You are on page 1of 3

CURRICULUM VITAE

Name Sex
Muhammad Haris Male
Place & Date of Birth Nationality
03 July 1960, Pematang Siantar – Sumatera Utara Indonesia
Height Weight Marital Status
170 cm 73 kg Married
Spouse Dependent Religion
Aprida Five (5) Children Islam
Major Physical Limitation Hobby
NONE Sport n
Reading
Course and Training : Supervisor Safety Level 1
Lock Out and Tag Out
Incident Investigation
Language Ability (Other than own)
English (Verbal & Writing)
Address Date of Photograph
Jl. B. Katamso Gg Pasar Senin no.22 Kel. Kampung Baru Kec. Medan Maimun December, 19
Medan 20158 Date prepared
Phone : 085265240676 (Mobile) / 08125058542 (Mobile) January 21, 20
Education
Year
Year School / College Remarks
Graduated

1968 – 1974 SD – Negeri 2 Pematang Siantar, Sumut 1974 Elementary School


1974 – 1977 SMP – Negeri Deli Serdang, Sumut 1977 Junior High School
1977 – 1981 STM – DwiWarna Medan, Sumut 1982 Technical High School

Work Experience
Position Location Date/Year
Corp. Dept. Or
Division
Brief Job Description / Key Job Responsibilities
Civil Advisor Karimun – Kepulauan Riau December 2019 – Present
Responsible to advice and monitoring of M&R Dept works (Specially civil & mechanical) and also repair
PT. Oiltanking
works at mooring dolphin Jetty 4 of Oiltanking Karimun as main job, start from Preparation, Demolishing
Karimun
and Reconstruction & Commissioning.

QC Muara Tewe – KALSEL July 2017 – August 2018

PT. Petrosea Tbk. Road Coal Mine


Earthworks, Civil Works, Construction and Mechanical Supervisor Jobs.

Civil Inspector Bogor – Jawa Barat Juny 2016 - Juny 2017


PT. POSCO Bogor - Ciawi - Sukabumi Tol Road
Earthworks, Civil Works, Construction and Mechanical Supervisor Jobs. For Tol Road.
PT. Oil Tanking Civil Coordinator Sangata - Kalimantan Timur September 2014 - Juny 2016
Nusantara Persada

Page 1 of 3
Earthworks, Civil Works, Construction and Mechanical Jobs.
Tank foundation, road construction and asphalting, building construction, manufacture chopsticks,
erection and casting dock, installation of the oil distributor to the dock.
Supervisor Cisumdawu Tol Road – West Java August 2013 - September 2014
PT. Shanghai
Contruction Group
Earthworks, Civil Works, Construction and Mechanical Supervisor Jobs. For Tol Road.

PT. Hamparan Site Supervisor Perawang – Siak Riau February 2010 – February 2013
Alam Baruna
Indonesia Earthworks, Civil Works, Construction and Mechanical Supervisor Jobs. For Manure Storage facilities.

SsangYong Supervisor Banda Aceh - Calang August 2008 – January 2010


Engineering &
Construction Co.,
Ltd. Road/Bridge Reconstruction & Rehabilitation Project.

Site Supervisor Sumut, Banda Aceh – NAD April 2006 – February 2008

Responsible and Report to Project Manager Activity and Decided the Executive in Field. Foundation and
Beam from Concrete and Leveling the Template in order Frame of Tower can Install Perfectly.

Thiess Contractors Use Grounding and Emergency Light in Tower and all accessories Tower. The Owner Project is
Indonesia Telkomsel and Radio belong to Ericsson.
Specially in Using and Placing the Tray and Ladder for Cable from Top until Bottom of Tower must be
placed as a Drawing and Check all List Materials must be done seriously cause of too much part number
different even though the shape is same.
CONTRACT FROM : Telkomsel and Ericsson – Medan, Sumatera Utara.
QA/QC CIVIL Duri – Riau May 2004 – Maret 2006

Responsible and Report to Manager about : Quality of ; Earth Work, Pilling and Concrete.
Making Job Formula and Random Sample before and after Structure done.
Thiess Contractors
Indonesia Responsible to Make sure the Job Mix Formula in Laboratory using in Site as Guidance.
Using that Formula for Ramp and Staging Area and Reported every day.
Make Access Road and Canal as a Main Transportation to Site.
CONTRACT FROM : PT. Caltex Pacific Indonesia.
Chief Soil and Concrete Duri – Riau April 2002 – April 2004

Responsible to Site Manager about : Soil Investigation, Concrete for Thiess Contractor Indonesia.
PT. Griya Teknik Soil : Aterbrg Limit, Specific Gravity, Compaction Test, CBR Test, Density Test.
Perkasa Concrete: Slump Test, Strength Test, Gradation Test and Crushing Test.
Making Job Mix Formula for using in site as a guidance.
CONTRACT FROM : PT. Thiess Contractor Indonesia.
PT. Uniba and Sons Laboratory Technican Lhoksukon – Aceh May 2001 – March 2002

Responsible for : Soil Investigation, Concrete and Asphalt for Mobil Oil.

Page 2 of 3
Soil : Aterbrg Limit, Specific Gravity, Compaction Test, CBR Test, Density Test.
Concrete: Slump Test, Strength Test, Gradation Test and Crushing Test.
Asphalt: Extraction Test, Asphalt Content and Ductility.
Making Job Mix Formula for using in site as a guidance.
CONTRACT FROM : Mobil Oil Indonesia Inc – Lhokseumawe, Aceh.
Laboratory Proj Task Force Lhoksukon – Aceh Sept 1996 – March 2001

Responsible for Booster Compressor LNG in Mobil Oil.


Special Task Laboratory and Field cause of Special Project.
Design and Execution and make Technical Justification for ;
PT. Uniba and Sons 1. Foundation of Turbine Generator
2. Foundation of Vessel Tank
3. Sub Base and Base
4. Foundation of Flow Line 42”
COTRACT FROM: Mobil Oil Indonesia Inc – Lhokseumawe, Aceh.
Laboratory Technician Lhoksukon – Aceh Jan 1985 – July 1996

Responsible for Site Preparation, Road and Building LNG in Mobil Oil.
Especially Task Laboratory and Field cause of Project.
Design and Execution and make Technical Justification for ;
PT. Alam Bakti 1. Land Clearing, Soil Investigation and Foundation for Rig Preparation
2. Air Strip Point A in Lhoksukon
3. Access Road and Main Road to inter Cluster in Lhoksukon
4. Langguru Airport in Kaimana Irian Jaya
5. Malikussaleh Airport in Lhokseumawe-Aceh
6. Access Road Inter Cluster.