabilitation and protection.
Fortunately, the NGO’s, civic organization, and other concerned sectors have either volunteered or contributed financially to help in rehabilitation activities,
but not enough to really accelerate the massive rehabilitation and protection program.
Development Goals
Objectives
Brief Situation
The LGU put up a conventional sanitary landfill as a solution to the garbage disposal problem and in compliance to RA 9003 otherwise known as the
Ecological Solid Waste Management Act of 2000. A central material recovery facility (MRF) was also established in the vicinity to reduce the solid wastes dumped. At
present, the sanitary landfill needs a major rehabilitation for its serviceable life is now overdue.
.
Despite a series of information and education campaigns that were continuously conducted in all rural and urban barangays to encourage waste segregation
and waste reduction at source. Improper waste disposal and un-segregated waste are still problems. This due to the fact that still a large number of residents were
not yet in full support of the program.
Development Goals
Objectives
1. To update with the latest directives of National Solid Waste Management Commission.
2. To effectively implement solid waste management plan.
3. To improve garbage collection in the entire city.
4. ADMINISTRATIVE GOVERNANCE
Brief Situation
The LGU has established an internal control system that reflects a clear delineation of duties, responsibilities and accountabilities of the officials. Through
this system, transactions are accurately recorded on time and audit findings are promptly resolved even though supplies and assets are not regularly inventoried.
1. Lack of knowledge on ISO certification procedures and taking initial steps on securing it.
2. No Management Information System Office.
Development Goals
Objectives
1. To seek ISO certification, improve the efficiency and effectiveness of government employees and public service.
Brief Situation
The LGU performs within the benchmark on Human Resource Management and Development. It has an effective human resource planning, recruitment
and selection process, and performance evaluation for its employees, human resource and career development, installation of an incentives and awards system and
establishment of a grievance committee.
1. Organizational management.
2. Personnel development.
3. Computerization of payroll system and personnel records.
Development Goals
Objectives
Brief Situation
For the current year, the city has initiated/implemented infrastructure projects and all other allowable projects in accordance with the guidelines on the
appropriation and utilization of the 20% Annual Internal Revenue Allotment. These are contained in the 2015 Annual Development Plan which was approved by the
Executive Committee of the Local Development Council and legitimized by virtue of SP Ordinance. The updated Comprehensive Land Use Plan which contains the
integrated infrastructure plan and sectoral strategies, is for approval of the Sangguniang Panlalawigan. However, the city necessitates the revision/updating of
Comprehensive Development Plan to ensure the access of the population to basic social services and economic opportunities.
Management Information System or Information technology in development planning has been very minimal and as such required greater connectivity to
enhance development opportunities and thrusts.
Development Goals
1. To formulate development plans which are reflective of the citizens’ will and aspirations.
2. To ensure peoples’ participation in the planning process.
3. To institute strong linkage with development-oriented organizations and offices through infotech.
Objectives
Brief Situation
The civil application system needs to be transformed into seamless transactional process. After all , the inherent motivation of putting up such a system is
to ensure the ease f obtaining civil registry and real property documents..
Issues and Problems
1. Organizational management.
2. Lack of data system.
3. Lack of appropriate manpower and technical support
Development Goals
Objectives
Brief Situation
Management and coordination processes for budgeting and accounting are in place. However, these processes need to be revisited and improved. They are
guarantees to an effective allocation and optimum utilization of financial resources.
Development Goals
Objectives
4. Installation of E-NGAS.
5. Computerization of accounting system.
6. Putting-up Website
7. Maintenance of government buildings, roads, bridges, canals and all govt. properties including vehicles and equipment.
8. Establishment of BAC Office.
9. Upgrading of motor pool division.
10. Improvement of Procurement and Storage System of Supplies and Materials (centralized system)
Brief Situation
Existing measures in support of revenue generation need to be enhanced. This is an initial eat essential step maximizing revenue generation potentials.
Development Goals
Brief Situation
In the area of Local Legislation, the Sangguniang Panglunsod had enacted ordinances in support of the basic services rendered by the city to its constituents
such as in the field of health, environment, education, economics and traffic management, among others. However, it has yet to enact Code of General Ordinances
and Environmental Code.
In order to strengthen the capability of the Sanggunian to effectively discharge its duties, it has to provide an efficient filing and retrieval system of
legislative measures and other legislative outputs through information technology.
The system has a minor setback as it entails voluminous filing system. It is suggested that the LGU consider the possibility of computerizing the system on
legislative tracking for efficiency and effectiveness.
1. To enable the Sangguniang Panglunsod to strongly adhere to its formulated Legislative Agenda in consonance with the Executive Agenda so as to ensure the
effective and efficient delivery of services by the city to the general public.
2. To modernize the tracking system of the Sangguniang Panglunsod of San Pablo.
Objectives
1. To rationalize the local planning system with the intention to faithfully comply with the applicable provisions of the Local Government Code.
a. To enact Environmental Protection Code and Code of General Ordinances.
b. To revisit and updating of Ordinance on Disaster Risk and Reduction Management and Adaptation to Climate Change.
2. To attain sufficient funds to support its modernization.
3. Develop skills among the staff.
4. Improve records retrieval and management.
1. Seek ISO 9001 certification on for the SP through establishing paperless SP Upgrade facilities in the Session Hall.
2. Development and installation of electronic Legislative Tracking System and linkage in official website.
3. Formulate Environmental Protection Code and Code of General Ordinances.
Part 5:
PRIORITY
PROGRAMS AND PROJECTS/
CAPACITY DEVELOPMENT AGENDA
STATUS OF PROGRAMS, PROJECT & ACTIVITIES, 2013-2016 ELA
22. Encode all existing old records into the SP 80% completed
computers and develop back up system
23. Conduct inventory of all ordinance and SP 40% completed
resolutions, both in hard and software
24. Updating of Comprehensive Land Use Plan CPDO 90% completed
(CLUP) and Comprehensive Zoning Sangg. Panglalawigan for review & approval
Ordinance (Z.O)
25. Re-organization of Local Development CPDO Meeting conducted w/ CSO/NGOs representative last
Council (LDC) Aug. 10 2016. Waiting for EO
26. Establishment of Computer database CPDO Not implemented
system
27. Upgrade recording and reporting facilities CHO Not implemented
28. Upgrade Laboratory Facility CHO Implemented
29. Requisition/allocation of basic CHO To be implemented – 2016 (under BuB)
equipment/materials for water analysis
30. Request for creation of item of 1 Lab CHO Not implemented
technician and assistant lab technician
31. Request for 1 Service Vehicle CHO Implemented (FV Van – 2015)
32. Supplemental feeding Information POPCOM On-going
Education Campaign Activities 2016 - 16 barangays
33. Upgrading Primary Hospital SPCGH Upgraded (with OR)
Reclassification under DOH level
AO 2012-0012
34. STD-HIV-AIDS CHO On-going
35. Upgrading of clinical laboratory to level 2 SPCGH Completed – License to operate approved last Sept.
and utilization of the ultrasound services 2015 by DOH
36. Renovation of Operating Room/DR SPCGH Completed
Complex Functional OR on March 2016
37. Hiring of additional medical Personnel SPCGH Implemented
(MDs, MTs, RTs) Hired medical officers (10 doctors – JO and plantilla)
Program/Project/Activity(PPA) Lead Agency/ Accountable Office Status
38. Increased bed capacity (32-72) SPCGH Not implemented
Need additional personnel to compensate with the
doctor-patient ratio (1:8) & nurse-patient ratio (1:12)
39. Implementation of Rabies Act RA 9482 CVO Implemented
AWA-RA 8485
40. Indigency Program for Sr. Citizens CMO-OSCA-CO Implemented- on going
b. Local Recruitment
Activity (LRA)
65. Business friendly LGU Streamlining of procedures in the CMO-BPLO Implemented
application of business permits & licensing
66. a. Tourism Promotion CHACTO a. Implemented – Joined 4 exhibition Coco and Anilag
festival, convention (DOT) brochures
b. Tourism Awareness b. Seminar in Tour Guiding; HISTOQUIZ for (SPC
Colleges) featured in national magazines
C. Tourist Police Visibility c. Assigned tourist police every time there are visitors
and during any event/activity
d. Tour Guide d. assigned tour guide (attended seminars/trainings)
67. Wrong Perception Regarding Cooperatives CCO Correction on-going
Program/Project/Activity(PPA) Lead Agency/ Accountable Office Status
68. a. Modernization of Agriculture sector through mechanized a. Implemented – Multi filler Tractor from APCO Sta. Cruz –
farming CAgO Feb. 2016
e. Credit and financing program and e. Continuous program – issued certificate to farmers and
marketing support (Agro-Industry) fishermen to avail loans from rural banks
f. Promote, develop livelihood potentia (income-generating f. On-going – ccoking demo, seminars for women (RIC –
projects) by providing assistance to small and Rural improvement Club) for men (BAFC)
medium agri-entrepreneurs
g. Fertilizers and seeds Subsidy/Dispersal Program g. On-going – Organic fertilizer or VERMICAST were given to
farmers
h. Livestock Upgrading Program h. On-going – pigs and cattle carabao dispersal
i. Lake Seedling i. On-going – LLDA gave bangus fry for 7 lakes on April 2016
k. Organic Agriculture k. On-going – Demo Farm at Brgy. Sta. Ana, Sta. Elena,
Green Valley, San Antonio
l. Soil Nutrient Management l. On-going – soil test
n. Preventive/Control measures instituted in Crops & Livestock n. On-going- deworming for goat, cow/cattle and carabao;
(Blood sampling, Vaccination & deworming) blood sample for chicken pig, cow and carabao;
vaccination for cow, goat and carabao (hemosep vac.)
o. Provision of equipment such as power sprayers. o. On-going – garden tools from APCO
Knapsack sprayers, etc
p. Not completed (laptop only)
p. Acquisition of audio-visual equipment
q. Not implemented
q. Service Vehicle
r. On-going – Demo Farm (harvest festival
r. City Nursery of vegetable on Aug. 23, 2016)
Program/Project/Activity(PPA) Lead Agency/ Accountable Office Status
s. City Agriculturist Office Building or Farmers Training Center CAgO s. Not Implemented
69. Implement PD 1586, PD 984 & DAO-26 CENRO Implemented (pollution control)- issuing clearances to
establishments and industries for license permit in
collaboration with other agencies
70. Adaptation of a forest protection program CENRO Implemented -on going
Conducted tree planting at Malabanban watershed, river
banks and lakeshore
Giving seedlings to different rural barangays in connection
with Arbor Day Celebration
71. Rehabilitation of Banadero River CENRO
Clean-up Clean-up – on-going
Construction of solidwaste traps in 4 Not implemented
locations along the river
72. Manila Bay Clean-Up CENRO Implemented -on going
Submitted quarterly monitoring report to DILG
73. Provision of an official website CIO
74. Active participation Civil Society CIO
organizations
LIST OF PRIORITY
PROGRAMS, PROJECTS AND ACTIVITIES
ON ELA IMPLEMENTATION
2016 – 2019
I. SOCIAL SECTOR
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
OFFICE : SAN PABLO CITY GENERAL HOSPITAL / CITY VETERINARIAN’S OFFICE PROVINCE : LAGUNA
CITY : SAN PABLO
Status of Implementation
LGPMS GAPS ADDRESSED On - going
Time Implementi Not Action
Starting % of Completion
No. ELA PPAs Frame ng Yet Funding Source Issues and Taken/Remarks
Date Completion Date
Office Concerns
SAN PABLO CITY GENERAL HOSPITAL
1 Amendment of hospital charges To generate additional 2017- SPCGH, SP 2017 2018 To consolidate
income 2018 proposed hospital
To update hospital charges
charges based on its
existing services available
2 Establishment of PHIC Point of To cater indigent in- 2017- SPCGH To submit proposed
Care patient not enrolled in 2019 PCGH, SP 2017 2019 Php1M POC program to SP
PHIC
3 Construction of laundry, ramp
and morgue at SPCGH SPCGH Php2M
2 Nutrition Information and Created awareness among the 2016- City Population 2016 2019 LGU Limited IEC Reproduction of IEC
Education Campaign general public on various 2019 Office National materials from the materials at the local
components on promotion of Nutrition National Nutrition level
good nutrition and Council, DOH Council, DOH
participation in the
government’s nutrition and 150k
health program through:
Pabasa sa Barangay Nutrition
Nutrition Counselling
Radio Guesting/Interview
Production and distribution
of IEC, posters, billboard
3 Weight surveillance among 2017- 2017 2019 Time availability of Follow up and
target children conducted for 2019 LGU Barangay Nutrition monitoring of
Monthly Growth Monitoring normal, underweight, severely Scholars to Population Program
through Operation Timbang underweight, and overweight City Population 45k conduct daily OPT Workers. Seek
(OPT) categories. Identified Office within a scheduled assistance from CHO
malnourished infants/children month of activity field personnel and
(0-71 months old) Barangay Health
Workers
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
5 Breastfeeding Station in One (1) Workplace 2017 City Population / 2017 2017 LGU Lack of available Scout for a possible or
compliance with RA 10028 Lactation Station Office, space or room vacant room at the
(Breastfeeding Act) permanently set-up at the City Health 50K City Hall and seek
City Hall lobby or vacant Office approval from the City
room. mayor for its
establishment/
Construction
6 Pre-Marriage Councelling (PMC) Engaged couples 2016- PMC Team 2016 2019 LGU No permanent Request approval for
As required by PD 965, Article understands their roles, 2019 (accredited venue for the the use of other
16 of the New Family Code, rights and obligation as counsellors 90K conduct of Pre- alternative and/or
and Reproductive Health Act married partners and from CPO, Marriage temporary venue like
before they obtain a marriage would be parents CHO, and Counselling ABC Training Center,
license from the Local Civil OSWD) (PMC) and Human Resource
Registrar’s Office Training Hall
7 Family Planning Program Provision of free surgical 2016- City Population 2016 2019 LGU, Private Time availability Frequent coordination
through Public Private outreach on Family 2019 Office, City medical of Marie Stopes with the private
Partnership on Family Planning Planning (Bilateral Tubal Health Office, foundation and Friendly medical foundation
Services Ligation, IUD insertion, San Pablo City (Marie Stopes Care, Inc. for schedules of at
Non-scalp Vasectomy) by a General and Friendly least quarterly Surgical
private medical groups Hospital Care, Inc.) Outreach Program on
(Marie Stopes Ligation, 180K Family Planning
Friendly Care)
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
1 CAPACITY BUILDING Children in need CY: 2016 - barangay 85% CY: 2016 – Brgy fund -Increasing number -Make functional
Strengthen the Barangay Council for of special 2019 officials, 2019 GAD of cases on children the BCPC in
the Protection of Children ( BCPC ) protection and juvenile justice in need of special coordinated newly
violence against system, OSWD, protection and to elected officials
women and DSWD, Open vawc
children (vawc) Heart -Monitoring of
cases addressed Foundation documents o
- Sustainability (NGO) monthly meeting
of the of BCPC
commitment of
barangay -Request for an
officials ordinance to
- For coming strengthen the
brgy. Elections LCPC and BCPC
therefore
another set of Provide an Inter
orientation is Local Agreement
required for the for CNSP in
new member coordination with
- Budgetary the Councilor
constraint at the League of Laguna
brgy level and ALSWODOPI –
- Readiness and Association of
willingness of Laguna Social
the brgy officials Welfare of the
- Non Philippines Inc.
implementation
of the programs
- 1% BCPC not
budgeted at the
barangay level
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
5 Strengthening Advocacy for Orientation for Magna 2016 - OSWD, Liga ng July 2016 December LGU Partial Full
Magna Carta for Women (RA Carta Advocacy to 2019 barangay 2019 NGA implementation of Ra implementation of
9710) Organized women 9262 RA 9262 for
group women
6 Strengthening the RA 9442 for In Sufficient 2016 - Liga ng July 2016 December LGU Lateral transfer of Advocacy and
Person with Disability manpower to handle 2019 barangay, 2019 NGA persons organized PWD
person with the OSWD, Human P.S. groups
disability and organize Resource
them at the barangay Office RA 9442 for PWD
and city level DILG through
National
- Sustainability of the Government
commitment of and NGO’s
barangay officials
- Forth coming brgy.
Elections therefore
another set of
orientation is
required for the new
member
- Budgetary constraint
at the brgy level
- Readiness and
willingness of the
brgy officials
- Non implementation
of the programs
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
8 Strengthening the - Readiness and willingness 2016 - July 2016 80% December GAD Continuous training Coordinate with
organized women group of the women group 2019 2019 budget for women on DSWD, DTI, Regional
(KALIPI) - Accreditation of Kalipunan brgy fund productivity skill Office
Liping Pilipina (KALIPI) – San DSWD Reg. training and lively
Pablo City IV-A hood Provision of training
DTI
Submit to Sanguniang
Panlunsod
Supporting paper for
accreditation of KALIPI
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
1. Amendments of City Ordinance 2011-01 City Jan 2017- CTMO October July 2017 Gen Fund 1. Traffic Congestion
and its full implementation Ordinance is July 2017 CTMB 1, 2016 Funds from NGA 2. Out dated traffic
1.1 Production and installation of traffic out dated PNP Grants Ordinance
signs and traffic lights already 3. Lack of information
1.2 Installation of CCTV Total of dissemination on
1.3 Establishment of traffic operation 12,000,000.00 City Ordinance and
center its strict
1.4Proper training of traffic enforcers local, 5,000,000.00 for implementation
regional & national level (UP National year 2017 4. Lack of personnel
Center for Transportation Services,MMDA, due to budgetary
LTO) 4,000,000.00 constraint
1.5Rationalization &Reorganization (Traffic For year 2018
enforcer)
1.6 Hazard pay 3,000,000.00 for
1.7 Construction of temporary barriers year 2019
1.8 Accreditation of traffic enforcer to
conduct investigation during minor
vehicular accident.
2.1 Seminars trainings not only to the road Financial 2016- CTMO 2016 2019 Gen Fund
users but also to CTMO BTAG personnel & Constraint 2019 Funds from NGA
operator and driver of motor tricycle Grants
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
OFFICE : CITY DISASTER RISK AND REDUCTION MANAGEMENT OFFICE PROVINCE : LAGUNA
CITY : SAN PABLO
Status of Implementation
LGPMS On - going
No. ELA PPAs GAPS Time Implementing Not Starting % of Completion Issues Action
ADDRESSED Frame Office Yet Date Completion Date Funding Source and Concerns Taken/Remarks
OFFICE : CITY DISASTER RISK AND REDUCTION MANAGEMENT OFFICE PROVINCE : LAGUNA
CITY : SAN PABLO
Status of Implementation
LGPMS On - going
No. ELA PPAs GAPS Time Implementing Not Starting % of Completion Issues Action
ADDRESSED Frame Office Yet Date Completion Date Funding Source and Concerns Taken/Remarks
3.Disaster Risk Reduction & Management Facilitators 2016- CDRRMO Jan 2017 June 2019 LDRRM FUND
Training for CDRRMC & CDRRMO from OCD 2019 SPC SAR GENERAL FUND
ICS (level1-5) PDRRMO GRANT
Basic DRRM Training OCD AID
Camp Management BFP 3,000,000.00
CBDRRM REDCROSS for 3 years
CBMS
PDRA
PDNA
Training & other related programs
& Activities
4. Training for Bgy. Officials/level Coordination 2016- CDRRMO Jan 2017 June 2019 LDRRM FUND
BERT with Brgy 2019 BRGY GENERAL FUND
CBDRRM Officials OFFICIALS 1,200,000.00
BDRRM Plan with BRGY LEVEL for 3 years
Evacuation Guide with
facilities & maps
OFFICE : CITY DISASTER RISK AND REDUCTION MANAGEMENT OFFICE PROVINCE : LAGUNA
CITY : SAN PABLO
Status of Implementation
LGPMS On - going
No. ELA PPAs GAPS Time Implementing Not Starting % of Completion Issues Action
ADDRESSED Frame Office Yet Date Completion Date Funding Source and Concerns Taken/Remarks
5 Disaster Response 2016- CDRRMO Jan 2017 June 2019 LDRRM FUND On going
Prepositioning/Mobilization of 2019 CDRRMC GENERAL FUND
Resources GRANT
Purchased of Foods for Rescue AID
8,400,000.00
Team/ CDRRMC Members
for 3 years
SPC SAR Members Accident
Assistance Benefits
6 Disaster Recovery and Rehabilitation 2016- CDRRMO Jan 2017 June 2019 LDRRM FUND On going
Provision of Relief Goods to 2019 CDRRMC GENERAL FUND
Disaster Victims and tents & GRANT
other Temporary Shelter Facilities AID
15,000,000.00
for 3 years
Establishment of a SPC Disaster Risk
7 Reduction & Management Operations 2016- CDRRMO Jan 2017 June 2019 LDRRM FUND On Going
Center 2019 CDRRMC GENERAL FUND
GRANT
AID
Establishment of a SPC Disaster
30,000,000.00
Risk Reduction & Management for 3 years
Operations Center, Office &
Training Bldg. With Equipments,
Supplies & Materials
1 Enhanced Community Engagement Increased No time SPCPS Jan. 1 Continuous LGUs PC and Printer Awareness
Community limit 2016 action /NGOs/PNP Campaign Thru
Involvement 25,000.00 per Brgy
year for 3 years visitation/pulong-
pulong
2 Intensified Anti-Criminality Operations Arrest of No time SPCPS Jan. 1 Continuous LGUs PC and Printer Recruitment of
thru Oplan Angry Bird, Countrerstrike and Criminals limit 2016 action /NGOs/PNP trusted Barangay
Maxxman 150,000.00 per Intelligence Nets
year for 3 years
3 Intensified Intelligence Monitoring and Potential No time SPCPS Jan. 1 Continuous LGUs PC and Printer Recruitment of
target hardening Criminals limit 2016 action /NGOs/PNP/DIL trusted Barangay
identified; G Intelligence Nets
establishment 200,000.00
s secured Every years for
3 years
4 Implementation of Project Double Barrel Increased 6 SPCPS July 1, Continuous PNP /LGUs Dedicated PC and Coordination
Community months 2016 action /NGOs/DILG Database with the LGU,
Involvement 1,800,000.00 DILG and BADAC
Arrest of No time SPCPS Continuous For 2017 Fund support Coordination
Pushers who limit action with the LGU and
failed to DILG
surrender
Half-way No time SPCPS Aug 11, Continuous Specific program and
center for the limit 2016 action fund support
surrenderors
CRIME SOLUTION
5 Enhancement of Investigative Capability Training of No time SPCPS Jan. 2, Continuous PNP/LGU/NGOs Fund support Coordination
Investigators; limit 2016 action 1,000,000.00 with the LGU and
Purchase of Every years for DILG
Investigative 3 years
equipment,
tools and kits
2. Conduct of random drug test for 2.1 To monitor the 2016- BJMP/LGU- LGU-CHO Requested for
BJMP personnel and inmates. effectiveness of 2019 or as CHO implementation
anti- illegal drugs necessary 100,000.00 and funding.
operations Yearly for 3
years
3 .Conduct of greyhound/searching 3.1 To totally Quarterly BJMP/PNP/
operation with other law enforcer eliminate the entry if not Other Law BJMP Requested to
agency. of contraband monthly Enforcement COP for
inside the facility Agencies implementation
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
3 Hiring of Local Fire Aide with their PPE and Lack of fire fighting crew 2016- LGU
Communication system and driver assigned in LGU 2017
fire trucks and for
1. Train & Designate fire truck crew and substation. BFP/LGU
driver
Establishment of Kiddie fire marshal 80,000.00
in coordination with DepEd Per year
4 Unavailability of one LGU Fire Truck due Unavailability of one LGU 2016-
to pump defect for 1 year. fire truck due to pump 2019 LGU fire truck is
defect since last year. LGU needed
Repair/Replacement of defective immediately
pump installed in the LGU fire truck 80,000.00 because it On Going
For the year serves as
2017 additional unit
for fire
suppression
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
OFFICE : DALUBHASAAN NG LUNGSOD NG SAN PABLO PROVINCE : LAGUNA
CITY : SAN PABLO
Status of Implementation
LGPMS Time Implementing On - going Funding Issues and Action
No. ELA PPAs GAPS Frame Office Not Starting % of Completion Source Concerns Taken/
ADDRESSED Yet Date Completion Date Remarks
DALUBHASAAN NG LUNGSOD NG SAN PABLO
1 On-going accreditation to Increase collections 2016- DLSP, SP 2016 2019 GF Budgetary Constraint
be a university and revenues 2019 Php5M/
Year
2 Increase in tuition and 2017- Enactment of Ordinance
miscellaneous fees based 2018
on geographic residency
-San Pablo residence
-Laguna residence -
Outside Laguna residence
3 Purchase of a coaster 2018 DLSP Php1M
4 Collect fees and charges 2016
from all business
establishments within
the premises of DLSP
5 Faculty and Staff Compliance to the 2016- Sponsor- 1. Most of the faculty members lack the Issuance of
Development Program CHED and ALCUCOA 2019 ship and academic/educational qualifications (MA/MBA memoran-
requirements as to Personal holders) per CHED/ ALCUCOA requirements, dum to all
educational Budget hence, the need to finish their graduate studies faculty
qualifications members
6 Construction/Upgrading Compliance to the DLSP, GSO, 2016 2019 DLSP Shortage/Inadequate physical plant & facilities
of Physical Plant and CHED and ALCUCOA CEO Budget 1. The need to provide/construct:
Facilities require-ments as to a. Auditorium
infrastructure and b. Multimedia Center
facility c. Speech Laboratory
d. Automotive Training Center
enhancement in
e. Covered pathway
support to
2. Upgrading of:
curricular offerings a. Science laboratories chemistry, biology and
physics
b. Computer laboratories
c. Gymnasium
d. food and service area
e. rest rooms
f. students center
g. HRM facilities
h. Library Facility
4 Construction of fence for San Safertty of school 2017-2019 DepEd 2017 2019
Lorenzo ES and Paaralang Pag- premises PhP 7.5 M
ibig at Pag-asa
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
OFFICE : LOCAL CIVIL REGISTRY / CITY LIBRARY /DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT PROVINCE : LAGUNA
CITY : SAN PABLO
Status of Implementation
LGPMS On - going Issues and Action
No. ELA PPAs GAPS Time Implementing Not Starting % of Completion oncerns Taken/Remarks
ADDRESSED Frame Office Yet Date Completion Date Funding Source
OFFICE :
2 KatarunganPambarangay
Seminar/ Workshop
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
2 Provide Technical assistance to Empowered community Sept. Sept. 30% CMO Disoriented and Community
community association relate association thru: 2016- 2016 mismanaged association are given
to housing concerns and issues Implementation of Sept. community orientation on
Magna Carta of 2019 association Magna Carta of
Homeowners Homeowners
Association Association
3 Monitor the movement of Coordinate with Office Sept. 1, CUDHO, PSA, Sept. 50% CMO, Increasing number of Proper coordination
population and its influence to relative to the growth 2016-Aug. POPCOM, BNS 2016 POPCOM undetermined with POPCOM on the
achieve a balance between rate of population and 2019 informal settlers no. of informal
urban capabilities and with the City Population settlers down with
population Office the BNS
4 Curtails activities of Dissemination of Sept. Liga ng Sept. 1, 50% DILG, CMO Increasing number of Intensified
Professional squatters and Memorandum Circular 2016- Barangay, 2016 squatting syndicates information
Squatting Syndicate 2011-7 of DILG re: Sept. DILG, CUDHO, campaign
Accountability of Punong 2019 CMO
Barangay and its officials
on the proliferation of
informal settlers and
their curtailment
5 Coordinate with Housing Urban Established strong June 28, CMO, CUDHO, June 28, 95% Dec. 14, DSWD, CMO, Lack of fund to Private sectors
Development Coordinating partnership and linkages 2015-June HUDCC, 2015 2016 CUDHO, sustain housing through their social
Council and National with the key shelter 2019 HLURB, Franklin needs responsibility
Government Housing Agencies agencies and private PUDHO Baker, Gawad donated 20 shelters
involved in assisting LGUs in sectors for the Kalinga to GK and 59 DSWD
the respective socialized attainment of affordable Core Shelter
housing project housing accomplished
7 On-going court proceeding on Filed the corresponding Dec. CUDHO, CMO, Dec. 80% CMO, Aoperation of the Filed the
the Land Titling of government action and other 2015- Legal 2015 CUDHO, Legal Republic of the extraordinary
lot situated at Brgy. San remedies particularly the Dec. 2017 Philippines cum remedy of Certiorari
Gregorio, San Pablo City as motion for Solicitor General on to the highest
housing project for Pag-ibig Reconsideration and the Titling of tribunal Supreme
members Certiorari Government Lot Court
8 Augment the capability of Local By virtue of Ordinance June CMO, CUDHO, June 90% CMO, Inadequate Housing Ordinance 2009-06,
Government Unit in 2009-06, Created the 2009- Legal, SP 2009 CUDHO, SP Staff Created the CUDHO
undertaking Urban City Urban Development June 2019 composition starting
Development and Housing and Housing Office which from the City Urban
programs and projects will spearhead and Development and
complement the Housing Officer and
rationalization of all other staff will
housing personnel come lateral
movement from
other offices
II. ECONOMIC SECTOR
Land Tax:
10 j. Additional personnel for
the delivery of notice of
delinquency 2016-2017 CTO Php300K
11 k. Purchase of vehicle Php2M
12 l. Computerization of
payments
2 Computerization of Payroll Automatic GSIS loan deduction Jan., 2017 CAO, CHRMO
System On-time Remittance to GSIS
Create database of employees
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
OFFICE : CITY HISTORY, ARTS, CULTURE AND TOURISM OFFICE / PUBLIC EMPLOYMENT SERVICES OFFICE / OFFICE OF THE BUILDING OFFICIAL PROVINCE : LAGUNA
CITY : SAN PABLO
Status of Implementation
LGPMS Implementing On - going Issues Action
No ELA PPAs GAPS Time Office/ Not Starting % of Completion Funding/ and Concerns Taken/Remarks
. ADDRESSED Frame Department Yet Date Completion Date Source
OFFICE : CITY ASSESSOR’S OFFICE / CITY PLANNING AND DEVELOPMENT OFFICE PROVINCE : LAGUNA
CITY : SAN PABLO
Status of Implementation
LGPMS GAPS Time Implementing On - going Issues Action
No. ELA PPAs ADDRESSED Frame Office Not Starting % of Completion Funding Source and Concerns Taken/Remarks
Yet Date Completion Date
1 Reclassification of real property Increase in collection 2016- CAO Php10M Budgetary Constraint
Database 2018
2 Upgrading of fair market value Management
based on actual use
1 Updating of the Comprehensive Create employment 2017 CPDO Php750K CLUP Approval
Dev’t Plan Increase revenue
OFFICE : BUSINESS PERMITS AND LICENSE OFFICE / CITY COOPERATIVE OFFICE / LOCAL ECONOMIC AND INVESTMENT PROMOTION OFFICE PROVINCE : LAGUN
CITY : SAN PABLO
Status of Implementation
LGPMS GAPS ADDRESSED Time Implementing On - going Issues Action
No. ELA PPAs Frame Office Not Starting % of Completion Funding and Concerns Taken/Remarks
Yet Date Completion Date Source
OFFICE : BUSINESS PERMITS AND LICENSE OFFICE
1 Purchase of service vehicle Information dissemination 2017 CCO Php1M Budgetary Constraint
to raise public awareness
on invaluable contributions
of coop. enterprise to
poverty reduction and
employment
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
7 Conduct of Symposium and or consultation 2017 Jan. 2017 Dec. 31, 200,000.00
2017
8 Production of Brochures for promotion 2017 Jan. 2017 Dec. 31, 20,000.00
2017
9 Lingakges Building matching programs 2017 Jan. 2017 10,000.00
11 Allocation of Integrity for Jobs (I4J) 2017 Jan. 2017 Feb. 2017 12,000.00
12 Activation of Local Investment Board (LIB) 2017 Feb. 2017 Mar. 2017 20,000.00
13 Activation of Local Economic Team (LET) 2017 Feb. 2017 Mar. 2017 20,000.00
2 Effective garbage collection CSWMO 2017 2017 20% Dev Fund 2. Insufficient
1. Purchase of additional two (2) garbage 2017- For 2017 garbage collection
trucks with retractable 8 bins. 2019 10,000,000.00 equipment.
2 .Purchase of one(1) dump truck.
3. Purchase of Service Vehicle. 2,000,000.00 3. Non participation
4. Participation of Brgy Officials on anti- 1,000,000.00 of Brgy Eco Warriors
littering law, plastic regulatory ordinance, & some Brgy officials
and waste segregation. on anti-littering law,
5. No segregation No collection policy. plastic regulatory
6. Strict implementation of plastic ordinance & waste
regulatory ordinance. segregation.
4 Strict implementation on “No Plastic, no Increase 2016 CSWMO 2016 Political Interventions
styro Ordinance” revenue and
environmenta
l protection
-Mobilize the
community to
participate on
regular clean up
of rivers and
waterways and
the conduct of
tree planting
activities along
lakeshores and
riverbanks.
6 Banadero River Tributaries Clean implementation of CY 2017 CENRO in - 3.4 M under problem on solid For implemen-
– up and Rehabilitation Clean Water Act of coordination The 20% devt. wastes and its tation
2004 (RA 9275) and with the fund harmful effect on
Ecological Solid Waste concerned water resources -to rehabilitate
Mgt. Act of 2000 (RA barangays, and improve
9003) other local water condition
government of Banadero river
agencies of the
City
Government
IV ADMINISTRATIVE GOVERNANCE
OFFICE : CITY MAYOR’S OFFICE / HUMAN RESOURCE AND MANAGEMENT OFFICE PROVINCE : LAGUN
CITY : SAN PABLO
Status of Implementation
LGPMS GAPS ADDRESSED On - going
No. ELA PPAs Time Implementing Not Starting % of Completion Funding Issues Action
Frame Office Yet Date Completion Date Source and Concerns Taken/Remarks
GENERAL ADMINISTRATION
1 Initial research and conduct Knowledge on ISO 2016- City Mayor’s 2016 2019 Gen. Fund/ Research on the Resolution
feasibility study on securing ISO certification procedures 2019 Office, SP Grants/ Other procedure of ISO requesting the
and taking initial steps on agencies certification CMO to initiate
securing it PhP410,000.00 Conduct feasibility the procedure in
on securing ISO securing ISO
certification certification
2 Membership to International 2016- CMO 2016 2019 Gen. Fund/
Organizations 2019 Grants/ Other
agencies
PhP105,000.00
3 Creation of Management Creation of MIS Office 2016- CMO 2016 2019 Gen. Fund
Information System Office under the CMO and lateral 2019 Human
movement of personnel Resource Mgt. 1,000,000.00
Office
HUMAN RESOURCE MANAGEMENT AND DEVELOPMENT
1 Managing the human resource in Rationalization of 2016- HR 2016 2019 GF Reorganization of
general towards a desired end personnel / 2019 Grants personnel
which is desirable organizational Personnel Development
performance and productivity
1. Performance Evaluation
2. Values Orientation Workshop 300,000.00
3. Team Building 450,000.00
4. Physical Fitness/Sportsfest 600,000.00
5. Training /Lakbay Aral (Local &
International) 1,500,000.00
LIST OF PRIORITY PROGRAMS, PROJECTS AND ACTIVITIES ON ELA IMPLEMENTATION
CY 2016 – 2019
OFFICE : CITY MAYOR’S OFFICE / HUMAN RESOURCE AND MANAGEMENT OFFICE PROVINCE : LAGUN
CITY : SAN PABLO
Status of Implementation
LGPMS GAPS ADDRESSED On - going
No. ELA PPAs Time Implementing Not Starting % of Completion Funding Issues Action
Frame Office Yet Date Completion Date Source and Concerns Taken/Remarks
HUMAN RESOURCE MANAGEMENT AND DEVELOPMENT
2 Training of Personnel Conduct training on: 2016- HR 2016 2019 GF
1. VOW and Code of Ethics 2019 840,00000
2. Supervisory
Development Course
Track 1 to Track 3 (SDC
T-1 to T-3)
3. Basic Customer Service
Skills (BCSS)
4. Public Service Ethics
and Accountability
2 Complete Rehabilitation of LCR 1. Allocation of Funds 2016- LCR, CEO, OBO 2016 2019 Appropriation
Office including the comfort 2. Preparation of 2019 City Budget Ordinance
rooms in the building Program of Work Office Approval of
3. Construction either by Contract if not by
administration or by admin
contractor
OFFICE : CITY MAYOR’S OFFICE / HUMAN RESOURCE AND MANAGEMENT OFFICE PROVINCE : LAGUN
CITY : SAN PABLO
Status of Implementation
LGPMS GAPS ADDRESSED On - going
No. ELA PPAs Time Implementing Not Starting % of Completion Funding Issues Action
Frame Office Yet Date Completion Date Source and Concerns Taken/Remarks
RESOURCE ALLOCATION AND UTILIZATION
1 Official Website Official Website for posting 2016 CMO 2016 2017 GF Improvement and
all important events of city CIO 100,000.00 reactivation of Official
and compliance with CAO website with links to
posting requirements of And other offices
national agencies GSO
2 Improvement of Procurement Purchase of supplies and 2016- GSO 2016 2019
and Storage System of Supplies materials in bulk on a 2019
and Materials (centralized quarterly basis as per
system) approved APP and store
them in at the GSO
stockroom
3 Compliance to all request by all 1.Conduct inspection, CEO
brgy concerns and other related 2.Prepare plan and POW
agencies/offices
4 Maintenance of Govt. bldg , Inspection and preparation CEO
roads, bridges, canals and all of necessary documents
govt. properties including needed
vehicles and equipment
5 Sidewalks and other Safe and secured sidewalks 2016- CEO/ CMO and 2016 2019 Dismantling of all
Government structures are free and public places 2019 Brgy Concern obstructions on all
from encroachment government spaces
6 Upgrading of motor pool division Less dependency of private 2016- CEO 2016 2019 Stand by stock of most
services/less expenses 2019 commonly used
materials needed for
the maintenance of
motor vehicles and
equipments ( motor oil,
etc)
7 Establishment of BAC Office Construction of BAC Office CMO GF
1,500,000.00
3 Development and installation of Negotiate with software 2017- Office of the 2017 2019 Test run
electronic Legislative Tracking developers to customize 2019 Vice-Mayor 1 Million
System and linkage in official and install the SP
website Legislative Tracking
System according to its
needs
Upgrade computers, printer
scanners, and Wi-Fi system in the Completed
office of the SP Secretariat (7th 500K
Floor)
CAPACITY
DEVELOPMENT
AGENDA
2016-2019
Performance Area: SOCIAL GOVERNANCE
CapDev Agenda
Current state of Desired state of Capacity Development Interventions Expected Output Target of Time Funding Requirements Process Source of
capacity capacity CapDev Frame Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Housing Board Functional Activation of the Board Implementation of the Member of the 1 year 30k CMO, CUDHO, CMO, CUDHO,
organized and housing board enacted ordinance defining housing board CPDO, CEO, SP CPDO, CEO, SP
defined through through regular the role of the housing
ordinance 2009- meetings and board
06 but not proper
functional coordination
Lack of Availability of Establish linkages to Agencies and Private Sector that Availability of Livelihood Informal dwellers 3 years 500k 500k 500k CMO, OSWD, CMO, OSWD,
employment and livelihood provides funds and conduct skills and trainings Programs, funds and trained City COOP City COOP
livelihood programs and beneficiaries
components for grants of
relocates livelihood
Limited resources Well-funded inter- Avail the housing Programs provided by Established linkages with Informal dweller 3 years 100k 100k 100k CMO, CUDHO, CMO, CUDHO,
to sustain housing Agency that will 1. Gawad Kalinga well-funded Inter-Agency along hazard TESDA, DSWD, TESDA, DSWD,
backlogs sustain housing 2. CFC- Global ANCOP Committee that will address prone area and PNR, NHA, PNR, NHA, DPWH
backlogs 3. Private Sectors (Social Responsibility) housing needs those affected by DPWH
4. Habitat for Humanity Government
Infrastructure
Seek the assistance from Housing Urban Program
Development Coordinating
Council relative to PNR Modernization Project
Lack of Updates Updated on Attend seminars, workshops and trainings (Local, Familiar with the current Housing Personnel 3 years 100K 100K 100K HUDCC, NHA, HUDCC, NHA,
on current current issues and Regional and International) and those given by the issues and policies relative HLURB HLURB
housing issues, policies Housing Urban Development Coordinating Council to housing program
policies and (HUDCC) and other key shelter agencies
implementing
rules
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
A. Functionality of Implemented the Strengthen the council
the different different laws for of the City and
councils and children, youth, Barangay level
structures women, family and -Coordinate with the
persons with Liga ng mga Barangay
disabilities and different stake
holders
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions CapDev Year 1 Year 2 Year 3 Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
3. R.A 9344 Full implementation Training orientation to Commitment / P700,000.00 P700,000.00 P700,000.00 OSWD Liga ng Open Heart
of the R.A 9344 the representative of Readiness and 2017 - 2019 3 years 3-4 days 3-4 days 3-4 days Barangay Foundation
-children in conflict each barangay willingness of training training training DSWD Reg.
with the law (CICL) the barangay IV-A
officials GAD budget GAD budget GAD budget
or 1% BCPC or 1% BCPC or 1% BCPC
Technical
support from
open heart
foundation and
DSWD Reg. IV-A
Full
implementation
of the training
conducted
4. R.A 7610 Standard report Capacity development Implementation Liga ng mga 2017 2nd P640,000.00 P640,000.00 P640,000.00 OSWD Open Heart
methods. conduct advocacy of training and barangay quarter 3-4 days 3-4 days 3-4 days DILG Foundation
-Protective service Increase awareness Advocacy 2018 2nd training training training Liga ng mga DSWD Reg.
for children on child abuse quarter One One One barangay IV-A
issues, CRC 2019 2nd participant participant participant
Convention of Child quarter from each from each from each
Rights Children’s law baranagay baranagay baranagay
among the
stakeholders Training for OSWD staff - Do - LGU 1 % LCPC 2017 2nd P250,000.00 P250,000.00 P250,000.00 OSWD LGU
to manned the center budget or quarter Liga ng barangay
for children budget OSWD LGU
5. R.A 9262 To equip VAWC desk Training orientation Implementation Liga ng mga 2017 3rd
officer in handling of the training baranagay quarter P320,000.00 P320,000.00 P320,000.00 - Do - - Do -
VAWC – Violence cases at the Make functional the monitoring 2018 3rd 2-3 days 2-3 days 2-3 days
Against Women barangay level VAWC desk quarter
and Children 2019 3rd
quarter
Functional VAWC
desk
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process Source of
capacity capacity Interventions CapDev Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
6. R.A 9710 To advocate the R.A Orientation to Monthly KALIPI women 2017-2019 GAD budget GAD budget GAD budget OSWD Open Heart
9710 organized women meeting with monthly 1 million 1 million 1 million LGU finance Foundation
Magna Carta of groups women to Day Care advocacy committee DSWD Reg. IV-A
Women advocate R.A Parents meeting
9710
Government
stakeholders
7. R.A 6972 – Equip Day Care Training Accreditation Day Care P365,000.00 P365,000.00 P365,000.00 Liga ng mga
Barangay Total Worker in Worker For 73 pax For 73 pax For 73 pax Barangay
Development and Implementing ECCD Fully Up training Up training Up training OSWD
Protection of Implemented 2017-2019 Liga ng mga
Children Act R.A 6972 Barangay
Up Day Care
Academy
P365,000.00 P365,000.00 P365,000.00 PSWDO
Liga ng mga For 73 pax For 73 pax For 73 pax
barangay LGU training LGU training LGU training
Objectives:
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Limited knowledge Develop well-trained To attend training for Well-trained 10 2017-2019 200K 200K 200K CMO-OSCA CHO/OSWD
and skills for personnel auxiliary care personnel
auxiliary care
Performance Area: SOCIAL GOVERNANCE
Objectives:
To Educate and Promote Awareness on road use and safety
Sub sector area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Traffic Congestion Traffic Decongested Conduct Training & Decongested Road user, 2016- 2019 50K 50K 50K CTMO PNP/HPG/LTO
seminars on public Traffic in Major CTMO
information on Road City personnel and
Safety, Rules and Thoroughfare Government
Regulations Officials
Traffic Congestion Traffic Decongested Conduct Training and Effective and CTMO 2016-2019 50K 50K 50K CTMO UP NCTS
Seminar on Traffic Competent Personnel and PNP/HPG/LTO
Administration Traffic Enforcer Brgy Traffic
Auxiliary Group
(BTAG)
Members
Traffic Congestion Traffic Decongested Conduct Training and Effective and CTMO 2016-2019 50K 50K 50K CTMO PNP/HPG/LTO
Seminar on Minor Competent Personnel
Vehicular Accident Traffic Enforcer
Traffic Congestion Traffic Decongested Conduct Training and Effective and CTMO 2016-2019 50K 50K 50K CTMO PNP/HPG/LTO
Seminar on CCTV Competent Personnel Service
Monitoring, Reporting Traffic Enforcer Provider
and Maintenance
Outcome Area Current Performance Level: Outcome Area Goal: To become more responsive and more attentive member of Bureau of Fire Protection.
Undermanned responding Firefighting units during fire Operation & Objectives: To established of well-equipped and well manned SPC Firefighting Units.
Control
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Insufficient To become more Training of Appointed Memo from LGU 10 Personnel 6 Months 90,000.00 90,000.00 90,000.00 LGU/BFP LGU
manpower But Responsive and Local Personnel for
organized more attentive local functions
Lack of awareness To become aware Training for our Junior Approval from 100 Students Last quarter of 160, 000.00 160, 000.00 160, 000.00 BFP/LGU/DEP-Ed LGU
of Students about the Students in fire Kiddie Dep-Ed and LGU T1 and
fire Safety and how prevention and part Fire Marshal Program in 1-3 Days Liga ng mga
to Extinguish a fire of basic fire safety public Per School Barangay
Schools by Dep-Ed
Performance Area: SOCIAL GOVERNANCE
Outcome Area Current Performance Level: Outcome Area Goal: To have a more efficient and responsible penology officer
BUREAU OF JAIL MANAGEMENT AND PENOLOGY Objectives: To equip personnel with the necessary tools in addressing challenges in the jail bureau.
CapDev Agenda
Current state of capacity Desired state of Capacity Expected Output Target of Time Frame Funding Requirements Process Source of
capacity Development CapDev Year 1 Year 2 Year 3 owner/ Office support/
Interventions responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Lack of paralegal officers to To train and have Attend seminars Additional All able BJMP- 2016-2019 10k 10k 10k BJMP/ DILG DILG/LGU
cater the needs of the additional paralegal regarding paralegal knowledgeable SPCDJ personnel
increasing number of inmates officers matters personnel who can
handle paralegal works
The need to refresh personnel Acquaint personnel in Conduct of firearm A more proficient All BJMP-SPCDJ 2016- 2019 20k 20k 20k BJMP/DILG LGU/DILG
on their skills in handling the use of their issued proficiency training personnel in gun- personnel (Semestral)
firearms firearms handling
Need to rehabilitate inmates Observance of self - Conduct of ALS To have a productive All qualified 206-2019 10k 10k 10k Dep-Ed/ LGU/ Dep-Ed/
thru ALS while in confinement preservation thru (Alternative Learning detainee while in detainees BJMP BJMP
education System) to all confinement
qualified detainees
Need to provide livelihood Enhancement of Conduct of skills Skillful and self - All qualified 2016- 2019 10k 10k 10k Dep-Ed/ LGU/ Dep-Ed/
programs as a tool in helping livelihood skills while in enhancement sufficient inmates detainees BJMP BJMP
detainees for their eventual confinement training (livelihood
reintegration into the training)
mainstream of society as law
abiding and productive citizen.
The need to support the To have a compliant Conduct of anti-drug To have a drug-free All BJMP 2016-2019 10k 10k 10k BJMP/ CHO CHO/ LGU/
Presidents campaign against personnel, inmates and campaign seminar to work place personnel, (quarterly) BJMP
the proliferation of illegal drugs visitors to the existing all personnel, inmates and
law inmates and visitors visitors
The need to educate personnel To have a compliant Attend/ Conduct of To have a smoke free All BJMP 2016-2019 10k 10k 10k BJMP/ CHO CHO/ LGU /
and detainees as to the ill personnel and inmate anti-smoking seminar work place personnel and (quarterly) BJMP
effect of cigarettes in the body to the mandate of the detainees
jail bureau
CapDev Agenda
Current state of capacity Desired state of Capacity Development Expected Output Target of Time Funding Requirements Process Source of
capacity Interventions CapDev Frame Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Only 27% of faculty 80% of faculty Pursuing graduate Faculty members are 10 teachers 2016-2017 300,000.00 DLSP Budget Office
members have the full members are fully studies through fully qualified, DLSP
qualifications as per qualified in terms of scholarship grants from competent and well- 20 teachers 2017-2018 400,000.00
requirements by CHED education and CHED and other trained for college
and ALCUCOA (masteral training by 2019 sponsoring individuals teaching 30 teachers 2018-2019 400,000.00 CHED
degree holders) and agencies Sponsors
Grants
Attending seminars and Attended Seminars
trainings in local/ and Trainings
regional/ national/
international
Attending seminars and Attended Seminars 3 personnel 2017 100,000.00 DLSP Budget
trainings in the and Trainings Gen. Fund
international level 3 personnel 2018 100,000.00
CapDev Agenda
Current state of capacity Desired state of Capacity Development Expected Output Target of Time Funding Requirements Process Source of
capacity Interventions CapDev Frame Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Enhance training skills Attends/conducts Attended/conducted Librarian &
continuing professional continuing Staff
education training professional/ seminars
programs. and training programs
Performance Area: SOCIAL GOVERNANCE
Outcome Area Current Performance Level: Outcome Area Goal: Efficient implementation of Population Management Program and Nutrition Program of the City Population Office
through attending and conducting related seminars.
Enhancement of facilitators’ training skills, updating and refresher Goals: Continuing a high quality of professional development Programs for Population , Responsible Parenthood , Reproductive Health ,
course on the conduct of Population and Nutrition Seminars for and Nutrition Program in San Pablo City
public clientele, including efficient implementation of office programs Objectives:
and activities. 1. To enhance training skills and technical knowhow of CPO staff and line agencies on various trainings and activities conducted
by the office.
2. Implement population and family planning programs and projects within the context of promoting family welfare, economic
growth and sustainable development.
3. Promote the value of responsible parenthood, birth spacing and a small family norm.
Sub sector area:
CapDev Agenda
Current state of capacity Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process Source of
capacity Interventions CapDev Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Limited technical CPO staff capable of Attendance to Efficient operation of competent 2017 20k City Population DOH,
knowledge and managing a Training/Orientation on Breastfeeding Station personnel from Office National
requirements on the Breastfeeding Station RA 10028 with qualified the City Nutrition
operation of a (Breastfeeding Act) personnel Population Council
Breastfeeding Station Office and City
Health Office
Updating on the issues PMC Team/training Attendance to a Accredited counselors Accredited 2018 30K City Population POPCOM
and topics for the delivery facilitators are Refresher Course on of PMC Team are counselors of Office Region 4
of Pre-Marriage updated on the Pre-Marriage updated on the PMC Team
Counseling (PMC) current issues, Counseling (PMC) in current issues, policies (City Population
policies and topics line with Family Code and topics and Office, City
for the delivery of enhanced training Health Office,
Pre-Marriage skills City Social
Counseling to Welfare and
engaged couples Development
who are applying for Office)
a marriage license at
LCR.
CapDev Agenda
Current state of capacity Desired state of Capacity Development Expected Output Target of Time Funding Requirements Process Source of
capacity Interventions CapDev Frame Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Updating on the topics to FDS Team /trainors Attendance to a FDS Team / training 2018 30K City POPCOM 4
be discussed for Family are updated on the Refresher Couse on facilitators are updated and Population
Development Session - topics and resource FDS/RP/FP Barangay enhanced facilitators’ skills Office
Responsible manual on Classes. on the conduct of
Parenthood/Family FDS/RP/FP to FDS/RP/FP Barangay
Planning (FDS/RP/FP) married couples/4Ps Classes
Barangay Classes members.
Limited technical skills and City Population staff To attend training on Competent CPO staff and CPO staff and 2017 30K City POPCOM 4
knowledge on the conduct and Barangay Basic Population BNSs to conduct a BNS Population
of a Population Database Nutrition Scholars Demographic Survey Population Database Federation Office
Development Data Federation Officers Development Data in 80 Officers
(Barangay Socio are knowledgeable barangays
Demographic Profile) on the systematic
conduct of a
population survey.
Lack of livelihood skills Indigent beneficiaries Attendance to different Additional income for SDG SDG 2017-2019 1M 1M 1M City Core City
and income generating acquired seminars and training: beneficiaries Beneficiaries Team Cooperative
projects of target management skills of Office, CHO,
beneficiaries for individual or group 1. Various Improvement on economic CPO,OSWD,
Sustainable Development livelihood and Livelihood status of beneficiaries CDRRMO, Red
Goal Project and enhance enhanced Projects Cross, TESDA,
moral values, family moral/spiritual 2. Spiritual and Moral Values Formation / DepEd FAITH
relationships, community values, family Moral Values Recovery Groups
participation and address relationship, Seminar
family basic needs. community 3. Health and Improvement of Health and
participation and Nutrition Nutrition Status
addressed family Seminars
basic needs. 4. Disaster Readiness on the time of
Management disaster
Seminar
5. Family Planning Responsible Parents
and Responsible
Parenthood Community Development
Seminar Participation
CapDev Agenda
Current state Desired state of Capacity Development Interventions Expected Output Target of CapDev Time Frame Funding Requirements Process Source of
of capacity capacity Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Limited grade Training on: 1. Governance Trained on Efficient & 2016 -2019 CHO DOH/NGAs
health service Governance, Governance, Service Effective Health
facility Service Delivery Delivery and Service delivery
and Competency Competency Based thru CHO trained
Base Training personnel
1. Management and Leadership 9,600.00 CHO
Training
2. Writeshop on the Formulation of 9,600.00 CHO
Ordinance & Resolution
3. Medico-Legal aspect of Emergency 16,000.00 CHO
management
2. Service Delivery
CapDev Agenda
Current state Desired state of Capacity Development Interventions Expected Target of Time Frame Funding Requirements Process Source of
of capacity capacity Output CapDev Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
g. ESU/HEMS training
1. Training on Disease Surveillance (with 76,800.00 CHO
government and private Hospitals)
2. Orientation on Notifiable and 76,800.00 CHO
Emerging Diseases ( with government
and private Hospitals)
3. Basic Life Support (with Hospitals) 28,800.00 28,800.00 CHO
4. Advance Pediatric Life Support 4,800.00 CHO
h. Environmental Sanitation CHO
1. Waste Management Training (with 4,800.00 CHO
hospitals)
2. Hygiene and Sanitation Principles and 4,800.00 CHO
Best Practices
i. Vector Control Program
1. Conduct trainings on Integrated 19,200.00 CHO
Vector Management
j. Data Management System
e-encoding 2016 7 encoders x CHO LGU/DOH
1,600 x 4=
Php 44,800.00
3. Competency Based Training Program CHO
1. Continuing Education for Hospital/ 14,400.00 CHO
RHU Staff on Health Service Delivery
2. Filling up of Death Certificate (with 3,200.00 CHO
hospitals)
3. International Statistical 8,000.00 CHO
Classification of Diseases10 (ICD10)
(with hospitals)
4. Refresher course on DQC and data 9,600.00 CHO
analysis training ( with hospital)
4. Health Programs CHO
1. Diabetes Control Program 4,800.00 CHO
2. Public Sanitation 4,800.00 CHO
CapDev Agenda
Current state Desired state of Capacity Development Interventions Expected Target of Time Funding Requirements Process Source of
of capacity capacity Output CapDev Frame Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
CapDev Agenda
Current state of Desired state of Capacity Development Interventions Expected Output Target of Time Funding Requirements Process Source of
capacity capacity (tie-up) CapDev Frame Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
1. Limited Develop To conduct/attend Continuing Well-trained All Hospital 2017-2019 350,000.00 350,000.00 350,000.00 San Pablo City DOH, PHIC
knowledge and competent Education Program for Health healthcare workers Personnel General and other
skills of health health worker Workers Hospital National
workers Government
Agencies
A. Governance
1. Management and Leadership
Training
2. Writeshop on the Formulation of
Ordinance & Resolution
3. Medico-Legal aspect of Emergency
management
B. Service Delivery
1. Lactation Management Training
C. Competency Based Training
Program
Laboratory
1. Blood Screening and Collection
2. Blood Chemistry
3. Parasitology
4. Hematology
5. Gene-X
6. DSSM
7. Blood Banking
CapDev Agenda
Current state of Desired state of Capacity Development Interventions Expected Output Target of Time Funding Requirements Process Source of
capacity capacity (tie-up) CapDev Frame Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Emergency Room
1. Updates for Emergency Nurses
2. Basic Life Support
3. Advance Cardiovascular Life Support
4. Updates in Hospital Patient Safety
Radiology and Ultrasound
1. Updates for Radiologic Technician
2. Training on Ultrasonography
Pharmacy
1. Updates for Pharmacists
2. Updates for eDPMS
D. Health Programs
Medical and Nursing Service
1. Training on Critical Incident Stress for
Emergency Management System
Debriefing
2. Training on Psychosocial Care in
Crisis & Disaster
3. Training on Surveillance Disater
Management/Emergency Management
4. Training on breastfeeding support
group
5. Health Emergency Preparedness,
Response and Rehabilitation Plan
(HERRP)
6. Solid Waste Management
7. Renal Disease Prevention Control
8. Infection Control
9. Training on Drug Rehabillitation
Program
CapDev Agenda
Current state of Desired state of Capacity Development Interventions Expected Output Target of Time Funding Requirements Process Source of
capacity capacity (tie-up) CapDev Frame Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
E. Administrative
1. Orientation of Local Chief Executive
& Legislators on Health Care Financing
Schemes & Strategies/ Best Practices
2. Career Development and
Management
3. Manual Development
4. Facilities Management
5. HOMIS Installation, Utilization,
Implementation and Maintenance
6. Ethics and Values Reformation
(Workplace Emotions, Attitudes, Values
and Ethics-WEAVE
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Cash deficiency To increase Computerization of Training CTO Personnel T1, T2, T3 Php200K Php200K Php200K CTO Personnel Program Service
collections Collection System Conducted Provider
(Land Tax, Market,
Business Tax)
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of support/
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Manual accounting To gain knowledge Training/seminar for Training Accounting T2, T3 Php200K Php200K City Accounting COA
system on the e-NGAS e-NGAS Conducted Division Staff Office
Manual Payroll To computerize the Training/Seminar on Training Accounting T1 Php100K City Accounting Land Bank of the
System payroll system Computer Payroll Conducted Staff and Office, CHRMO Phils.
System CHRMO Staff Payroll System
Provider
Updates on To update Conference/seminar Training Accounting T1, T2, T3 Php75K Php75K Php75K City Accounting COA and various
various accounting accounting staff on on Various Accounting Conducted Staff Office agencies and
rules and various accounting Rules and Regulations organizations
regulations rules and
regulations
Updates on CPA’s To update on Conference/seminar Training City T1, T2, T3 Php50K Php50K Php50K City Accounting PICPA and other
continuing on Continuing Conducted Accountant Office professional
education for Education for and organizations
accountants Accountants (local, Accountant IV
regional, national,
international)
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
Sub sector area: CITY HISTORY, ARTS, CULTURE AND TOURISM OFFICE (CHACTO)
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Insufficient 10 well trained Advance Training for Training 5 – CHACTO T1, T2, T3 Php75K Php50K Php50K CHACTO, CIO, DOT Regional
number of Local local tour guides Tour Guiding Seminar Conducted 30 – Brgy. BRGY. OFFICIAL, Office, PROV’L
Tour Guides and Frontliners Officials CTMO, PNP, GOV’T
30 – Academe SCHOOLS, CHACTC
2 – PNP
5 – CTMO
10 - CHACTC
Lack of knowledge Well prepared and Training for Basic Training 2 – CHACTO T1, T2, T3 Php25K Php25K Php25K CHACTO, BRGY. DOT Regional
on how to prepare recorded tourist Statistics on Recording Conducted 20 – Brgy. OFFICIALS, Office, PROV’L
statistic records of arrivals in of Tourist Arrival as Officials CHACTC, Tourism GOV’T
tourism arrivals accordance to DOT per RA 9593 5 – CHACTC related
required tourism 30 – Tourism establishment
format establishment owners
owners
Sub sector area: CITY HISTORY, ARTS, CULTURE AND TOURISM OFFICE (CHACTO)
CapDev Agenda
Lack of promotion Well Tourism Awareness Training 5 – CHACTO T1, T2, T3 Php80K Php80K Php80K CHACTO, CHACTC,
on tourism informed/promote Seminar on Tourism Conducted 30 – Brgy. Brgy. Officials,
programs, projects d tourism plans, Plans, Projects and Officials Academe, Tourism
and activities projects and Programs related to 20 – CHACTC related business
programs Tourism Master Plan 20 – Tourism establishment
(Local, National related owners, NGOs
International) business
establishment
owners
10 – NGOs
10 – Schools
Protection of Protected and Computation and Training CHACTO T1, T2 Php33K Php33K CHACTO, FARMC, DENR
natural resources maintained natural Formulation of Conducted FARMC CENRO
of eco-tourism resources of eco- Carrying Capacity for CENRO
sites tourism sites Sustainable Eco-
Tourism
Proper protocol of Well trained Training on Training CHACTO, T2 Php33K CHACTO, CDRRMO,
identification of barangay tourism Identification of Conducted CDRRMO, Barangay
hazards in the committee Hazardous Areas on Barangay Committee on
possible eco- members in Possible Eco-Tourism Committee on Tourism
tourism area in the identifying the Sites in their Tourism
selected hazards eco- Respective Barangay
barangays, first tourism area in
and find rescue their respective
training with barangay with first
CDRRMO and find rescue
training
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Updates on PESOs To update status of Capacity Development Training PESO T1, T2, T3 Php50K Php50K PESO LGU
all PESO managers by attending Seminar attended
Updates on job’s To update on job’s Seminar on Job’s Fair, Training PESO T1, T2, T3 Php100K Php100K PESO LGU
fair, local fair, local and Local and Special attended
recruitment special recruitment Recruitment Activities
activities and activities By attending Seminar
special recruitment
activities
Conferences/Seminars
officials travels for
updates on latest
issuances on
employment
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Lack of qualified To train and equip Seminar/training on Training OBO, at least 2 T1, T2, T3 Php50k Php100K Php50K OBO DPWH
manpower additional building
Building Inspection Conducted Additional
inspector
manpower
Web linkages To computerize and Computerization Training OBO T2, T3 Php15M Php10M OBO Computer System
digitally archive the Program on Conducted Provider
assessment and Assessment and
payment system Payment System
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
General revision of To upgrade the Revision of Increase RPT City Assessor’s T1, T2, T3 Php2.5M Php2M Php2M City Assessor’s
assessment value of real Assessment Office Office
properties
according to
approved schedule
of market value.
Manual revision of To computerize Computerization of Increase RPT City Assessor’s TI, T2, T3 Php5M Php2.5M Php2.5M City Assessor’s Computer System
tax RPT RPT Office Office Provider
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Update on CDP To update the CDP Stakeholders Training CPDO staff T1 PhP750K CPDO staff Head Consultant
in compliance with
seminar/training on Conducted Different Diff. offices of the
RA 7160
CDP update offices of the city gov’t
city gov’t Brgy. Officials
Brgy. Officials
IT know- how To train Brgy. Seminar on CBMS Training CPDO T2 PhP1M CPDO Brgy. Officials,
Officials on the Application Conducted Brgy. Officials DILG
CBMS application
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Update the To update Revenue Stakeholders Training BPLO staff, T2, T3 Php100K Php50K BPLO staff, Brgy. Head Consultant
Code
Revenue Code seminar/training on Conducted Stakeholders Officials, of DTI, DILG
update of Revenue Brgy. Officials Stakeholders
Code
Internet Linkages To improve Information Info. BPLO, T2, T3 Php5M Php500K BPLO, Brgy. DOST, DTI
business friendly Dissemination disseminated stakeholders Officials,
policy Brgy. Officials Stakeholders
Electronic Payment To install electronic Non-appearance Increase BPLO, T2, T3 Php500K Php50K BPLO, DOST, DTI
System payment system Payment revenue Stakeholders, Stakeholders, Brgy.
without
personal Brgy. Officials Officials
appearance
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Awareness to To be aware of the Cooperative Congress, Training City T2, T3 Php50K Php50K City Cooperative Cooperative
cooperative cooperative National Tripartite Conducted Cooperative Office Development
updates updates Conference and Officer and Authority
League of Cooperative Cooperative (CDA)
Development Officer Training
Officer
Enhancement of To enhance Trainor’s Training Training 5 – CCO Staff T2, T3 Php50K Php50K City Cooperative CDA
knowledge and knowledge and Conducted Office
skills of skills of cooperative
cooperative staff staff
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
Sub sector area: LOCAL ECONOMIC AND INVESTMENT PROMOTION OFFICE (LEIPO)
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Lack of personnel To train would-be Seminar/training on Training 4 – LEIPO T1, T2, T3 Php 10K Php 10K Php 10K LEIPO Seminar provider
personnel on
Customer Relation Conducted Personnel
customer/client
relation
Lack of To train personnel Seminar/training on Training 4 – LEIPO T1, T2, T3 Php 10K Php 10K Php 10K LEIPO DTI, GO Negosyo
training/experienc on business Business Mentoring Conducted Personnel
e on business mentoring
mentoring
Need for To attain sufficient Attend international Symposiums 4 – LEIPO T1, T2, T3 Php 400K Php 400K Php 400K LEIPO LGU, Foreign
immersion and knowledge and symposiums and and seminars Personnel assisted
exposure on exposure to seminars attended Project/Seminars
current global international
business trend current business
global trend
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Interventions Expected Target of Time Funding Requirements Process owner/ Source of
capacity capacity Output CapDev Frame Year 1 Year 2 Year 3 Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Staff not officially Technical staff International Conventions/Trainings on More AEWS T1, T2, T3 Php200K Php200K Php200K City Agri. Office DA, ATI,
allowed to attend updated with Crop and Livestock; Production, Pests efficient and concerned International
international international and Diseases Control and Prevention updated Institution
trainings/convention issues/events technical
s staff
Human resource Updated staff Local/regional/national Highly Technical T1, T2, T3 Php110K Php110K Php110K CAO DA Reg. 4A
base needing update trainings/seminars/summits/conventions competent staff ATI
of knowledge : staff who are Selected UPLB
a.Crops and Livestock effective and UWs (Utility OPAG
-Production and Management (TOT) efficient in Workers)
-Propagation (crops) the transfer
-Pests and Diseases Control and of technology
Prevention
-GAP/OA Technology and Certification
b.Geo-tagging of Projects
c.Process on FITS Upgrading
d.Sustainable Development
-Ecosystem Conservation and
Preservation
-Climate Change Competent Concerned
e.Cap. Dev. of Focal Persons staff staff
-Rice/HVC/Livestock/Youth/RIC
f.Computer Skills Training
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Updates on NMIS To update all meat Seminar on NMIS Seminar Meat T1, T2, T3 Php100K Php100K Php100K City Vet. Office NMIS – National
guidelines inspectors on NMIS Guidelines attended Inspectors Meat Inspection
guidelines Services
Updates on To update City Vet. Continuing Education Updated City T1, T2, T3 Php100K Php100K Php100K CVO Federation of
profession as City On new guidelines on Veterinary (local, guidelines on Veterinarian Veterinarians
Veterinarian regarding the regional, national, the profession
profession international)
To attend Seminar/Training on Seminar City PHp 200K Php 200K City Vet. Office
international FAVA (Federation of attended Veterinarian
conventions Asian Veterinary
Association)
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Consistent To update the City Seminar/training/ Training City Budget T1, T2, T3 Php100K Php120K Php140K City Budget Office DMB thru
attendance Gov’t. and Brgy. meetings on New Conducted Personnel Barangay Officials CMBOLL
on CMBOLL Officials of new Issuances of Budget Brgy. Officials Provincial Budget
monthly issuances of Circulars Office
meeting by a budget circulars
Budget from the DBM and Local, Regional, National
Office personnel other agencies
regarding budget
process and
operations
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Non-Participation LGU/CSWMO Attendance to seminars More efficient CSWMO Staff 2016-2019 135,000.00 135,000.00 135,000.00 CSWMO LGU
and non- compliance to and conferences (local, and effective NSWMO
cooperation of National Agency regional, national and staff to conduct
constituents to LGU directives. international) for IEC.
in the update of RA 9003 or
implementation of Ecological Solid Waste
RA 9003. Management Act of
2000 and other
National laws
concerned.
.
Annual seminars of LGU/CSWMO Attendance to Updated skill CSWMO Staff 2016-2019 15,000.00 15,000.00 15,000.00 CSWMO LLDA
Population Control compliance to training/seminars of and knowledge EMB
Officer. National Agency Population Control of PCO. DENR
directives. Officer of the City
Sanitary Landfill
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
FOREST ECOSYSTEM MANAGEMENT
Need for Acquired Attendance to seminars and Technically CENRO staff/ Within 3 150,000 200,000 250,000 CENRO CENRO-DENR
continuous new technologies/ conferences (local, regional, trained personnel ERDB-UPLB
years
learning on upgrading national and international) staff/personnel PG-ENRO
forest protection on forest for updates In charge of LLDA
resources on latest forest
& rehabilitation
projects rehabillitation issuances on forest protection
protection, laws, rules and
projects
regulations
(PD 705)
Wildlife Act
International
Environmental
Updates
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
URBAN ECOSYSTEM MANAGEMENT
Substantially Acquired Attendance to seminars and Technically CENRO staff/ Within 3 150,000 200,000 250,000 CENRO PENRO-DENR
Compliant but in new technologies/ conferences (local, regional, trained personnel EMB-DENR
years
upgrading national and international) staff/personnel PG-ENRO
need of more
on pollution for updates on latest in charge of LLDA
trainings and control issuances on Urban pollution PCAPI R4
capabilities Pollution (solid & liquid control
equipments
waste, Air quality
standards/emissions)
RA 9003
Clean Water Act
Clean Air Act
PD 1586
PD 984 Seminars
Refresher course
PCO
Hazardous Waste
Management
Environmental
Permitting
Incident Command
System
International
Environment
Updates
Performance Area: Environment protective, climate change adaptive and disaster resilient LGUs
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Mainstreaming of To formulate and Training/Technical Formulated and CDRRM Council 2017 1,000,000.00 CDRRMO CDRRMC
plans mainstream all review for the mainstreamed members DILG
CDRRM plans. formulation and Plans CDRRMO OCD
mainstreaming of NSC
DRRM Plan, PDRRMO
Contingency Plan,
LCCAP, Business
Continuity Plan & Pre
emptive and forced
Evacuation Plan and
Arm conflict.
Organized CDRRMO To become more Attendance to Trainings CDRRMO 2016-2019 1,000,000.00 1,000,000.00 1,000,000.00 CDRRMO CDRRMC
and SPC SAR but effective seminars, trainings conducted SPC SAR PDRRMO
insufficient responders. and conferences (local, Members OCD
trainings regional, national and BFP
international) Basic & DILG
Advanced for CDRRMO REDCROSS
& SAR
Members/Responders
WASAR
Swiftwater
Urban Search &
Rescue (USAR)
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Collapsed
Structure Search
& Rescue (CSSR)
Hazmat Training
BLS
Ambulanced
Management
EMT Course
Fire fighting
Vehicular Extrication
Continuous training Compliance to RA Attendance to seminars Trainings CDRRMC 2016-2019 1,000,000.00 1,000,000.00 1,000,000.00 CDRRMO CDRRMC
for CDRRMC and 10121 and conferences (local, conducted CDRRMO OCD
CDRRMO in regional, national and Support Group DILG
compliance to RA international) Disaster PDRRMO
10121 Risk Reduction & BFP
Management Training REDCROSS
for CDRRMC & CDRRMO
ICS (level1-5)
Basic/Advance
DRRM Training
Camp
Management
C/BDRRM
CBMS
PDRA
PDNA
Training & other
related
programs &
Activities
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of Time Frame Funding Requirements Process Source of
capacity capacity Interventions Output CapDev Year 1 Year 2 Year 3 owner/ Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
Continuous training Compliance to City Training for Bgy Trainings Brgy Official 2016-2019 400,000.00 400,000.00 400,000.00 CDRRMO CDRRMC
needed in ordinance no. 2014- Officials/level conducted and OCD
compliance to City 18 BERT Constituents DILG
ordinance no2014- C/BDRRM PDRRMO
18 “An ordinance BDRRM Plan with BFP
requiring every Evacuation Guide with PNP
brgy to create a facilities & maps REDCROSS
Brgy Emergency LIGA NG MGA
Response Team BRGY
(BERT) in the city of
San Pablo”.
Continuous training Compliance to RA DRRM Awareness Trainings and Private & 2016-2019 300,000.00 300,000.00 300,000.00 CDRRMO CDRRMC
for all stakeholders. 10121 Programs & IEC for drills Public Sector OCD
community DRRM conducted Establishments DILG
Orientation and Drills Public & PDRRMO
Private School BFP
PNP
DEP ED
REDCROSS
Outcome Area Current Performance Level: Outcome Area Goal: Strengthened Internal Governance through a high-performing, accountable,
responsive and transparent LGU
Objectives: To seek ISO certification, improve the efficiency and effectiveness of government
employees and public service
Sub sector area: OFFICE OF THE CITY MAYOR AND SANGGUNIANG PANLUNGSOD
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of CapDev Time Funding Requirements Process owner/ Source of support/
capacity capacity Interventions Frame Year 1 Year 2 Year 3 Office Technical Assistance
responsible
1 2 3 4 5 6 7 8 9 10 11
Competitive LGU Highly competitive Training of personnel Knowledgeable Personnel to be Three (3) 200,000 200,000 200,000 City Mayor’s Gen
LGU (both local and and trained designated by Years Office and SP Fund/Grants/Other
international) personnel to the City Mayor Agencies
to conduct research secure ISO and the City
and/or feasibility study certification for the Vice-Mayor
on the pursuit of ISO City Government
certification and and membership
membership / linkages to international
with international organization
organizations
None Yet Creation and Training of personnel Trained personnel MIS personnel Three (3) 50,000 50,000 50,000 City Mayor’s Gen
Operation of the on MIS Years Office Fund/Grants/Other
Management Agencies
Information System
Office under the
Office of the City
Mayor
Outcome Area Current Performance Level: Outcome Area Goal: Strengthened Internal Governance through a high-performing, accountable,
responsive and transparent LGU
Goals: To develop a highly competitive LGU
Objectives: To seek ISO certification, improve the efficiency and effectiveness of government employees
and public service
Sub sector area: HUMAN RESOURCE MANAGEMENT AND DEVELOPMENT
CapDev Agenda
Current state of Desired state of Capacity Development Expected Target of CapDev Time Funding Requirements Process owner/ Source of support/
capacity capacity Interventions Output Frame Year 1 Year 2 Year 3 Office Technical Assistance
responsible
1 2 3 4 5 6 7 8 9 10 11
Over/under Effective and efficient Training of focal persons Knowledgeable HR personnel Three (3) 300,000 300,000 300,000 HR Gen Fund
staffed offices management and on rationalization and trained and Department Years
development of process for personnel focal persons Heads and
human resources Assistants
geared towards an
organization
composed of
knowledgeable,
healthy and competent
public servants
Training for personnel Trained Division Chiefs
for Supervisory personnel and Assistant
Development Course Department
Track 1 to Track 3 (SDC Heads from all
T-1 to T-3) departments
Outcome Area Current Performance Level: Outcome Area Goal: Strengthened Internal Governance through a high-performing, accountable,
responsive and transparent LGU
Objectives: To seek ISO certification, improve the efficiency and effectiveness of government
employees and public service
CapDev Agenda
Current state of capacity Desired state Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
of capacity Interventions CapDev Year 1 Year 2 Year 3 Office support/
responsible Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
EFFICIENT Highly Training of personnel Trained CIO personnel , Three (3) 300,000 100,000 100,000 CIO, All Dept. General
effective and on IT skills, Personnel MIS personnel years concerned Fund/Other
efficient computerization and and potential IT Agencies
information journalism personnel from
disseminatio other
n to all departments
sectors especially those
with
computerized
programs
Outcome Area Current Performance Level: Outcome Area Goal: Strengthened Internal Governance through a high-performing, accountable,
responsive and transparent LGU
Goals: To develop a highly competitive LGU
Objectives: To seek ISO certification, improve the efficiency and effectiveness of government
employees and public service
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions CapDev Year 1 Year 2 Year 3 Office responsible support/
Technical
Assistance
1 2 3 4 5 6 7 8 9 10 11
POOR Efficient and Training on Civil Registry Trained Personnel LCR Personnel Three (3) 300,000 200,000 100,000 LCR General
competent civil laws, rules and years Fund/Other
registry personnel regulations Agencies
Outcome Area Current Performance Level: Outcome Area Goal: Strengthened Internal Governance through a high-performing, accountable,
responsive and transparent LGU
Goals: To develop a highly competitive LGU
Objectives: To seek ISO certification, improve the efficiency and effectiveness of government
employees and public service
CapDev Agenda
Current state of Desired state of Capacity Development Expected Output Target of Time Frame Funding Requirements Process owner/ Source of
capacity capacity Interventions CapDev Office responsible support/ Technical
Year 1 Year 2 Year 3 Assistance
1 2 3 4 5 6 7 8 9 10 11
GOOD Efficient and effective Training on government Trained Personnel GSO Three (3) 100,000 100,000 100,000 GSO General Fund/
procurement of procurement systems Personnel years PAGSO/DBM/
supplies and materials pursuant to RA 9184 COA /Other
Agencies
Outcome Area Current Performance Level: Outcome Area Goal: Strengthened Internal Governance through a high-performing, accountable,
responsive and transparent LGU
Goals: To develop a highly competitive LGU
Objectives: To seek ISO certification, improve the efficiency and effectiveness of government
employees and public service
Sub sector area: LOCAL LEGISLATION
CapDev Agenda
Current state Desired state of capacity Capacity Expected Output Target of Time Frame Funding Requirements Process owner/ Source of support/
of capacity Development CapDev Year 1 Year 2 Year 3 Office Technical Assistance
Interventions responsible
1 2 3 4 5 6 7 8 9 10 11
Excellent The imperatives of Training/Seminar/ Environmental City Vice Mayor Three (3) 250,000 250,000 250,000 SP/Vice- General
quality legislation have Workshops Protection Code Office, City years Mayor/DILG fund/grants/Other
to be looked into. This Local Councilor and SP Agencies
might mean looking into Secretariat
legislative staff
competence and the Training/Seminar/ 3M 3.5M 3.5M
greater use of legislative Workshops
tools such as agenda International
development, legislative
tracking, backstopping
committee and
legislative performance.
Code of General City Vice Mayor One (1) year 1,000,000 SP/Vice-Mayor General Fund
Ordinances Office, City
Councilor and SP
Secretariat
Revisit and City Vice Mayor Three (3) SP/Vice-Mayor/ General
updating of Office, City years CDRRMO/ OCD fund/grants/Other
Ordinance on Councilor and SP Agencies
Disaster Risk and Secretariat
Reduction
Management and
Adaptation to
climate change
Outcome Area Current Performance Level: Outcome Area Goal: Strengthened Internal Governance through a high-performing, accountable,
responsive and transparent LGU
Goals: To develop a highly competitive LGU
Objectives: To seek ISO certification, improve the efficiency and effectiveness of government employees
and public service
CapDev Agenda
Current state of Desired state of Capacity Expected Output Target of CapDev Time Funding Requirements Process Source of support/
capacity capacity Development Frame Year 1 Year 2 Year 3 owner/ Office Technical Assistance
Interventions responsible
1 2 3 4 5 6 7 8 9 10 11
Minimal Active participation Orientation of the Oriented CSOs CSOs Six (6) 50,000 50,000 50,000 CMO. CIO SP, CPDO
participation of of CSOs CSOs regarding their knowledgeable on months
CSOs role their role and
responsibilities as
members of Special
Bodies
No accreditation San Pablo People’s CSOs Profiling Recognition of One CSOs Six(6) 50,000 50,000 50,000 SP CMO, SP, GSO
of CSOs Council CSOs federation Federation(General months
through )
ordinances
No official CSOs Functional CSOs Place of CSOs Linkages of all Workshop Six (6) 50,000 50,000 50,000 CMO, GSO GSO, Engineering
office office CSOs in San Pablo months
More need to be done to institutionalize business friendly environment. There are factors that need to be looked into. Improve the quality of permitting or
licensing. Ensure the ease of doing business, strategize to effect the issuance of building occupancy and business permits in more expedient manner. Provide or
cause of provision of direct support services to business particularly those categorized as micro, small and medium enterprises. Support may come in the form of tax
incentives, product labeling, product packaging, training, job fairs and trade fairs.
Development Goal
Objectives
1. Computerization of RPTAS (Real Property Taxing and Assessment System), collection system, collection of business RPT, including software and system.
2. Improvement of market facilities.
3. Construction of City Pound.
4. Updating of Comprehensive Development Plan.
5. Institutionalization of PESO
6. Creation of LEIPO
7. Intensify skills and leadership trainings.
8. Purchase service vehicles.
PESO
1. Age requirements of available jobs limited up to 24 years old.
2. Job mismatch
City Cooperative
1. Wrong perception about cooperatives.
Development Goal
Objectives
Development Goal
Objectives
7. Computerization of RPTAS (Real Property Taxing and Assessment System), collection system, collection of business RPT, including software and system.
8. Improvement of market facilities.
9. Construction of City Pound.
10. Updating of Comprehensive Development Plan.
11. Institutionalization of PESO
12. Creation of LEIPO
13. Intensify skills and leadership trainings.
14. Purchase service vehicles.