Professional Documents
Culture Documents
1
A
A GO BACK TO INDEX A
2
Ø42
Ø30
+1.0 A
168
B TEST REQUIREMENTS B
1. DIMENSIONAL REPORT
2. INTERFACE CHECK THROUGH QC/SBC PRIOR
5
5 5. TO BULK PRODUCTION
D 3. SURFACE FINISH : 3.2 MICRONS
PC a
ON 4. HYDROSTATIC TEST : PROOF PRESSURE TEST AT 1.5 TIMES AND LEAK
23 44 LE TEST AT 1.25 TIMES OF THE WORKING PRESSURE
30°
38 HO 5. LPT
3.2 A Ø3
6. TRACEABILITY MARKING : AIPL & BOM ID.
Ø3
1.5 X 45°
Ø55.5
A/C 86.5
M60X2
Ø43
Ø75
C C
1.6
1.5 X 45°
15 2 A
82 A/F 75
TABLE NO.3.4
Ø42
Ø55
Ø30
D D
1.6 1
1 SHEET NO. 1 1
+1.0 12
113
SCALE
1 2 3 4 5 6
70