KAIZEN
Kai Zen
Break apart Study
To change Make better
Continuous Improvement
• Low cost
– Define and exploit the “technical
boundaries” of existing resources
– “Creativity before capital” thinking
• Rapid Implementation (during the
event)
Originator
31
PT = 10 mins.
C&A = 10%
Supplies
Hard Copy
Vendor
Form File File Maker Quicken Excel ERP
Website
Data Entry
0.25 days 0.5 days 5 days 1 days 1 days 0.5 days 3 days 7 days 10 days LT = 28.4 days
5 mins. 5 mins. 5 mins. 5 mins. 10 mins. 15 mins. 5 mins. 15 mins. PT = 65 mins.
AR = 0.477%
RFPY = 4.2%
PT = Process Time
LT = Lead Time
Customer Demand: C&A = % Complete & Accurate
615 requisitions per y ear AR = Activ ity Ratio (PT/LT x 100)
RFPY = Rolled First Pass Y ield
Future State Value Stream Map
Supplies Purchasing - Future State VSM
Purchasing Segment
Non-repetitive purchases less than $5,000
Additional
IT access
Enter Req. 1
in ERP
Supplies
Requisition
Checklist
Vendor
File Maker ERP
Websites
Standard
Work for
review Approval
Additional
IT access Dedicated
Review Approve Place Buyers
2 3 4 5
Req. in ERP Order External
Supplier
Dept.
Supervisor Corp Purchasing
Manager
2 6 hrs. 1 6 PT=20 mins.
4 hrs. 8 hrs. 80 hrs.
PT=5 mins. PT=5 mins. PT=20 mins.
C&A = 95% C&A = 90% C&A = 98%
Eliminate handoff to admin asst; orig to Define standard work and cross-train
7 KE Dianne M.
corp LT = 1.25 days originators in ERP data entry
Improve %C&A from originator to 85%; Create checklist for requisition initiation;
1 KE Ryan A.
RFPY to 71% integrate into existing form
Approvals
Executive Sponsor Value Stream Champion Value Stream Mapping Facilitator
Signature: Signature: Signature:
Type legend: JDI = Just do it; KE = Kaizen Event; PROJ = Project; RPE = Rapid Planning Event
Hold Kaizen Events when…
Act Check
• Adjust process • Monitor process
as needed performance
• Continuously • Complete
improve 30-Day List
• Conduct 30-Day &
60-Day Audits
22
Kaizen Events - Macro PDCA Cycle
• Create Charter • Hold Event
• Scope & Schedule • Create
Event Sustainability Plan
• Form Team • Communicate
• Gather Data success
• Conduct Lean
Overview Plan
(4-6 weeks Do
prior)
Act Check
• Adjust process • Monitor process
as needed performance
• Continuously • Complete
improve 30-Day List
• Conduct 30-Day &
60-Day Audits
23
Kaizen Event Charter
• Define fenceposts,
conditions, and
limitations.
• Gives the team
“freedom with
boundaries.”
• Tells the team what
they do NOT have
permission to do.
Domestic Consumables
Warranty
Service Parts
Non-
Order Warranty
Fulfillment
Process
Units
International Consumables
Warranty
Service Parts
Non-
Warranty
Scoping Activity
First Step
Last Step
1
2
3
Event Goals and Objectives 5
6
7
8
1
4 9
5 10
Potential Deliverables On-Call Support
1 Function Name
2 1
3 2
4 3
5 4
Possible Obstacles Approvals
1 Executive Sponsor Value Stream Champion Facilitator
2
3 Signature: Signature: Signature:
4 Date: Date: Date:
Additional Prep: Data and Materials
Act Check
• Adjust process • Monitor process
as needed performance
• Continuously • Complete
improve 30-Day List
• Conduct 30-Day &
60-Day Audits
42
Within The Event - Micro PDCA
• Kick-off • Design & develop
• Document & analyze the improvements
current state
• Design future state
• Brainstorm &
prioritize
solutions Plan Do
Act Check
• Refine & finalize
Macro improvements • Test
PDCA • Implement improvements improvements
• Train workforce
Plan Do
Act Check
43
Kaizen Commandments
• The team starts and ends the day together.
• Being on time is critical.
• The team stays 100% committed and 100% focused.
• No interruptions.
• All wireless devices on silent mode or off. No vibration.
• Rank has no privilege.
• Finger-pointing has no place.
• No veto power from outside the team.
• No silent objectors. Don’t leave in silent disagreement.
• Seek the wisdom of ten, rather than the knowledge of one.
• The current process isn’t “broken”; it needs improvement.
• It’s okay and encouraged to disagree; it’s not okay to be
disagreeable.
© 2011 Karen Martin & Associates
44
5-Day Kaizen: Sample Structure
Day 1 & 2 Analyze current state
Perform root cause analysis
(Plan)
Design future state
Interim briefing
Day 3 & 4 Design & test improvements
(Do, Check) Obtain buy-in
Interim briefing
Finalize improvements
Day 5 Train process workers and
(Check, Act) affected stakeholders
Team presentation
CELEBRATE!
© 2011 Karen Martin & Associates
45
Steps
• Understand the current state (identify waste)
• Perform root cause analysis
• Brainstorm improvements
• Design improvements (eliminate waste)
• Test improvements
• Adjust & finalize
• Document improvements
• Train operators / staff
• Monitor performance
Act Check
• Refine & finalize
Macro improvements • Test improvements
PDCA • Implement
improvements
• Train workforce
Plan Do
Act Check
47
Document / Analyze the Current State
• Go to Gemba / observation
• Spaghetti diagrams
– Calculate motion/transportation costs and productivity
losses
• Work breakdown structure or Metrics-Based
Process Mapping (MBPM)
• Root Cause Analysis
• Surveys / audits
• Videotape
• “Product” samples
• Floor plans / blueprints
P/U
Water
Power Pole
Table
DeskDesk
Desk Desk cart
Table Table
Desk Desk
11 10
6, 7, 8, 9
6, 7, 8, 9
6, 7, 8, 9
Table
Table
Desk Desk
6, 7, 8, 9
6, 7, 8, 9
6, 7, 8, 9
4a Table
4c 3 4b
Table
1
2
Table Table
Staging Area 12
Desk Desk
51
Root Cause Analysis
• RCA is necessary to:
– Avoid jumping to conclusions
– Avoid creating “band-aid” fixes
– Create lasting solutions that permanently eliminate
the problem
5 Why’s People
Lack of experience
Material / Info
Changing schedule
Budgets
Act Check
• Refine & finalize
Macro improvements • Test
PDCA • Implement improvements
improvements
• Train workforce
Plan Do
Act Check
54
Brainstorming Improvement Ideas
20 14
19
6
7
11
2 18
12
Difficult
High Low
Anticipated Benefit
Building a Lean Enterprise
Tools for Realizing the Future State
• 5S • Work cells
• Visual Management • Cross-training
• Standardized work • Load leveling
• One-piece flow (heijunka)
• Pull systems • Work balancing /takt
– FIFO lanes time
– Kanban systems • Setup / Changeover
• Batch size reduction reduction
• Quality at the Source
(poke yoke)
© 2011 Karen Martin & Associates 58
Within The Event - Micro PDCA
• Kick-off • Design & develop
• Document & analyze the improvements
current state
• Design future state
• Brainstorm &
prioritize
solutions Plan Do
Act Check
• Refine & finalize
Macro improvements • Test
PDCA • Implement improvements
improvements
• Train workforce
Plan Do
Act Check
59
Within The Event - Micro PDCA
• Kick-off • Design & develop
• Document & analyze the improvements
current state
• Design future state
• Brainstorm &
prioritize
solutions Plan Do
Act Check
• Refine & finalize
Macro improvements • Test
PDCA • Implement improvements
improvements
• Train workforce
Plan Do
Act Check
60
Testing Improvements
Act Check
• Refine & finalize
Macro improvements • Test
PDCA • Implement improvements
improvements
• Train workforce
Plan Do
Act Check
62
Calculating and Communicating Results
Reduced lead time from time requistion is received until it is input from Engineers and maintence given access to ERP and
1
approx 11 days to 2 days. trained how to create requisitions
5 Team Members
8 Sam Parks
9 Paul Dampier
10 Michael Prichard
Team Presentation
• Team introductions
• Scope and objectives (review Charter)
• Current state discoveries
• Future state design / key improvements
implemented
• Key open action items (30-day and parking lot lists)
• Sustainability Plan
• Lessons learned
• Q&A
• Team recognition
© 2011 Karen Martin & Associates
65
Team Presentation Agenda
Order Fulfillment
Value Stream Champion Sally McKinsey Event Name
Process
Facilitator Dave Parks Event Dates 11/26 - 11/28/2008
Agenda Item Presenter(s)
Opening Comments
1 • Team introductions Sean Michaels
• Agenda
• "Rules" for attendees
Scope and Objectives
• Process being addressed
• First & last steps
2 • Specific conditions Sean Michaels
• Event drivers / current state issues
• Objectives
• Boundaries & limitations
"Before" Condition
3 • VSM and/or MBPM review Sam Parks & Tom Albin
• Relevant metrics
• Photos (if relevant)
Key Improvements Implemented
4 • Key improvements and accomplishments implemented during the event Paul Dampier & Michael Prichard
• Tools used
"After" Condition
5 • New process description Dianne O'Shea & Mary Townsend
• Projected results (direct and collateral)
Key Open Action Items
6 Brian Utke
• 30-Day List
Sustainability Plan
7 • Potential obstacles that could prevent attaining projected performance Ryan Austin
levels
Parking Lot Issues
8 Sean Michaels
• Define what a "parking lot" item is
Lessons Learned
9 • Greatest success; greatest challenge as required
• Team feedback (each individual)
10 Facilitator Feedback Karen Louise
Check
Act (4-8 weeks
after)
• Adjust process • Monitor process
as needed performance
• Continuously • Complete
improve 30-Day List
• Conduct 30-Day &
60-Day Audits
67
Keys to Sustaining Improvements
• Assigned accountability/ process ownership
• Daily monitoring initially (tapering off if appropriate)
• Weekly follow-up meetings
– 30-day list management
– “Tweaking” as necessary
• Visual management
• Periodic formal audits
• Consistent training for new hires
• Continuous improvement
Who will lead audit & when? How will results be communicated? To whom?
Post the Event Report, 30-Day List, Sustainability Plan. Who is accountable? Where posted? Conduct 30-day audit. How will the process be adjusted, if needed? What's the plan for continuous
improvement?
Update SOPs and other ISO or regulatory documents Who will lead audit & when? How will results be communicated? To whom?
Who identifies relevant documentation? Who updates it? By when?
impacted by changes.
Conduct 60-day audit. How will the process be adjusted, if needed? What's the plan for continuous
improvement?
Communicate and post 30-day and 60-day audit
Who communicates? How? To whom? Where posted?
results.
Communicate process performance measurement How is process performance going to be communicated to workers? Are
plan. additional visuals needed? Who owns this activity?
Act
Check
(ongoing)
• Adjust process • Monitor process
as needed performance
• Continuously • Complete
improve 30-Day List
• Conduct 30-Day &
60-Day Audits
71
30-Day Audit Report
Executive Sponsor Event Name
Value Stream Champion Event Dates
Lead Auditor Audit Date
Criteria Yes No Corrective Action Needed Owner
Are workers following the process as designed in the event (or
1
authorized modifications made since the event)?
Is there evidence that all workers, including those new to the area,
2
have been trained on the new process?
10
11
Performance Metrics
Projected Actual Actual Change
Metric / Activity Before Projected
Unit of Measure After After (from Before Comments
Being Measured Measurement Change
Measurement Measurement Measurement)
Lead Time
Process Time