1 May,2021 PT. Sinar Terang Mandiri Indonesia PT. Sinar Terang Mandiri, Working construction
to may,
2023 ( MINING,CONSTRUCTIONS Access Houl road ( Weda Bay Nickel Project ), the
& ENGINEERING ). location in North Maluku with the length of the path
30 Km. As a member in highway team responsible to
prepare Design Civil 3d Drawings and deal with
revision due to site modification.
2 Sep, 2020 PT. Indra Karya ( Persero ) Indonesia PT. Indra Karya ( Persero )
to April,
2021 Project preparation consultant firm for development of
the Wadaslintang irrigation system ( PPC-DWIS ) in
the central java under Ministry of Public Works. As a
Chief Cad Drafter responsible to prepare Cad
drawings for irrigation and drainage canal design
including structure. The improved is add a new roof
structures as door protector and replace slucice gates
already broken.
3 Oct 2019 PT. Hutama Karya Indonesia PT. HUTAMA KARYA Insfrastruktur, Working
to Sep Infrastruktur construction
2020
Access Toll road ( Trans sumatra Project ), the
location in Pekanbaru – Bangkinang with the length of
the path 40 Km. As a member in highway team
responsible to prepare Design 3d civil Drawings and
deal with revision due to site modification.
4 Sept PT. Resindo Konstruksi & Indonesia RESINDO KONSTRUKSI & ENERGY , Joined Buma
2019, to Energy
July 2019 for the planning and construction of the haul road,
. which will be used for the mining of the owner of PT.
Adaro Met Coal - Maruwai Lampunut Haul Road
Project Package located in Central Kalimantan. As
well as building camp facilities for office,
Employing organization and your
Summary of activities performed relevant to the
No Period title/position. Contact Country
Assignment
information for references
workshop,Mosque Senior staff, Junior staff & non
staff.
5 Marc PT. Resindo Konstruksi & Indonesia RESINDO KONSTRUKSI & ENERGY , has been
2018, to Energy assigned to provide an integrated infrastructure
Agust design and Haul Roads planning. The project is to PT.
2018 Weda Bay Nickel deliver a design which could
become a solid reference for further planning. Project
Package located in south Halmahera. As well as
building camp facilities for Senior staff, Junior staff &
non staff.
7 Nov 2016, Freelance PT. Wahana Krida Indonesia Infrastructure Initiative for Master Plan Investment
to Jan Konsulindo ( WKK ) Package Project Reviera at Puri Tangerang . As a
2017 Designer Grading plan and Acess roads responsible
to prepare drawings.
8 Nov 2011, AECOM Indonesia, Indonesia AECOM has been assigned to provide an integrated
to Oct master plan services which include spatial plan,
2016 economic analysis, environmental study, infrastructure
design and transportation planning. The project is to
deliver a conceptual design which could become a
solid reference for further area planning, phase of
development and development policies. As a multi
discipline project, Water and Urban Development has
been involved in the infrastructure part of this project,
engaging a conceptual design for water, wastewater,
drainage, power, telecommunication, including
providing selectable option of water resources and
advise to the phase of development in relation with
the infrastructure provision Involve in design water
Employing organization and your
Summary of activities performed relevant to the
No Period title/position. Contact Country
Assignment
information for references
and sanitation system.
9 Feb 2008, PT. Mott MacDonald Indonesia Suprabahari Mapannindo Mineral for Mining
to Oct Indonesia, Infrastructure Design Project. As a Cad Drafter
2008 responsible to prepare Cad drawing for all
infrastructure design (Conveyor, Jetty loading
infrastructure, Office , workshop, mass hall, mosque,
etc) including documentation.
10 Feb 2011, PT. Mott MacDonald Indonesia Involve in design of water and sanitation system under
to June Indonesia, Indonesia Infrastructure Initiative for Wastewater
2011 Master Plan Investment Package Project East Java.
As a Cad Drafter responsible to prepare Cad drawing
for water and sanitation system including
documentation.
11 Jan 2010, PT. Mott MacDonald Indonesia Involve in design of water and sanitation system under
to Nov Indonesia, Indonesia Infrastructure Initiative for Wastewater
2010 Master Plan Investment Package Project East Java,
West Java and Central Java. As a Cad Drafter
responsible to prepare Cad drawing for water and
sanitation system including documentation.
12 June PT. Mott MacDonald Indonesia Involve in design of water and sanitation system under
2009, to Indonesia, Indonesia Infrastructure Initiative for the Design
Dec 2009 Project. Of Rural water and Sanitation System project
in Banjarmasin and Surakarta. As a Cad Drafter
responsible to prepare Cad drawing for water and
sanitation system including documentation.
13 Feb 2008 PT. Mott MacDonald Indonesia Involve in design of water and sanitation system under
– Oct Indonesia, Indonesia Infrastructure Initiative for the Design
2008 Project. Of Rural water and Sanitation System project
in Banjarmasin and Surakarta. As a Cad Drafter
responsible to prepare Cad drawing for water and
sanitation system including documentation.
14 March200 PT. NIPPON KOEI CO., LTD. Indonesia Involve in Access toll road in Tanjung Priuk section.
7, to Dec As a member in highway team responsible to prepare
2007 design Cad Drawing and deal with revision due to site
modification.
15 June2006, PT. NIPPON KOEI CO., LTD. Indonesia Involve in rehabilitation design of irrigation facilities in
to Feb java under Ministry of Public Works. As a Chief Cad
2007 Drafter responsible to prepare Cad drawing for
irrigation and drainage canal design including
Employing organization and your
Summary of activities performed relevant to the
No Period title/position. Contact Country
Assignment
information for references
hydraulic structure.
16 Aug2006, PT. IstakaKarya (Persero) Indonesia Involve in rehabilitation design of irrigation facilities in
to java under Ministry of Public Works. As a Chief Cad
Aug2006 Drafter responsible to prepare Cad drawing for
irrigation and drainage canal design including
hydraulic structure
17 Marc2004 PT. IstakaKarya (Persero) Indonesia Construction of Hanggar non Garuda facilities in
, to Airport of International Soekarno - Hatta. As a Chief
June2005 Cad Drafter responsible to prepare Cad drawings
structure and architect
18 Feb. PT. IstakaKarya (Persero) Indonesia Design & Costruction of Higway (JatiAsih –
2003, to Cikunir)under Ministry of Public Works. As a Chief
Feb. 2004 Cad Drafter responsible to prepare Cad drawing for
Higway.
19 June PT. IstakaKarya (Persero) Indonesia Involve in rehabilitation design of irrigation facilities in
2002, to java under Ministry of Public Works. As a Chief Cad
Jan2003 Drafter responsible to prepare Cad drawing for
irrigation and drainage canal design including
hydraulic structure
20 Nov 2001, PT. Nippon Koei.,Co.LTD Indonesia Involve in Bali Beach Conservations Project
to June (BBCP)under Ministry of Public Works. As a Chief
2002 Cad Drafter responsible to prepare Cad drawing for
irrigation and drainage canal design including
hydraulic structure
21 Nov 2000, PT. Nippon Koei.,Co.LTD Indonesia Involve in design rehabilitation design of irrigation
to June Joint Operation with facilities in java under Ministry of Public Works. As a
2001 PT.Indokoei AutoCAD Operatorresponsible to prepare Cad
drawing for irrigation and drainage canal design
including hydraulic structure
22 Aug1990, PT. Nikken Consultant, INC Indonesia Involve Drainage and Floods Control Project Ciliwung
to Oct Joint Operation with – Cisadane Riverunder Ministry of Public Works. As a
2000 Nippon Koei.,Co.ltd AutoCAD Operator responsible to prepare Cad
drawing for irrigation and drainage canal design
including hydraulic structure
Employing organization and your
Summary of activities performed relevant to the
No Period title/position. Contact Country
Assignment
information for references
23 Feb1999,t PT. IndraKarya Indonesia Involve in design of Higway(JatiAsih – Cileungsi and
o June Lancape) under Ministry of Public Works. As
1999 aAutoCAD Operatorresponsible to prepare Cad
drawing for Higway.
24 June1997, PT. Nippon Koei.,Co.LTD Indonesia Involve in design of Hydro Electric Power
to Jan Projectunder PT. PLN (Persero) As a AutoCAD
1999 Operator responsible to prepare Cad drawing for
Hydro Electric Power.
25 Aug 1995, PT. Nippon Koei.,Co.LTD Indonesia Involve in design of Hydro Electric Power
to May Projectunder PT. PLN (Persero) As a AutoCAD
1997 Operator responsible to prepare Cad drawing for
Hydro Electric Power.
26 Aug 1994, PT. Dacrea Indonesia Involve in design of House Residence. As aAutoCAD
to Operator responsible to prepare Cad drawing for
Oct1995 House
27 Marc PT. Nippon Koei.,Co.LTD Indonesia Involve in design of Hydro Electric Power
1993, to Projectunder PT. PLN (Persero) As a AutoCAD
Oct 1994 Operator responsible to prepare Cad drawing for
Hydro Electric Power.