Professional Documents
Culture Documents
Work Experiences
PT. DAITAN SOLUSI UTAMA - BEKASI JAWA BARAT Oct 2023 - Jan 2024
SURVEYOR
PROJECT LIVING PLAZA BANJARMASIN BUILDING / PT. KAWAN LAMA GROUP
take measurements of a buildingthe project I am working on is a steel structure
PT. DAITAN SOLUSI UTAMA - Bekasi Jawa Barat Jul 2023 - Sep 2023
ASISTEN SURVEYOR
PROJECT IGNITE DATA CENTER BUILDING HYPERSCAPE / PT. CINA STATE COUNSTRUCTION
Tasked with measuring building axles, shooting column points,lifts,sheerwalls and elevations, carrying out column verticality, and
checking beam and floor elevations
PT. DAITAN SOLUSI UTAMA - BEKASI JAWA BARAT Apr 2023 - Jun 2023
ASISTEN SURVEYOR
PROJECT BUILDING DATA SENTER CGK-064 / PT. INDOCOMAS BUANA PERKASA
CARRYING OUT MEASUREMENTS, COLUMN MARKING, VERTICALITY, AND BUILDING ELEVATION
PT. DAITAN SOLUSI UTAMA - BEKASI JAWA BARAT Jan 2023 - Mar 2023
SURVEYOR
WAREHOUSE BUILDING CONSTRUCTION / PT. DAITAN SOLUSI UTAMA
CARRYING OUT MEASUREMENTS, COLUMN MARKING, VERTICALITY, AND BUILDING ELEVATION
PT. DAITAN SOLUSI UTAMA - BEKASI JAWA BARAT Aug 2022 - Dec 2022
SURVEYOR
FACTORY WAREHOUSE CREATION PROJECT / PT. KAO INDONESIA
CARRYING OUT MEASUREMENTS, COLUMN MARKING, VERTICALITY, AND BUILDING ELEVATION
Education Level
SMK GEO INFORMATIKA - KABUPATEN BOGOR Jun 2019 - Apr 2022
Teknik SURVEI DAN PEMETAAN
Organisational Experience
PECINTA ALAM SMK GEO INFORMATIKA - KABUPATEN BOGOR Jul 2019 - Mar 2022
KORDINATOR UMUM
Palantika organization is an organization of nature lovers or can be called sispala
ask members what problems they are experiencing and report them to the core management and also convey information from the
core management to each division and make bridges