Professional Documents
Culture Documents
3 L3
3 L3
L 10
IP
TL a
TM TA
R R
0 1 2 3 4 5 6 7 8 9 10
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000
bidang persamaan / reference level
+ 0.00 meter
PATOK HEKTOMETER
Hm 9 Hm 10
HECTOMETER STONE
NOMOR PROFIL
PROFILE NUMBER D4 D5 D6 D7 D8
1043.3
1093.3
893.3
943.3
993.3
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
50.0 50.0 50.0 50.0
ACCUMULATED DISTANCE
12.17 12.17
12.00 12.00
12.20 12.20
12.39 12.39
11.76 11.76
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
YANG ADA
EXISTING
12.10
12.40
12.49
11.86
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
12.45
12.49
12.48
12.47
12.46
ELEVASI TANGGUL
BANK LEVEL
RENCANA
DESIGN
11.88
11.87
11.86
11.85
ELEVASI DASAR SALURAN
BED LEVEL