You are on page 1of 114

COMPANY PROFILE

Office & Workshop I Workshop II


Jl. Muara Baru No.10 Jl. Bidara Kav.42
Jakarta Utara 14440 Marunda – Cilincing
T: +62 21 6692166 Jakarta Utara 14150
F: +62 21 6613613
E: mail@shinnetsko.com
Company Outline
Company Outline
Company Name : PT. SHINNETSKO PRIMA
Address
Office and Workshop I : Jln. Muara Baru No.10
Jakarta Utara 14440
Indonesia
Workshop II : Jln. Bidara Kav.42
Marunda, Cilincing
Jakarta Utara 14150
Indonesia
Phone Number : +62 21 6692166 (hunting)
Fax Number : +62 21 6613613
Email Address : mail@shinnetsko.com

History : Company PT. SHINNETSKO PRIMA started from individual


business form in 1969 performed the field work, and then
developed so that in 1981 formed a legal entity with the
name of CV. SHINKO PRIMA ENGINEERING which is
located at Jl. Muara Baru No.10, North Jakarta on an area
of 5,000 m2.
Along with the development of industry sector and
company progress, then the year 1992 CV. SHINKO PRIMA
ENGINEERING changed to PT. SHINNETSKO PRIMA.
This development is indicated by the increasing demand
for production and the expansion of workshops with the
establishment of Workshop II on an area of 26,000 m2,
having its address at Jl. Bidara Kav.42, Marunda,
Cilincing.
Major Business : - Storage Tank
- Pressure Vessel
- Crane
- Steel Structure
- Chimney
Scope of Work : - Design
- Engineering
- Procurement
- Fabrication
- Painting
- Site Construction
Board of Directors,
Organization Chart
Board of Directors
President Director : Bintoro Teny
Director : Hegiat Teny
Director : Herxon Teny
Director : Herjend Teny
President Commissioner : Helexis Teny
Commissioner : Heppian Teny
ORGANIZATION STRUCTURE
PT. SHINNETSKO PRIMA
President Director

Director Technical Advisor

General Manager

Secretariat Cost Control Team

Warehouse & Logistic Finance & Accounting


Marketing Manager Engineering Manager Fabrication Manager Project Manager QA/QC Manager Purchasing Manager HR & GA Manager
Manager Manager

Marketing Head of HR &


Head of Estimator Head of Workshop I PPC Head of Inspector Staff Purchasing Warehouse Finance
Administration Personalia

Head of General
General Marketing Head of Engineering Head of Workshop II Project Supervisor Logistic Accounting
Affair

Head of
Hoist Marketing Head of Drafting Taxation Head of HSE
Maintenance
Company Permits and Legals
COMPANY PERMITS AND LEGALS
Date of
No. Description Issued By Document No. Validity
Issued
1 Akte Pendirian Perusahaan Notaris Helena Kuntoro S.H 2 02-01-1992 -
Surat Pengesahan Akte
2 Menteri Kehakiman Republik Indonesia C2-1.274.HT.01.01.TH.95 27-01-1995 -
Perusahaan
3 Perubahan Anggaran Dasar Notaris Desman S.H Hum. M.M 72 18-07-2013 -
Surat Persetujuan Perubahan Menteri Hukum dan Hak Asasi Manuasia
4 AHU-47721.AH.01.02 11-09-2013 -
Anggaran Dasar Republik Indonesia
5 Nomor Pokok Wajib Pajak (NPWP) Direktorat Jenderal Pajak 01.316.556.8-041.000 08-01-1983 -
Surat Pengukuhan Pengusaha Departement Keuangan Republik Indonesia PEM-
6 04-02-2003 -
Kena Pajak (SPPKP) Direktorat Jenderal Pajak 32/WPJ/05/KP.0103/2003
7 Tanda Daftar Perusahaan (TDP) Pemerintah Kota Administrasi Jakarta Utara 09.01.1.46.04976 28-07-2017 17-07-2022
Surat Keterangan Domisili 94/27.1BU.1/31.72.01.1001
8 Pemerintah Kota Administrasi Jakarta Utara 06-02-2017 06-02-2022
Perusahaan /071.562/e/2017
Surat Izin Usaha Perdagangan 355/AC.1.7/31.72/-
9 Pemerintah Kota Administrasi Jakarta Utara 02-04-2019 -
(SIUP) 1.824.27/e/2019
Sertifikat Badan Usaha Jasa 0-3175-08-139-1-09-
10 LPJK Provinsi DKI Jakarta 14-08-2017 13-08-2020
Pelaksana Konstruksi 9064887
Sertifikat Badan Usaha Jasa 0-3175—06-139-1-09-
11 LPJK Provinsi DKI Jakarta 14-08-2017 13-08-2020
Pelasana Konstruksi 9064887
039/C.31.1/31.72/-
12 Izin Usaha Jasa Konstruksi (IUJK) Pemerintah Kota Administrasi Jakarta Utara 21-02-2019 13-08-2020
1.785.56/2019
13 Surat Keterangan Terdaftar (SKT) Direktorat Jenderal Minyak dan Gas Bumi 5940.Ket/19.11/DMT/2017 10-10-2017 10-10-2023
il 0TA B ts

}IELET{A KUNTORO S.H.

PEJAAAT PETIBUAT AKTA TANAH


DAERAH KHUSUS BU KOTA JAXABTA
.
JL. ALAYDRUS NO.4O TELP.357I9O -

JAKARTA

AKTA

!},&SiE!OAN lliltBATAS.

!IP.T. gIiINIil,lSKO ?KIMAO

2 .laDusri 1992. o, 2.-


'd
I lr:
1)

f;ro
T,:nro tr fi
tr( c ir' o\
6l0riI
tx g D
I
a
rJit\ Fi o
) .\]
o
,4 o
c I
(J
1--l

,l! il
'i € .A\
E
ls
..t
..1 r6
]E 5
a
l..l
E

{
:a f.- .o ...1
--___-- P. T. SHII.INETSKO PRII,IA
f,y:
(selan-iutnya dalam anqgaran dasar
ini .uiuo __-_-_
disingkat .lenqan perseroan. ). berkedudLrkan di
Jakarta dengan rnemoun)/a1 cabanq.atau oerwakilan
-
ditempat lajn,.bajk didalam maupun djtuar nege|i
.ebdqa i mana oiLeLaoran oleh D.raf s1

-PerseToan ini drmulai pada tangqa I ar'r g _oa ran dasar


inr dise]:u-rui oleh yang berwerang dan didirtkan -
untLrk jangka waklu tutuhoujLrh r ra Laft Lt n l arnanVa,
_-. _ MAKSUD DAI,] 'IUJUAI.I
_ pasal :.
1.1'laksud dan tuiuan dari perseroan tni jalah:
l,leneruskan segala usaha dari perseroan Dengan - _
Firma Serta En Commandite C.V.SHINKO pRIMA _-__-
ENGINEERING yanq berkedU.trrka"1 di Jakarta dan yang
andgafan dasarnva termuat dalam akLe saya. no!aris
tert,ang_qal duapuluh dua Aprj I seribu sembi lanratus
delaoanouluh sat.u ( 22-4-19gi ) nomer 47 dan _ __- _
-elit JLLnVa 16moor.LdS Oiddng JSahanya ceoel|f .an-
ruoa, sehinqga usaha t,ersebut untuk selanjutnya _
sel urqhnya adalah sebaqai berikut:
a. Men j a'l ankan peral:reanqan Ltmum termasuk
ekspor, perdaqangan in]-erinsLt ler clan
(sebagai !lrosir. leveransir dan cljsLr rDuLor)
---
sert a sebagai aqen komisi:

lb
Men-ialankan oerusahaan pdrindustrian dalam _-_-_

c,l'lenJ al ankan perusahaan oercetakan dan pen i i .l i dan


dal am segal a bidang;
d. Menjalankan perusahaan penganqkutan di darat: -
e. llen-ial anl(an perusahaan perbengl(e lan da lam seaa I il
bi dang. terLrtama perbenqkelan besi konstrLrks i -
baja dan penqecoran logam, kecLral i pe.benake )an
kapa'l;
l4enjalankan perusahaan yanq berqeral( dalam -,
b'jdang -iasa, kecuali .jasa hukum:
Men.ia'lankan perusahaan peternakan. aJerikanan. -
pertan i an , perkebLrnan dan kehutanan:
l"enja'lankar oeTUsanaa-t ya,lo oe, ae.d. orlJrn
bidan-q pernborongan (kontraktor) yang metioul_i
FeTencanaan dan pembuatan banqL_tnan-banqunan. __-
.ialanan-jalanan, .iembatan--jembatan. proyek -- __
irigasi dan saluran aiT, pemasangan inst,alasi -
listrik. air ledeng. _qas dan telepon dan lain _-
lain yang berhubunqan den_qan itu: - --
.Men-ialankan perusahaan yang trerqeral< clalam
bidang Real Estate, terutama oembangLtnan
perumahan beseTta prasarananya. Oenqernban_qalt
- _
wilayah daerah pemukiman. pembanqunan qeduno_ _
.iembdLan. .ta'lan serta oernasdTan I una.l 06. ,.uL ..
I
I l,ardhnva.
2.Perseroan berhak menialankan segala keorat,atn darl
usaha untuk mencapai maksud dan tu,juan t.ersebut --
(i9 I5Ii dalam ayal diatas baik atas tanggungan sendjri
s/ /! maupun bersama-sama dengan pihak lain. dengan cara
It
il Oan bentuk yang sesua: denoan heoer luan D6r s6roa-l -
CI i/ sert,a dengan men_qindahkan peratLrran per{rndanqan _.

yang berlaku, untuk itu perseroan berhak


bekeria -
f
sarna termasul( tetaDi tidak terbatas secaTa usaha
pot l1,ra, OJt tJoJ Le.lol JnLul. .ner,Ol.lla,j dLalr _ _

turut menjadr oerneganq saharn dari bLrclan


hLrku l lain
baik dari dalarrn maLtoun iLrar neaert. yanq
nlenrDunvart
naksLrd dan tlr.iLlan yang sama atau hamoir sa|ta _ _
delrgan rnal<sud dan Lu.juan pe.rseroan tnt. _-_ _-_-_-

l.Modal dasar rseroan i r


pe

Ro.1 . O00.000. OOO, .- ,satr,r ni lyar


rupi ah ) terba.r I -
atas '2.00O (dua ribu) saharn. nasinq-masi
n_q sahant -
uernt tat nomtnal sebesar Rp. 5O0.00o.
-- {
ri bu rupi ah ) .
2.Dari rnodal dasar tersebut telah diambi I
baha,rian
dan d i setor oenuh oleh:
a.oenehadap BINTORO TENy tersebLrt sebanyal<
450 __
(embatratus I imapuluh) saham,
dengan berni lai _-
nominal selLtruhnya sebesar HD.225.OOO.OOO._- _ _
(duaratus d!rapuluh lima
ruptah);
-iLrLa
b.penghadao RUDy TJENDRA terseilut sebanvak
I50
(seratus I irnapuluh ) saftatn. oengan
bern I I

nomi nal selLiruhnya sebesar Ho.7S.OOO.OOo


(tuJuhpuluh I jma Juta rupiah
);
penqhadap nvonya HOEI KIN KUK
tersebui_ sebanyak_
250 ,O,ra.a!us lrmapuluh) saham. denqa.r be.n
lat_
nominal se'luruhn.ya sebesar Rp.i25.0OO,OOO. _ __-
(seratus duapulLth lima
Juta ruDiah):
oe19r deaD 1. o.r! , -AQ rANT) cH6\DpA
Le-seoLri __ _
sebanyak 150 (seratus ljmapuluh) saham.
dengan -
ber1r'lat nominal seluruhnl/a sebesar
Rp. 75 . 00O . 0O0 , -- ( t.u i uhpu l uh li ma _ju1-a ruDjah):-
atau sel uruhnya 1.O O) { sel^ rbJ ' odl.all dr
berni I ai nomi na l besar Rp. 5O0 . 000 . OOO , ( I irrLa -
ratus.iuta rupi ah )
_Penyetoran modal perseroa| vang Le lirll cjjLentuat,Ia]r
sejumlah Rp.5OO.OOO.OOO.-- ( ltflaratus iuta ruoiah)
tefsebut telah ter-iadi dengan memasukan kedatam --
DeTseroan terbatas ini seluruhnva akt,rva dan
pasiva dari Perseroan Denqan Firma Serta En - ---
Commandite "C.V.SHINKO pRIt"lA EI.]GINEERING dan
berdasarkan Neraca singkat yang dtbLrat dibalrah
tangan terLanggal satu JanLtari seribu sembilan ---
ratus sembilanpulLrh dua (1-1-1992) dan yanq
bermeterai cukup dilekatkan pada asli akte ini
vang diberj nilai sebesar Rp.S00.OOO.O0O,-- ----
( Ii maratus -iuta ruoiah)
-Pemasukan teTsebut telah dit,erima oleh oerseroan-
terbatas ini denqan keLentuan. bahwa semua ---- -
perbuatan hukum yanq di lakukan oleh perseroan
Dengan Firma Serta En Commandite ,C.-V.SHlNKO pRIlvlA
ENGINEERING" tersebut terhadap.pi hak keLiqa
seb6:1um dimasukan kedalam Derseroan terbatas i
tetap menjadi tanggung jawab dari- dan karena itU
tetap mengikat para bekas pesero, yaitLt para
PEnghadap BINTORO TENY, RI]DY TJENDRA. Nvonya HOEI
//*9 'I+N KIN KUK dan nyonva
'!( // \.=
l" secara pribadi dan segala
HARYANTY cHANDRA IerSebLrt

| -oemindahan
hak, izi n
/qo'
KT K9/ serta fasilitas perseroan DqnQan Firma Serta Err '-
Commandite "C.V.SHINKO PRIMA ENGINEERING, tersebut
dilakukan dengan tidak menquranoi izin dari vanq
,
be r!ra Ii
3..Saham-sahamlajnnya vanq belurn cttarnllr I

akan.dikeluarkan menu Tu L l(eper lLtan trooa L

Perseroan, pada waktu dan denqan syara! y.'nI ---


ditetapkan oleh Di reksi dan denqan mengi ndahkan -
l(etentuan-keLenLuan dalam an!rqaran clasar
saja pengeluaran itu tidak den-aan harga di bawah --

4.Apabi la hendak dikeluarkan saham vanq rnasih


da'lam simoanan. maka para Demegane saham )/anq
namanva tercat,at dalam Daftar saham mempunyai
1-erleblh dahulu unLuk tnengambt'l bahagjan atas
saharn van-q akan dikeluarkan ilu dalam ianqka !.raktu
30 (tigapLrluh) hari kalender setetah Direksr ---
menl/iarkan keputusannya tentana pen-aeluaran sahatn-
tersebut darl masing-mastng pefite9an9 $aharJt LerseiruL
berhak mengambi I bahagi an menurut, Dertlanct I rl.rarr
jumlah saham yang rnereka miliki. -------
-Bilarnana setelah leuratnya,iangka waktu 3O (tlqa -
puluh) hari kalender tersebut ternyata masih ada -
sahambaru yang al(an dil<eluarkan van.r belLrrn -----
diambil bahagian, maka lewatnya -ianqka !"raktu ---,-
tersebut rnen.iadi bukti vang cukup bahwa perneganq. -
saham yang bersanqkutan tidak berkehendak untLrk -
mernoer gunakan haknya untuk mengarnbi I bahaqi an atas

s.aham baru t,ersebut, maka selan.iutn)/a Direksi -


berha^ lerd^aryo. o 5d sd am .ang oetLn d;amb'l
bahagian tersebut kepada pihak yang di1-unJUk o1

Rapat UmLrrn Pemegang Sahanl.


5. Sel u ruh modal dasar harus te ldlr drle Ludr t.rrr
dalarg janska r,laktu 1O (sepu luh ) Lahun Lerh I Lung -
-
mLr lai tanqgal .disetu.tuinya an_qgaran
dasar int. _-
kecual i jika jangka waktu itu perlu diperpan,iang
-
o'l eh yang berwenang, atas Pe rmi ntaan Direkst. - --
----SAH A M --- ------- -- --
pasdt 5.
l.Semua saham yang dikeluarkan oleh Perseroan --
adal ah saham atas nama-
2.Yang boleh memiliki dan rnernpergunakan hak atas
suatu saham hanyalah seorana Warqa l,,leqara ___ __-
Indonesia atau suatu badan hukum Indonesia.
3,Perseroan hanya mengaku.i seoran_e atau satu
sebagai pemjlik dari satu saham.
hukLrm

4.Apabila saham karena sebab apaDun mentadt - __-


xepu.lydan beberapa orang. mdl\d nere,d ,dna
memiliki itu diwa-iibkan untuk _- __,
beTsama-sama
me{un.iuk seorang oiant,dra ne.eka alal seor ano la J,
sebagai kuasa mereka bersama dan yan_q ditun-iuk _-
atau diberi kuasa itu sa.ialah yang berhak __- _-
memperSunakan hak-hak yang diberikan.oleh hLrl,.um _
atas saham te rsebut
5.Selama ketentuan dalam ayat 4 d i atas belum
- -.'-
dilaksanakan, maka suara yanq di kel uarkan dal arn
--
Rapat Umum pemegang Saham untuk saham itu dIanq!laD
,6t ! ti dak sah, sedan-qkan pembayaran divi den untuk -- -
t saham iLu jr.ga d.t LanqqLhkan.
;{ E
6.Seoran9 pemilik saham menurut hukuln harus tundl_l11
k; kepada anggaran dasaT dan keDada sernua keDutusan
yang diambil dengan sah dalam Rapat pemeqanqLlmLtm
Saham.

1
SI]RAT SAHAM

pasat O.

l.PeTseToan dapat mengeluarkan sLtrat saham.


2.ADabila dikeluarkan surat saham. maka untuk ti aD

saham diberl sehBlai surat saham.


3.Pada surat saham dicatat nama dari Demr 'l i
llnva. -
4.Surat saham diberi nomor urut seria d i tanda ---
tanqani oleh seorang angqota Direksi dan seorang
Komi sari s .

5.Sura*" l(olektip dapat dikeluarkan sebaqai bukti


pemilikan dari 2 (dLra) aLau lebih sah.lrrr varLr
iki oleh seorano pemegang safianr. ctalar t suraL
dimi'1
kolekirlp harus disebutkan .iumlah saham anq
be sanq! Ltaa dan 'loTor LrTuL saha-n sanam Ler eeDUL,
serta harus ditanda tan-qani oleh seoran-q anggota -
D rahsr dd. seorang L orn is3.I s.
6.Pada seLiap suraL saham at,alt sural- holektrlr
harus dicantumkan tangqal penqeluaran dan catatan-
lentanq ket-entuan pengalihan sahant serta ----
persyaratan lain yang berlaku untuk_ saham tersebut
sesuaj dengan ketentuan dalam anggaran dasar
--t----------- PENGGANTI SURAT SAHAM -------
pasal 7.
1.Jika'lau suratr saham rusak atau tidak daoat -----
dipakai laci, rnaka Direksi akan rrenqeluarr(af ---
penggantinya atas permintaan dari- dan keDada yang

:
2.Surat saham as'linya kemudian dihapuskan dan darl
kejadian ini oleh Direksi dibuat berita acara dan-
di laporkan dalam Raoat Umum Pemegang Saharn yang
berikutnva.
3.ADabila surat saham hilang. maka atas oermintaan
dari vang berkepentinqan keoadanya oleh Di reksi
diberikan penggantj dari surat saham yanq hr lanq -
itu setelah menurut pendaDat Direksi kehilanqan
itu.c.rF,trD dibJ(Lrkan dan oe,lqan tdr nat ,d.o
dipandan_q perlu oleh Direksi untLtk tiap-tiap - --
peri stiwa yang khusus.
4.Setelah penggantj suraL saham ter sebu L ----
d i ke'l uarkan. maka suTat as I r nva Lr dak ber lakLr

terhadap Perseroan.
5.Semua ongkos yang bersangkutan dengan ---.,-,-
penieluaran pengganti surat saham iLLr ditanggung -
oleh oemeganq saham yang bersanqkutan
6.Ketent,uan dalam pasal 7 inj berlaku secara -
mutatis mutandis ba-qi Denqeluaran oengqanti surat_
kol ekt i p .
. DAFTAR SAHAI"l -.. ___.

l,Untuk saham-saham diselengaarakan DaftaT Saham


yan_q disjmpan di tempat kedLtdukan perseroan. ,
-
Dalam Deft.ar Saham dicatat narna dan LempaL trngqrat
dari para pemeganq saharn dan keLerangan lat rrva --
yang diang_qap oerlu o leh Di reksi .

2.Pemegang sahamharus memberitahukan seti


{/*g ia
li IR."\ perolndahan tempat Linggalnva denqa.1 suraL keoada-
It \?"\
/s Di reksi.
_Selama pemberitahuan itu
vr> (,*V -be'lum di lakukan.
segala panggjlan dan pemberitahuan kepada peme qan q
saham adalah sah apabi la dialamatkan oa.la al amat,
s
Dernegang saham vane oalinq akhir dicat.at clalam
Daf Lar Saham.

3.Pemindahan nama saharn harLts berdasarkan akta _ _


pernindahan hak yang ditanda tanqani oleh vanq __ -
memindahkan dan yang menertma pemindahan atau __-
waki l-waki I rnereka alau berciasarkan surat_suraL
larn yan rnenurUlt pendapaL Ltrel..s (ldt)lrL. d rlr,,r d.L Lr

sebagar bukti vana sah un1-uk Demt rcjalran rLu.


4.Pernindahan nafila lersebut harus di lakul(an der)gall
suatu caLatan tentang penyerahzLn rtLr vanq dt LLrl ts
didalam Daftar Saharn., apabr la dlkelLtarl(an surat
saham -iuqa dicatai pada surat'saharnnva. diberi
tanggal dan dit.anda tanqani oleh seorang anqgota
D i rer s I oan Jeoru.lq honl I ca!

5.Pefirindahan narna saham hanya diperbolehl(an.


:iikalau semLta ketentuan dalarn anggaran dasar telah
d ' Oe,lLn I

6.1'1ulai hari pangqi lan RaDat LJr.tLrrn pemegan! Saham


sarnpar den an hari raoat itu. Demrndahan nanta
.,al_ on t,oaL O'oar(ena (dr --.
7. reksi berke\.raj i ban unLuk nenv r rrilr) dan _ -
Di

memel ihara Daftar Saharn sebatk-batknya. _- _.-

LSetiaD pemeqang saham berhak melrhat DafLar


Saham oada waktu jarn ker-.ta I(ant,or perseroar-].
,_ PEI,lINDAHAN HAK ATAS SAHAI.l _-.
- - pasat 9.
1.Pen-iualan dan Demindah-an hak atas sahant iianya
dioerbolehkan keoada oara qemeganq saham lijnnlra -
at.au keDada pihak lain vang dituniuk oleh RaDat --
tlrnum Pemeganq Saham dan dengan perantaraan Direksr
!16
2.Pemeqang saha,n yang hendak men,jual saham harus
menav/arkannlr'a secara tertulis terlebih dahLllLr
kepaoa oard pemegarq sanan tdir.nyd oenadn
menyebuLkan dalam oenawa-an Le.scbuL I ar gd oat -

pecsyaratan penjualan tersebut dan metnberttahLrt(an-


kepada Di reksi secara tertul js tenltana oenawaran _
te rsebut -

3.Para pemegang saham la.tnnl/a berhak membe.li saham


yang ditab/arkan dalam jangka waktu 30 (tigaouluh)_
hari kalender se.iak ditavJarkannya dan rnereka _-- _
berhak uniuk mernbel jnva sesuai den-qan perrfilbanqan
jumlah saham yang dimilii(i masing-rnasjng. --
--
4.Apabila dalam jangka waktu 30 (tiqapuluh) harj :
ka-lender yang ditetapkan tersebut. ternyata masil.)
ada saham yang tidak dl laksanakan Dembel rann a.
maka dengan lewatnya -tangka wakt,u yang dit€rntLrkan_
tersebut merupal(an bukti bahwa oemegang saham yancl
bersangkutan tidak berkehendak uni_uk ntenDerqLrnaka|l
haknya untuk membeli saham tersebut. sehrnqqa srs.r
sanam t!u dapat diJ!ral clengan perantaraan D ireks r

kepada pemegang saham lain yang rnasjh berminat, _


-
untuk membelinya dengan harga yang sana, ataLr _ __
kepada pihak ketj_qa yang disetujuj oleh Rapat
Umum
Pemegang Saham, satu dan lain dengan harga
lr'an!r _
serendahnva sama dengan yang diNawarkan l(eoada _
t-- -
/,i"\ t. RX para pemegang saham l ai nnyeL.
--/ 5.Pemindahan saham secara
t"\ -lain daripada ka.ena __
penjualan (kecLra'li karena war,isan).
\\3,"- K* hanva _-_- _ _
diperbolehkan dengan persetu-iuan darj RaDaL !.lmunr _
Pemegan-q Saham
6.Apabi la sahiltn l(arer\a wat-rsan.. pert(a\!lrran aLau -
.i
seLlab-sebab lain beraLth l,akrrva Ltdn L)Llal( lagl
- _
men-iadi milik Warqa I,legara lndonesra aLaLr tra(iarl
hukum Indonesia atar.t aoabi lit seorano oeriegang
saham kehilanqan kewarllaneqaraan Indonestanva
maka dalam tanqka !.raklu 1.(saLu) tahun oranq
badan hul(Lrnt tersebut diwaribl(an untLrl( meniLral aLir\l
rirem,i ndahkan hak atas saham itu keoada seoranq

|Jarqa Nectara Indonesta ataLt sl.taLu badan hukunt


Indonesia. rnenurut ketenLuan dalam anqaaran dasar_
ini. ---
7.Selama ketentLtan tersebut belum dilaksanakan.
Tnaka suara yat.rg drkeluarkan dalafit RaDal Umum __-__
Pemeqan,q Saharn untLrk saham itu dianqqao tidak sah.
sedanq pernbal/aran dlvrden. aL.rs sahal tLu d rLu ld:i_,
K E P EE N GU U R U S A I,]. -. -_...
--- Pasa l 10.
l.Perseroan djurus dan dipimoin oleh suatLt Direl(si
yan terdi ri dari seoranq Di rektur atau I ebi h, _-
-iikalau diangkat lebih darj. seoranci Direktur. maka
.6eorang diantaranya dapat dian_qkat sebagai _-____-
Di rekt.u r iltarna
2.Yang boleh diangkat sebagai angqota Direks.r
hanya Waraa Neqara Indonesia_ dalam hal kehi lanoan
Kewarqanegaraan Indonesia, maka angqota Dj reksj -
yanq bersanqkutan djanggaD denqan sendirinya tetah
meleLlrl dn jdoaLan1.,a. -i-. .-----
3.Para ang!tota Direi,,si dianokaL oteh RaoaL
Pemeganq Saham, rnasing-rJtas nq Ll LLtt. rill].rl.ir
vang tidak dttentul(an la ..llrva. akall Let.ar]r
L
tidak menourangi hak darr Rapat LJrllu r poi eoa g

Saham Lrntuk memberhentikan mereka seu/akLu-\^/al(ilu.


n
4.uaFa a'lqqota Dtrel,sr ddpa! oiber, oa.1 dLdJ _

tun.iangan, vang -iumlahnya diletaokan oleh RaDat

5.Jikalau oleh sesuatu sebab -rabatan anggoLa --


Oireksi lowong. mal(a dalam .jangka !./al(tu 3O (l.iga -
ouluh) hari kalender sesudah teriadt lo!.ronqan.
harus diselenqgarakan Rapat Umurn pemegang Sahant --
Lrntuk menqisi lowongan itu_ denoaF memogrhaL I l(it)r
keEentual avaL 2 pdsal trl-. ----
6.Setiao Den_qgantian anaooLa Direl,,st harus
didaft,arkan dalan Daftar Wat.ib perusahaan sesuat
dcnqar Ket,e,1LLan lJroan .unda.,q IoIc. I Ldr,rt. rl
( qeri bu sembilanratus delapanouluh dua)
TUCAS DAN I.JEWLNA\C DIREKSl
__-__ pasal i1. ___-
1 .Di reksi bertanggung .lawab oenuh dalam rnelaksana

kan tuQasnya yanq ditu-tukan untuk kepentingan


?grSeroan da'lam mencapai mal,sucl ddn /l LLr luar a
2.Setiap anggota D.i reksi wa-iib men-ialankan __- __-
tugasnya sebaik munqkin denean mengindahkan _- _--
peraturan perLr;danq-undangan )/anq berlal..u dan _-,
an qaran dasar ini
3. Di reksi berhak mewaki I i Perseroan di dal am dan
'1:
--
di uar pengadi lan tentanq seqala hal dan dalaor ---
'l

l-i
'.\ I: segal a keJ ad j an. menqikat Persel-oafi derrqarr D tiral\ -
s/
v> E' lajn dan pihak lain dengan P_eTseroan. se r l_a ,
menjal ankan seqal a tindakan , baik yang menqenai --
Penqurusan maUDUn pemi l i kan , akan tetapi dengan -_
B
6".,,-",b--4a .LLr : -

]o.ru,.n.or aLdu ren rr ram\dr. uang alas nama ------


Pe rseroan ( tidak terJnasuk mengambi
I Lranq -- --
Pe rse roan ' d i - ban k- ban k ) :

ln. rnembel i .
nen-iLral atau den .qan cara la rn -- -- -
melepaskan hak-hak aLas harta tei-ao dan -- --- -
pe rLrsahaan-pe rLtsahaan atau fler berat.l harLa --- -
kekayaan Perseroan
perseroan sebagai pen-ia lin:
c.,neng i ka1,
d-mendi ri kan suat,u Lrsaha baru;
_haruslah dengan DerseLulLran dalr r aLaLr
suaaL sur al_
yang bersangkutan t,Lr ru L dtLa|Ua-Lan!rarl r ole I

sekuranq-kurangn\,a seoranq Komtsar.ts,


4.a.Di.ektur Utama berhak dan berwenang bertindak_
untuk dan atas nama DiTeksl serta newal(i l r
Perseroan:

fr Diclalam hal Il1rel,.Lur ULana Lidal<. hacl rr aLiru -.


berhalanaan karenar sebab apaoun ir.l!ra, hal rrranai
tidak perlu dibul(t.ikan kepada pjhak ketiga. _

rnalia salah seoranq anggoLa Direksi lerinnva __

oer I dl. d.lr be, v,cndrq ber . .trclal- .rnLL,,


dan dLd:.
nama Direksi serLa mewaki li perseroan,
5 . Dl rel(s i untuk tinclakan-tindakan tertent.u
ber h ak-
pula menganqkat seoranq atau lebth sebaqat
atau kuasanya dengan mernbertl.arr l..epddiartr'd
kekuasaan l(el(uasaan lr'anq
iaLur da larn sur aL l(uasi
ci

6.Didalam hal Perse-oan tioal menpLlnval DirekLur -


Utama, rlaka segala tugas-dan !.rewenang yang djberi_
l'dn keoddd Ot-el,Lur Ufar.ra datarn .lnggdrdr, dosdr
daDat di-ialankan oleh Direktur l/ang ada dalam _--
T.Pembaha_qian tu as dan we!./enanq dtan|ara Dara _-
ang_qota Direksi diatur dan ditetapkan atas
- _- _
Persetu"i uan meTeka be rsama
S.Dalam hal perseroan mempunvai kepenLjnqan vano
bertentangan denqan kepent.inqan pribadi seorana
-
anggota Direksi. maka perseroan akan di!.Jakili oleh
an9gota Direksi larnnva dan dalam hal perseroall _
mempunyar kepentingan yang boalentangan denqa
) _

kepentinqan seluruh anggota Direl(st. naha .la arl


hal ini perseroan diwak.tli oleh Der.ran Komisarts.
__. RAPAT D]REr.ST _.
-*----__-__ *_-__,__ pasal i2.
1 . Di riksi mengadakan raoat setlaD
,val<tu bi I amana -
dipandang perlu oleh seoran atau lebih angqot.a
--
Direksi atalr atas oermintaan tertLl I ts dari seoranq
atau lebih anggota Delran Kornisaris.
2.Panggi-lan rapat. Direksi dilakLrkan
oleh anagoLa
Direksi yang berhak mewakili Direksi menurut _- _
keteii.uan pasal 11 anggaran dasar ini_ _ _- _- _
-
3.Panggilan rapat Direksi harus disamDaii(an
dengan
surat, tercatat atau disamoajl(an keoada setiap _
-
angt6ota Di re.ksi secara lanasL|rg, der)!rar1
lrenallrpaL
tanda terima yang layak. sedikit_dikitnva 7 _-_-
-
(tujuh) hari kalender sebelum raDat. diadakan.
i; dengan tidak memperhitun_ekan tanggal pangq.i lan dan
I raoat.
t angga
ltl
:/
EI 4.Panggilan itu harus mencantlmkan acara,
tangqa t.
Eit waktu dan lempat rapat.
S.Apabi la semua anggota Di reks i had i r aLau ---- -_
l'
diwakili. oanqgilan tertebih dahutu tersebut Ll
dis aratkan dan rapat, daDaL diadakan dtrnanaoun
dan
berhak untLrt( I kepuLusan vang menqil<at
mengambi
6.RaDat Di.eksi diDimDin oleh Direl<tur ULama_
dalam hal Direkt.ur lltama tidak dapat hacljr
atau _-
berhalanqan hal mana Ljdak.perlu d UuiLrk.lri tieDadit
pihak ketiga. maka raoaL akar) o Dlr,,orn
oir,il
seorang t/an diOjlih dart anLara ?1nlrqrjL.l Utrel.:i j

7- Seol^ang anogota Dr reksi


L diwap.ili dalam -
daoa
rapat hanva oleh an.Jqota Dr reksi larnnva
be surat k!tasa.
rdasarl..an
S.Rapat Direksi adalah sah dan berhak rnenqanlbr I _-
keputusan-kepLttusan yang mengikat aoabila __-_-
-
sedikitnya lebih dari setengaf, _.tumlah ang-qota -__-
Direksi hadir atau diwakili dalam raoat dan _- _-,
L,1ooild r.t.,LLk ,apaL !e,se,rL.e.dt, d jd-1r,.rt,o.
secaTa sah sesLJar denqan ketentual.t anggaralt
dasar.
9.Ke6ut\-rsan rapat Drreksl harus di.lrnbt I irer.lasar
kan oerselLr-iuan suara tera,ariyak dar.r .anu.rol_a -
-
Direksi vang hadir danlatau orwalr.rlt .tdii1r, r.r,,di. -
1o.a-Setiap anggota Djreksi yanq hadir berhak _- _
mer'rgeluarkan I (satu) suara dan ta,lbahan 1 _
( satu ) suara untuk
seti ao anggota D ireksi ___
I ai nnt/a yang diwaktlinva.
b.PanLaoJt.do SL'rrd nengetdi dirr .-eseor n9 - --
di I al(ul<an dengan sura-t suara terl i pat anpa
-
LanOa Fdnoa,1. OerUTo.lt.aR SUa-d rp'lqend
hal lain di lakukan secara lisan, l(ecLla
ketua rapat menentukan l'ain tanEl ada
I
I
l-ebe-a111 dd.' vunu ,,.,r| I

.Suara blanko dan suara yang tidak sah _--


lc
dianggap t,idak dil(e luarl(an secara sah d.rn -
karenanya dianggao tidak' ada ctan Lidafl ---
dihit.unq dalam penentuan jurnlah suara va rq
di kel uarkan.
ll.Direksi dapat juga mengambil keputusan yang sah
tanpa mengadakan rapat Direksi. dengan ketentuan -
semua anggota Direksj telah diberttahu secara
tertulis men enai usul yang bersanqkutan dan semua
adggota Direksi telah memberikan persetujLran ----
mereka atas usul yang dial\rkan Lersebut sebagar
mana dibuktikan denqan persetu.iLtan terLul is vanq ,
ditanda t.angani . Keputusan yanq dtambi I dengan --
cara dernikian. mempunyai kekuatan yanq sarna denqan
keoutusan vang diarnbil dengan sah dalam raDal.
- DEWAN KOI,4ISARI S ___.-_---.
----- pasal 13. ------_-- _--
l.Dewan Komisarjs melal(Lrkan pengawasarr aias -.---
kepenguTusan Perseroan /an9 oitahukd; o,et^ D,rek- |

2.Deuan komisaris terdiri dari seoranq at.au lebih_


Komisaris, jikalau diangl(at lebih darj seoran.r -
Komisaris, maka seoran-q djantarAnya dapat dran.rtrarL
seoacar Koml sar.t s lJtarna.
3.Yang boleh diangkat sebagai anggota De!.ran _- __
tr"91r&;\ Komisaris hanyalah trraraa Neoara Inooroslo. dalam _
I5 t \;- 'l
1l /-'/ I
)ii)i ha'l kehi langah kewaT-qanegaraan Indonesia. ntaka
(v.") yang bersangkutan dianqgap dLnqan sendirin a tel.rh
E"K-)ll"
meleiakkan .iabatannva.
4. Para ang-eota Dewan Komisari s di anQkat o leh RaDat
q
UmLlrn Pemeganq Saham unLuk ran!rl.a
tent,ulian lamanva, den!rall Ltddi.
cli

dar-i PaD.rl- Unum peneqanq 5a, dr u,


kan mereka sewaktu-waktu,
5.PaTa anqgota oowan Komisaris daoat,
drber.l
honorarium dan tLrnjangan. latnnya. yang
iuml
ditetaDkan oleh Rapat Urnurn peraegang Saham.
6,Jikalau oleh sesuat.u sebab terJadi loworrgan
- -
anqgolla De,r'ran Kornisaris maka da.larn iangka
vrakt,Ll
30 {tiqapuluh) harl kalender setelah terraclinva
lo\,/onqan. harus diselenggaral<an Raoat,
Urnum _-_-_-
Perneoanq Saham unLuk menqisi lowonqan itu den!tan
memperhaLjkan keleni:.uan ayat 3 oasal
ini. _- _-_-
7 . Setr ao oenqqanti an anqgota
Dewan Komi sari s harus
d r daf t arkan da lam Daf tar 'tr'a,l
i b per Lrsahi,iilrl s{isu_r I

denqan Undana-Llndang l]o[)er .j Liil,u I i!1,-


i-er l],1
semb' ldnra L-s de I aoanoL I u.. oud j .
_.-. -. TUGAS DAI.I V/EWENAI.IG DEWAN T.OMISARIS _.-_ -.
_--_-_ pasa I 14
l.Para Komisaris baik bersama-sama mauoun sendndiri
sendjri setiap waktu da.lam -iam keria kantor
Perseroan berhak memasuki banqunan oan
halanran _-,
atau tempat lain yang djpergunakan atau vanq _-:_
dil..uasai oleh perseroan dan berhak rnemeriksa
buku
bukLr, surat.-surat, bukti-bukti, memeriksa dan __-_
re,coco\l-a.,) l,eaoaan Lanq haS da1 ld t,.t
!ebaclaih\a _
serta rnenqetahui segala.tindakan
t,ang telah - _-._
d i.i a'lankan oleh Direksi

2. Di reksi dan seti ap anggoLa


member i kan pen ielasan tenLariq vilr|g -- _
-
di tanyakan oleh Komisaris
3.Dewan Komisaris dengan suara terbanyak, seLiaD -
waktu berhak untuk membebas tuqaskan uniuk -----
semenqara wal<tu seorang ata! lebih anggota Dlreksl
Jikalau ia (mereka) bertindak bertentanqan denoan-
anggaran dasar ataLr rne l al ai kEn kewa i i ban atau -
karena hal-hal yanq oentinq lainlrva.
4.Pemberhentian tugas semenLara rtu harus
diberitahukan kepada yanq bersanqkuLan drserLal --
alasan-a'lasan yanq menyebabkan Lindakan ttu.
5:Dalam jangka waktu 30.(tigaoulLrh) hari kal
sesudah pembebasan tu_qas sementara it,u. De\,ran

Komisaris diwajibkan unLuk rnenvelenggaral(an F?apaL

Umum Perneqdnq Sahan. raodL tnard ,ang d.an --


memutuskan aoal(ah anggotaDtrel(si yanq
bersan-qkulan akan diberhenttkan seterusnya atau --
djkembalikan kepada kedudukannya semula. sedanc -
yang d'ibebas tugaskan sementara itu diberi -------
kesempatan untuk hadir guna membela drri.
6.Fapdt ini oip'trnpin oleh h.orlsar rs Lltama dan LI o

1au ia tidak hadir. oleh salah seoTanq l(o rsar.r


dan .jikalau tidak ada seorangDUn F.omisaris vanq
hadir oleh salah seorang yang dipilih oleh dan ---
dar r anLara merel. a ., d.lq . aoi r

T.Jikalau Rapaf Umum pemegan_q Saham


tidak diadakan
da'am .iangka wakru 30 tL.gapLtuhr na-. fd,-r der
setelah pembebasan tuqas se_menlara itu, maka ----
pembebasan tugas sementara itu men.iadj batal derfi-
hukum dan yang bersangkuian akan men-iabat kembal i-
jabatannva semu I a. -:
I
A.JikalaLt para anggoia Direksi dibebas tLrqaskan --
unLul( sement,ara waktu dan perseroan Lidal(
mempunyai seorangpun anggota Direksi, maka untuk -
sernentara Dewan Komisar.ts dtwat tirkan unt.rrll
mengurus PeTseroan.
g.Dalam hal iIu De\4an Kornisarls berftak untuk
limemberikan kekLtasaan sementara kepada seorana
'lebih dtant,ara mereka atas canggLrn an rereka
bersama.
lO.Didalam hal hanya ada seorang Komj sarls. filal(a .-

segala tugas dan wer,Jenan_q yana diberi l(an baq i


KomiGaris lJtama atau para Komisaris. dal am -- ----
an9garan dasar ini berlaku p!rla baqi nYa. ---- :-
RAPAT DEWAN KOMISAR]S

----- Pasal 15.


l.Dewan Komisaris dapat mengadakan rapat bi lamana-
dianggap perlu oleh seoran'q atau lebih anggot.a --
Dewan Komisaris sebagatrnilnal LjlLenLut\i1n oletr --
Komi sari s Utama. -------

2.Panoor'lar raDaL Dehan h.omtsar.ts.dttal,J^an o,eh -


Komisaris lltarna. Jikalau Kom.isaris Utama tidak --
m,elaksanakan panggi lan tersebut dalam -iangka viaktu
'14 (emoatbelas) hari kalender se-iak disampaikannya
permintaan lrnt,uk diadakannya rapat iersebut. mal(a
anggota Dewan Komisaris yang menqajukan permintaan
unluk di adakannya rapat berhak rnemancqr I sendi rj

3.Pan,qgilan Tapat Dewan Komjsaris disampaikan r---


denqan su.aL orcaLaL ataL. O isanoatka.] ,\eoaoa
setiaD angqota Dewan Komisaris secara lanqsunq. --
dengan mendapat tand a terima vang laval(. soCrkrll
d tnya 7 (tu-iuh) har I
i'li i l(a len der sebelutn raDaL -
d i adakan . dengan tidak hi Lungkarr Larrgga I

Panggi I an dan tanggal rapat -

4. Pangg i 1an itu harus n6n.a_L-nl-a'1 a__ :. Ldnqqa,


wakt.u dan tempat rapat.
S.Apabila semua anqqota Dewan Komisaris hadir aLau
di!./aki'li, pang_qi1an terleb jh dahLtlu tersebLrt tidak
disyaratkan dan Tapat dafjal- diadakan dtrnanaoun dan
berhak untuk menqambi l keoutusan vanq sah alan
nerql(aL. ----
6.Rapat. De!./an Komisaris dipimDjn oleh Kornisar
Utama, dalam hal Komisaris lJtama t.jdak daoat had ir
atau berha'lanqan hal mana tidak oerlu .libukli
keoaiila pihak ketiga. rnaka raoat allan diprnrDtt.r o leh
6eorang vang dipi I ih dari arlLar .r eLnq(loL.r Uef ,rLr
homidaris /drq hod
T.Seorang anggota Dewan Komisaris daoal allwaki I i ,
dalam raDat hanya oleh angqota Dewan Komi:jaris
'l
d ia.1ya berdasar (dn sLrraL RLa-d - ----

8.R.aFat Dewan Komisaris adalah sah dan berhak


mengambi'l keput.usan-keputusan yanq mellcrikat han a-
apabila sedjkitnya 'lebih dari setengrh jurntah -
anggota Dewan Komisaris hadir atau diwakili ctalarir-
rapat -dan pan_qgi lan untuk rapat tersebut ie.tah ---
djisampaikan secara sah sesuaj de tqan keLentuan
ansgaran dasar. ---
9.Kepuiusan rapat Dewan Komis:.rjs harus clia,nbil
berdasarkan persetujuan suar:, terbauval.. a.lar I - ___
anggota Dewan komisaris val.t,J fradir- dari/aLau - ---
)-1
il r dal pa L
a. Set i ap anggo ta Dew K q hadr r ---
be rhak me n
-qe
lu rka n1 (s atu ) uara dan -----
t arn bah a n't ( t r
L.t l Lrnt,u k set i ao angqota-
Dewan t( ri s la v a yan9 d Lr !d. --
b. lan s r eng na i di TI
di I akuk an de n9 a ns Llra L S uara t erl i Pat tanoa -
tanda t ansan p nqu t genai - - -
hal-hal lain di lak uka s ecar a lisa
Suara bI anko d Li dak sah - -- -- v anq
diang,qa p Lid al( drk elu a rk ans aTa
sah dan ---
karenan ya d i gap ti d ak ada d ant i dak ------
dihitun g da I am pen l_t h su
dikelua rkan.

yang sah tanpa men-qadakan raoat


Oevran Komisarts __
.denpan l-etenLuan :iernua aagoota Delra,t honts.
I rs -.
telah diberitahu secaTa tertu.lis mengenai
!rsul ___
yang bersanqkutan dan menlbeTikan persetr.l,juan _-__-
mereka atas usul yang dja-iukan tersebut
sebagai __
rnana dibuktikan denqan perset,ujuan tertLrlis vanq _
di tanda-tangani . Keputusan yang diambi
I dengan ,_-
cara demikian, memounyai kekuatan yanq sama
derlgan
keputusan yang diambil dengan sah dalam
raDat. ,_-
--.--l--------i-r-- TAHUN BUKU --------__
--I -------__-_--_-- Pasal 16
I .'lahun buku perseroan ber.tal an dart LdrlgqixI
I --
r saLu, ,anLrdTI Sa.npdt OenLldrr
Larrg!ra I Jl lr-tqauutuir
satLr ) Desember.
-Pada akhi r bul an Desember tiao tahun. b..tku-bukri _
PerseToan d i tutup.
*lJntuk pertama kal inya buku-buku Perseroan :rl(arr di
tutup pada t anggal tiq dPJlLr' saLL Dc-er L6r .F' :L '.
sembi I anratus semb i I an pJluh dud t3 - t/-'992.. -

2.Dari penutLrpan buku- lrJru Le, ebuL olen D,rer -:


;
dihuat neraca dan perh i Lunoan laba -uor. vdncr
.
sete'1ah diperiksa oleh De^dn romi)ar,,. oertkrL --
laporan keuangan 'lainnya, harus sLrdah disediakan
dikantor PeTseToan, sekLrranq-kuranqnya l4 (empat -
be'l as ) hari ka'lender sebel un tJnqgaI PdodL ,r'nur',

Tahunan Pemegang Saha rn. agar daoaL oroarl.sd ola'' _

para pemegang saham.


RAPAI' UI4UI'4 PEI4EGANG SAHAI'4 _-_'-_--__-

1.Rapat. lJmum Pemegang Saham dalam Perseroan ada'l ah


a.Rapat Umum Tahunan Pemegang Saharn. vail:u Raoat
Umum Pemeganq Sahatm yang dimaksud dalam pasa l -
'18 diba!.Jah ini:
b.Rapat, Umum Luar Biasa Pernegang Saham. yai tu -
semua Rapat Umum Pemeqan Saham ,di I uar Raoat
Umum Tahunan Pemegang Saham.
2.Ist'i'lah Rapat Umum Pemegang Saham dalam anggaran
dasar ini berarti keduanya, yakni Rapat L]mum -,--
Tahunan Peme_qang Saham dan Raoalt umum LLrar Bjasa
Peme_qang Saham, kecuali denaan ieqas dinyatal(an --
I uU. -------- I ----
---:--- .RAPAT Ul,4uf4 TAHUNAN PEI',IEGANG SAHAM

l.Rapat ljmum Tahunan Pemeqang Saharn di se I enq-aara -


kan ti ap t'dirLln, setainfdt-'tambatnya dal am bul an ---
)3
Ju I j;. untLrk perlama kali selambat*lambatnya
oada _
akhir bul an Jul i seribu sembi lanratus sembi.lan- -_
puluh tiga.----
.. ud ra.n \aoaL llnum .t ahLlnan pemeganQ
Saham: --, - -
a. Di reks i waiib memberikan taooran
tentang ----
jal annya perse roan dan.hasi.l_hasi 'l yang
tel ah-
dicapar dalam tahun bUku yang lal
teri sti mewa menqenai kepen,qurusan PeTseroan:
-
neraca dan perhitungarr lzltra rurr j d la tul:iti - -
untuk d j sahkan olelr r.apalL;
dj putuskan pembaq i an keunLungan:
d djbicarakan hal-hat lain. yang dja.iukan _-_-_-_
sebagaimana mestinva den-qan t.idak
menguranqi _
. lketentuan-ketentuan dalan anggaran dasar. __-_
3.Penqesahan neTaca dan perhitungan
laba ruai o.lel-
^dudL ur\lm tahunan pemegang Sahan. be,arl I membrr I

kan pelunasan dan pembebasan.sepenLlhnya


kepada -__
para anggdta Direksi dan Dewan
Kom.lsaris alas _-_-
tjndakan-tindakannya maupun lrengawasan yanq
telah_
di-ialankannva selama tahLrn buku vang
lalu. se,jauh_
tindakan-tindakan teTSebut tercermtn dalam
neraca_
dan perh-itungan.laba ruq j
------ RAPAT UMUM LUAR BiASA t,i:ttIGAi]i; LAliAr.i
-----

l.Rapat Umurn Luar Biasa peme_qan-q Saham


diadakan _-
tiao kali .iika'tau dianggap perlu o.teh Direksi.
-_-
2,Direksi wajjb memanggil-dan menyelenggaTakan ___
Rapat Luar Biasa pernegang Saham atas
Umum
permintaan tertulis dari seorang
Komisaris at au
seoranq atau lebih pemegang saham yanq
meni tiki
tnya 1O % (seput uh persen) dari i
sedi ki
yang telah dike'luarkan o'l eh Perseroan.
Permi ntaan mana har us d'isebutkan hal-ha
hendak di bi carakan.
3.Ji}(alau Direksi lalai untuk ntenvelenoqarakan ---
rapat_ itu dalam waktu 30 (tiqa.puluh) hari l(alen.ler
setelah surat permintaan itu dit,erinra. nral(a vang -
menanda-t,anqani surat oerminiaan berhak renlanqqr l-
senal.i rapat atas biava perseroan. denqan
mengindahkan ketentuan-ketenluan yano t,ermakt,ub
dalam anggaran dasar ini, dalam rapat itu KetLra --
Rapat dipi'lih oleh dan dari antara mereka yang --_
hadir dan semua keoutusan yang diambil dalam raDaL
ittr mengikat Perseroan. asal sa-ia tidak
bertentan-aan dengan anggaran dasar ini.

--. - . -.''-'-----..-.- ----- Pasal 20. ----------


l.Rapat UmLrm Pemegang saham diadakan ditemoat - --
kedudukan Perseroan.
2.Panggi'lan untuk Rapat Umirm pemegang Saha ------
dilakukan dengan iklan dalam surarL l<abar ha -tan
qqrbahasa Indonesia vang terbit ditemoai k,rdudukan
PeTseroan at,au dengan surat tercatat, --
yanG l.)arus
dimuat ataLr diki|imkannya selambatnya t4 lemDat --
belas) hari kalender sebelum tanqqal ra)at dan
-iikalau hal-ha'l yang akan dibicarakan itu rnenLrrut-
pendapat Direksi harus segera djselesaikan. maka
waktu untuk pang-qilan itu dapat di.rersingkat - -
menjadi 7 (tu-iuh) hari ka'lender jebetumnva. satu -
dan lain dengan tidak memperhi',Lrngkan tanogal ----
,<
oar,u.r lr'. .l.1rr L.l rooir I I .rpc.
3.Panggilan rapat harus mencantumkan hari, tanggal
-iam, -tempat dan acara Tapat.
Parlq9ttan LrTLul. RaoaL uml/m .lahL,t,atr oefi.Fgat,!t 5dt,4rj.
harus pula mencantLtmkan bahwa rre.aLa uan
perhitunqan laba rugi te tah tersedr.r dr kanL.r,. _-
Perseroan
4.Jikalau semua pemeqang saham hadir atau diwakili
dalam rapat. maka panqgi lan terlebih dahulu __ _
seperti dimaksud diatas tidak rnen-iadi syarat dan _
dalam rapat itu dapat diambi I keputusan yanq sah -
serta mengikat mengenai hal-haj vang dibicarakan._
sedanqkan raDat daoat diselenggarakan dimanapun _-
iuga dalam wilavah Republik Tndonesia.
PII4PINAN DAN BERITA ACARA -._--__,__._
RAPAT UI.1UIV1 PEI,4EGANG SAHAM -_-.--.--.._
-__-- pasal 21.
1,J i ka'l au dal am anggaran dasar ln LIdtrl ----
ditentukan lain, rnaka Rapai Untu t pernegdrrg 5al .,r,
dlp'mp'n oleh D;-ektL,r uL.ama. dalan l.at Dl.eliLLlr _

Utama tjdak ada ataLr berhalangan kaTena sebab _- _

ap?pun, rapat dipimpin oleh salah seoranq _- _-,


DiFektur, dalam hal semua Direktur t,idak hadir , _

atau berhalangan karena sebab apapun, rapat ___--_


dipimpin oleh Komisaris utama, dalam hal Komj
Utama t,idak ada atau berhalangan karena sebab
apapun. rapat djpimpin oleh salah seorang
Komisaris, dalam hal semua.Komisaris tidak had i r -
berhalangan karena sebab apapLrn, maka raDat
alraLr
dioimpin oleh seoTanq yang dipi lih oleh dan dari
antara merel(a yang hadir.
2,.pari segala apa yang alibicaral(an dan dioutusl(arl
dalam raDai djbLrat Beril-a acara l?apaL. urtuli sai,
nya ditanda-langani oleh Kelua Rapal dan seorang
oemeqanq sanan aLaJ I -asd peleqano 5ahdn \J-]o
ditun-iuk untuk 'itu oleh rapat dari antara merel'.a
yanq hadir dan isi Berita Aca.a rapai tersebui --
men-iadi blrkLi nyaLa terhadap semua pemeqanQ saham-
dan pihak ket.iga tentanq. kepuLusan dan ke-iadian --
vdnq Ler.jad i dalam rdoaL. _----- _

3. Penanda-tanganan trdak diperlukan .ji1<alau BeriLa


Acara Rapat itlr dibuat dalam bentul( zLkte notaris-
KORUM, HAK SUARA DAN KEPUTUSAN --___

'1 . Rapat Umu m Pemegang Saham harlva sah. I ikalau


rapat itu ihadiri oleh 50 % t limaDulufr Dersen)
d

j um'1 ah saha m yan t,elah dikeluarkan oleh Perseroatt


kecua'li -iik alau dilentukan lain dalam anqcraran ---
dasar ini.
2 . Mas i ng-mas i n9 peme-qan-q saham hanya daDat -------
diwakili oleh pemeganq saham I ajn atau orang 1ai n

denqan surat kuasa.


3. Ketua Rapat berhak m'inta agar sural kLrasa un 1-u l(
mewaki I i pemegang saharn di perl i hatkan kepadanya -'-
pada vJaktu rapat di adakan.
4,Dalam Rapat lJmum Pemegan-q'Saham, tiap saham ----
mbmberikan hal( kepada pemiliknya untuk menqeluar -
k:n 1 (satu, suara. ------ l.
5. Para anggota Direksi dan Der,?an F.o rrsarTis Can -
pada umumnya para karya!./an Perseroan Lrdak bo Leh
bertindak selaku kLtasa dalarn oeniL_rnl,uLar su.rr
dalam Rapat Umum pemeganq Saham,
Suara yang mereka keluarkan selaku
kuasa ti dak ---
dihitung dalam pemLrngLrtan suilra.
6. PemunqLltan suara tentang cjtri oranq di I akLrkan _-
dengan surat, tertutup yang t.idak di
tanda- tan gan i _
dan tentang hal-hal lain denqan lisan.
kecuali ---
-i i kal au rapat rnenentukan Iain

T.Suara blanko atau suara yanq tidak sah


dianggap-
tidak ada dan tidak difritung da lam rnenentukan
----
-iumlah suara yang dikeluarkan.
.;
8.Senlra keputusan diambjl berdasarkan
suara
lebih_ dari 5O x ( .l imapulufr persen ), kecua I I

,iikalau dalam anQ-qaran dasa. I rr o LcrrLuiid r d ir._


Apabi 1a Jumlah suara yanq setu-lu
oan ttoat( setu.ru_
sama banvaknya. maka undianlah yang
menentukan - _
jt<a1au mengenai dtri orang dan
dranggap sebaqai _
djtoJak, .iikalau rnenoenai hal-ha1 .tain. _-____-_-_
9,Para peme_qan-q saham juga dapat me.ngambi ____-__
I
keDut,usan yanel sah dan menqikat tanpa
menqadakan _
rapat, asal saja usul yang bersangkutan telah
-___
diberitahukan secara tertLtl is keoada semLra __-_-__
pemegang saham dan menyetu-iui
usul tersebut denqan
menbe-ika.l 0ernvaLdar secara re-tults vang
dtLanoa
tanqani sebagai bukLi persetu-iLran merel,a. __ __._
Kepltusan yang diamb.j l dengan cara demikian ___-_-
mempLrnyaikekuatan yan-e sarru.r cte|!tat) yixl|9 d ta|lrb I I

dengan sah dalam rapat.

--._ I(EUI]TUNGAN
l.Keuntungan bersih perseroan dalarn suatLr t.ahun -
buku seperLi yanll tercanLum dalam neraca dan - _-
perhitungan laba rugi yang Lelah disahkan oleh
Rapat Unlum lahunan pemeqanq Saham, dibzlcrt menLrruL
cara yang ditentukan oleh Rapat Umum Tahunan _-,
Peihegang Saham.
2,Rapat Umum Tahunan Peme_qan9 Saham juga dapat. --
menentukan bagian dari keuntLtnqan yanq di sed't akan-
untuk dana cadangan dengan meneindahkan
perundang-undangan yang berl aku.
3.Jikalau menurut pertimbanqan RapaL Unrurn Femeqrrn(l
Sd6am.iumlah dana cadangan telah cukup besarnva_
maka Taoat dapat memutuskan agar bagian darj
keuntungan yan_q disediakan untuk dana cadangan itu
d19U1al'an un!Ltrh Aepe-',Ldn ld1n. ----
4.Jikalau perhitunaan laba rugi pada suatu tahun -
menunjLrkkan kerugian yang tidak dapat ditutuo __-
denqan dana cadangan. maka kerugian itu akan te Lao
dicatat dan dimasukkan dalam perhitunqan laba
dan dalam tahun-tahun selanjutnya perseroan __-- _

dianggap tidak mendapat keuntungan selama l(er!gian


yang tercaLat dan dimasukkan dalam perht Lunoan _-
laba rugi itu belum sama sekali tert.irtup
5.KqLrntungan yang dibagikan sebagai clivl yan 9
tidak diambil dalam waktu 5 (lima) tahun
disediakan untuk dibavarkan, menjadl mil rll
Perseroan.
--- DANA CADANGAN
- Pasal 24.
Dana cadan_qan digunakan untuk menut,uD kertqtarl
yang dider.ita oleh perseroan . Denoan
t roal.. .- -. -
men gu."an g t ketenLLran d .aLas
. Raoat Umum pemegang -
Saham dapat menentukan aqar dana cadangan
ilu --_-
selurLthnya atau sebagian di !unal<an untuk ___
moda I
ke r"i a atau untuk kebutLrhan I ai n.
i harus mengelola dana.cadangan agar darra-
2. Di reks
cadangan itu rnemperoleh I aba, satu dan I ar n
denqan
cara yang diang_qap baik c I ehnva denqan De rsetLt t u a11
dari Dewan Komisaris.
3.Laba yang diperoleh darr dana caoa;r!., rLu __-_-
dimasukkan dalarn perhitungan laba ruqi
PENGUBAHAN ANGGARAN DASAR
-.--_---.__
_ pasai 2S
l.Pengubahan atas ketentuan dalam an,qqaran
dasar -
in1 terrnasuk juga menqubah nama, tempat. kedudul,,an
dan: tujuan perseroan. memperpan,iang -iangka waktu -
Perseroan. ne4gubah modal dasar aLaL memperpectl _
modal Perseroan yang ditempatkan hanya dapat ___,_
terjadi dengan keputusan dari Rapat Umum Luar ____
Blasa Deme_qan9 Saham yana senga.ta d.tpanqg i I dan ._
di'6elen_qgarakan unluk maksud itu. Dalam rapat. mana
harus diwakj li sekurangnva Z/3 | t)ua Dert.tga) dilr
t_
iumlah saham yang telah dike luarkial] olerr perser(jar,,
dan us!rl itu harus disetu-iut oleh sekurangnya 3,/4-
(tiga Derempat) dari jumlah suara
t/an!l dikelLrarkan

Satu dan lain dengan tjdak-menguranqi izin dari ,


Di hak yang berwenang, --r---,:-------

2.Jikalau dalam raDat -vang disebut dal am ayat


-- -
yang terdahulu banyaknva saham yanq
di!,/aki'l i ti dak
mencapai l(o rufir yang clitentul(an. mal(a secepaLrrvLr
7 (tu.iuh) h ari kalender dan se'lamtrat- larnbatnya
30 ( ti gapu I uh) hari kalehder seielah rapat. pert-ama
i tLr, dapat diselenqgaral(an rapal kedua denqan --- -

syarat dan acara yang sama seperii yanq dioerlul<an


LlntLtk rapat oertama. dengan l(etentuan bahr,/a ian(]l..a
r.raktu pangg i'lan untul( rapat [(edL]a rLu daDaL _-- --
meny i mpanq dar' odsal 20 a)d' ? diata.. _-----'
3.Uslrl mengenai memoerl'ecr' modd' ^d iib o,urLrn, d'
ol eh Di rek si dalarn surat kabar harian berbahas.l
l ndones i a yang terbit dltenpat kedudukan Perseroarl
dan da'l am Berita Neqara Lrntuk keDentin,tar) pdra __-
l(reditur-
PEMBUBARAI.I DAN LI K}IIDASl
-.-^r :(,.
1.l\eEenLuan odsal 25 mutaLis mJLandis lra.']dl r iiqd
bagi.. pembubaran Perseroan sebeluin -iangka wal(t.u
yang ditentukan dalam pasal 2 djatas.
2.Jikalau Perseroan ini dibubarkan. maka harus
d'radaKan likwioasr oleh U,rer.!-r oroawdlt oe.lqahasdt.
De!.Jan Komi sari s , kecua l i j j ka lau Rapat Ufl]ufir

Pef,lggang Saham menentukan Iarn


3.Dalam raoaL rLLr d'rLen+uk{r J uga upah bali pafa -
'likr{idatur.
4.KeputLrsan pembubaran harus didaftarkan Dada ---
Kepaniteraan Pengadilan Negeri ditempal keclud!kan
Perseroan, diumumkan dalam Berita Negara Republik
Indonesia dan dalam surat kabar har r an t/ang Lerbit
dalarn baha6a Indonesia ditempat kedudukan
oerseroan denadn dtser Ld: panqg I lan untuk oar a
3i
kredilrur.
5.Sisa dari oerhitungan I ikwidasi terlebih dahutu_
dibaqjl<an,ke_pada para pemegang saham yana
lu0tlalr -
nominal saham yang telah dibavar Derruir t l]Lrrk s.rl,njl
yanq mereka mt lrkidan s isilnvd l] rtr.r! rt\.,, risr,L,r 1,,
cara yanq ditentukan oleh RaDat Ltrnurn penlegang -.-
Saham yanq khusus drselenggarakan untuk l<eDerluan-
itu
6.Anggaran dasar ini sepe.Lt yanq lermaktub dalarn
akte ini atau mungkjn dengan oenqubahan-oenqubahan
nya dikemudian harj.tet.ap berlal(u samoaj denoan
tanggal disahl,.annya Derl-ritunQan I ik\,/jdasi oleh _-
Rapat Umum pemeqang Saham dan drberikannva _- __-
oelunasan dan oembebasan seoenuhnva keoada Dara -
likr.Jidatur
_ PERATURAN PEI.lUTUP -.-

-Seqala sesuatu yanq tidai.. ai_arLr itelurn L!rr.uij U,qi,,r


dalam angqaran dasar ini. miil!a RaodL U[]Ll pune!r.rrrq
c ahdn ./ar o al. an neln- L rs, dn.., d .
-Selan-iLrtnva Dara penqhadap menerangkan bahwa: - _
I.Menyjmoang dari ket.entuan yang ditentukan dalam_
pasal 10 dan oasal 13 tentanq caTa penqanqkat.an _
ang!ota Direksi dan Dewan Korn.tsarjs, maka untul,, __
oPTtama (r t. diangkaL sebaoai:
:*D i rektu r Utama PEnghadap BINTORo TENY;
-Di rektur OE'lqhadao, RLJDY TJE\DRA: --.
S UTAI'4A penghadao nyonya HOEI KIN KUK:-
_Komi sari s Denol'aoap nvon.a '1AR yAN T , --
lcHanonn;
lPenqangkaian lersebui dialas nenuru1] keleranoan
para penghadao telah drlerlfra oleh iriisrrr(r_rrr'ISrrr!r

yanq bersangl(uLan dan akan di perkuaL da larjl llaDaL


Umurn Pemegang Saham yarg per1]arna kalr d'adal''a-l

sete'lah anggaran dasar inj mendapal oerseLuluarr -


dari yang berwenanq.
II.Direksi dan

baik bersama-sarna mallpun sendiri-sendiri dei9an -


hak untuk memindahkan kekuasaan in'l keoaLi"_ orang
lain dikuasakan untuk rnemollon perseLu'luan aLas -_

anggaran dasar ini dari ajhak vang beruenang dan -


menyat,akan serta rnenvusun peLrquoahan-Dengubalal
dan/atau tambaharl-tambahannya dengan akle noLarls
jikalau oersetLriuan ajlas anggaran dasar r]-u -- _
berganlrunq pada pengubahan dan/aLau tarntrallair - ,'

t,ambahannva itu. unLuk l( e p e r i a lr - k e o e r l a r nr;r ra


Ll Lr

rnenghadap dimana per'lu. rnembeni keterangan --- ---


keteran-aan, membllat. minta dibuail(an serta Iner'ralrdil
!aaQa''l' SenJa Su'aC/ahLe ,a19 Olbt-LJ1l'dl aat ---'
selan.rutnya rnelakuP.an segala lindakaln yang
dianggap baik dan berguna untuk rnenyelesarkalr ---_
hal-hal yang disebutkan diat,as. --'*---

-Dibikin dan diperbuat su.atrakte inr, Ler Lu I rs,


dlbaca dan tertanda tanqani di Jakarta. oada harr.
tan,agal , bulan dan tahun seperti yang te TSebut -
pada permulaan surht al<t,e ini , dihadapan Tlong _-
S^ e Tter Sarla^a FurJT Ud'r ' ,or.,4 5.r'. /

L Sd-:'ana uutLF. l,e lJ".JLan.d peg--d' I


'------...- aa
'l$rl r
dan tin!gat di a, sebaga I sa,s t-sir

notaris ke.pada oara oenghadao dan sakst,sal(sr. _-


lanias sekelika rlu -ruga djT_anda tanqani oleh Dar.r
Irenqhadao. saksi-saksi dan saya, nolarjs, _ _-.
-Dlbikin denqai tanpa coretan: tanoa coretan sert.i
.l.1rt I an dan satu tantbahan.
Ak!e inr ditanda tanqani oleh:
-Bi|rt-oro Tenv
Rudv T-lendaa
-f.ly.Hoei (in (uk;
_llv.Harvantv C hand r ar i
- T.rof !r trr!re
_Surv vt a/a !,fl i

_He lena t(Lr | !o ro S.11

sal rIan

-./tcs11e./-f^

'i)]i:drii:;yzr
NOMOR:

H r,l. 0 HnIl/r! 1T.{, S .


DEPARTEMEN KEHAKIMAN
REPUBLIK INDONESIA
DIREKTORAT JENDERAL
HUKUM DAN PERUNDANG-UNDANCAN
YS,
KEPUTUSAN MENTERI KEHAKIMAN REPUBLIK INDONESI.A

NOMOR I C2-',] .274 iir-" !11" 01


" "
lir.95.
i,ENTERI KEHAI(IMAN REPTELIK INDONESIA,

Sura: pelrnohoilan i:riai1:,.:jn1 -a -1pr::tl 1r92 ncrnor :


52/7!/1,992 dari ].,lotanis iiefena (uaioro, Sil. yang
iieni iei'ina Lan::aaf 22 Aplr,ll 199" ai.n l--rnlrhir
!a4gga1 21 ie-r.rLiari 1994 s.:r'i. arhlenJl-iapan4ya
i:.nggal :5 .laruari i995 ;
Mcnimbang Bahwa dalam akta pendiriafi tidak terdapat hal-hal yang bertentangan dengan
syaratsyarat yang biasa diperlukan untuk persetujuan peneroan terbatas se-
hingga tidak ada keberatan untuk memberikan 'persetu.iuan atas akta pendirian
perseroan terbatas yang dimaksud.

MenginSat l. Pasal U Aturan Peralihan tlndang-Undang Dasar Republik Indonesia tahun


1945:
2. Kitab Undang-Undang Hukum Dagang (Staatsblad Tahun 1847 No. 23)
seba8aimana telah diubah, terakhir denSan Undang-Undang Nomor4 Tahun
l9? I tent.ng Perubahan dan Ponambahan Ketentuan pasal 54 Kitab Undang-
Undang Hukum DaganS (Lembaran Negara Tahun t97t Nomor 20 Tam-
bahan Lembaran Negara Nomor 2959):
3. Keputusan Presiden Republik Indonesia Nomor j2 Tahun 'l:188"
tentang Susunan OrSanisasi Depa €men,

MEMUTUSKAN:
Menetepkan

PERTAMA Memberikan persetuiuan aras akia pendirian perseroan Terbaras :

PT" :1i1, rii]].!'r.,0 Pnrr,-,


fiu-'-.,n t\iP\iP. 1 .a16.5i6 "A-C\i . ,
erkedudukEin da Jaliarta yarr3 dibuai. ladtr. r-1n::.il
rut: t -a-lQ Januari 1992 nonor 2 dihadapan llotaris ljefena
I
&tt toro, SH. ,ang berkedudukan .li J akiirba Can aii-
erlraiki dei'l8aii allta !--rian66a1 27 j.n\]Lri 1)9a
or0or 48 lral8 dibuat .iihada_car irio |aris iiu .tuLa ;

KEDUA I K€putuMn ini disampaikan kepada yanS bersangkutan untuk diketahui dan
dilaksanaka. sebagaimana mestinya.

Ditetapkan di : Jakarta
,."tnZ-L Padi tangaat : ?:7 Januarj- 19t5"
A.n, MENTERI KE}IAKIMAN REPUBLIK INDONESIA
DIREKTUR JENDERAL
PERUNDANG,{INDANGAN

R PERDATA

!,ati l,iiijayai,
, o4Qoi i:95 "
Cetak Izin http ://pelayanan j akarta. go.id/admin/peri zinan/ cetak/ 1993 529

UNIT PEIAKSANA PELAYANAN TERPADU SATU PINTU


KELURAHAN PENJARINGAN

SURAT KETERANGAN
No mor 941 27 .1 BU. l 13 1 .7 2.01 .1 001 l -O7 1 .5621 e I 2017
=

TENTANG
KETERANGAN DOMISIL! PERUSAHAAN
A.N PT. SHINNETSKO PRIMA

Yang bertanda tangan di bawah ini:

Nama Daniel Jonny Hasiholan D.


Jabatan Kepala Unit Pelaksana PTSP Kelurahan PENJARINGAN

Berdasarkan Surat Pemyataan Tempat Kedudukan/ Domisili tanggal 03 Februari 2017 dengan ini
menerangkan bahwa:

Nama BINTORO TENY


NIK 3172011709470002
Pessport
Tempat / Tanggal Lahir Medan / 17 September 1947
Kewarganegaraan INDONESIA
Alamat JL. MUARA BARU NO. 10 Kel. PENJARINGAN Kec. PENJARINGAN KOTA
ADMINISTRASI JAKARTA UTARA DKI Jakarta

Merupakan Penanggung Jawab Usaha/ Badan Usahe/ Badan Hukum sebagaimana tersebut di bawah ini:

Nama Perusahaan PT, SHINNETSKO PRIMA


NPWP Perusahaan 013165568041000
Alamat Perusahaan Jl. Muara Baru No. 10 RT/RW 0081017 Kel. PENJARINGAN Kec.
PENJARI NGAN KOTA ADM I N ISTRASI JAKARTA UTARA
Status Kepemilikan Bangunan Milik Sendiri
Jumlah Karyawan 1so(Seratus Lima Puluh ) Orang
Akta Pendirian
Nama Notaris Helena Kuntor SH.
Nomor & TglAkta 2 &02 Februari 1992
Nomor & Tgl SK Pengesahan C2-1 .274.HI.01 .01 .TH.95 & 27 Januari 1995
Akta Perubahan
Nama Notaris Notaris Desman, S.H. Hum.M.M.
Nomor & TglAkta 72 & 18Ju|i2013
Nomor & tgl Pengesahan AHU-47721.AH.01.02 & 11 September2013
Status Kanlor Kantor Mandiri

Surat Keterangan Domisili Perusahaan ini hanya merupakan pendaftaran atau pelaporan keterangan
domisili. usaha (pencatatan), .tidak dilakukan peninjauan lokabi, serta' tidak 'uniuk dijadikan r6korirendasi terhadap
penerD[an penzrnailnon peni tnan.

Demikian Surat Keterangan Domisili Perusahaan ini dibuat untuk dipergunakan sebagaimana mestinya.

Keterangan ini berlaku sampai tanggal : 06 Februari 2022,1

06 Februari 2017

PELAKSANA

asiholan D.
1004
Surat lGterengan Domisili ini berlalru 5 (lirna) tahun atau berakhir lebih eing ha/Badan ttaha/Badan liil(Jm yang bersangkubn
pindah lokasi atau terdapat perubahan tarhadap keterangan yang diberikan

I dari 1 0610212017 9.40


UNIT PELAKSANA PELAYANAN TERPADU SATU PINTU

KOTA ADMINISTRASI JAKARTA UTARA

SURAT IZIN USAHA PERDAGANGAN (SIUP) MENENGAH

NOMOR 355/AC.1.7/31.72/-1.824.27/e/2019

1. Nama Perusahaan : PT. Shinnetsko Prima


2. Nama Penanggung Jawab / Jabatan : BINTORO TENY / Direktur Utama
3. Alamat Perusahaan : Jl, Muara Baru No. 10, RT. 08, RW. 017, Penjaringan, Penjaringan, Kota Jakarta
Utara, DKI Jakarta. KODE POS. 14440
4. Nomor Telepon Perusahaan : 021-6692166
5. Nilai Kekayaan Bersih Perusahaan (Tidak Termasuk Nilai Tanah
: Rp 1.200.000.000,00-
dan Bangunan )
6. Kelembagaan : Penyalur/Distributor/Ekspor Impor
7. Zonasi : K.1 SUB ZONA PERKANTORAN
8. Kegiatan Usaha (KBLI) :
4663 PERDAGANGAN BESAR BAHAN DAN ALAT BANGUNAN TANKI, BESI/BAJA U
PERLENGKAPAN BANGUNAN
4659 PERDAGANGAN BESAR MESIN, PERALATAN DAN ALAT TEHNIK, MEKANIKAL/ELECTRICAL, ALAT KONSTRUKSI, MESIN-MESIN DAN SUKU
PERLENGKAPAN LAINNYA CADANGNYA

SURAT IZIN USAHA PERDAGANGAN INI BERLAKU DI SELURUH WILAYAH REPUBLIK INDONESIA, SELAMA PERUSAHAAN MENJALANKAN
USAHANYA SESUAI IZIN INI

DENGAN TERBITNYA SIUP INI, MAKA IZIN USAHA PERDAGANGAN NOMOR 07118-02/PM/1.824.271 TANGGAL 19 FEBRUARI 2014
DINYATAKAN TIDAK BERLAKU LAGI.

SIUP ini diberikan dengan ketentuan :


1. Pemilik SIUP wajib menyampaikan laporan kegiatan usahanya setiap 6 (enam) bulan kepada Pejabat Penerbit SIUP.
2. SIUP akan dicabut apabila tidak mengikuti ketentuan/peraturan perizinan yang berlaku di bidang usaha perdagangan.

SIUP ini dilarang digunakan untuk melakukan :


a. Kegiatan usaha perdagangan yang tidak sesuai dengan kelembagaan dan/atau kegiatan usaha, sebagaimana yang tercantum di dalam SIUP;
b. Kegiatan usaha yang mengaku kegiatan perdagangan, untuk menghimpun dana dari masyarakat dengan menawarkan janji keuntungan yang tidak wajar (money
game); atau
c. Kegiatan usaha perdagangan lainnya (selain butir a dan b) yang telah diatur melalui ketentuan peraturan perundang-undangan tersendiri.

Ditetapkan di Jakarta
Pada tanggal 02 April 2019

KEPALA UNIT PELAKSANA


PELAYANAN TERPADU SATU PINTU
KOTA ADMINISTRASI JAKARTA UTARA

LAMHOT TAMBUNAN
NIP. 197301252000031005

*Perizinan ini TIDAK DIKENAKAN BIAYA (GRATIS)

Dokumen ini ditandatangani secara elektronik menggunakan sertifikat elektronik dari BSrE BSSN

Powered by TCPDF (www.tcpdf.org)


Equipment and Tools List
EQUIPMENT and TOOLS LIST
No. EQUIPMENT CAPACITY QTY MODEL / TYPE
Equipment at Workshop I
I. ELECTRIC POWER
1. PLN / Electricity 233 Kva. 1 Direct Line From Government, 380 Volt, 3 Phase
2. Genset 500 Kva. 1 Cummins Diesel KTTA.19G2+ Alternator Stamford
HC.534.E
3. Genset 40 Kva 1 Nissan Diesel FD-33 + Alternator Taiyo PXG

II. HANDLING
1. O.H.C. ( Over Head Crane ) 5 Ton x 24 Meter 1 Hyundai Hoist, H5D, 2012 + Double Box
2. O.H.C. ( Over Head Crane ) 3 Ton x 24 Meter 1 Kamiuchi Hoist, 2010, Single Box + I Beam
3. O.H.C. ( Over Head Crane ) 5 Ton x 18 Meter 2 Nippon Hoist, NH5S,+ Single Channel Box
4. O.H.C. ( Over Head Crane ) 5 Ton x 18 Meter 1 Korea Hoist, 2006, Single Box + I Beam
5. O.H.C. ( Over Head Crane ) 3 Ton x 18 Meter 1 Tiniou Hoist, Double Box
6. O.H.C. ( Over Head Crane ) 2 Ton x 7 Meter 1 Umega Chaint Hoist, 2001, Single Box + I Beam
7. O.H.C. ( Over Head Crane ) 0,5 Ton x 7 Meter 1 Nippon Hoist, 1985, Single Box + I Beam
8. S.G.C. ( Semi Gantry Crane ) 5 Ton x 10 Meter 1 Bando Hoist, BD5-H12-MH, Double Box
9. S.G.C. ( Semi Gantry Crane ) 2 Ton x 10 Meter 1 Umega Chaint Hoist,UH420,1997, Single Box+I Beam
10 S.G.C. ( Semi Gantry Crane ) 3 Ton x 7 Meter 1 Bando Hoist, BH3SH6, 2003, Single Box + I Beam
11. S.G.C. ( Semi Gantry Crane ) 0,5 Ton x 5 Meter 1 Nippon Hoist, NH2K, 1985, Single Box + I Beam

III. COMPRESSOR
1. Rotary Screw Motor Driven 12,5 M3 / Min 1 Gre Comp, GCP-100, 10,6 kgf/Cm2, 75 Kw, 380 Volt

IV. WELDING

A. S.M.A.W
A. 1. Power Sources Multi Operator 1200 Ampers 1 Esab LCF - 1200, 88 Kw, 133 Amp, 380 Volt.
1.1 Welding Regulator 500 Ampers 14 Esab. RC - 500, DC

A. 2. Power Sources Multi Operator 1500 Ampers 1 Miller GPS - 1500, 133 Kw, 200 Amp, 380 Volt.
2.1 Welding Regulator 400 Ampers 13 Miller MOG - 400, DC
2.2 Welding Regulator (350 x 2 ) Ampers 7 Miller MOG - (350 x 2), DC

B. S.A.W
B. 1. Automatic Welding Head Solid Wire 0,8 - 2,4 mm 1 Lincoln. NA-5S
1.1 Power Sources 600 Ampers 1 Lincoln. AL.2006.1. Ideal ARC DC-600

B. 2. Automatic Welding Head Solid Wire 0,9 - 5,6 mm 1 Lincoln. NA-3S


2.1. Colum dan Boom Manipulator H6 x Arm 6 Meter 1 Romar RM-6060 Std
2.2. Power Sources 1000 Ampers 1 Lincoln DC-1000

B. 3. Automatic Welding Tractor Complete Solid Wire 2,4 - 4,8 mm 2 Lincoln LT-7 Tractor
3.1. Power Sources 600 Ampers 2 Lincoln. AL.2006.1. Ideal ARC DC-600
3.2. Welding Rotators ( Drive ) 60 Ton 2 Romar PR.60 / 100 Tb
3.3. Welding Rotators ( Idler ) 30 Ton 6 Romar IR - 30

V. PLATE, PIPE, EQUAL ANGLE BAR WORKING

A. PLATE SHEARING
A. 1. Hydraulick Guillotines Shear. 20 mm x 3 Meter 1 Sagita CP - 3120, 40 Kw, 380 Volt
2. Machine Guillotines Shear. 12 mm x 2 Meter 1 Roc. Q. RRC. 50 Kw, 380 Volt

B. PLATE BEVELLER
B. 1. With Roller Cutter 25 mm 1 Pull Max, X-94, Bevel Angle 25◦ - 55◦, 5 Kw, 380 Volt
12 mm 1 BCM - 12, Bevel Angle 30◦ - 55◦, 2,5 Kw, 380 Volt.

C. PLATE BENDING
C. 1. Hydraulic 3 Rolls Bending 32 mm x 3 Meter 1 Hydraulic 300 Ton, 40 Hp, 380 Volt.
2. Hydraulic 3 Rolls Bending 17 mm x 3 Meter 1 LVD. S 125 / 25. 30 Hp. 380 Volt.
3. Machine, 3 Rolls Bending 8 mm x 1,5 Meter 1 Own. Manufacture

D. PIPE END EQUAL ANGLE BAR BENDING


D. 1. Maschinenbow Durst 3" / 100 mm 1 U.P 100 Plus, 5,6 Kw. 380 Volt.

E. BODEM BENDING
E. 1. Skk Hydraulick 12 mm X 3000 mm. 1 Own. Manufacture, 20 Kw, 380 Volt.
No. EQUIPMENT CAPACITY QTY MODEL / TYPE

F. PIPE END EQUAL ANGLE BAR CUTTING


F. 1. Machine C.Trannjaeger. 3" / 2 mm 1 Tranjaeger DKA.2508, 15,6 Kw, 380 Volt.
F. 2. Machine T-Jaw 4" / Schedule 80 1 T-Jaw, AEF-H, 15,6 Kw, 380 Volt
F. 3. Portable grinding machine Tenzhou 4" / Schedule 40 2 Tenzhou SQ-40-1, 2,2 Kw, 380 Volt.

G. HARDENED BED WAYS


G. 1. Machine Kirloskar 560 mm x 2000 mm 1 Kirloskar EP-2215, 10 Kw, 380 Volt.
G. 2. Machine Seibukoki 1000 mm x 1500 mm 1 Seibukoki, 25 Kw, 220 Volt, 3 Phasa.

H. PRESS BRAKE
H. 1. Hydraulic Fording Press 300 ton 1 LVD. PPCB 300 / 40, 35 Kw, 380 Volt.
H. 2. Hydraulic Bodem Press 300 ton 1 Own. Manufacture, Hydraulic Rider RUC-300..
H. 3. Hydraulic Press 100 ton 2 Own. Manufacture, Jaguar Hydraulic, PV-2 Re-26LR

I. DRILLING
I. 1. Drilling Radial 10 s/d 80 mm 1 Drilling Radial Motil, RFN-71. 30 Kw, 380 Volt.
I. 2. Drilling Radial 10 s/d 50 mm 1 Drilling Radial ZJ, Z.3050 x 16 J. 4 Kw, 380 Volt.
I. 3. First Drilling Machine 6 s/d 15 mm 1 First Drilling Machine, LC-30, 1,5 Kw, 380 Volt.

J. PUNCHING
J. 1. Hydraulic Punch Imac. 44 44 ton 2 Imac Q 8 HAYAN 46, AL.44 & AN.44, 1,5 Kw,220V
J. 2. Hydraulic Punch Imac. 66 66 ton 6 Imac SRL - F.133, AL66, 10 Kw, 380 Volt.
J. 3. Hydraulic Punch Imac. 120 120 ton 2 Imac SRL - F.133/000, AL120 & AN-120,10Kw, 380V.
J. 4. Hydraulic Punch Imac. 170 170 ton 1 Imac E.427 - 2 M, Al-170, 5,5 / 18,5 Kw, 380 Volt
J. 5. Hydraulic Punch Imac. 250 250 ton 1 Imac E.427, AL-250 x 200 DE, 22 Kw, 380 Volt.
J. 6. Hydraulic Rider 100 ton 2 Hydraulic Rider FEP-1-DS, Type-7, 2,2 Kw, 380 V

Equipment at Workshop II
I. ELECTRIC POWER
1. PLN / Electricity 233 Kva. 1 Direct Line From Government, 380 Volt, 3 Phase

II. HANDLING
1. G.T.C. ( Gantry Crane ) 15 Ton x 20 Meter 1 Nippon Hoist, NHE-15-DH + Double Box
2. G.T.C. ( Gantry Crane ) 5 Ton x 18 Meter 1 Kamiuchi Hoist, FMT-5A, Single Box + I Beam
3. G.T.C. ( Gantry Crane ) 3 Ton x 18 Meter 1 Tiniou Hoist, 2AH-DM,+ Double Box
4. G.T.C. ( Gantry Crane ) 5 Ton x 20 Meter 1 Hyundai Hoist, HN5-H12, Single Box + I Beam
5. G.T.C. ( Gantry Crane ) 3 Ton x 20 Meter 1 Korea Hoist, Single Box + I Beam.
6. G.T.C. ( Gantry Crane ) 5 Ton x 22 Meter 1 Hyundai Hoist, HN5-H12, Single Box + I Beam

III. COMPRESSOR
1. Rotary Screw Motor Driven 8,9 M3 / Min 1 Air Man SAS 55P - 54. 7 kgf/cm2, 55 Kw, 380 Volt.

IV. WELDING

A. S.M.A.W
A. 1. Power Sources Multi Operator 1500 Ampers 1 Miller GPS - 1500, 133 Kw, 200 Amp, 380 Volt.
A. 1.1 Welding Regulator (350 x 2 ) Ampers 7 Miller MOG - (350 x 2), DC

B. 2. Welding Transformer 300 Ampers 13 Nasional Welding Travo, 300 Amper Ac, 20 Kw, 380V

V. PLATE, PIPE, EQUAL ANGLE BAR WORKING

A. PLATE SHEARING
A. 1. Hydraulic Guillotines Shear 16 mm x 3 Meter 1 Cesoia A Ghigliottina CO. 40 / 13

B. PLATE BEVELLER
B. 1. With Roller Cutter 25 mm 1 Pull Max, X-94, Bevel Angle 25◦ - 55◦, 5 Kw, 380 Volt

C. PLATE BENDING
C. 1. Hydraulick. 3 Rolls Bending 50 mm x 3 Meter 1 Akyapak, AHS. 30 / 40 - 50, 55 Kw, 380 volt
C. 2. Machine. 3 Rolls Bending 12 mm x 2 Meter 1 Own. Manufacture, SKK Gear Motor, 11 Kw, 380 Volt
C. 3. Machine, 3 Rolls Bending 8 mm x 1,5 Meter 1 Own. Manufacture, SKK Gear Motor, 7,5 Kw, 380 V.

D. PIPE END EQUAL ANGLE BAR BENDING


D. 1. Maschinenbow Durst 3" / 100 mm 1 U.P 100 Plus, 5,6 Kw. 380 Volt.

E. PIPE END EQUAL ANGLE BAR CUTTING


E. 1. Portable grinding machine Tenzhou 4" / Schedule 40 2 Tenzhou SQ-40-1, 2,2 Kw, 380 Volt.

F. DRILLING
No. EQUIPMENT CAPACITY QTY MODEL / TYPE
F. 1. First Drilling Machine 6 s/d 15 mm 3 First Drilling Machine, LC-30, 1,5 Kw, 380 Volt.

G. PUNCHING
G. 1. Hydraulic Rider 100 ton 1 Hydraulic Rider FEP-1-DS, Type-7, 2,2 Kw, 380 V

Equipment for Construction


I. ELECTRIC POWER
1. Genset 350 Kva 3 Caterpillar Diesel, B.3406 + Alternator Engga
2. Genset 150 Kva 2 Nissan Diesel, RD-8.02 + Alternator Lanzhou
3. Genset 150 Kva 1 Mitsubishi Diesel, GD-22 + Alternator B.S.A

II. HANDLING
1. G.T.C. ( Gantry Crane ) 15 Ton x 24 Meter 1 Kamiuchi Hoist, H15D, + Double Box
2. G.T.C. ( Gantry Crane ) 10 Ton x 24 Meter 1 Kamiuchi Hoist, 2010, + Donble Box
3. G.T.C. ( Gantry Crane ) 5 Ton x 18 Meter 2 Nippon Hoist, NH5S,+ Single Channel Box

III. COMPRESSOR
1. Rotary Screw Motor Driven 3,8 M3 / Min 1 Gre Comp, GCP-30, 8,5 kgf/Cm2, 22,75 Kw, 380 Volt
2. Rotary Screw Motor Driven 6,1 M3 / Min 2 Fusheng, SA-350A, 7 kgf/Cm2, 37 Kw, 380 Volt
3. Rotary Piston Motor Driven 2,5 M3 / Min 2 Hitachi, 5,5P-14T, 7 kgf/Cm2, 5 Kw, 380 Volt

IV. WELDING

A. S.M.A.W

A. 1. Power Sources Multi Operator 2400 Ampers 1 Esab LCF - 2400, 164 Kw, 248 Amp, 380 Volt.
A. 1.1 Welding Regulator 500 Ampers 24 Esab. RC - 500, DC

A. 2. Power Sources Multi Operator 1200 Ampers 2 Esab LCF - 1200, 88 Kw, 133 Amp, 380 Volt.
A. 2.1 Welding Regulator 500 Ampers 43 Esab. RC - 500, DC

A. 3. Power Sources Multi Operator 1500 Ampers 2 Miller GPS - 1500, 133 Kw, 200 Amp, 380 Volt.
A. 3.1 Welding Regulator 400 Ampers 13 Miller MOG - 400, DC
A. 3.2 Welding Regulator (350 x 2 ) Ampers 10 Miller MOG - (350 x 2), DC

A. 4. Power Sources Multi Operator 1600 Ampers 1 Miller Mark-VIII-2, 55 Kw, 100 Amp, 380 Volt.
A. 4.1 Welding Regulator 200 Ampers 8 Miller MOG - 200, DC

A. 5. Welding Transformer 300 Ampers 14 Nasional Welding Travo, AW - 300, 20 Kw,31A,380V

B. S.A.W

B. 1. Automatic Welding Head Solid Wire 2,4 - 4,8 mm 3 Ebenezer EM-GW-011, NA-5.
B. 1.1 Power Sources 1000 Ampers 3 Lincoln. AL.2006.1. Ideal ARC DC-1000

B. 2. Automatic Welding Head Solid Wire 2,4 - 4,8 mm 1 Lincoln, NA - 5, Romar


B. 2.1 Power Sources 1000 Ampers 1 Lincoln. AL.2006.1. Ideal ARC DC-1000

B. 3. Automatic Welding Tractor Complete Solid Wire 2,4 - 4,8 mm 4 Lincoln LT-7 Tractor
B. 3.1 Power Sources 600 Ampers 4 Lincoln. AL.2006.1. Ideal ARC DC-600
B. 3.2. Welding Rotators ( Drive ) 60 Ton 2 Ebenezer, RB - 60, 25 Ampers, 380 Volt.
B. 3.3. Welding Rotators ( Idler ) 30 Ton 6 Ebenezer, RB - 30
Image of Equipment

Overhead Crane Hydraulic Press


Image of Equipment

Bending Machine Shear Machine


Image of Equipment

Rolling Machine Air Compressor


Image of Equipment

Milling Machine Drilling Machine


Image of Equipment

Punch Machine Hydraulic Jack


Image of Equipment

SAW Welding Machine SMAW Welding Machine


Experience List
Summary Experience List
No. Client Main Contractor Description

1 PT. Polychem Lindo PT. Satyamitra Surya Perkasa Fabrication and Erection 18 units Tank (2003)

2 Pertamina UPMS III Truba Jurong – Indokomas Fabrication and Erection 11 units Tank (2003)
Truba Jurong – Mitsubishi
3 PLN Erection 7 units Tank (2004)
Heavy Industry
4 ConocoPhillips PT. Thiess Indonesia Erection 3 Units Tank (2005)

5 Pearl Oil Ltd. PT Kelsri Fabrication and Erection 5 units Tank (2005)

6 PT. Indo Raya Kimia PT. Shinnetsko Prima Fabrication and Erection 1 unit CS2 Tank (2005)

7 PT. Indo Bharat Rayon PT. Shinnetsko Prima Fabrication and Erection 31 units Spinning Line 5 Tank (2006)

8 Petrochina Int. Ltd. PT. Gatra Kilang Persada Repair 1 unit Tank cap. 20.000 BBL (2006)

9 PT. Indo Bharat Rayon PT. Shinnetsko Prima Fabrication and Erection 11 units Spinning Line 6 Tank (2007)

10 PT. AKR Corporindo Tbk. PT. Shinnetsko Prima Fabrication and Erection 3 units Tank – Belawan (2007)

11 PT. AKR Corporindo Tbk. PT. Shinnetsko Prima Fabrication and Erection 8 units Tank – Stagen (2007)

12 Oiltanking PT. Rotary Eng. Indonesia Fabrication and Erection 21 units Tank (2008)
Summary Experience List
No. Client Main Contractor Description

13 BHP Billiton PT. Thiess Indonesia Fabrication and Erection 2 units Tank (2008)

14 Linc Terminal PT. Satyamitra Surya Perkasa Fabrication and Erection 10 units Tank (2009)

15 Pertamina DPPU PT. Wijaya Karya Tbk. Fabrication and Erection 3 units Tank (2009)

16 PT. Indo Bharat Rayon PT. Shinnetsko Prima Fabrication and Erection WSA Plant and Chimney (2009)

17 Balmer Lawrie Indonesia PT. Shinnetsko Prima Fabrication and Erection 14 units Tank (2010)

18 Pertamina Depot LPG PT. Wijaya Karya Tbk. Erection 2 units Tank (2011)

19 PT. Berau Coal PT. Shinnetsko Prima Fabrication and Erection 2 units Tank (2011)

20 ConocoPhillips PT. Wijaya Karya Tbk. Erection 3 units Tank (2012)

Fabrication and Erection 2 unit Spinning Line 7 Maturing Drum


21 PT. Indo Bharat Rayon PT. Shinnetsko Prima
(2012)
Fabrication and Erection Steel Structure and 2 units Overhead
22 Bali Fiberglass PT. Shinnetsko Prima
Crane cap. 4 x 7.5 Tons (2013)
Summary Experience List
No. Client Main Contractor Description

23 PT. Pupuk Sriwijaya PT. Satyamitra Surya Perkasa Fabrication and Erection 4 units Tank (2014)

24 BP Tangguh LNG PT. Wijaya Karya Tbk. Erection 2 units Tank (2014)

25 Black and Veatch PT. Satyamitra Surya Perkasa Fabrication and Erection Steel Structure – PLN Lontar (2016)

26 Bosowa Corporation PT. Satyamitra Surya Perkasa Fabrication and Erection Chimney (2016)
Project Image

PT. Pertamina (persero)


Pertamina Depot BBM, Cikampek – West Java
• 3 Units Tank Capacity 11.500 KL, Ø 36.000 x 10.500 mm
• 3 Units Tank Capacity 10.000 KL, Ø 35.000 x 10.500 mm
• 3 Units Tank Capacity 5.000 KL, Ø 25.000 x 10.500 mm
• 2 Units Tank Capacity 500 KL, Ø 10.000 x 7.200 mm
Project Image

PT. AKR Corporindo Tbk.


Terminal Stagen, South Kalimantan
• 8 Units Tank Capacity 5.000 KL,
Ø23.200 x 12.300 mm
Project Image

PT. PLN (persero)


PLTU I West Java – Indramayu (3 x 300 MW) Power Plant
• 1 Unit Chimney, Ø 8.500 x 215.000 mm
Project Image

PT. OilTanking Merak


Tank Terminal and Jetty Topside, Merak – Banten
• 5 Units Dome Roof Tank Cap. 22.300 KL, Ø 40.000 x 17.800 mm. • 3 Units External Floating Roof Tank Cap. 20.000 KL, Ø 38.000 x
• 4 Units External Floating Roof Tank Cap. 12.500 KL, Ø 30.000 x 17.800 mm.
17.800 mm. • 2 Units External Floating Roof Tank Cap. 7.000 KL, Ø 23.000 x
• 7 Units Dome Roof Tank with Internal Floating Cap. 7.400 KL, Ø 7.000 mm.
23.000 x 17.800 mm.
Project Image

Steel Structure and Overhead Crane Cap. 4 x 7.5 Tons


Project Image

PT. Indo Bharat Rayon


WSA Plant, Purwakarta – West Java
• WSA Condenser
• SO2 Converter
• Combustion Chamber
• Hot Air Ducting
• Chimney
Project Image

British Petroleum Ltd. Tangguh LNG ‐ West


Papua.
New Condensate and Diesel Tank (NCDT)
• 1 Unit Diesel Tank Cap. 2.800 KL, Ø 18.000
x 11.000 mm.
• 1 Unit Condensate Tank Cap. 22.000 KL, Ø
40.000 x 18.000 mm.
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


Storage Tank and Piping

1 Oil Terminal Rantau - Aceh Pertamina E.P.I PT. Biro Asri Erection of 1 unit 25.000 kl Floating Roof Tank 1969

2 Expansion Depot Pertamina - Semarang Pertamina PDN III Santafe Poneroy & PT. Biro Asri Erection of 4 units 4000 kl Cone Roof Tank 1970
Installation : piping around the tank yard
pump house, filling set
1 line offshore & on shore pipe line dia.18

3 Putri Tujuh Refinery Oil - Dumai Pertamina UP II Taisei International C.O. + PT. Biro Asri 1 unit 40.000 kl Cone Roof Tank 1971
1 unit 25.000 kl Cone Roof Tank
1 unit 10.000 kl Cone Roof Tank
1 unit 10.000 kl Floating Roof Tank

4 Jati Barang Oil - Cirebon Pertamina EP III Niigata Eng.Corp. + PT. Biro Asri Block Station A: 1973
4 unit 2000 kl Cone Roof Tank
1 unit 300 kl Cone Roof Tank
1 unit 500 kl Cone Roof Tank
Block Statiun B :
4 unit 2000 kl Cone Roof Tank
1 unit 300 kl Cone Roof Tank
Terminal Balongan :
1 unit 68.500 kl Cone Roof Tank

5 Putri Tujuh Refinery Oil - Dumai Pertamina UP II Taisei International C.O. + PT. Biro Asri 1 unit 40.000 kl Cone Roof Tank 1973

6 Depot Pertamina Labuan - Medan Pertamina Labuan Santafe Poneroy & PT. Biro Asri ± 20 km On shore & off shore piping dia. 20",8",6" 1974

7 Expansion Pipe line R/Panjang - Aceh Pertamina EP I PT. Karya Pelita ± 260 tons terminal piping 1975

8 Depot Oil Expansion - Padang Pertamina PDN II PT. Biro Asri Fabrication & erection of 1 unit 4200 kl Cone Roof Tank 1975
and installation the new pipe line inside in Depot

9 Cimalaya Gas Pipe Line - Cilegon Pertamina EP III Nippon Steel + PT. Biro Asri Installation of ± 75 km pipe line dia.24" 1975
Booster Station No. 1, ± 1300 tons installation of piping to
station 1976

10 Expansion Depot Pertamina Koja - Jakarta Pertamina PDN III PT. Sinar Mutiara 1 unit 11.500 kl Dome Roof Tank + Piping 1976

11 Expansion Depot Pertamina - Semarang Pertamina PDN PT. Sinar Mutiara 1 unit 11.500 kl Cone Roof Tank + Piping 1976

12 Expansion Depot Baru Pertamina - Pertamina PDN PT. Sinar Mutiara 3 units 500 kl Cone Roof Tank 1977
Sungai Siak, Pekan Baru 4 unit 1200 kl Cone Roof Tank
2 unit 1500 kl Cone Roof Tank
Installation :
Piping at Yatty Site (Y.S.), at Filling Set (F.S), at Pump House (P,H)

Page 1 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


at Tank Yard (T.Y.), Pipe Line T.Y to P.H from Y.S to F.S
± 10 km fire line around the project

13 Expansion Depot Pertamina - Solo Pertamina PDN PT. Sinar Mutiara 4 units 500 kl Cone Roof Tank 1977

14 Expansion Depot Pertamina - Semarang Pertamina PDN PT. Sinar Mutiara 1 unit 11.500 kl Cone Roof Tank 1978

15 Cone Roof Tank - Palembang PLTU Palembang Buana Power Enterprise 1 unit 2.250 kl Cone Roof Tank + Piping 1978

16 Expansion Depot Pertamina Plumpang - Pertamina PDN PT. Sinar Mutiara 1 unit 11.500 kl Cone Roof Tank + Piping 1979
Jakarta

17 Expansion Depot Pertamina Panjang - Pertamina PDN PT. Sinar Mutiara 1 unit 3.500 kl Cone Roof Tank 1980
Lampung

18 Expansion Oil Food Factory - Bekasi PT. Bina Karya Prima CV. Shinko Prima Engineering 1 unit 2.000 kl tank + piping 1980

19 Accumulation Tank - Tanjung Priok PT. Unilever Indonesia PT. Wasa Mitra Engineering 2 units 2.000 kl tank 1980
2 units 190 kl tank + piping

20 Expansion Depot Pertamina Rewulu - Pertamina PDN PT. Sinar Mutiara Indah 1 unit 10.000 kl tank + piping 1982
Jogjakarta

21 Expansion Depot Pertamina Tasikmalaya - Pertamina PDN PT. Sinar Mutiara Indah 1 unit 4.200 kl tank + piping 1982
West Java

22 Accumulation Tank for Chemical factory - PT. Sumi Asih CV. Shinko Prima Engineering 20 units 2.000 kl tank + piping 1982
Tambun

23 Expansion Depot Pertamina Pontianak - Pertamina PDN PT. Sinar Mutiara Indah 2 units 4.200 kl tank, removal of 1 unit 500 kl tank 1983
West Kalimantan

24 New Depot Pertamina Toli-Toli - Sulawesi Pertamina PDN PT. Hutama Karya 1 unit Cone Roof Tank Cap. 1.500 kl 1983

25 Expansion Depot Pertamina - Pontianak Pertamina PDN PT. Trimarco Salop 1 unit Cone Roof Tank Cap. 4.200 kl 1983

26 Additional of tank Pertamina Sei Pakning - Riau Pertamina UP II PT. Ribison 1 unit Cone Roof Tank Cap. 150 kl 1984

27 Expansion of Glycerin factory - Tambun PT. Sumi Asih CV. Shinko Prima Engineering 2 units Cone Roof Tank Cap. 2.000 kl 1984

28 Expansion Depot Pertamina Pelumpang - Pertamina PDN PT. Trimarco Salop 1 unit Cone Roof Tank Cap. 22.500 kl 1984
Jakarta

29 Oil Plant Pertamina Cilacap - Centre Java Pertamina PDN PT. Jaya Gas 3 units Vertical Tank 200 kl 1984
3 units Vertical Tank 100 kl
2 units Hydrofor Tank 30 kl

Page 2 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


3 units Hydrofor Tank 20 kl
2 units Hydrofor Tank 15 kl
1 unit Hydrofor Tank 60 kl

30 New Depot Pertamina Ujung Berung - Bandung Pertamina PDN PT. Sinar Mutiara Indah 2 units Cone Roof Tank Cap. 11.500 kl 1985

31 Expansion Depot Pertamina - Jogjakarta Pertamina PDN PT. Sinar Mutiara Indah 2 units Cone Roof Tank Cap. 11.500 kl 1985

32 New Depot Pertamina Kertapati - Pertamina PDN PT. Mulia Andhika Jaya 2 units Cone Roof Tank Cap. 11.500 kl 1985
South Sumatera

33 Chemical Storage Terminal - Merak PT. Redeco Petrolin Utama PT. Berca Indonesia 4 units Cone Roof Tank 2.500 kl 1985
7 units Cone Roof Tank 1.500 kl
1 unit Cone Roof Tank 1.000 kl

34 Expansion Depot Pertamina - Tasikmalaya Pertamina PDN PT. Sinar Mutiara Indah 1 unit Cone Roof Tank Cap. 9.600 kl 1985

35 Expansion of Accumulation capacity The Deli Tank PT. Manggala Galatta Consortium 2 units Cone Roof Tank Cap. 5.000 ton 1986
Palm Oil Mill

36 Export facility for Molasses Tank - K.A.H PTP. Gula PT. Alsthomindo-PT. Galatta Guna 2 units Molasses Tank Cap. 10.000 kl 1988
Tanjung Mas Harbour, Semarang

37 Food Oil Factory - Bekasi PT. Bina Karya Prima CV. Shinko Prima Engineering 1 unit Vertical Tank Cap 2000 kl. 1989

38 Indoprin project - Merak PT. Indoprin PT. Satyamitra Surya Perkasa Fabrication & erection of Various Vertical Tanks : 1989
5 units Caustic Soda Storage Tank dia.14,5 M' x 9,14 M'
2 units Sodium Hypo Chlorites Storage Tank dia.9,14 M' x 5,8 M'
1 unit Pure Bride Storage Tank dia.10,67 M x 9,14 M'
2 units Dry Chlorine Filter Tank
2 units Fresh H2SO4 Storage Tank
2 units Spent H2SO4 Storage Tank

39 Chemical factory - Cikupa PT.Eterna Buana CV. Shinko Prima Engineering 1 unit dia.13,503 x 9,144 M' tank Cap 1000 ton. 1990
Chemical Industries 3 units dia.9,15 x 9,145 M' tank Cap 500 ton.

40 Gula Putih Mataram - Bandar Lampung PT.Gula Putih Mataram PT. Alsthomindo 2 units 5000 M3 Molasses Tank 1990

41 Indoprin project - Merak PT.Indoprin PT. Alsthomindo 2 units 7000 M3 Tank 1990

42 Cheil Samsung Astra - Pasuruan PT.Cheil Samsung Astra PT. Summa Surya Perkasa Erection of Various Tank : 1990
3 units Sand Filter FA 3420 A/B/C
1 unit FA 3281 DW Storage Tank
1 unit Chemical Settling Tank FD 3516
1 unit Cake Hopper Tank FD 5116

Page 3 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


1 unit Diesel Dry Tank FA 3102
1 unit BFW Tank FA 3103
1 unit Circulation Water tank FA 3101

43 PN Pertamina - Cilacap Pertamina Cilacap Konsorsium Dubreco 2 units Storage Tank 22.000 kl Dia. 43.000 x H. 14.710 mm 1990

44 Proyeck Induk Pembangkit Thermal Jawa Timur PLN - PLTU Paiton CV. Shinko Prima Engineering 1 unit Fuel Oil Storage Tank 7.700 kl 1991
1 unit Fuel Oil Day Tank 330 kl
2 units Demin Water Storage Tank A/B 1.800 kl
1 unit Chemical Waste Neutralizing Tank 1.080 kl
2 units Condensate Storage Tank A/B 725 kl

45 PLTU Suralaya - West Java PLN Jawa Barat PT. Summa Surya Perkasa Tank Cap. 5.000 kl Dia. 22.500 x H. 14.632 1991

46 Statomer project Statomer project PT. Summa Surya Perkasa 27 units Processing Tank 1991

47 Depot Pertamina Meneng - East Java PT.Pertamina PT. Wijaya Pura 1 unit 5000 kl tank dia.24,384 x 10,974 M' 1991

48 PLTU Suralaya PLN PT. Summa Surya Perkasa 1 unit 5000 kl tank dia. 22,5 x 14,632 M' 1992

49 Diesel Power Plant - Silae, Palu PLTD Silae New Sulzer Diesel France S.A 1 unit Fuel Tank Cap 500 ton. 1992

50 Belawan Combined Cycle Power Plant- PLTU Belawan PT. Catur Insan Pertiwi 1 unit Fuel Oil Tank Cap 12.500 M3. 1992
North Sumatera

51 Jambi Power Station Extention PLTD Jambi Mirrlees Blackstone (Stocport) Limited 9 units Storage tank 1992

52 Maos project Maos Project PT. Sinar Mutiara Indah 1 unit Vertical Tank Cap 11.500 kl. 1992

53 LOMC Tank - Cilacap PT.Pertamina UP.IV Cilacap CV. Shinko Prima Engineering 1unit Floating LOMC Tank Cap 23000 kl 1993
2 units transfer pump c - w the equipment

54 Overhaul Tank - Balikpapan PT.Pertamina UP.V CV. Puspita 1 unit Overhaul tank A-18 1993
Balikpapan

55 Water Tank - Balikpapan PT.Pertamina UP.V CV. Puspita 1 unit 318 M3 Water Tank 1993
Balikpapan

56 Zamrud New Water Treating Plant - PT.Caltex Pacifix Indonesia PT. Sumber Tjipta Djaya 1 lot (3 units) tank + shelter and accessories 1993
Rumbai, Pakanbaru

57 T-900/Balikpapan PT.Pertamina UP.V PT. Shinnetsko Prima 1 unit Crude Oil Tank Cap 15.000 M3. 1994
Balikpapan

58 Plasticizer Plant - Balaraja PT.Anugerah inti PT. Sempec Indonesia Supply and construction of : 1995
Deltapersada 1 unit 2000 MTon Octanol Tank
1 unit 2000 MTon Dop Tank

Page 4 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


1 unit 300 MTon Paraxy Lene Tank
2 units 500 MTon Solvent Tank
1 unit 50 MTon Diesel Fuel Oil Tank
1 unit 500 MTon DOP Tank

59 Floating Roof Tank - Merak PT.Styrene Mono Indonesia PT. Satyamitra Surya Perkasa 1 unit Vertical Tank Cap 5000 M3 + internal Floating 1995

60 Food Oil Factory - Pondok Ungu - Bekasi PT.Darmex Oil & Fat PT. Shinnetsko Prima 22 units Food Oil Storage Tank 1995

61 Butyl Acetate Plant - Merak PT.Buana Salvindo PT. Sempec Indonesia 9 units Chemical Storage Tank 1996

62 PLN Bintan - Tanjung Pinang PLTD Air raja-Tanjung Pinang PT. Poeser Indonesia 1 unit HSD Storage Tank 1996
1500 m3 and small tanks

63 Fully Refined Wax Plant - Balikpapan PT.Pertamina Balikpapan PT. Soegih Interjaya 9 units Storage Tank 1997

64 SUS Tank - Merak PT.Tri Polyta Indonesia PT. Satyamitra Surya Perkasa 4 units SUS-304 Tank 1997

65 SMI 2 - Merak PT.Styrene Mono Indonesia PT. Satyamitra Surya Perkasa Fabrication & erection of 4 units Internal Floating Tank, 1997
Cap 6000 kl.dia. 20,270 20,110 mm H. (jack up system)

66 PT. Sibelco Lautan Mineral (SLM) - Cikarang PT.Sibelco Lautan Mineral PT. Sempec Indonesia 4 units Tank (Surge Tank,Air Reciver Tank,Gas Oil Storage 1997
Gas Oil Day Tank )

67 Crude Oil Storage Tank - Sungai Angit - PT.Pertamina - Palembang PT. Babat Kukui Energi 5 units Crude Oil Storage Tank, Foundation and Fire wall 1998
Palembang

68 71 T-61 PT.Pertamina RU-IV Cilacap CV. Singgalang Improvement of roof plate of Crude Oil Storage Tank 1999

69 Construction of Crude Oil Tank - EOR JOB Pertamina Suryaraya PT. Shinnetsko Prima 4 units Crude Oil Storage Tank 1999
Benakat, Pendopo Teladan (2000 BBL, 1000 BBL and 500 BBL cap.)

70 PT. Indochemical -Cikande PT.Indo Chemical PT. Satyamitra Surya Perkasa 10 units MS 2000
Storage Tank 300 m3 cap. ID.dia. 7,720 x 7,300 mm

71 Sagging (Jack-up tank) - Balongan PT.Pertamina UP.VI PT. Lauser Pratama Eng. Improvement of Tank foundation 42-T-303 A , 19.500 m3 2000
Balongan cap. dia. 44,100 mm x 14,700 mmH.

72 Soap Plant - Bekasi PT.Bina Karya Prima PT. Shinnetsko Prima Fabrication & erection of : 2001
- 1 unit Platfrom tank
- 6 units Vessel tank
- 2 units Concrete tank
Renovation of 1 unit soap building

73 Storage Tank - Bekasi PT.Bina Karya Prima PT. Shinnetsko Prima 2 units Storage Tank Cap. 3.000 Kl, Dia. 15.440 x H. 18.250 2001
Include foundation work

Page 5 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


74 Gas Utilization Air Serdang - Prabumulih PT.Pertamina D.O Hulu PT. Bhumi Arthaprima Cemerlang-PT. Titis 1 unit Slug Catcher 2001
Prabumulih Sampurna

75 Gas Utilization Air Serdang - Prabumulih PT.Pertamina D.O Hulu PT. Titis Sampurna 3 units Oily Water Tank 2001
Prabumulih 500 BBL dia. 15' - 6' x 16" + instrument

76 Gas Utilization Air Serdang - Prabumulih PT.Pertamina D.O Hulu PT. Titis Sampurna 1 unit Condensate Storage 2001
Prabumulih Tank Cap 3000 BBL ID.dia.9660 mm x 7000 mmH.

77 Gas Utilization Air Serdang - Prabumulih PT.Pertamina D.O Hulu PT. Titis Sampurna 3 units LPG Storage Tanks 2001
Prabumulih ID.dia. 3600 x 32.87m

78 Sagging (jack up) - Balongan PT.Pertamina UPPDN III PT. Shinnetsko Prima Repair of bottom plate tank Cap 68500 kl dia. 94,690 mm 2001

79 Sagging (jack up) - Cilamaya Pertamina DOH Jawa Barat CV. Putri Mandiri Repair of 1 unit Bottom Plate of Test Tank (T-02) 2002
300 BBL cap.

80 Storage Tank - Cikande PT. Indochemical PT. Satyamitra Surya Perkasa 3 units Storage Tank Cap 500 M3 2002

81 Storage Tank - Cikupa PT. Indochemical PT. Satyamitra Surya Perkasa 12 units Storage Tank Cap 110 M3 2003

82 Chemical Tank - Merak PT. Polychem Lindo PT. Satyamitra Surya Perkasa Fabrication & erection of 18 unit Storage Tank : 2003
- 1 unit Carbon Steel 5000 kl ID.dia.19.280 x 18.250 mm
- 3 units Carbon Steel 2000 kl ID.dia.14.467 x 12.775 mm
- 2 units Carbon Steel 1500 kl ID.dia.12.545 x 12.775 mm
- 2 units Carbon Steel 1000 kl ID.dia.10.615 x 12.775 mm
- 2 units Carbon Steel 750 kl ID.dia.10.615 x 9.125 mm
- 2 units Carbon Steel 500 kl ID.dia.8.685 x 9.125 mm
- 1 unit Carbon Steel 300 kl ID.dia.7.720 x 7.300 mm
- 1 unit Carbon Steel 8 kl ID.dia.1.800 x 3.300 mm
- 1 unit SUS-304 1500 kl ID.dia.12.545 x 12.775 mm
- 2 units SUS-304 750 kl ID.dia.10.615 x 9.125 mm
- 1 unit Carbon Steel 5 kl dia.1400 x 3.200 mm

83 Fuel Oil Storage Tank - Cikampek PT.Pertamina UPMS III Kerjasama Truba Jurong-Indokomas Buana Fabrication & erection of 11 unit Storage Tank : 2003
Perkasa - 3 units Premium Tank cap. 10.000 kl dia.34.140 x 10.974
- 3 units Kerosene Tank cap. 5.000 kl dia.24.380 x 10.974
- 3 units Solar Tank cap. 11.500 kl dia.36.570 x 11.974
- 1 unit Inter Face Solar/Kerosene Tank cap. 500 kl
dia.9140 x 7750
- 1 unit Inter Face Premium/Kerosene Tank cap. 500 kl
dia.9140 x 7750

84 Separator - SPG. Subang Pertamina DOH Jawa Barat CV. Zyainur Yathi 1 (one) unit LP Test Separator 2003
and 1 (one) unit 50 M3 Test Tank c/w the accessories

85 WIPT - Pertamina DOH Jabar - Tambun, Pertamina DOH Jawa Barat PT. Citra Panji Manunggal 2 units Water Tank Cone Roof type - 1500 barrels 2003

Page 6 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


Bekasi

86 Tank Expantion step II, chemistry PT.Bumi Merak Terminalindo PT. Orient Technical Centre in corporation with Fabrication and erection of Solvent Tank & Over Bridge 2003
liquid terminal - Banten PT. Jagat Baja Prima Utama

87 740 MW Cilegon Combined Cycle Mitsubishi Heavy Industry PT. Truba Jurong Engineering Erection work for 7 (seven) units Storage Tank 2004
Power Plant - Cilegon - DO Tank 40,720 x 13,750 mm (T-01)
- FO Receiver Tank 7,750 x 7,660 mm (T-02)
- Raw Water Tank 25,210 x 12,800 mm (T-03)
- FW Tank no.1 - 15,500 x 11,000 mm (T-04A)
- FW Tank no. 2 - 15,500 x 11,000 mm (T-04B)
- Make Up Water Tank 14,710 x 16,460 mm (T-05)
- Condensate Tank 5,730 x 9,175 mm (T-06)

88 Cone Roof Storage Tank - Pulogadung PT.Panca Nabati Prakasa PT. Shinnetsko Prima 1 unit Storage Tank Cap 4.250 2004

89 Storage Tank - Jababeka PT.Tiga Sekawan Perkasa PT. Shinnetsko Prima Fabrication and erecton of 8 units Storage Tank 2004
- 5 (five) units Vertical Tank 60 M3 dia.3380 x 6700
- 3 (three) units Vertical Tank 170 M3 dia. 5780 x 6700

90 Suban Phase 2 Gas Project - Suban Conoco Philips PT. Thiess Contractors Indonesia Field Erection of 3 (three) units Welded Storage Tanks 2005
- Condensate Storage Tank 30000 BBL dia.27.6 m x 9.1 mH
- Produced Water Tank 5549 BBL dia.9.8 m x 11.8 mH
- Lean Amine Surge Tank 1940 BBL dia.6.7 m x 9.1 mH

91 Mengoepeh Oil Field Development - Pearl Oil Ltd. PT. Kelsri Fabrication and erection of 5 (five) units Storage Tanks 2005
Tungkal, Jambi - 1 (one) unit Water Tank 480 M3 dia.9000 x 7500 mm
- 2 (two) units Blend Oil Tank 80 M3 dia.12000 x 10000 mm
- 2 (two) units Export Oil Tank 1200 M3 dia.14000 x 10000 mm

92 IKPT Package II & III - Pertamina PT.IKPT PT. Timas Suplindo 4 (four) units tank work package II (Benuang) and 2005
Sumbagsel 11 units package III (Merbau & Pagar Dewa)

93 CS2 Storage Tank/PT. IRK Plant Site - PT. Indo Raya Kimia PT. Shinnetsko Prima CS2 (Carbon Disulphide) Storage 2005
Cikampek Tank Cap 1882 M3 ID.dia.13.500 x 12.300 mmH & Containment
Wall ID.dia.19.500 x 6.800 mmH, piping work and structure

94 Equipment for Spinning Line-5 - Purwakarta PT.Indo-Bharat Rayon PT. Shinnetsko Prima 31 units MS and M.S. with S.S. 2006
Cladding Vessel and Various Tank

95 Peningkatan Kehandalan SWS Unit 24 - PT.Pertamina UP.VI PT. Jasa Kita Bersama 1 unit tank Cap.2400 M3 Tank no.24-T-102 2006
Kilang PT. Pertamina UP.VI Balongan Balongan

96 CPO Storage Tank/Pulo Gadung,Jakarta PT. Panca Nabati Prakarsa PT. Shinnetsko Prima 1 unit CPO Storage Tank Cap 4200 kl 2006

97 Repair Storage Tank D-101-5 Petrochina Int'l Ltd. PT. Gatra Kilang Persada Repair Service 1 (one) unit Storage Tank 20.000 BBL 2006
Kasim Marine Terminal, Sorong - Papua dia.18288 x 12194 mm

Page 7 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR

98 Expantion step III PT. Bumimerak Terminalindo PT. Shinnetsko Prima Erection work 4 units tanks, mechanical & piping work, 2007
PT. Bumimerak Terminalindo - Merak electrical & civil work.
- 3 units cap. 800 M3 dia. 7,7 x 18 M
- 1 unit cap. 600 M3 dia. 6 x 18 M

99 Spinning Line 6 - Purwakarta PT. Indo-Bharat Rayon PT. Shinnetsko Prima Fabrication & erection of 11 units MS Tank 2007
- 4 units Plof tank cap. 30 M3
- 4 units Setler Tank cap. 96 M3
- 1 unit Spinning Tank cap. 50 M3
- 2 units Maturing Drum 22 M L x ID.2.743M

100 Storage Tank - Merak PT. Indochemical Citra Kimia PT. Satyamitra Surya Perkasa 3 units Storage Tank 2007

101 Storage Tank & Piping PT. AKR Corporindo Tbk. PT. Shinnetsko Prima Fabrication & erection, piping of 3 units Storage Tank : 2007
Terminal Anggada, Belawan-Medan - 1 unit Storage Tank 3500 kl dia.19300 mm x 12.490 mm
- 1 unit Storage Tank 1500 kl dia.13.520 mm x 12.275 mm
- 1 unit Storage Tank 1000 kl dia.11.590 mm x 10.751 mm

102 Storage Tank & Piping PT. AKR Corporindo Tbk. PT. Shinnetsko Prima 8 (eight) units Storage Tank Cap 5000 Kl 2007
Pelabuhan Stagen - Kota Baru -
South Kalimantan

103 Tank Farm 2 - Merak PT. Oiltanking Merak Rotary Engineering Indonesia-PT. Satyamitra Fabrication & erection 7 units Floating Storage Tank : 2008
Surya Perkasa - 3 units (T201/202/203) : ID.dia.38.000 mm x 17.800 mm
Floating Roof Tank 19.000 M3
- 2 units (T204 & T205) : ID.dia.23.000 mm x 17.000 mm
Floating Roof Tank 6.700 M3
- 2 units (T206 & T207) : ID.dia.23.000 mm x 17.800 mm
Dome Roof Internal Floating Tank 7.000 M3

104 Tank Farm 3 - Merak PT. Oiltanking Merak Rotary Engineering Indonesia-PT. Satyamitra Fabrication & erection 5 units Storage Tank 2008
Surya Perkasa T301/302/303/304/305 : ID. dia. 40.000 mm x 17.800 mm
Dome Roof Tank 21.200 M3 (jack-up system)

105 Tank Farm 1 - Merak PT. Oiltanking Merak Rotary Engineering Indonesia-PT. Satyamitra Fabrication 9 units Floating Storage Tank 2008
Surya Perkasa - 4 units (T101 ~ T104) : ID.dia. 30.000 mm 17.800 mm
Floating Roof Tank 12.000 M3
- 5 units (T105 ~ T109): ID.dia.23.000 mm x 17.800 mm
Dome Roof Internal Floating 7.000 M3

106 Tabang WHE Coal Upgrade - Balikpapan PT. Thiess Contractor PT. Shinnetsko Prima 2 Units Atmospheric Water Storage Tank Cap 500 M3 2008
Indonesia

107 External Service-WSA Plant Project - PT. Indo Bharat Rayon PT. Shinnetsko Prima 6 units Process Tank & Equipment and 1 Unit Chimney 2009
Purwakarta

Page 8 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR

108 Polychem - Merak PT. Polychemlindo PT. Satyamitra Surya Perkasa 1 (one) unit Solvent Storage Tank 2009
cap. 6000 kl dia.21,236 x 18,245 M

109 Gresik Upgrade - Gresik BOC Gases PT. Satyamitra Surya Perkasa Fabrication 1 unit Liquide Nitrogen Storage Tank 2009
Cap.2000 M3 Dome Roof Frame
Inner Tank ID.13.5 M x 14.283 M
Outer Tank ID.15.7 M x 17.058 M

110 Polychem - Merak PT. Polychemlindo PT. Satyamitra Surya Perkasa 1 (one) unit Solvent Storage Tank Cap 6000 Kl 2009

111 EPC Steel Tanks for 20 MW Diesel PT. Central Daya Energi PT. Shinnetsko Prima Fabrication & Erection 7 Units Storage Tank & 2 Units Vessel 2009
Generator Rental - Balikpapan - 2 unit Storage Tank @ 1200 kl
- 1 unit MFO Buffer Tank 60 kl
- 1 unit MFO Day Tank 60 kl
- 1 unit HSD Day Tank 20 kl
- 1 unit Oil Water tank 5 kl
- 1 unit Concreted Sludge Tank 5 kl
- 1 unit Air Receiver 3 M3 P = 30 Bar
- 1 unit Air Receiver 500 ltr P = 8 Bar

112 Repair Tank - Pertamina RU-VI Balongan PT Pertamina (Persero) RU-VI PT. Shinnetsko Prima Repair of 1 unit Naptha Tank 42-T-107A cap.44000 M3 2009
ID. 68600 mm x 15500 mmH. (jack-up system)

113 LINC Terminal Phase 3 - Ciwandan LINC PT. Satyamitra Surya Perkasa Fabrication & erection of 10 units Storage Tank : 2009
- 3 units HSD/MFO Tank 12.000 kl ID.28 M x 20 M
- 2 units HSD Tank 5.000 kl ID.18 M x 20 M (jack-up system)
- 4 units HSD Tank 2.000 kl ID. 12 M x 18 M (jack-up system)
- 1 unit Fire Water Tank 2.600 kl ID.14 M x 20 M (jack-up system)

114 Storage Tank/DPPU Bandara Pertamina UPMS III PT. Wijaya Karya 3 units Dome Roof Tank Cap 12.000 kl 2009
Soekarno Hatta

115 Solar Tank - Samarinda PT. Mahakam Sumber Jaya PT. Shinnetsko Prima 1 unit Solar Tank cap. 200 kl 2010

116 TBT Project - Merak PT. Indochemical Citra Kimia PT. Satyamitra Surya Perkasa 3 units Solvent Storage Tank Cap 2500 Kl 2010

117 Grease Processing and Lube Oil PT. Imani Ganda Utama PT. Shinnetsko Prima Fabrication & erection of 14 units Petroleum Storage Tank 2010
Blending Plant - Base Oil Tank Farm - (Balmer Lawrie Indonesia) - 1 unit Base Storage Tank T-101 cap. 250 M3
Cikande dia. 6.750 mm x 8.000 mm
- 1 unit Base Storage Tank T-103 cap. 100 M3
dia. 5.000 mm x 6.000 mm
- 3 unit Base Storage Tank T-104, T-105, T-106 cap. 70 M3
dia. 4.250 mm x 6.000 mm
- 1 unit Disolved Polymer Storage Tank T-112 cap. 50 M3
dia. 3.000 mm x 8.000 mm
- 4 unit Other Grade Oil Tank T-121, T-122, T-123, T-124

Page 9 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


cap. 35 kl dia. 2750 mm x 6000 mm
- 1 unit Base Oil Day Tank T-505 cap. 5 M3
dia. 1000 mm x 1800 mm x 3000 mm
- 1 unit Lube Oil Storage Tank ST-504 cap. 5 M3
dia. 1800 mm x 2100 mm
- 1 unit Bitumen Storage Tank TK-601 cap. 35 M3
dia. 2750 mm x 6000 mm
- 1 unit HSD Day Tank TK-804 cap. 20 M3
dia. 2500 mm x 5500 mm

118 Perbaikan Tanki 71T-2 (jack-up system) PT. Pertamina RU-IV Cilacap PT. Shinnetsko Prima jo PT. Virgo Makmur Perbaikan Kerusakan-Kerusakan Pada Tanki 71T-2 2011
- Cilacap Perkasa Di Area 70 PT. Pertamina (Persero) RU-IV Cilacap

119 MKS-EPC For LPG Spherical Tank - Gresik PT. MKS PT. Satyamitra Surya Perkasa Fabrication & Erection of : 2011
- 1 unit Condensate/Propane Storage Tank cap.1000 M3
ID.dia.13.700 x 9.900 mm
- 1 unit Condensate/Propane Storage Tank cap.2000 M3
ID.dia.17.500 x 12.100 mm
- 1 unit Fire Water Storage Tank cap. 3000 M3
ID.dia.15.000 x 18.000 mm

120 Bulk Tank Terminal - Merak PT. Indochemical PT. Satyamitra Surya Perkasa 2 units Solvent Storage Tank Cap 2500 Kl 2011

121 Relokasi Depot LPG Tanjung Priok - Jakarta Pertamina Depot PT. Wijaya Karya (Persero) Tbk. 2 units Cone Roof Tank cap. 7500 kl 2011
LPG Tanjung Priok

122 Pembangunan Tanki BBM - Kalimantan PT. Berau Coal PT. Shinnetsko Prima Pembangunan Tangki BBM Kap. 2 x 20.000 kl 2011
ID.dia.17.470 x 9.125 mm

123 Perbaikan Tanki 71T-12 Pertamina RU-IV Cilacap PT. Shinnetsko Prima Pekerjaan Perbaikan Kerusakan-Kerusakan Pada Tanki 2011
Di Area 70 Pertamina RU-IV - Cilacap 71T-12 dia.84.000 mm x 22.715 mm (Single Floating Roof)

124 Perbaikan Tanki 37T-104 -Cilacap Pertamina RU-IV Cilacap PT. Shinnetsko Prima Pekerjaan Pembersihan, Perbaikan dan Pengecatan 2011
Tanki 37T-104 cap.50.000 M3 ID.dia.57.000 x 20.100 mm

125 Suban Condensate Storage Tank - Suban Conoco Phillips PT. Wijaya Karya Persero (Tbk) Engineering & Erection : 2012
- 2 units Condensate Tank cap. 8500 kl ID.dia.36.881 mm
x 10.058 mm
- 1 Unit Fire Water Tank cap. 950 kl ID.dia.13.716 mm
x 10.973 mm

126 Replacement of Bottom Plate - Gresik PT. PJB Unit Pembangkitan PT. Alan Perkasa Replacement of Bottom Plate Residual Oil Storage Tank 2012
Gresik No. 5 cap. 20.000 kl dia. 37,800 M x 18,300 MH.

127 Spinning Line #7- Purwakarta PT. Indo Bharat Rayon PT. Shinnetsko Prima Fabrication, supply, erection and panting of Maturing Drum 2012
For Spinning Line #7

Page 10 of 12
EXPERIENCE LIST
Storage Tank and Piping

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


128 Storage Tanks - Semarang PT. Adiguna PT. Satyamitra Surya Perkasa 6 units Oil Based Mixing Tank Cap 100 Kl 2013

129 NCDT Project -Papua Barat BP Tangguh LNG PT. Wijaya Karya (Persero) Tbk. Erection 2013
- 1 unit Condensate Storage Tank dia.40,000 mmx18,000 mm
- 1 unit Diesel Oil Storage Tank dia.18,000 mmx10,800 mm

130 Storage Tanks - Palembang PT. Pusri II B PT. Satyamitra Surya Perkasa 4 units Storage Tank 2014
- CS Steam Condensate Tank ID.3100 x H.3700 mm
- SS Urea Solution Tank ID.12.200 x H.11.500 mm
- SS Carbonate Solution Tank ID.11.000 x H.11.000 mm
- SS Process ID.11.000 x H.6500 mm

131 Amec Foster Wheeler-JSP Amec Foster Wheeler P.T. Rotary Engineering Indonesia Fabrication and Erection Storage Tank 2015

132 Storage Tanks - Surabaya PT. Adiguna PT. Satyamitra Surya Perkasa 3 units Storage Tank Cap 200 M3 -Cone Roof Vertical Tank 2016

133 Storage Tanks/MM2 - Cibitung,Bekasi PT. Sugimura PT. Satyamitra Surya Perkasa 2 units Storage Tank Cap 200 M2 - Cone Roof Vertical Tank 2016

134 Blending Oil Storage Tank - Cikande PT. Balmer Lawrie Indonesia PT. Shinnetsko Prima 1 unit Oil Storage Tank Dia. 5.000 x H 8.000 mm Cap. 150 Kl 2017

135 Chemical Storage Tank - Pulo Gadung PT. Mahkota Indonesia PT. Satyamitra Surya Perkasa 1 unit SUS Chemical Tank Dia. 7.700 x H 7.600 mm 2017
1 unit CS Storage Tank Dia. 7.700 x H 7.600 mm

136 Storage Tank - Sidoarjo PT. Adiguna PT. Satyamitra Surya Perkasa 3 unit Storage Tank Dia. 6.000 x H 9.120 mm 2017

137 PLTU Lontar Extention Coal Fire Steam Power PLTU Lontar PT. Satyamitra Surya Perkasa 1 unit Condensate Make Up Tank Dia. 7.988 x 7.500 2018
2 unit Demineralized Water Tank Dia. 12.976 x 13.000
1 unit HSD Daily Oil Tank Dia. 11.784 x 10.600
1 unit HSD Storage Oil Tank Dia. 15.982 x 11.300
1 unit Clean/Dirty Oil Tank W 8.000 x H 4.000
2 unit Row Water Tank Dia. 18.964 x 16.000

138 PLTU Lontar Extention Coal Fire Steam Power PLTU Lontar PT. Satyamitra Surya Perkasa 5 unit coal silo Dia. 10.000 2018

139 Central Java Coal Fire Power Plant PLTU Batang PT. Satyamitra Surya Perkasa 1 unit LFO Storage Tank Dia. 23.140 x 14.820 2018
2 unit SWRO Water Tank Dia. 10.200 x 5.620
2 unit Demineralized Water Tank Dia. 22.200 x 10.320
1 unit BWRO Permeate Tank Dia. 6.130 x 6.620
2 unit Filtered Water Tank Dia. 10.200 x 5.620
2 unit Service and Fire Water Tank Dia. 28.140 x 14.220

140 Pembangunan DPPU Bandara Kertajati PT. Pertmina (Persero) - UPMS PT. Wijaya Karya (Persero) Tbk. 3 unit Jet Fuel Tank Dia. 18.000 x 9.600 2018
Majalengka, Jawa Barat 1 unit Fire Water Tank Dia. 15.000 x 12.000

Page 11 of 12
EXPERIENCE LIST
Pressure Vessel

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


Pressure Vessel
1 Various of Hydrofor tanks - Jakarta Departemen P.U. PT. Techno Prima Prawarsa Engineering Fabrication of Hydrofor tank 1987
- 15 units of 1500 ltr
- 23 units of 3500 ltr
- 17 units of 7000 ltr

2 Multi Media Filter System - Kalimantan Pertamina-Bow Valley (Tanjung) Ltd. HOH System Inc. - PT. Tria Silira Murti 4 units Vertical Filtration Vessel 150" OD x 80"T/T x 3/4" 1993

3 Single Media Filter - Prabumulih Pertamina Husky Limau PT. Murinda Iron Work 2 units Single Media Filter 1993

4 Benfield Accumulator - Dumai Pertamina Dumai PT. Widya Karya 1 unit Benfield Stripper Overhead Accumulator dia. 1,6 x 7,45 1994

5 Tanks & Vessel PLN Ombilin PT. Reka Kurnia Alam 7 units tank and 10 units & Pressure vessel 1994

6 Textile Factory - Purwakarta PT. Indorama Synthetics PT. Shinnetsko Prima Fabrication of 16 units Pressure Vessel 1995
- 1 unit Teg Boil Out Tank to
- 1 unit Vent Collection Tank 1996
- 2 units Instrument Air Receiver
- 1 unit HEM Condensate Tank
- 3 units Compressed Air Receiver
- 1 unit Nitrogen Receiver
- 1 unit Separator
- 1 unit Condensate Tank
- 1 unit Off Gas Scrubber
- 1 unit Hot Condensate Tank
- 1 unit Common Dow Feed Tank
- 1 unit Nitrogen Receiver
- 1 unit Air Receiver Tank

7 Butyl Acetate Plant - Merak PT. Buana Solvindo PT. Sempec Indonesia Construction of 8 units Pressure Vessel 1996
- 1 unit Azeotropic Decanter dia.1300 mm ID x 2200 mm
- 1 unit Reactor dia.1500 mm ID x 3000 mm
- 1 unit Azeotropic Lower Drum dia.600 mm ID x 1000 mm
- 1 unit Azeotropic Upper Drum dia.750 mm ID x 1200 mm
- 1 unit Catalyst Feed Drum dia.400 mm ID x 500 mm
- 1 unit Rectifier Decanter dia.1050 mm ID x 1700 mm
- 1 unit Rectifier Upper Drum dia.650 mm ID x 1000 mm
- 1 unit Steam Condensate Drum dia.1000 mm ID x 1400 mm

8 Liquified Amonia Service - Kalimantan PT. Pupuk Kaltim PT. Pelita Kaltim-PT. Masa Depan Teknik 1 unit Horizontal Vessel dia.1250 ID x 2,550 mm 1996
Rumbai, Pakanbaru

9 LPKO Drum - Jakarta PT. Amoseas Indonesia PT. Shinnetsko Prima 1 unit LPKO Drum V-7903 B dia.458 x 1678 mm 1996

Page 1 of 6
EXPERIENCE LIST
Pressure Vessel

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


10 LPG Tank - Dumai Pertamina Dumai PT. Elnusa Fabrikasi 3 units LPG Tank OD.3600 mm x 1400 mm 1997

11 High Pressure Scrubber Tank - Prabumulih Pertamina OEP Prabumulih PT. Budidaya Mandiri 1 unit Horizontal HP Scrubber Tank & skid 1997
2700 ltr ID.dia.1067 mm x 3048 mm
Design pressure : 1000 psi

12 Casing Separator Vessel - Pekanbaru PT. Caltex Pacific Indonesia PT. Promatcon Tepatguna 2 units Vertical Separator 17' x 23' S/S WT.0.562" 1997
2 units Vertical Separator 18' x 24' S/S WT.0.562"
Design pressure : 60 psi

13 Hot Water Tank - Jakarta PT. Reka Kurnia Alam PT. Shinnetsko Prima 1 unit Hot Water Tank 2500 ltr ID.1200 mm x 1500 mm 2000
1 unit Hot Water Tank 3000 ltr ID.695 mm x 800 mm

14 Pressure Tank - Jakarta PT. Rapi Tirta Treatmindo PT. Shinnetsko Prima - 1 unit Hydrofor Tank dia.1100 mm x 2000 mm 1996
- 2 units Filter Tank dia.1130 mm x 1500 mm
- 2 units Carbon Filter Tank dia.1320 mm x 1800 mm
- 2 units Softener Tank dia. 1265 x 2300 mm

15 Air Receiver Tank Unocal Indonesia Company PT. Promatcon Tepatguna 6 units Air Receiver Tank ID.dia.16" x 840 mm 2001
Working pressure : 150 psig

16 Oven Tank - Jakarta PT. Tjipta Djaya Bone Industry PT. Shinnetsko Prima 2 units Oven Tank dia. 1300 mm x 3000 mm 2001
Design pressure : 150 psi

17 Separator Tank - Sumatera Pertamina Operasi EP Jambi PT. Mahawangsa Jaya Utama 1 unit Two Phase Separator Tank 1100 ltr 2001
ID.dia.711 mm x 2667 mm
Design pressure : 660 psi

18 Filter Tank - Bogor PT. Megasari Makmur PT. Shinnetsko Prima 5 units Filter Tank ID.dia.12" x 1500 mmH. 2001
Design pressure : 140 psi

19 Water Treatment - Jakarta PT. Jaya Geograte Indonesia PT. Shinnetsko Prima 1 unit Sand Filter, 1 unit Carbon Filter, 1 unit 2002
Softener, 1 unit Skid for Sand and Carbon, 1 unit Skid for
Softener.

20 Sand Silo PT. Halliburton Indonesia PT. Pupma 1 unit Sand Silo 10' x 10' x 20' 2002

21 Air Receiver - Bandung PT. Turbindo Chikara Surya PT. Shinnetsko Prima 2 units Air Receiver 5000 ltr cap.
Working pressure : 500 psi
Design pressure : 600 psi

22 LPG Storage Tank - Tabanan, Bali PT. Kiani Pacific Nusantara PT. Bina Pemuda 2 units LPG Storage Tank 60 M3. Dia. 2.850 x 10.000 2006
Design Pressure: 18 Kg/cm2

Page 2 of 6
EXPERIENCE LIST
Pressure Vessel

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR

23 Pembangunan DPPU Bandara Kertajati PT. Pertamina (Persero) - UPMS PT. Wijaya Karya (Persero) Tbk. 2 unit Defuel/Degas Tank Dia. 2.600 x 6.000 2018
Majalengka, Jawa Barat 2 unit Drain Tank Dia. 3.000 x 8.600
1 unit Diesel Tank Dia. 2.300 x 5.000

Page 3 of 6
EXPERIENCE LIST
Steel Liner Chimney

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


Steel Liner Chimney
1 Chimney - Indramayu PLTU Indramayu CRI International+PT. Satyamitra Surya Perkasa Fabrication & assembly Chimney 4215 M, support, 2009
ducting 3 x 300 MW
- Liner plate & inlet ducts chimney
- Support platform chimney
- Rest plate form + railing

2 Chimney - Rembang Jawa Tengah PLTU Rembang CRI International+PT. Satyamitra Surya Perkasa Fabrication & assembly Chimney 4215 M 2 x (3 x 330- 2009
400 MW)
- Cutting/bending of liner plates and prefabrication of
line flanges

3 Chimney - Labuan PLTU Labuan CRI International+PT. Satyamitra Surya Perkasa Fabrication & assembly Chimney 2 x 330 MW 2009
- Bending/cutting and prefabrication of Liner Plates
and Flanges

4 Chimney - Tanjung Jati B - Jepara PLTU Jepara CRI International+PT. Satyamitra Surya Perkasa - Steel Liners, Supports and Bumper 2010
- Inlet duct, tie road/buckle
- Pengecatan

5 Can Liner Fabrication - Paiton , Jawa Timur PLTU Paiton CRI International+PT. Satyamitra Surya Perkasa Site assembly can liner 2011

6 Chimney - Jeneponto - Sulawasi Selatan PLTU Jeneponto CRI International+PT. Satyamitra Surya Perkasa Prefabrication and site fabrication/erection Liners, 2011
Bumpers + Inlet Duct

7 Chimney - Cilacap PLTU Cilacap CRI International+PT. Satyamitra Surya Perkasa Chimney liner flue & inlet duct 2015
(CAN A sampai CAN H)

8 Jeneponto Expansion Chimney - PLTU Jeneponto CRI International+PT. Satyamitra Surya Perkasa 1 unit Steel Liner Chimney Dia. 5.000 x H 150.000 mm 2017
Sulawesi Selatan 1 unit Ducting for Chimney

9 Steel Liner Chimney - Kalimantan Selatan CRI PT. Satyamitra Surya Perkasa 1 unit Steel Liner Chimney Dia. 3.650 x H 125.000 mm 2017

Page 1 of 1
EXPERIENCE LIST
Crane and Hoist

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


Crane and Hoist
1 Steel factory - Semarang Inti General Jaya Steel PT. Wira Mustika Indah Over Head Crane (O.H.C.) : 3 T x 25 M & 5 T x 25 M 1978

2 Paper factory - Kerawang PT. Pindo Deli Pulp& Paper Mills PT. Wira Mustika Indah O.H.C.10 T x 24 M x 252 M = 1 unit 1979

3 Paper factory - Kerawang PT. Pindo Deli Pulp& Paper Mills PT. Wira Mustika Indah O.H.C.3 T x 24 M x 24 M = 1 unit 1980

4 Steel factory - Cilegon Krakatau Steel Cilegon PT. Wira Mustika Indah O.H.C. 5 T x 24 M' = 1 unit 1981
Jib Crane 1 T x 5 M = 1 unit
O.H.C. 5 T x 15 M' = 1 unit

5 Steel construction factory - Bekasi PT. Murinda Iron Steel PT. Wira Mustika Indah O.H.C. 5 T x 20 M' = 1 unit 1981
Gantry Crane 3 T x 17 M' = 1 unit

6 Tractor service workshop - Cakung PT. United Tractor PT. Wira Mustika Indah O.H.C. 5 T x 15 M' = 1 unit 1981
O.H.C. 5 T x 19 M' = 1 unit

7 Steel factory - Ujung Pandang PT. Sarniwa Steel Works PT. Wira Mustika Indah O.H.C 3 T x 15 M' = 1 unit 1981

8 Glass factory - Jakarta PT. Asahi Mas PT. Wira Mustika Indah O.H.C 3 T x 14 M' = 1 unit 1981

9 Steel factory - Bekasi PT. Murinda Iron Steel PT. Wira Mustika Indah O.H.C 3 T x 19 M' = 1 unit 1982
Semi Gantry Crane 3 T x 12 M' = 1 unit
Gantry Crane 3 T x 17 M' = 1 unit

10 Cement factory - Cibinong PT. Indo Cement PT. Wira Mustika Indah O.H.C 5 T x 12 M' = 1 unit 1982

11 Plastic factory - Cimanggis PT. Sari Multi Utama PT. Wira Mustika Indah O.H.C 7,5 T x 30 M' = 1 unit 1982

12 Steel factory - Semarang PT. Raja Besi PT. Wira Mustika Indah O.H.C 10 T x 17 M' = 2 units 1982

13 Ceramic factory - Bekasi PT. KIA PT. Wira Mustika Indah O.H.C 10 T x 10 M' = 1 unit 1982

14 Steel factory - Jakarta PT. Jaya Steel PT. Wira Mustika Indah O.H.C 5 T x 19 M' = 1 unit 1983

15 Wood Sawmill - Solo Roda Jati PT. Wira Mustika Indah Gantry Crane 3 T x 25 M' = 1 unit 1983

16 Steel factory - Cilegon PT. Krakatau Steel PT. Wira Mustika Indah Slewing Jib Crane 3 T x 5 M' = 2 units 1983

17 Steel factory - Semarang PT. Raja Besi PT. Wira Mustika Indah O.H.C 10 T x 16 M' = 2 units 1983

18 Cement factory - Cirebon PT. Jaya Steel PT. Wira Mustika Indah O.H.C 5 T x 20 M' = 4 units 1983

19 Sugar factory - Jatibarang Aji Kanja PT. Wira Mustika Indah O.H.C 7,5 T x 16 M' = 1 unit 1983

20 Lembaga Metalurgie Lembaga Metalurgie PT. Wira Mustika Indah O.H.C 10 T x 3 T x 15 M' = 1 unit 1983
Monorail 3 Ton x 14 M' = 1 set

Page 1 of 4
EXPERIENCE LIST
Crane and Hoist

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR

21 Steel Store- Jakarta Tjayaco Steel Store Jakarta PT. Wira Mustika Indah Gantry Crane 5 Ton x 19 M x lift 5 M' = 1 set 1984

22 Nail & zinc factory - Cakung Nail & zinc factory - Cakung PT. Wira Mustika Indah O.H.C. 10 Ton x 23 M x lift 14 M' = 1 unit 1984
Jib Crane 3 Ton x 4 M x 360 x 6 M h. = 1 unit
O.H.C. 2 Ton x 21 M x lift 59 M = 1 unit
O.H.C. 3 Ton x 21 M x lift 35 M = 2 unit

23 Concrete pipe factory - Bekasi PT. Wira Teknik PT. Wira Mustika Indah O.H.C. 10 Ton x 12 M x lift 18 M = 1 unit 1984
Gantry Crane 5 Ton x 17 M x lift 60 M = 1 unit
Semi Gantry Crane 5 Ton x 25 M x lift 42 M' = 1 unit

24 Steel construction factory - Jakarta Elka Indonesia Raya PT. Wira Mustika Indah O.H.C. 5 Ton x 15 M x lift 54 M = 1 unit 1985
Semi Gantry Crane 5 Ton x 20 M x lift 48 M = 1 unit

25 Chemical Storage Terminal - Merak Chemical Storage Terminal PT. Shinnetsko Prima Gantry Crane 15 Ton x 26 M x lift 200 M = 1 unit 1985
Merak 15 Ton x 26 M x Lift 12 M = 2 unit

26 Lathe & repair workshop - Cilegon Tjokro Putra Persada PT. Shinnetsko Prima O.H.C. 20 Ton x 15 M l lift 54 M' = 1 unit 1987
O.H.C. 3 Ton x 15 M x lift 54 M = 1 unit

27 Expansion of bolt factory - Tangerang PT. Nito Alam Persada PT. Shinnnetsko Prima O.H.C. 2 Ton x 20 M x lift 42 M 1987

28 Expansion of steel factory - Bekasi PT. Murinda Iron Steel PT. Shinnetsko Prima 1 set Gantry Crane 10 Ton x 30 M x 12 M h. 1988
1 set Over Head Crane 3 ton x 12 M
1 set Over Head Crane 2 Ton x 6,4 M

29 Ebara Pump - Bogor PT. Ebara Indonesia PT. Sahabat Indonesia Abadi 1 set Over Head Crane kap. 1 Ton x 14,485 M 1990
1 set Over Head Crane kap. 1 Ton x 5,55 x 48 M

30 Steel factory - Tangerang PT. Sinar Tangerang Steel PT. Sahabat Indonesia Abadi 1 set Over Head Crane kap. 5 Ton x 19,1 M x 45 M 1990
1 set Over Head Crane kap. 5 Ton x 22,7 M x 45 M

31 Steel factory - Tangerang PT. Interworld Steel Mills PT. Shinnetsko Prima 1 set Over Head Crane 60 Ton + 20 Ton x 18,250 MM 1990
Indonesia 1 set Over Head Crane 50 Ton + 15 Ton x 18,250 MM
1 set Over Head Crane 15 Ton x 18,250 MM
2 sets Over Head Crane 10 Ton x 22,900 MM

32 Casting Plant - Jakarta PT. Toyota Astra Motor PT. Sahabat Indonesia Abadi 1 set Under Hung 3 Ton x 9 M + (2 x 0,75 M) x 37 M 1991

33 Indo Seiki - Tangerang PT. Indo Seiki Metal Utama PT. Sahabat Indonesia Abadi 1 set Over Head Crane 2 Ton x 21,15 x 72 M' 1991
& Garuda Metal Utama

34 Sanyang Metal - Citeureup PT. Sanyang Metal Indonesia PT. Shinnetsko Prima 1 set Over Head Crane 2 Ton x 12 M x 30 M' 1991

35 Hume Sakti - Cikarang PT. Hume Sakti Indonesia PT. Summa Surya Perkasa 2 sts Gantry Crane 2 x 5 Ton x 150 M 1992

Page 2 of 4
EXPERIENCE LIST
Crane and Hoist

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


36 Pertamina - Balikpapan Pertamina UP. V PT. Shinnetsko Prima 1 set Over Head Crane 5 Ton x 16 x 35 M 1992

37 Poultry Equipment - Balaraja PT. Charoen Pokphand PT. Sahabat Indonesia Abadi 1 set Over Head Crane 3 Ton x 22,05 x 48 M 1992

38 Pertamina - Balikpapan Pertamina Balikpapan PT. Soegih Interjaya 3 units O.H.C. 2,5 Ton x 6,2 M 1997
1 unit O.H.C. 5 Ton x 13,1 M
4 units O.H.C. 10 Ton x 13,1 M
1 unit O.H.C. 15 Ton x 13,1 M

39 International Machinery factory - Bekasi PT. International Machinery PT. Shinnetsko Prima 1 Set O.H.C. 5000 Kg x 20.8 M x 8 M 2002

40 PT. Mikiwa - Cikupa PT. Mikiwa PT. Shinnetsko Prima Construction of O.H.C. 10 Ton x 22,45 M x 66 M 2002

41 Sumber Mesin factory - Cilandak PT. Sumber Mesin Raya PT. Shinnetsko Prima Construction of O.H.C. 3 Ton x 20 x 55 M' = 1 unit 2002
Construction of O.H.C. 5 Ton x 20 x 55 M' = 1 unit

42 PT. Stanley - Cikupa PT. Stanley PT. Sahabat Indonesia 1 set O.H.C. 5 Ton x 18,9 M 2002
1 set O.H.C. 5 Ton x 13,925 M
1 set O.H.C. 5 Ton x 13,8 M

43 Can Factory - Tangerang PT. Pelangi Indah Canindo PT. Shinnetsko Prima 1 unit O.H.C. Double Girder Box 15 Ton 2003

44 Girder Box - Cikupa, Tangerang PT. Union Yashindo PT. Shinnetsko Prima 1 unit O.H.C. Single Girder Box 5 Ton x 23 M 2004
1 unit O.H.C. Double Girder Box 10 Ton x 23 M

45 Girder Box - Cikupa Mas, Tangerang PT. Stanley PT. Sahabat Indonesia 1 unit O.H.C. Double Girder Box 10 Ton 2005

46 Pulogadung PT. Sarana Steel Engineering PT. Shinnetsko Prima 1 unit Wire Rope Hoist Kap. 10 Ton x 12 M 2006
1 unit Wire Rope Hoist Kap. 20 Ton x 12 M

47 PT. Taehang - Cikarang, Bekasi PT. Eljindo Konstruksi Abadi PT. Shinnetsko Prima 1 unit O.H.C. 3 Ton x 6 M' 2006
1 unit O.H.C. 5 Ton x 6 M'

48 Supply Hoist - Jakarta PT. Binakreasi Bajaperkasa PT. Shinnetsko Prima 1 unit Hyundai Hoist 5 Ton x 9 M lift 2009

49 Supply Hoist - Purwakarta PT. Eins Trend PT. Shinnetsko Prima 1 unit Hyundai Hoist 7,5 Ton x 12 M lift 2009

50 Supply Hoist -Depok PT. Eljindo Konstruksi Abadi PT. Shinnetsko Prima 1 unit Hyundai Hoist 5 Ton x 6 M lift 2009

51 Supply Hoist - Jakarta PT. Inasa Wahana Lestari PT. Shinnetsko Prima 2 unit Hyundai Wire Rope Hoist 5 Ton x 12 M lift 2010

52 Supply Hoist-Kudus PT. Pura Barutama PT. Shinnetsko Prima 1 unit Hyundai Hoist 7,5 Ton x 12 M lift 2010

53 Overhead Crane - Karawang PT. KIIC Karawang PT. Sahabat Indonesia 1 unit Overhead Crane 5 Ton x 13,9 M x 74 M 2010
1 unit Overhead Crane 10 Ton x 13,9 M x 74 M

54 Gantry Crane -Subang PT. Inasa Wahana Lestari PT. Shinnetsko Prima 1 unit Gantry Crane 35 Ton x 12,625 M x 7 M lift 2010

Page 3 of 4
EXPERIENCE LIST
Crane and Hoist

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR

55 Building Construction & Overhead Crane - Bali PT. Bali Fibreglass PT. Shinnetsko Prima Building construction 11 x 36 m x T.12 m 2011
Construction of 2 unit OHC 7,5 Ton x 10 M on runway 56 M

56 Supply Hoist - Depok PT. Eljindo Konstruksi Abadi PT. Shinnetsko Prima 1 unit Hyundai Hoist 5 Ton x 6 M lift 2011
2 unit Hyundai Hoist 3 Ton x 6 M lift

57 Supply Hoist - Subang PT. Inasa Wahana Lestari PT. Shinnetsko Prima 2 unit Hyundai Wire Rope Hoist 20 Ton x 12 M lift 2011

58 Supply Hoist -Jakarta PT. Inasa Wahana Lestari PT. Shinnetsko Prima 1 unit Hyundai Wire Rope Hoist 10 Ton x 9 M lift 2011

59 Supply Hoist - Subang PT. Inasa Wahana Lestari PT. Shinnetsko Prima 2 unit Hyundai Wire Rope Hoist 20 Ton x 12 M lift 2011

60 Building Construction - Tiga Raksa PT. Stanley PT. Sahabat Indonesia Inti Mandiri 3 unit Overhead Crane Double Girder 15 Ton x 25,5 M 2011
on runway 192 M

61 Sugar factory - Semarang PT. Indo Sutech Sejahtera PT. Shinnetsko Prima Fabrication, assembly, installation of 3 units Overhead Crane 2012
1 unit Single Box Girder 3 Ton x 23,5 M x 78 M
1 unit Double Box Girder 5 Ton x 23,5 M x 78 M
1 unit Double Box Girder 10 Ton x 23,5 M x 78 M

62 Sugar factory - Situbondo PT. Cipta Tehnik Abadi PT. Shinnetsko Prima 1 unit Overhead Crane Double Box Girder 10 Ton x 12 M Lift 2012
x 24 m runway

63 Boat Manufacture - Bali PT. Bali Fiberglass PT. Shinnetsko Prima 2 units Overhead Crane c/w 4 unit Hoist Cap. 7.5 Ton 2013
include all steel structure work

64 PLTU Lontar - Tangerang PLTU Lontar PT. Satyamitra Surya Perkasa 1 unit Overhead Crane Cap. 3 Ton 2017

Page 4 of 4
EXPERIENCE LIST
Steel Structure

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


Steel Structure
1 Expanding Plant of B.H.P - Belitung Singapore - B.H.P United Engineering Main Factory Proses Timah 1974

2 Sunyaragi Stadion - Cirebon Pertanian, EP. III Biro Asri Stage Construction 1974

3 P.V.C. Leather Shinsuitex - Cengkareng P.V.C. Leather Shinsuitex Shinsuitex Steel Construction & Civil Work of Factory Building 1974
Cengkareng

4 Milting Factory B.I.U - Pulo Gadung Baja Utama Ind. United Engineering-Singapore Main Milting Factory Step I & Step II 1975

5 Traso Plant Sumber Latex Group - Traso Plant Sumber Latex Group - Sumber Latex 3 lines Steel Construction of Factory Building 1975
Cengkareng

6 Control Pulpit & Milting Partition Krakatau Krakatau Steel. Caputra 24 Units Control Pulpit & Milting Partition 1975
Steel - Cilegon

7 Site Mill Office K.S. - Cilegon Krakatau Steel. Caputra. 1 Lot Site Roof Truss 1975

8 Sang Hyang Sen Real Estate - Sukabumi Sang Hyang Sen Real Estate PT. Matson Nusantara Rice Processing Plant ± 3000 Tons 1976

9 Harapan Kita Hospital - Jakarta Yayasan Harapan Kita PT. Cahaya Teguh Kencana 1 Lot Steel Roof Truss for Nurse housing & Canteen 1976

10 Depot Baru Pertamina Sungai Siak - Pertamina PT. Sinar Mutiara all steel construction building inside 1977
Pekan Baru the Depot such as : filling set, pump house, warehouse,
security post and office
Civil work : 2500 DWG oil quay wall

11 New Depot Pertamina Sungai Siak - Pertamina PDN PT. Sinar Mutiara Jetty Tanker 2000 DWT 1977
Pekan Baru Jetty Head 36 M
Jetty Tail 50 M

12 Bury tank - Tanjung Priok PT. Pulai Sambu AE Brother , PT. Timsco Indonesia 4 units 600 kl, 2 units 1000 kl, 3 units Cap 2000 Kl, 4 unit Cap 500 K 1977
PT.Trisasi , PT.Bimoli Piling construction 35 x 35 + piling concrete plate = 272 ea x

13 Pesantren Baru Sugar Factory - Kediri P.T.P. Mastodon Perkasa Andalas Erection/Installation of Factory Building, Process Plant 1977

14 Sragi Sugar Factory - Pekalongan P.T.P. Mastodon Perkasa Andalas Old Factory Rehabilitation : Erection Process Plant 1977

15 Expanding Plant Oil Factory - Riau Expanding Plant Oil Factory PT. Pulau Sambu Fabrication & Erection of Main Factory ± 35 Tons 1978

16 Expanding Plant Paper Factory - Kerawang Expanding Plant Paper Factory PT. Pindo Deli Pulp & Paper Mills Main Factory (23m x 252m x T.12m) + (2x10m x 54m x T.6m) 1979
= 7002 M2
Warehouse (23.5m x 252m x T.12m) + (235m x 17.5m x 54m x
T.6m) = 4329 M2
2 lines machine foundation product I = 20 m x 54 m

Page 1 of 12
EXPERIENCE LIST
Steel Structure

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


II. 20 m x 60 m material tub = 20 ea

17 New Depot Pertamina Lubuk Linggau Pertamina PDN PT. Sinar Mutiara Fabrication + erection of Building inside of the Depot : 1979
Filling set, Warehouse, Office, Pump Huse, Workshop, etc.

18 Expanding Plant paper factory PT. Pindo Deli Pulp & Paper Mills PT. Shinnetsko Prima 1. Foundation + floor + wall 1979
Span : 24 M' High : 12 M' Total : 11.331 M2
2. 2 line foundation of production machine
Wide : 20 M Total length : 114 M'
3. 20 ea Concrete Mixer tank for material
6 M x 4 M x 2 M H.

19 Expanding Plant of Nail & Galvanised PT. Wira Mustika Indah PT. Shinnetsko Prima Factory & Warehouse : 42m x T.6m = 882 M2 1980
Sheet Iron Factory 21m x 24m x T.6m = 504 M2
3 x 21,5m x 144m x T.6m = 9288 M2
23.5m x 144m x T.7,5m = 3384 M2

20 New Factory of Food Oil Company - Bekasi PT. Bina Karya Prima PT. Shinnetsko Prima Main Factory Building 2 x 23m x 66m x T.6m = 3036 M2 1980

21 New Depot Pertamina Merauke - Irian Jaya Pertamina PDN PT. Sinar Mutiara Indah Building Fabrication and others building in Depot : Filling Set, 1980
Warehouse, Office, Pump house and security post.

22 Expanding Plant Candy Factory - Tangerang PT. Super World Wide PT. Shinnetsko Prima Warehouse Building : 23m x 72m = 1656 M2 1981
23m x 48m = 1104 M2
(23m + 8m) x 72m = 1116 M2
2 x (23m + 23.5) x 24m = 2232 M2
31m x 102m + 23m x 42m = 4128 M2
Workshop building + spare part 23m x 42m x 42m = 966 M2

23 Expanding Plant Paper Factory - Karawang PT. Pindo Deli Pulp & Paper Mills PT. Shinnetsko Prima Factory Building (23.5 + 17.5) x 60m x T.12m = 2460 M2 1981

24 Food oil factory - Bekasi PT. Bina Karya Prima PT. Shinnetsko Prima Foundation + floor + wall 2 x 23 x 66 x 6 M H. = 3026 M2 1981

25 Office Building - Jakarta PT. Wira Mustika Indah PT. Shinnetsko Prima 3 floor Office building 1981
Construction of foundation & beam, concrete floor, brick wall

26 Candy factory - Tangerang PT. Super World Wide PT. Shinnetsko Prima Foundation + floor + wall of various building 6 mH 1981
Total = 15642 M2
Cooling tower 8 x 12 x 1m H. = 1 unit

27 Chemical factory - Bekasi PT. Sumi Asih PT. Shinnetsko Prima Foundation + floor of Main Plant building 15 x 43 x T.17,5 M = 1982
645 M2
Foundation of warehouse + floor + wall = 20 x 30 x T.6 M = 600 M2
Cooling tower 6M x 3 M x 15 MH.
Foundation of Tower Physical Refening + machine foundation

Page 2 of 12
EXPERIENCE LIST
Steel Structure

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR

28 New Factory of Fatty Acid & Glycerine Factory - PT. Sumi Asih PT. Shinnetsko Prima Main Plant 15m x 25m x T.17.5m = 575 M2 1982
Tambun Warehouse 20m x 30m x T.6m = 600 M2

29 Float Light Signal - Jakarta PT. Intechinco PT. Shinnetsko Prima Floating Tank + Float Light Signal Stucture = 3 units 1982

30 Light Signal Tower - Irian Jaya Bintang Mas PT. Shinnetsko Prima Fabrication of 25 m Tower Structure = 3 sets 1982
Building Construction Fabrication 18 x 60 x T.6m = 1080 M2

31 Iron Chair Factory - Jakarta PT. Metropol PT. Shinnetsko Prima Fabrication + Erection of Main Factory 16 x 42 x T.6M 1982

32 Chemical Factory - Cikupa PT. Eternal Buana Chemical PT. Shinnetsko Prima/ Fabrication + Erection of Tower Tank 20 Kl + 10 kl and 1982
Industry 20M tower structure

33 Tower Lamp Mandala Krida Stadion - Stadion Mandala Krida PT. Shinnetsko Prima 4 units tower structure for stadion lamp = 21 m 1983
Yogyakarta

34 Expanding Plant Candy Factory - Tangerang PT. Super World Wide PT. Shinnetsko Prima Main Plant : 15 x 18 x T.16,5 M = 270 M2 ( two floor) 1983
Warehouse : (23m x 36m) + (23m x 24m x T.8m) = 1380 M2
(23m x 36m) x T.6m = 2760 M2

35 Expanding Plant, Tissue Factory - Tangerang PT. Total Liberty Paper Product PT. Shinnetsko Prima Warehouse Building : (18m + 7m) x 30m x T.6m' = 750 M2 1983

36 Tiled Roof Factory - Cileungsi PT. Lantai Keramik Mas PT. Shinnetsko Prima Steel Construction Work : 1984
- Turnel Kiln, Sub Dryer & Dryer
- Ducting Turnel Clean & Dryer
- Chamotter Crushing Plant & Ducts for Dust Collection

37 Expanding Plant Candy Factory - Tangerang PT. Super World Wide PT. Shinnetsko Prima Factory Building 18 x 60 x T.16,75 M' = 1080 M2 1984
Various Equipment for Hopper Container, Storage Silos for
PVC Resin

38 Electric Panel Box Factory - Tangerang PT. Indo Jaya PT. Shinnetsko Prima Factory & Office 24m x 60m x T.8m = 1440 M2 1984

39 Light Signal - Irian Jaya PT. Medan Jaya PT. Shinnetsko Prima Fabrication of Tower Structure 3,8 x 3,8 x 20 M T 1984

40 Expanding Plant Fatty Acid & Glycerine PT. Sumi Asih PT. Shinnetsko Prima Main Plant : 15 x 18 x T.16.5 M = 270 M2 (two floor) 1984
Industry - Tambun

41 Expanding Plant Paper Factory PT. Pindo Deli Pulp & Paper Mills PT. Shinnetsko Prima Building Factory : 1984
(17,5 x 23,5) x 24 x T.6 M' = 972 M2
(17,5 x 23,5) x 30 x T.12 M' = 1215 M2

42 Candy factory - Tangerang PT. Super World Wide PT. Shinnetsko Prima Foundation + floor of Main Processing Plant Building 1984
18 x 60 x 16,75 MH.

Page 3 of 12
EXPERIENCE LIST
Steel Structure

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR

43 Panel Box Electric Factory - Tangerang PT. Indo Jaya PT. Shinnetsko Prima Foundation + floor + wall of factory building + 2 floor office 1984
24 M x 60 M x 8 MH. = 1440 M2

44 Supermarket - Rawamangun Tip Top Supermarket PT. Shinnetsko Prima Foundation + floor + 3 floor wall 21 M x 24 M 1985

Pertamina D.T.I. - Tanjung Priok Pertamina Manggala Galatta Consortium 2 units of 5000 ton tank foundation 1985

42 Tip Top Supermarket - Jakarta CV. Tip Top Supermarket PT. Shinnetsko Prima Three Floor 21 M x 24 M 1985

43 Expanding Plant Rubber Factory - Lampung PT. Garuntang PT. Shinnetsko Prima Building Factory 21 x 24 x T.6M 1985

44 Expanding Plant Iron Chair - Jakarta PT. Metropole PT. Shinnetsko Prima Factory Building 24 x 36 x T.6 M 1985
24 x 12 = 288 M2 (two floor)

45 Weapon Factory - Bandung PT. Pindad (Persero) Bandung PT. Adi Perkasa Buana Building Construction 2 x 30 x 54 x 8,10 M 1986

46 PLTU Suralaya Unit III PLTU Suralaya PT. Murinda Iron Steel Coal Mining Bunker = 5 units 1986

47 Expanding Plat Oil Factory - Jakarta PT. Tjengkareng Djaya PT. Shinnetsko Prima Platform 4,8 x 5,5 x T.7,5 M 1986

48 Expanding Plant Chemical Factory - Tangerang PT. Timur Raya Indah PT. Shinnetsko Prima Building Construction 2 x 22.5 M x 42 m x T.6M 1987

49 Office Building - Jakarta Bimantara Group PT. Suma Surya Fabrication + Erection of Steel Structure for Office Building 1988
15 m x 35 m x 5 Floor

50 Plywood Factory PT. Sinar Barito Indah Plywood PT. Catur Insan Pertiwi Fabrication of 1 set Boiler equipment N200 max.400.000 kg/H 1988
& PT. Tunggal Agathis Indah Wood Fabrication of 2 sets Boiler equipment N900 max.300.000 kg/H

51 Warehouse for PT. New Crown Metal Works PT. New Crown Metal Works PT. Shinnetsko Prima Steel Construction of Warehouse 13,25 x 42 M' = 12,9 Ton 1989

52 Bakti Usaha School - Jakarta PT. Pembangunan Perumahan PT. Shinnetsko Prima Supply + erection of Steel Roof Construction = 227,5 Tons 1989
Cabang III

53 Electrolux Service Centre - Jakarta Electrolux Service Centre PT. Satyamitra Surya Perkasa Construction Work 36 x 36 x 6 M' = 127,7 Tons 1989

54 Indoprin Project - Merak PT. Indoprin PT. Summa Surya Perkasa Laboratory Construction + Platform = 19,9 Tons 1989

55 Indoprin Project - Merak PT. Indoprin PT. Summa Surya Perkasa Steel Construction Work of : 1989
- Waste Water Demercuritation
- Mercuri Distilation
- HCL Receiver
- Na OH Filling Shelter
- Vent Air Demercuritation
- Sludges Dewatering

Page 4 of 12
EXPERIENCE LIST
Steel Structure

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR


- Chilling & Compressed Air Vent
- Sodium Hypochlorite Production
Total : 50,8 Tons

56 PTBA - 067 Project - Tanjung Enim PT. Tambang Batubara Bukit Asam PT. Wahana Sari Sakti Supply of 190 Sets Belt Frame Conveyor BW-1200 1989

57 PTBA - 256 Project - Tanjung Enim PT. Tambang Batubara Bukit Asam PT. Wahana Sari Sakti Supply of 500 Sets Belt Frame Conveyor BW-1200 1989

58 Building Construction - Anyer PT. Tri Polyta Indonesia PT. Satyamitra Surya Perkasa Fabrication + Erection of Building Construction 1990
Total = 479,837 Tons

59 Expansion of Soap Factory - Tangerang PT. Timur Raya Indah PT. Shinnetsko Prima Construction (6x18) + (18x36) + (18 x 18) M = 30,7 Tons 1990

60 Depot Pertamina Tanjung Priok - Jakarta PT. Sinar Mutiara Indah PT. Shinnetsko Prima Fabrication + Erection of Laboratory Roof = 18,5 Tons 1990

61 Patra Kuningan Raya - Jakarta PT. Sinar Mutiara Indah PT. Shinnetsko Prima Fabrication + Erection of Roof Structure = 6,3 Tons 1990

62 Palm Oil Mill - Riau PT. Dutapalma Nusantara PT. Shinnetsko Prima Upper Structure Main Building Palm Oil Factory = 35,9 Tons 1990

63 Expansion of chemical factory - Tangerang PT. Timur Raya Indah PT. Shinnetsko Prima Steel construction (6x18) + (18+36) + (18 x 18 M') 1990
Foundation + wall + farious of civil work for building

64 Ceramic factory - Tangerang PT. Satyaraya Keramindo Indah PT. Shinnetsko Prima Foundation for Solar Tank + Water Tower 1990

65 Paper factory - Karawang PT. Pindo Deli Pulp & Paper Mills PT. Shinnetsko Prima Heightening of building from 6 M' to 12 M' 1991

66 Office Building - Jakarta PT. Tatapuri Perdana PT. Shinnetsko Prima Roof of Office Building of YDPK-BEII = 12 Tons 1992

67 Supermarket - Jakarta Tip Top Supermarket PT. Shinnetsko Prima Construction & civil to re-build supermarket & Dept. Store building 1992

68 Exor I Pertamina - Balongan Pertamina Balongan PT. Summa Surya Perkasa Fabrication + erection of 7 units steel construction building 1992
= 500 Tons

69 Steel Construction - Merak Niigata Engineering Corporation - PT. Satyamitra Surya Perkasa Pipe rack, Building, etc. = 340 Tons 1994
PT.Styrene Mono Indonesia (SMI )

70 Steel Construction Fabrication -Suralaya Samsung Heavy Industries - PLN Suralaya PT. Satyamitra Surya Perkasa Coal Handling = 550 Tons 1995

71 Scrapper Bridge - Sulawesi PDAM Ujung Pandang PT. Tirta Degremont Fabrication & Erection of 4 units Scrapper Bridge = 25 Tons 1999

72 Steel Construction - Tangerang PT. Putra Mahatiti PT. Shinnetsko Prima Construction & Civil work in warehousing block E = 310 tons 2002

73 LPG Plant II, MKS - Gresik PT. Satyamitra Surya Perkasa PT. Shinnetsko Prima Steel Structure for Single Box Girder 5 Ton 2011

74 Civil Work - Cikupa PT. Indochemical PT. Satyamitra Surya Perkasa Spiral Stairway & Bridge for Storage Tank 2011

Page 5 of 12
EXPERIENCE LIST
Steel Structure

No. Project Name Owner MAIN CONTRACTOR DESCRIPTION YEAR

75 Steel Construction - Cibinong Alfa Mart PT. Sinar Mutiara Indah Fabrication + Erection 2012
Warehouse + Office Construction = 900 Tons

76 Steel Construction - Bali PT. Bali Fiberglass PT. Shinnetsko Prima Material, Fabrication, Erection 2012
Building Construction 11 x 36 M x T.12 M

77 Warehouse - Karawang PT. Satyamitra Surya Perkasa PT. Shinnetsko Prima Fabrication + Erection : Badan talang, tulang talang, backing strip 2013
base plate & UNP.150

78 Construction Work - Palembang PT. Pusri II B PT. Satyamitra Surya Perkasa - Fabrication & Installation Workshop 2014
- Hoist Crane Cap. 3 Ton

79 Workshop and Warehouse - Serpong PT. Satyamitra Surya Perkasa Kojo Techno Park Steel Works Fabrication = 85 Ton 2016

80 Service Production Facility - Tangerang PT. Satyamitra Surya Perkasa PT. Raja Top Food - Fabrikasi dan instalasi struktur baja Pipe Bridge dan Canopy 2016
= 15 Ton
- Pekerjaan sandblasting dan pengecatan = 478 M2

Page 6 of 12

You might also like