You are on page 1of 4

Resume.

1. Name :. Pandey Radha Mohan


2. Father’s name : Late shree vishnudeo pandey
3. Date of birth : 6th 2nd 1965. Age: …53+ Male.
4. Address. : R.M.Pandey , Att & p.o – Patti Aswari ,. P s – Kathaiya Distt :- Muzaffarpur .Bihar
-- ( India) . 843124.
5. Correspondence : R.m.pandey c/o Nagender pandey . Near block chouk ,kanti sain road.kanti
Muzaffarpur. Bihar (India) 843109 .
6. Contact details . : Mail I’d rmpandey2009@gmail.com . Mobile no. 6203621459. Or 7250576903
7. Academic records :--

Course/degree/ Fro To School/college Main Marks


Deploma m / Subjects %
University .
Secondary 1976 197 S.P Academic Hindi,English 43%
9 Hardi Miz. Math,Physics,
Chemistry ,Adv
Math,social
science,shanshkrit
Intermediate 1979 198 R.P.S Collage Hindi,English,Math 48%
0 Jaitpur.Muz. .
Physics,chemistry
Phylosphy.
D.C.Engineerin 2000 200 JANARTHAN Civil Engineering Grade
g 2 RAI NAGAR B
RAJASTHAN
VIDYAPEETH
UNIVERSITY
UDAYPUR
RAJASTHAN
INDIA

8. CARRIER OBJECTIVE : To work in challenging embedded system Environment that gives me an


opportunity for constributting towards Technology and overall me professional development of
the Organization.
9. KEY SKILL’S (IT .profession) :--
1. Designing auto CAD for houses,( independent, Duplex building ,Commercials,
Strom water Drainages system (is standards) by precast Technology.)
 Estimation and costing of building, Consulting to customers for site execution.
2. Preparation of Daily site Activity reports to communicate Clint / Consultant to
apply appropriate applications as Specification, Drawings and plan .
3. Assessment of quantity Materials as per project plannings seggment wise
scheduling to perform concern activity to achieve Targeted Plan of project.
4. Costing of PRW for project site.
5. Plotting of sectional Drawing for as built project DRW and leading of civil work .
6. Preparation of Bar binding schedule for light and heavy structure , check out bbs
application as DRW at site.
7. Use ofMicrosoft Excel and Word for Billing processing. Check out the sub contacted
bill work out in project site
10. Professional Exposers in past projects:-
I have over 30+ year’s of experience in multidisciplinary of projects in India and Abroad . My
professional Exposers are going through started by surveying activities in Oil and Gas based
refineries , steel plant ,Power project, Up-gradation of national highways ,Laying of oil and natural
gas based pipe line ,water supply pipe line projects.
As concern of civil work Layout/setting out of plant buildings ,road ,pipe racks , Equipment’s ,pump
foundations ,cable trench,duck drainage system etc all cocern activities remaining requirements at
project site.

11. Details of past Emplyments :-

Preod Name and Designation. Job profile Resign of


Employers address of leaving
employer
From To
21 /2/20 31/3/20 Kumar Deputy Balance work On going
To creation pvt manager Completion Resign.
ltd Tandwa (civil)
Jan 2018 Still Bhagwati Incharge New rail Up going
today construction/ project project.
Indian Railway concern civil
work
April 2015 Oct 2017 Self employee Design Precast Down drop
&Technical buildings Financial
advisor concrete Cress
project
(CLC)based
Jan 2o14 Oct.2014 SRC / Rail way Earth work Completion
RITs/NTPC extension ,bridges & of project
project concern civil
work
Nov Oct 2013 PCL/CEC/NTPC Sr.civil 13km NTPC Completion
,,2012 Kanti Muz engineer plant of project
boundary(civil) work.
&Up-gradation
of plant area
20th June Dodsal Civil Central Completion
Nov2007 2009 engineering & engineer processing of project
construction facility
pte LTD /OXY &Satellite
Mukhaizna OMAN.
Oman
Jan2005 19th Dodsal Civil DOLPHIN Completion
Nov2007 engineering engineer Onshore of Project
&construction facilities QATR

May2001 Dec2004 Dodsal Pvt Civil GSEG-APIL Completion


LTD engineer cycle power of project
project/ Surat
Manor Tollway
project
Jan1996 March Dodsal LTD Sr.civil BWSSB/ AMC Completion
2001 supervisor Water supply of all
pipe line projects
project/HPCL
DHDS project/
ESSAR Refinary
/ONGC
Etention
phaise iii

Jan 1992 Nov EPL /ESSAR Civil By Draz line Completion


1996 STEEL HAZIRA supervisor back filling for of project
upgradetion of
plant area,
,pilling
,Road,Building
s
Equipments
foundation
,water
Reservers etc
civil work.
August Nov 1991 Dodsal HBJ pipe Completion
1986 company line/VIP pipe of project.
Pvt LTD line/kakarapar
kribhco pipe
line project

12. OTHERS Personnel Details :-


1. Nationality :. Indian .
2. Language known :. Hindi , English .
3. Marritus status :. Married.
13. ADDITIONAL ACHIVEMENT:-
1. Our Company management response me to complete Drainage system of national highways
20km seggement in all respects with quantity assessment execute to work and reconciliation of
site with sub contractors bills etc within Targeted period.
2. In DOLPHIN ONSHORE FACILITIES the company task me to make 8000. Staff. & Workman’s
leaving facilities camping with all respects according to RLC standard . This is my additional
ACHIVEMENT including plant civil work .
3. I started my own business CLC based , Design precast built & consult Building project in
Nazimabad UP (India). Which is beheld condition now .
4. My mission to provide Mason +Mud free home solution to nation. Design precast construct &
consult with in the interlocking system for housing projects.
14. Post. :-. Quatity engineer.
15. Salary CTC p a : 5 to 6 Lac Or Negotiable

Radha. Mohan pandey