TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES

GENERAL DPWH
DEPARTMENT OF PUBLIC WORKS AND HIGH WAYS
G ENGINEER / BUILDING OFFICIAL
1 COVER PAGE

DISTRICT / CITY / MUNICIPALITY


ARCHITECTURAL

A
LAND USE AND ZONING
PERSPECTIVE VIEW, VICINITY MAP, SITE DEVELOPMENT PLAN
1 & TABLE OF CONTENTS

A
SUMMARY OF QUANTITIES, SCHEDULE OF QUANTITIES
2

A GROUND FLOOR PLAN, SECOND FLOOR PLAN, ROOF PLAN,


3 FRONT ELEVATION, REAR ELEVATION, SCHEDULE OF WALL
FINISHES, SCHEDULE OF FLOOR FINISHES

A LEFT SIDE ELEVATION, RIGHT SIDE ELEVATION, LONGITUDINAL


4 SECTION, CROSS SECTION LINE AND GRADE

A
5 SCHEDULE OF DOORS AND WINDOWS

GROUND FLOOR REFLECTED CEILING PLAN, SECOND FLOOR


A REFLECTED CEILING PLAN, CEILING ISOMETRIC DETAIL, CEILING
6 SECTION DETAIL, SCHEDULE OF CEILING FINISHES, TYPICAL GLASS
WALL PARTITION DETAILS
STAIR DETAIL PLAN, STAIR DETAIL LONGITUDINAL SECTION, STAIR
A DETAIL CROSS SECTION, TYP. DETAIL OF SECTION OF STAIR LANDING,
7 TYP. DETAIL OF SECTION OF STAIR STEPS, SPOT DETAIL (NON-SKID
NOSING STRIP), SPOT DETAIL (TYP. HANDRAIL)
ARCHITECTURAL
A RAMP PLAN, RAMP SECTION, HANDRAIL SECTION, HANDRAIL
8 SPOT DETAIL, SPOT DETAIL SECTION OF RAMP FLOORING, TOILET
DETAIL PLAN, TOILET DETAIL SECTION

STRUCTURAL

S GENERAL CONSTRUCTION NOTES


1
NOTE:
ALL COLORS SHALL BE
PERSPECTIVE APPROVED BY THE END-USER S
2
GENERAL CONSTRUCTION NOTES
STRUCTURAL

FOUNDATION PLAN, SCHEDULE OF FOOTING, REINFORCED


S
CONCRETE COLUMN SCHEDULE, COLUMN DETAIL,
3
FOUNDATION DETAIL (ISOLATED), WALL FOOTING DETAIL

S GROUND FLOOR FRAMING PLAN, SECOND FLOOR FRAMING


4 PLAN, ROOF FRAMING PLAN, SCHEDULE OF SLAB

SCHEDULE OF GIRDERS AND BEAMS, TYPICAL MOMENT


S FRAME GIRDER DETAIL, STAIR PLAN DETAIL, STAIR SECTION
5 DETAIL, DETAIL OF SECTION OF STAIR ON FILL, DETAIL
SECTION OF RAMP
SANITARY
PLUMBING

GROUND FLOOR WATER LINE LAYOUT, SECOND FLOOR WATER


P
LINE LAYOUT, WATER LINE LAYOUT ISOMETRIC DIAGRAM,
1
PLUMBING NOTES, PLUMBING LEGENDS

GROUND FLOOR SANITARY LAYOUT, SECOND FLOOR


P SANITARY LAYOUT, SANITARY LINE LAYOUT ISOMETRIC
2 DIAGRAM, DETAIL OF SEPTIC VAULT WITH REINFORCING BARS,
SCHEDULE OF TOP SLAB REINFORCEMENT

P STORM DRAINAGE LAYOUT, SITE DEVELOPMENT PLAN, CATCH


3 BASIN DETAIL, STORM DRAINAGE LAYOUT ISOMETRIC DIAGRAM ELECTRICAL

ELECTRICAL

GENERAL NOTES AND SPECIFICATIONS, SITE DEVELOPMENT


E
PLAN, GROUND FLOOR LIGHTING LAYOUT, GROUND FLOOR
1
POWER LAYOUT, GROUND FLOOR ACU LAYOUT

E SECOND FLOOR LIGHTING LAYOUT, SECOND FLOOR POWER


2 LAYOUT, SECOND FLOOR ACU LAYOUT

E ELECTRICAL LEGENDS AND SYMBOLS, SCHEDULE OF LOADS MECHANICAL


3 AND COMPUTATIONS, SINGLE LINE DIAGRAM, ELECTRICAL
RISER DIAGRAM

VICINITYMAP SITEDEVELOPMENTPLAN
DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

PERSPECTIVE VIEW
LOCAL PROGRAM - LOCAL INFRASTRUCTURE VICINITY MAP ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - SITE DEVELOPMENT PLAN A 2
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF TABLE OF CONTENTS
ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 1 8 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ARCHITECT II DATE: DATE: DATE:
SUMMARY OF QUANTITIES SCHEDULE OF QUANTITIES

NOTE:

1. THE STAKE-OUT SURVEY BETWEEN THE CONTRACTOR AND THE GOVERNMENT SHALL BE CONSIDERED AS THE FINAL PLAN.

2. THE ITEMS OF WORK IDENTIFIED WITH THE CORRESPONDING COMPUTED QUANTITIES IN THE APPROVED JOINT AS-STAKE SURVEY PLANS WILL BE BASIS OF PAYMENT.

REPUBLIC OF THE PHILIPPINES DRAFTED:


PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SUMMARY OF QUANTITIES ASHLEY A. CAPARAS
REGION IV-A LOCAL PROGRAM - LOCAL INFRASTRUCTURE SCHEDULE OF QUANTITIES ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES -
CAVITE 3RD DISTRICT MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF
PREPARED: RAMIL L. JULIANO REIMART REGIN P. BAUTISTA ELENA M. CASTILAN DONNIE D. CUNA A 3
ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEERING OFFICE MULTI-PURPOSE BUILDING AT MOLINO 4, 2 8 22
JANICE F. REDONDO
CARMONA, CAVITE SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ARCHITECT II DATE: DATE: DATE: DATE:
A B C A B C A B C
3 3 3
A-5 10000 A-5 10000 A-5 11200

5000 5000 5000 5000 600 5000 5000 600

2000 850 1200 950 925 1200 600 1200 1075 2000 850 1200 400450 925 1200 600 1200 1075

2 1 1 1 2 2 1 1

600

600
W W W W W W W W
1 1 1

600
EF EF EF
IWF-3

975
IWF-3
4

300
FL-3
PWD

1800
1900
W
ELEV. ±281.00
ELEV. ±3780.00
PANTRY
ELEV. ±3800.00
SHE

500 300 1200 300


FL-3 IWF-1 1
FL-2

3500
W 1
OFFICE 1

600 1200

SLOPE 2%

SLOPE 2%
RAMP DN 4
W
ELEV. ±3800.00
4800

4800

4800

4800

4800

4800
1300
5 3 D IWF-1
1450
2 D EWF-1 D FL-1
4

300
W 2
D G-WF W
1

1200
W EF HE IWF-1
EF 2 ELEV. ±3780.00

325 300300
1700
4
1450

W FL-3 2
MULTI-PURPOSE AREA LOBBY

350 150
3 IWF-2 D OFFICE 2 W

825
IWF-3
PANTRY

10450
W FL-1 ELEV. ±3800.00
ELEV. ±3800.00
ROOF SLAB
2 2 2

10900
FL-1

3050
ELEV. ±300.00 ELEV. ±300.00 FL-1
550

ELEV. ±7200.00

875
FL-2 IWF-2

11000
FL-6

400 1425 325


1

11600
5

300225 1200
1 W
1500

G-WF
12400

W W G-WF
1
IWF-2 W

600 1200
6 UP DN

300 175

SLOPE 2%

SLOPE 2%
D 20 4
4750

4750

4750

4750

4750
1 19 1 2 W
STO. 2
IWF-1 EWF-1 18 2 D OFFICE 3
3 17 3 ELEV. ±3800.00

6200
1200
1

2025
INFORMATION 6 IWF-2 FL-1

1200
1

3150
4 16 4
2700

W W
15 5 W 15 5

6 6

425 300
14 14
7 7 G-WF 4

300
13 13

1025
6 W

575
12 8 12 8

3 11 9

10 3 11 9

10
W
3

750
2
4 1 4 D TERRACE 4
1450

1450
EWF-1

1300

1300
LANDING D LANDING ELEV. ±3780.00
A-5 4 4 A-5 EWF-1 A-5
FL-2 W FL-5 ELEV. ±280.00
W FL-2 FL-5
2850

600
1 FL-5 7
ELEV. ±280.00
1200

RAMP UP W
FL-5 UP
FL-4

275 150 425 150 150150


3550 300300 1150 1900 300300300600 3550 1450 1414 2025 1562 600 3550 1450 5000 600

5000 5000 5000 5000 5600 5600

10000 10000 11200

1 GROUND FLOOR PLAN 2 SECOND FLOOR PLAN 3 ROOF PLAN


SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M
A-3 A-3 A-3

SCHEDULE OF WALL FINISHES


A B C C B A
4.5mm THK FIBER CEMENT DOUBLE WALL PARTITION, 300mm HEIGHT FROM FLOOR
G-WF FINISH, PAINTED FINISH, WITH 2.10m HEIGHT ALUMINUM FRAMED GLASS WALL

TOP OF PARAPET WALL TOP OF PARAPET WALL


EL ± 8600.00 EL ± 8600.00
PLAIN CEMENT
100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT PLASTER
PLAIN CEMENT
FINISH WITH
IWF-1 PAINTED FINISH
1400

1400
150

150

FINISH WITH
GROVE (PAINTED)
GROVE (PAINTED)
ROOF SLAB
EL ± 7200.00
ROOF SLAB
EL ± 7200.00 IWF-2 4.5mm THK FIBER CEMENT DOUBLE WALL PARTITION
550

550
125

125

CEILING LINE CANOPY LINE 1.5 x 50 x 50mm CEILING LINE CANOPY LINE
EL ± 6300.00 EL ± 6375.00 F FF TUBULAR FRAME EL ± 6300.00 EL ± 6375.00 200 X 300 mm VITRIFIED GLAZED TILE WALL FINISH
PLAIN CEMENT
7 F F F
RAILINGS SPRAY PLAIN CEMENT EF EF
IWF-3 - TYPICAL ON ALL TOILET WALLS
W
3400

3400

FINISH (PAINTED) 2 6 PAINTED FINISH (PAINTED)


D
2575

2575

F FF FW F F FINISH WITH 1.5 x 25 2 2


x 25mm TUBULAR W W CANOPY
PLAIN CEMENT CANOPY (PAINTED 1 1 (PAINTEDFINISH) EWF-1 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER PAINTED FINISH
STEEL SPACED @
8600

8600

FINISH WITH FINISH) W W


GROVE (PAINTED) F FF F F F 125mm O.C.
SECOND FLOOR SECOND FLOOR
EL ± 3800.00 EL ± 3800.00
HOME OWNER'S ASSOCIATION
800

800

CEILING LINE
EL ± 3000.00 CANOPY LINE 1 STAINLESS STEEL
CEILING LINE
EL ± 3000.00 CANOPY LINE SCHEDULE OF FLOOR FINISHES
125

125

EL ± 2875.00 EL ± 2875.00
D
LETTERING (BY OTHERS)
EF 600 X 600 mm GLAZED TILE FLOOR FINISH
3500

3500

50 mm Ø G.I. PIPE FL-1 (SUBMIT SAMPLE FOR APPROVAL)


2575

2575

F F F F F 2
HANDRAIL FULLY
PLANT BOX W
WELDED WITH 1 1 1 600 X 600 mm TEXTURED CERAMIC TILE (NON-SKID) FLOOR FINISH
PAINTED FINISH W W W FL-2 (SUBMIT SAMPLE FOR APPROVAL)
GROUND FLOOR 4 4 GROUND FLOOR
EL ± 300.00 NATURAL GRADE LINE W W EL ± 300.00 NATURAL GRADE LINE
200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH (SIZE AND/OR COLOR FOR
EL ± 00.00 EL ± 00.00
FL-3 APPROVAL BY END-USER) PROVIDE WATER BASE WATERPROOFING
300

300

NON-SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES AT


FL-4 100mm O.C.
4 FRONT ELEVATION 5 REAR ELEVATION
SCALE 1:100 M SCALE 1:100 M FL-5 NON-SKID CEMENT FLOOR FINISH
A-3 A-3
FL-6 PLAIN CEMENT FLOOR FINISH WITH WATER PROOFING

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

GROUND FLOOR PLAN


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SECOND FLOOR PLAN ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - ROOF PLAN A 4
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF FRONT ELEVATION
REAR ELEVATION ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 3 8 22
SCHEDULE OF WALL FINISHES
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE SCHEDULE OF FLOOR FINISHES ARCHITECT II DATE: DATE: DATE: DATE:
1 2 3 3 2 1

TOP OF PARAPET WALL TOP OF PARAPET WALL


EL ± 8600.00 EL ± 8600.00
PLAIN CEMENT
PLAIN CEMENT
FINISH WITH

1400

1400
150

150
FINISH WITH
GROVE (PAINTED)
GROVE (PAINTED)
ROOF SLAB ROOF SLAB
EL ± 7200.00 EL ± 7200.00

550

550
1.5 x 50 x 50mm

125

125
CEILING LINE CANOPY LINE CEILING LINE CANOPY LINE TUBULAR FRAME
EL ± 6300.00 EL ± 6375.00 EF EL ± 6300.00 EL ± 6375.00
F F F F F RAILINGS SPRAY
PAINTED
3400

3400
1 1 1
FINISH WITH 1.5 x 25 W W W

2575

2575
2 F F F F F F F F F F F
CANOPY (PAINTED W x 25mm TUBULAR CANOPY (PAINTED
FINISH) STEEL SPACED @ FINISH)
8600

8600
125mm O.C. 4 4 4
F F F F F W W W
SECOND FLOOR SECOND FLOOR
EL ± 3800.00 EL ± 3800.00
5 6
800

800
W W PLAIN CEMENT PLAIN CEMENT
CEILING LINE
CANOPY LINE
PLAIN CEMENT CEILING LINE
CANOPY LINE FINISH (PAINTED)
EL ± 3000.00 EL ± 3000.00 FINISH WITH
125

125
EL ± 2875.00 FINISH WITH EL ± 2875.00
GROVE (PAINTED) GROVE (PAINTED)
EF
3500

3500
PLAIN CEMENT
50 mm Ø G.I. PIPE
FINISH (PAINTED) 2
2575

2575
3 50 mm Ø G.I. PIPE HANDRAIL FULLY
W
W 1 HANDRAIL FULLY WELDED WITH 1 1 1 1
W WELDED WITH PAINTED FINISH W W W W
GROUND FLOOR PAINTED FINISH GROUND FLOOR
EL ± 300.00 NATURAL GRADE LINE EL ± 300.00 NATURAL GRADE LINE
EL ± 00.00 EL ± 00.00
300

300
1 LEFT SIDE ELEVATION 2 RIGHT SIDE ELEVATION
SCALE 1:100 M SCALE 1:100 M
A-4 A-4

3 2 1 A B C

TOP OF PARAPET WALL TOP OF PARAPET WALL


EL ± 8600.00 EL ± 8600.00
1400

1400
150

150
ROOF SLAB ROOF SLAB
EL ± 7200.00 EL ± 7200.00
550

550
125

125
CEILING LINE CANOPY LINE CEILING LINE CANOPY LINE
EL ± 6375.00 2 EL ± 6375.00
EL ± 6300.00 EL ± 6300.00
F F F F F W EF

19 mm SQUARE BAR ALUMINUM FIXED


3400

3400
PLAIN CEMENT 5 4 5
WINDOW
RAILING WITH D
F F F F F
2575

2575
FINISH WITH F W
F F F W F
CLEAR GLASS
PAINTED FINISH FULLY
GROVE (PAINTED)
WELDED ON G.I. PIPE
8600

8600
HANDRAIL SPACED @
F F F F F OFFICE 3
SECOND FLOOR 20 HE SHE SECOND FLOOR 150mm O.C. 20 LOBBY
EL ± 3800.00 19 EL ± 3800.00 19
18 18
PLAIN CEMENT
800

800
17 17
16 FINISHED (PAINTED) 16
CEILING LINE 15 CEILING LINE 15
CANOPY LINE 14 CANOPY LINE 14
EL ± 3000.00 2 EL ± 3000.00
125

125
EL ± 2875.00 13 EL ± 2875.00 13
12 W 12 CEILING (4.5 mm
50 mm Ø G.I. PIPE 11 EF
600 X 600 mm 11
3500

3500
HANDRAIL FULLY
LANDING
TEXTURED LANDING FIBER CEMENT
BOARD ON METAL
2575

2575
WELDED WITH CERAMIC TILE
3 6 FRAME CEILING)
PAINTED FINISH STORAGE (NON-SKID) FLOOR
1 W STORAGE 1 1
FINISH WITH
W NOSING W W
GROUND FLOOR PWD GROUND FLOOR MULTI-PURPOSE AREA
EL ± 300.00 NATURAL GRADE LINE EL ± 300.00 NATURAL GRADE LINE
EL ± 00.00 EL ± 00.00
300

300
3 LONGITUDINAL SECTION 4 CROSS SECTION
SCALE 1:100 M SCALE 1:100 M
A-4 A-4

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEFT SIDE ELEVATION


LOCAL PROGRAM - LOCAL INFRASTRUCTURE RIGHT SIDE ELEVATION ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - LONGITUDINAL SECTION A 5
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF CROSS SECTION
ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 4 8 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ARCHITECT II DATE: DATE: DATE: DATE:
900 800 800 1000 800
1900
2150

2150

2150

2150

2150

2150
KICK PLATE

1 2 3 4 5 6
D D D D D D

PANEL DOOR OR APPROVED EQUAL GLASS DOOR OR APPROVED EQUAL PVC HOLLOW CORE FLUSH DOOR WITH PVC HOLLOW CORE FLUSH DOOR PVC HOLLOW CORE FLUSH DOOR WITH LOUVER PLYBOARD HOLLOW CORE FLUSH
SWING TYPE W/ LEVER TYPE DOOR SWING TYPE LOUVER OR APPROVED EQUAL SWING OR APPROVED EQUAL SWING TYPE AND KICK PLATE OR APPROVED EQUAL SWING DOOR OR APPROVED EQUAL SWING
KNOB TYPE W/ LEVER TYPE DOOR KNOB W/ LEVER TYPE DOOR KNOB TYPE W/ LEVER TYPE DOOR KNOB TYPE W/ LEVER TYPE DOOR KNOB
1 SET 4 SETS 2 SETS 1 SET 1 SET 1 SET

1500
1425 2025
420 660 420
712.50 712.50 670 685 670

600
1200 1200 600 300 F FF

600

600
F F F F F
400

600
1000

2750
1550
F F F F F F F FF

2575

2575
1375

1375
1750
1700

1500
1100

600

600

600
F F F F F F FF

400
1 2 3 4 5 6 7
W W W W W W W

ALUMINUM SLIDING WINDOW ALUMINUM SLIDING WINDOW AWNING WINDOW ALUMINUM FIXED WINDOW ALUMINUM FIXED WINDOW ALUMINUM FIXED WINDOW ALUMINUM FIXED WINDOW
CLEAR GLASS CLEAR GLASS CLEAR GLASS CLEAR GLASS CLEAR GLASS CLEAR GLASS CLEAR GLASS

13 SETS 5 SETS 1 SET 11 SETS 1 SET 2 SETS 1 SET

1 SCHEDULE OF DOORS AND WINDOWS


A-5 SCALE 1:50 M

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

SCHEDULE OF DOORS AND WINDOWS


LOCAL PROGRAM - LOCAL INFRASTRUCTURE ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - A 6
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 5 8 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ARCHITECT II DATE: DATE: DATE: DATE:
A B C A B C
10000 10000 0.40x25x25mm WALL ANGLE
150mm THK WALL
5000 5000 5000 5000
550
HANGER, FROM 0.8 x13 x 38mm
2000 450 2150 400400 4050 500 2050 400 2000 400 400 4100 550 500 CARRYING CHANNEL
METAL FURRING, 0.40x19x50mm @ 0.40M O.C.
CONCRETE CONCRETE CONCRETE CONCRETE 4.5mm THK FICEM BOARD /

500

550 500
CL-2 CL-2 CL-2 CL-2
1 CANOPY CANOPY
1 CANOPY CANOPY
6.0mm GYPSUM BOARD

550
ELEV. ±3100.00 ELEV. ±3100.00 ELEV. ±6300.00 ELEV. ±6400.00
CONCRETE

CONCRETE
SHE
CANOPY

PWD CL-1

CANOPY
1800
1900

OFFICE 1

CL-2
ELEV. ±2700.00 ELEV. ±6300.00

CL-2
40
CL-1 CL-1 PANTRY 12 0 CARRYING CHANNEL,

2500
00
ELEV. ±6300.00 ELEV. ±6400.00 40 0.8x13x38mm @ 1.20M O.C.
4800

4800

4800

4800
CL-1 0

1300
CL-1
CL-2

CL-2
1450

ELEV. ±6300.00
CL-1
ELEV. ±3000.00 W-CLIP

CONCRETE
ELEV. ±3100.00

CANOPY
CL-1

CONCRETE

450450
ELEV. ±6400.00

CANOPY
CL-1
CONCRETE

ELEV. ±6300.00
PANTRY ELEV. ±6400.00

1700
CANOPY
1600

ELEV. ±3100.00

2
MULTI-PURPOSE AREA
2
HE LOBBY
ELEV. ±6300.00
OFFICE 2
3 CEILING ISOMETRIC DETAIL

8600
ELEV. ±3000.00

2150
CL-1 ELEV. ±3100.00 CL-1 NOT TO SCALE
A-6
400 700 400400
11000

11000

11000

11000
CL-2
1650

CL-2
ELEV. ±3000.00 ELEV. ±6400.00 CL-1

CL-2
ELEV. ±3100.00 ELEV. ±6300.00
CL-2

CL-1 CL-1 CL-1

450450
ELEV. ±6400.00

400400400
ELEV. ±3000.00 ELEV. ±6400.00
ELEV. ±6400.00
4750

4750

4750

4750
ELEV. ±6550.00

CONCRETE
ELEV. ±3000.00
ELEV. ±3100.00

ELEV. ±3000.00

OFFICE 3

CANOPY
ELEV. ±6450.00

ELEV. ±6300.00

CONCRETE
ELEV. ±6400.00
CONCRETE

CANOPY
CANOPY

2200
2700

ELEV. ±6550.00
CL-1
CL-1
B C

2400
OPEN ELEV. ±6300.00

CL-2
ELEV. ±3100.00

400500400 400
3 3
ELEV. ±6400.00

1450 350
CONCRETE
CL-2 CL-2

400400
1450

1450

1450

1450
ELEV. ±3200.00 ELEV. ±6450.00 CANOPY 1200 1200 1200 400
CL-3
ELEV. ±3300.00
ELEV. ±6550.00 TERRACE

3550 400 5650 400 500 2550 1950 400400 3250 400 550 2B-2A 2B-2A
5000 5000 5000 5000

100
10000 10000

1 GROUND FLOOR REFLECTED CEILING PLAN 2 SECOND FLOOR REFLECTED CEILING PLAN CARRYING CHANNEL,
0.8x13x38mm @ 1.20M
SCALE 1:100 M SCALE 1:100 M
A-6 A-6 O.C.

FIBER CEMENT CEILING


BOARD 4.5mm THK

HANGER, FROM 0.8


x13x38mm CARRYING
CHANNEL

4.5MM THK FICEM BOARD,


CEILING (PAINTED FINISH)
4.5MM THK FICEM BOARD, WALL
PARTITION (PAINTED FINISH)
CEILING LINE
4 CEILING SECTION DETAIL
SCALE 1:30 M
varies

AC UNIT A-6

GLASS WALL GLASS WALL GLASS WALL


2 F F

4.5MM THK FICEM BOARD, D


2100

SWITCH
WALL PARTITION
(PAINTED FINISH) 4.5MM THK FICEM BOARD,
SCHEDULE OF CEILING FINISHES
WALL PARTITION
(PAINTED FINISH) CL-1 CEILING (4.5 mm FIBER CEMENT BOARD ON METAL FRAME CEILING)
900

CL-2 EXPOSED UNDER SLAB (PAINTED)


ELECT. OUTLETS
FLOOR FINISH
CL-3 PVC CEILING PANEL BOARD (NOT INCLUDED IN THE PROGRAM)
SECTION ELEVATION

5 TYPICAL GLASS WALL PARTITION DETAILS


SCALE 1:40 M
A-6

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

GROUND FLOOR REFLECTED CEILING PLAN


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SECOND FLOOR REFLECTED CEILING PLAN ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - CEILING ISOMETRIC DETAIL A 7
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF CEILING SECTION DETAIL
SCHEDULE OF CEILING FINISHES ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 6 8 22
TYPICAL GLASS WALL PARTITION DETAILS
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ARCHITECT II DATE: DATE: DATE: DATE:
3 2 A
A A
2 2
A-8 A-8
3250 3250

1625 1625 1625 1625


F F F F F LOBBY
LOBBY
SECOND FLOOR 20 SECOND FLOOR 20
EL ± 3800.00 EL ± 3800.00 19

10 RISER @ 175.00=1750mm
19

10 RISER @ 175.00=1750mm 10 RISER @ 175.00=1750mm


2 PANTRY 2 17
18 18
17
FL-2 16 16
600 X 600 mm
15 15
TEXTURED
MULTI-PURPOSE 14
CERAMIC TILE
14
AREA LOBBY 13 (NON-SKID) FLOOR 13
2050

2050

2050
FL-1 FL-1 12 FINISH WITH 12

2100
11 NOSING 11
LANDING

3500
LANDING 10

3500
UP DN
20 STORAGE 6

1750
1 1
19 1
4750

4750
STORAGE
STORAGE 2 2
18 W

10-TREADS @ 175=1750mm

10-TREADS @ 175=1750mm
3 17 3

4 4 GROUND FLOOR GROUND FLOOR


16 EL ± 300.00 EL ± 300.00

300
300
2700

2700
5 5 NATURAL GRADE LINE NATURAL GRADE LINE
15 15 EL ± 000.00 EL ± 000.00

14 6 14 6

13 7 13 7

12 8 12 8

9 9
3 11
10
3 11
10

3 3 2 STAIR DETAIL LONGITUDINAL SECTION 3 STAIR DETAIL CROSS SECTION


1300

1300
1200
1450

A-8 LANDING A-8 LANDING SCALE 1:50 M SCALE 1:50 M


FL-2 FL-2 A-7 A-7
CL

1625 1625 1625 1625 350


19 mm SQUARE BAR VERTICAL
3250 3250 RAILING WITH EPOXY PAINTED FINISH
(FULLY WELDED ON G.I. PIPE HANDRAIL)
6 mm THK. NON-SKID
METAL NOSING STRIP
GROUND FLOOR PLAN SECOND FLOOR PLAN (SUBMIT SAMPLE)
19 mm SQUARE BAR VERTICAL
RAILING EMBEDDED ON REINFORCED

1 STAIR DETAIL PLAN CONCRETE STAIR

50
SCALE 1:50 M REINFORCED
A-7 A-8
7
CONCRETE STAIR
600 x 600mm TEXTURED CERAMIC TILE
(NON-SKID) FLOOR FINISH (FL-2)
38 mm Ø G.I. PIPE HANDRAIL
WITH PAINTED FINISH
(FULLY WELDED ON STEEL
BAR RAILING)
38 mm Ø G.I. PIPE HANDRAIL
WITH PAINTED FINISH
6 mm THK. NON-SKID METAL SPOT DETAIL
NOSING STRIP (SEE DETAIL)
(FULLY WELDED ON STEEL
BAR RAILING) REINFORCED CONCRETE STAIR
6 (NON-SKID NOSING STRIP)
SCALE 1:5 M

900
(SEE STRUCTURAL DETAIL)
A-7
175

19 mm SQUARE BAR RAILING


WITH EPOXY PAINTED FINISH
175
900

(FULLY WELDED ON G.I. PIPE HANDRAIL)


600 x 600mm TEXTURED 38
CERAMIC TILE (NON-SKID) 38 mm Ø PIPE HANDRAIL WITH PAINTED
175

6
FLOOR FINISH (FL-2) A-8 FINISH (900 mm HIGH FROM FINISH FLOOR

38
LINE-LANDING)

(TYPICAL DEPTH)
175

LANDING 19 mm SQUARE BAR RAILING


WITH EPOXY PAINTED FINISH FULLY WELDED

100 mm
(FULLY WELDED ON G.I. PIPE
175
175

HANDRAIL)
19 mm SQUARE BAR VERTICAL RAILING
175

REINFORCED CONCRETE 50 50 50 50 50
LANDING SLAB (EXPOSED 6
UNDER SLAB WITH PAINTED 1250 A-8 300 300 300 300 300
FINISH) 300

4 TYP. DETAIL OF SECTION OF STAIR LANDING 5 TYP. DETAIL OF SECTION OF STAIR STEPS 7 SPOT DETAIL (TYP. HANDRAIL)
SCALE 1:15 M SCALE 1:15 M SCALE 1:5 M
A-7 A-7 A-7

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

STAIR DETAIL PLAN


LOCAL PROGRAM - LOCAL INFRASTRUCTURE STAIR DETAIL LONGITUDINAL SECTION ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - STAIR DETAIL CROSS SECTION A 8
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF TYP. DETAIL OF SECTION OF STAIR LANDING
TYP. DETAIL OF SECTION OF STAIR STEPS ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 7 8 22
SPOT DETAIL (NON-SKID NOSING STRIP)
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE SPOT DETAIL (TYP. HANDRAIL) ARCHITECT II DATE: DATE: DATE: DATE:
NON-SKID CEMENT 50 mm Ø G.I. PIPE
FLOOR FINISH WITH HANDRAIL FULLY
A 6mm GROOVE LINES
AT 100mm O.C.
WELDED (EPOXY
PAINTED FINISH)
B 2-50mm Ø G.I. PIPE HANDRAIL WITH
50mm Ø VERTICAL SUPPORT
100
100 x 100 CONCRETE SKIRTING
NON - SKID CEMENT
FLOOR FINISH WITH 6 mm
19mm/VARIABL
E 19mm/VARIABL
E
HORIZONTAL GROOVE
LINES 6 6 mm THK.
6
GROOVE LINE

200
3 12mm Ø STEEL DOWEL EMBED IN

6
CONCRETE

900

600
50mmØ G.I. PIPE VERTICAL SUPPORT

100
NON-SKID PLAIN CEMENT FLOOR FINISH @ 1000mm O.C. PROVIDE

150
WITH GROOVE LINES REINFORCED CONCRETE SLAB

100
12mmØ STEEL DOWELS

150
300 3550 1500 1100

100
100

5
2 A-9
A-9
SPOT DETAIL SECTION

1300
1500
RAMP UP LANDING
1400
1200

FL-4
3
A-9
FL-5
4 HANDRAIL SECTION 5 HANDRAIL SPOT DETAIL 6 OF RAMP FLOORING
100

100
SCALE SCALE M SCALE M
A-8 1:20 M
A-8 1:10
A-8 1:15

300 5150 1000


6450

1
1 RAMP PLAN 1700

A-8 SCALE 1:50 M 1 2 1


CEILING (4.5 mm FIBER
CEMENT BOARD ON
1850 4800 METAL FRAME CEILING)

100 1700 150 100 1600 100 1200 100 1600 150
PLAIN CEMENT FINISHED
A B (PAINTED)

A A

950

400
2
W
NON-SKID CEMENT 50 mm Ø G.I. PIPE LAV FD FD LAV LAV FD
FLOOR FINISH WITH HANDRAIL FULLY
EF SINK EF
WC WC WC

2420
6mm GROOVE LINES WELDED (EPOXY

670
AT 100mm O.C. PAINTED FINISH)

1800

1800

1719
245 630 1000 1000 1000
RAMP PWD 2 9 FL-3 FL-3 2
6 FL-3 10 LAV
DN W A-9
SHE W
D HE 4 4
A-9

800

800
URI D D
WC

350
4

19
A-9

PWD GRAB BAR

550 250
800
800

GROUND FLOOR
EL ± 300.00 TOILET DETAIL PLAN TOILET DETAIL PLAN TOILET DETAIL SECTION
300

280
100
100

NATURAL GRADE LINE


EL ± 000.00

7 (GROUND FLOOR) 8 (SECOND FLOOR) 9 (GROUND FLOOR)


SCALE 1:50 M SCALE 1:50 M SCALE 1:50 M
100 THK. GRAVEL BEDDING A-8 A-8 A-8

2 RAMP SECTION
A-8 SCALE 1:50 M 2 1
1600 100 1200 100 1600

B A CEILING (4.5 mm FIBER


CEMENT BOARD ON
METAL FRAME CEILING)
SCHEDULE OF FLOOR FINISHES
50 mm Ø G.I. PIPE NON-SKID CEMENT
HANDRAIL FULLY FLOOR FINISH WITH PLAIN CEMENT FINISHED 600 X 600 mm GLAZED TILE FLOOR FINISH
WELDED (EPOXY 6mm GROOVE LINES
EF (PAINTED) FL-1 (SUBMIT SAMPLE FOR APPROVAL)
400 400

PAINTED FINISH) AT 100mm O.C.


800

2 600 X 600 mm TEXTURED CERAMIC TILE (NON-SKID) FLOOR FINISH


762.50 762.50 1000 1000 1000 630 245 W FL-2 (SUBMIT SAMPLE FOR APPROVAL)

700
200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH (SIZE AND/OR COLOR FOR
2520

2520
FL-3 APPROVAL BY END-USER) PROVIDE WATER BASE WATERPROOFING
1120

200
4
1720

A-9
NON-SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES AT

100
SINK
LAV LAV FL-4 100mm O.C.
URI

800
600
800

WC WC

20 350
FL-5 NON-SKID CEMENT FLOOR FINISH
550 250
100

800

GROUND FLOOR
EL ± 300.00
300

280

FL-6 PLAIN CEMENT FLOOR FINISH WITH WATER PROOFING


100

NATURAL GRADE LINE


EL ± 000.00
100

100 THK. GRAVEL BEDDING


TOILET DETAIL SECTION
10 (SECOND FLOOR)
3 RAMP SECTION SCALE 1:50 M
SCALE 1:50 M A-8
A-8

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

RAMP PLAN
LOCAL PROGRAM - LOCAL INFRASTRUCTURE RAMP SECTION ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - HANDRAIL SECTION A 9
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF HANDRAIL SPOT DETAIL
SPOT DETAIL SECTION OF RAMP FLOORING ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 8 8 22
TOILET DETAIL PLAN
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE TOILET DETAIL SECTION ARCHITECT II DATE: DATE: DATE: DATE:
GENERALCONSTRUCTIONNOTES
GENERAL NOTES NOTES ON CONCRETE MIXES & PLACING
1. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT 3. IF SLABS AR E REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED
1.0 STANDARDS AND REFERENCES
(28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMP AS FOLLOWS. BELOW THOSE ALONE THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN FOR
THE FOLLOWING SHALL GOVERN THE DESIGN FABRICATION AND CONSTRUCTION OF THE PROJECT.
MAX. SIZE OF REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN STRIPS
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P 2015) VOL. 1, SEVENTH EDITION. LOCATION 28 DAYS STRENGTH MAX SLUMP SHALL
) SLAB NOT
THICKNESS.
BE MORE THAN ONE AND A HALF ( 1 1 2
AGGREGATE
2.0 DESIGN CRITERIA ALL OTHERS, INCLUDING 20 mm 100mm 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION AND
3000 PSI (20.7 MPa)
2.1 LOADINGS SHALL NOT BE LESS THAN 0.0025 X GROSS-SECTIONAL AREA (Ag) OF THE SLAB.

CONF. REINF.
BEAMS JOINT HOOP SPACE @ "2Sh" WHEN
COLUMNS 3000 PSI (20.7 MPa) 20 mm 100mm ( SEE SCHEDULE BELOW)
A. DEAD LOAD THERE ARE BEAMS HAVING WIDTH OF
SUSPENDED SLAB 3000 PSI (20.7MPa) 20 mm 100mm AT LEAST ONE-HALF THE COLUMN

D JOINT REINF. D
CONCRETE 23.56 kN/m3 20 mm 100mm
SLAB ON FILL 2500 PSI (17.5 MPa) SCHEDULE OF MINIMUM SLAB REINFORCEMENT WIDTH & DEPTHS NOT LESS THAN
STEEL 76.93 kN/m3
THREE QUARTERS OF THE DEEPEST
150 mm THK. CHB WALL 3.30 kPa 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. MINIMUM TEMPERATURE BARS BEAM THAT FRAME INTO FOUR

CONF. ZONE
100 mm THK. CHB WALL 3.17 kPa SUSPENDED SLABS 20mm 100 mm 10mm Ø @ 250mm EACH WAY SIDES OF THE COLUMN. ALL OTHER

SPECIAL
FLOOR 5.69 kPa SLAB ON GRADE 40mm 125 mm 10mm Ø @ 250mm EACH WAY CONDITIONS USE HOOPS @ "Sh" CENTERS.

Sh
B. LIVE LOAD WALLS ABOVE THE GRADE 25mm
150 mm 10mm Ø @ 250mm EACH WAY
OFFICE 2.40 kPa BEAM STIRRUPS AND COLUMN TIES 40mm 175 mm 10mm Ø @ 250mm EACH WAY

CONF. ZONE
C. WIND LOAD WHERE CONCRETE IS EXPOSED TO FOR COL. BAR SPLICES SEE TABLE
EARTH BUT POURED AGAINST FORMS 200 mm 10mm Ø @ 250mm EACH WAY OF MIN. LAP SPLICE LENGTH OF
P = qh [(GCpf)-(GCpi)] (DESIGN WIND PRESSURE) 50mm
WHERE CONCRETE IS DEPOSITED COLUMN REINFORCEMENT
WHERE: qh = VELOCITY PRESSURE (kPa) 75mm 5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED WITH 10mm Ø
DIRECTLY AGAINST EARTH

CONF. ZONE
GCpf = EXTERNAL PRESSURE COFFECIENT AT 250mm O.C. EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME SHALL

SPECIAL
NOT BE LESS THAN 3.65 METER APART.

Sh
GCpf = INTERNAL PRESSURE COFFECIENT 3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSISITON WITHOUT SEGREGATION. RE-HANDLING

D
D. SEISMIC LOAD
OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES , BUCKETS OR WHEELBARROWS, 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOES EDGES) NOTE:

D JOINT REINF.
NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM HOPPERS TO BUIGGIES, AS SHOWN BELOW. ALL CONCRETE REINF. DETAIL SHOULD
BE DONE IN ACCORDANCE WITH ACI
V = Cvl W (DESIGN BASE SHEAR) WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED SIX (6) METERS 7. CONCRETE SLAB REINFORCEMENT BE PROPERLY SUPPORTED WITH 10mm STEEL CHAIR
RT DETAILING MANUAL (LATEST EDITION)

CONF. REINF.
IN AGGREGATE LENGTH. OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS.
Vmax = 2.50CaI W Vmin = 0.11 CalW 4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS
RT
Vmin = 0.80 ZNvI W (ZONE 4) AUTHORIZED IN WRITING DESIGNER AND ONLY FOR UNUSUAL CONDITIONS WHERE VIBRATIONS
R Ø12x1000 LONG AT
ARE EXTREMELY DIFFICULT TO ACCOMPLISH. MID-DEPTH OF SLAB
WHERE: W = TOTAL DEAD LOAD TYPICAL COLUMN ELEV. SHOWING
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED & SECURED
T = NATURAL PERIOD = Ct (h) IN PLACE PRIOR TO PLACING OF CONCRETE. DOWN INTO EDGE BEAM. EXTENDED AT EACH CORNER
WHERE: C = NUMERICAL COEFFICIENT 4-Ø 12@ 1800 LONG TOP BARS BEND 1-Ø12 TOP &
DOWELS AND TIES SPACING
6. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS IMMEDIATELY BARS MIN. OF 1,200 (4'-0") INTO BARS. BOTT. BARS
h = BUILDING HEIGHT
AFTER POURING BY THE USE O WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER
I = IMPORTANCE FACTOR = 1.50 4-Ø12 BOTT. BARS
APPROVED METHODS.

400
R = NUMERICAL FACTOR = 8.50
7. STRIPPING OF FORMS AND SHORES: LAP SPLICE LENGTH:
SEISMIC COEFFICIENT Cv = 0.44 Nv 24 HOURS AT ANY LEVEL NO MORE THAN
Ca = 0.64 Nv FOUNDATION
SUSPENDED SLAB EXCEPT WHEN 0 SLAB 38mm ALTERNATE BARS SHOULD BE
NEAR SOURCE FACTOR (5 km) Nv = 1.0
8 DAYS
0 60
OPENING CLEAR SPLICED. MIN. DISTANCE BET.
ADDITIONAL LOADS ARE IMPOSED 60
Na = 1.2 21 DAYS TWO ADJACENT BARS SPLICES
WALLS SHALL BE 600mm.
Z = SEISMIC ZONE = 0.40 (ZONE 4)

CONF. REINF. TIES LAT. TIES H (CLEAR HEIGHT OF COL.)


400
BEAMS 14 DAYS
S = SOIL TYPE = D 21 DAYS L
COLUMNS
2.2 DESIGN STRESSES

WITHIN CENTER
IN TWO WAY SLAB EXTEND
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE

HALF OF "H"
BARS UP TO BEAM SUPPORT

60
A. CONCRETE COMPRESSIVE STRENGTH @ 28 DAYS: CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE

0
0.25L
a. FOOTINGS, COLUMNS, BEAMS AND SLABS f'c = 20.7 MPa (3,000 psi) POURING FOR APPROVAL. OMIT TRIMMER BARS WHERE
OPENING IS FRAMED BY BEAM TOP BARS @ SUPPORT (CONT.)
b. SLAB ON FILL f'c = 17.5 MPa (2,500 psi) 9. THE CONTRACTOR SHALL FURNISH AND MAITAIN ADEQUATE FORMS AND SHORINGS UNTIL THE TYPICAL CORNER SLAB DETAIL REQ'D. BOTT. BARS @ SUPPORT
C. SLAB f'c = 20.7 MPa (3,000 psi) CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH. TYPICAL SLAB

JT. REINF.
B. REINFORCING STEEL BARS OPENING DET.
a. FOR BARS 16mm AND GREATER (INTERMEDIATE GRADE DEFORMED BAR) fy = 414 MPa (60,000 psi)
b. FOR BARS LESS THAN 16mm (STRUCTURAL GRADE DEFORMED BAR) fy = 275 MPa (40,000 psi) NOTES ON FOOTINGS
C. MASONRY UNIT (CHB) 1. FOOTINGS ARE DESIGNED FOR AN ALLOWANCE SOIL BEARING PRESSURE OF 145 KPa (2000psf).
NON - LOADING BEARING CHB WALLS fm' = 3.45 MPa (500 psi) CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING ,THE ACTUAL SOIL CONDITIONS
NOTES ON COLUMNS 0.165L SPLICE
BOTTOM BARS
AT MID SPAN
UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE DEPOSITING CONCRETE. 1. PROVIDE EXTRA SETS OF TIES AT 100 O.C. FOR TIED COLUMN REINFORCEMENT ABOVE 0.22L EXTRA TOP BARS
3.0 IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN. 2. FOOTING SHALL REST AT LEAST 1500mm BELOW NATURAL GRADE LINE UNLESS OTHERWISE @ SUPPORT
AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTIONS PURPOSES INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL EQUAL TO GREATER OF THE OVERALL THICKNESS OF COLUMN, 1/6 THE CLEAR HEIGHT OF
4.0 IN REFERENCES TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS IN FLOOR 3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE 75mm CLEAR FOR CONCRETE COLUMN OR 450mm.
SLABS , OPENINGS IN THE WALLS AND SLABS , INTERIOR PARTITIONS , LOCATIONS OF DRAINS ETC. DEPOSITED THE GROUND AND 50mm FOR CONCRETE DEPOSITED AGAINST A FORMWORK.
5.0 IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS BETWEEN THE
4. IN CASES WHERE THE SOIL CONDITION IS SUCH THAT THE MINIMUM ALLOWABLE SOIL PRESSURE
2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST
MONOLITHICALLY WIT HTHE CORE WITH A MINIMUM THICKNESS OF 40mm AND NOT LESS
TYP. DETAIL OF COL. LAP SPLICE
OF 96KPa (2000 psf) CAN NOT BE ATTAINED AT A PRACTICAL DEPTHS THE USE OF MICROPILES ,
STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTORS SHALL NOTIFY BOTH THE BORED PILES, OR DRIVEN PILES MAY BE ADOPTED IN LIEU OF STANDARD ISOLATED FOOTINGS. THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS. & EXT. GIRDER TO COL. CONNECT.
STRUCTURAL ENGINEER AND ARCHITECTS. 3. WHERE COLUMNS CHANGE IN SIZE ,VERTICAL REINFORCEMENT SHALL BE OFFSET AT A
6.0 ALL CONCRETE WORKS AND CONCRETE REINFORCEMENTS SHALL BE DONE IN ACCORDANCE WITH THE SLOPE MONOLITHICALLY WITH THE CORE WITH MINIMUM THICKNESS OF 40mm AND
ACI.318-14 BUILDING CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS ACCORDING WITH THE
NOTES ON REINFORCEMENT NOT LESS THAN 40 TIMES THE MAXIMUM SIZE COARSE AGGREGATE IN MILLIMETERS
WITH THE AISC-05 IN SOFAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENT. 1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS SHALL BE: 4. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN NOTES ON BEAMS AND GIRDERS
A. FOOTINGS , FOOTING BEAMS AND GIRDERS fy = 414 MPa ( 60,000 psi ) REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND
7.0 ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC REFERS TO AMERICAN INSTITUTE OF STEEL B. COLUMNS AND SHEAR WALLS fy = 414 MPa ( 60,000 psi ) 1. UNLESS, OTHERWISE NOTED IN PLANS , CAMBER ALL BEAMS AND GIRDER AT
CONSTRUCTION AND ASTM REFERS TO AMERICAN SOCIETY FOR TESTING MATERIALS. THE SPLICE LENGTH SHALL BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED
C. BEAMS AND GIRDER fy = 414 MPa ( 60,000 psi ) LEAST 6mmØ FOR EVERY 4.5O M OF SPAN , EXCEPT CANTILEVERS FOR WHICH
MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS
8.0 CONSTURCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR D. NON-LOAD BEARING WALL PARTITIONS ,BEDDED SLABS , FLOOR & ROOF SLABS, THE CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER
PARAPETS ,CATCH BASIN,SIDE WALK fy = 275 MPa ( 40,000 psi ) ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES
NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm. BUT IN NO CASE LESS THAN 20 mm FOR EVERY 3.0 M OF FREE SPAN.
2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH THE ASTM A-706
9.0 SHOP DRAWING WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, MISCELLANEOUS 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS
BARS SMALLER THAN 10mm MAY BE PLAIN.
IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION. 3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE w/ TABLE B SHOWN IN FIG. B-1
10. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEUOS CURBS, SILLS , STOOLS EQUIPMENT AND (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWNON DRAWINGS , SPLICES SHALL BE H
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL , ELECTRICAL AND MECHANICAL DRAWINGS. STAGGERED WHENEVER POSSIBLE.
11. ALL RESULTS OF THE MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL STEEL MUST CROSS-TIE
NOTES ON CONCRETE SLABS

350mm. MAX.
BE NOTED & APPROVED BY THE MATERIALS ENGINEER/STRUCTURAL DESIGNER. L1 L2

1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM THE TOP OF SLAB. L1 13 L1 13 L2 13 L2 13

2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS ELEVETED SLAB SHALL BE CUT AS FOLLOWS:

10

H
dm
in.
BENT BAR
L1 L2
L1/4 L1/4 L2/4 L1 15 L1 15 L2 15
TOP BARS L2 1 5

TOP BAR 2 Ø 12mm SIDE BARS WEB BARS


BOTTOM BARS

FIGURE B-1

BOTTOM BAR

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

GENERAL CONSTRUCTION NOTES


LOCAL PROGRAM - LOCAL INFRASTRUCTURE ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - S 10
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 1 5 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
GENERALCONSTRUCTIONNOTES
TABLE 'A' TABLE 'B'
REINFORCING CONCRETE LINTEL BEAMS IN NOTES ON STIRUPS
4-Ø16 VERT. BARS
TENSION BARS COMPRESSION BARS CONCRETE BLOCK WALLS SEE CONSTRUCTION NOTES
FOR MASONRY WALL REIN- 4-Ø16 VERT. BARS
1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS

550
TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) FORCEMENTS (TYPICAL) OTHERWISE PERMITTED BY THE STRUCTURAL ENGINEER.

550
FIN. FLR. LVL.
LINTELS IN BLOCK WALLS

VARIES
2. AS SHOWN IN THE DESIGN DRAWINGS OR
BAR SIZES fc`= 20.7MPa(3000psi) fc`= 27.6 MPa (4000psi) BAR SIZES fc`= 20.7MPa(3000psi) fc`= 27.6 MPa (4000psi)
CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT
PERMITTED BY THE STRUCTURAL ENGINEER.
(DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED (DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED NAT. GRD. LVL.
SPAN LENGTH fc' LINTEL DOWEL BARS TO MATCH 3. TIES & CLOSE STIRRUPS MUST BE AT 135.
CHB VERTICAL BARS

600 (MIN.)
Ø10 300 300 300 300 Ø10 225 300 200 300 (L) (L+0.40M) (MPa) (mm) BOTTOM TOP STIRRUPS 550 550
Ø12 300 300 300 300 Ø12 275 300 250 300
Ø10 BOTT. BARS
@ 300 O.C. 180 DEG. HOOKS

250
1.20 M 1.60 M 200 1-Ø10 1-Ø10 Ø6 mm @ 200mm
Dbar
Ø16 300 400 300 400 Ø16 350 400 325 400 1.50 M 1.90 M 14.0 200 1-Ø10 1-Ø10 Ø6 mm @ 200mm 3-Ø10 BOTT. BARS TYPICAL CONNECTION DETAIL

D+12db
Ø20 400 550 350 500 Ø20 450 500 475 500 1.80 M 2.20 M 200 1-Ø12 1-Ø10 Ø6 mm @ 200mm

550 550
OF R.C. WALL AT CORNERS
Ø25 600 800 750 Ø25 550 625 625 400
2.10 M 2.50 M 250 1-Ø12 1-Ø10 Ø6 mm @ 200mm
Ø28 750 1000 650 850 Ø28 625 675 625 675 2.40 M 2.90 M 17.0 250 1-Ø12 1-Ø10 Ø6 mm @ 200mm
4db OR 65mm

Ø32 950 1300 850 1100 Ø32 700 775 700 775 2.70 M 3.10 M 250 1-Ø16 1-Ø12 Ø10mm @ 200mm
DOWEL TO MATCH
NOTES ON WELDS 90 DEG. HOOKS
3.00 M 3.40 M 300 1-Ø16 1-Ø12 Ø10mm @ 200mm CHB VERT. BARS
NOTES: NOTES: 1. USE E60xx ELECTRODES FOR ALL MEMBERS WELDED. Dbar
1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 3.30 M 3.70 M 20.0 300 1-Ø16 1-Ø12 Ø10mm @ 200mm
2. NOT MORE THAN 33% OF THE BARS SHALL BE 2. NOT MORE THAN 33% OF THE BARS SHALL BE 3.60 M 4.00 M 300 1-Ø20 1-Ø12 Ø10mm @ 200mm 300 2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS
OTHERWISE SHOWN OR DETAILED IN THE DRAWINGS.

L
SPLICED WITHIN THE REQUIRED LAP LENGTH SPLICED WITHIN THE REQUIRED LAP LENGTH (TYP.)

DOWEL

12db
3. VALUES GIVEN ABOVE CAN ALSO BE USED FOR COLUMNS

400
12 THK. EXPANSION JOINT
FIN. FLR. LVL.
WITH MASTIC FILLER
NOTES ON STRUCTURAL STEEL D

250
1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS
3. IF THE BEAM REINFORCING BARS END IN A WALL, THE CLEAR DISTANCE FROM THE BAR TO THE FARTHER FACE OF THE 1-Ø16 VERT. BARS 6-Ø10 BARS (AS SHOWN) STRUCTURE SHALL COMPLY WITH ALL THE PERTINENT PROVISION OF AISC

(DOWEL)
Ø10 BOTT. BARS @ 300 O.C. MAIN BAR END HOOKS
WALL IS NOT LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B'

400
CHB WALL 400 SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL (ALL GRADES)
1-Ø16 VERT. BARS
FOR COMPRESSION BARS UNLESS UNLESS SPECIFIED IN PLAN. TOP BARS AND SHALL NOT BE SPLICED WITHIN THE FOR SIZE AND SPACING STEEL FOR BUILDING LATEST EDITION. BAR SIZE DIAMETER 180° HOOK 90° HOOK
COLUMN OR TWO STIRRUPS SHALL BE PROVED AT ALL SPLICES. OF HOR. & VERT. BARS (DEFORMED) (mm)
FOR SIZE AND SPACING SEE CONSTRUCTION NOTES. 2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL D+2db L L
4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USED 25mm BAR SEPARATORS SPACED AT 1.0M ON OF HOR. & VERT. BARS DOWEL TO MATCH STEEL UNLESS OTHERWISE INDICATED. 10 mm Ø 60 75 125 150
SEE CONSTRUCTION NOTES. CHB VERT. BARS
ON CENTER ON NO CASE SHALL THERE BE THAN TWO (2) SEPARATORS BETWEEN LAYERS OF BARS 3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE 12 mm Ø 75 100 150 200
CHB WALL WHERE DEPRESSED
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES SHALL BE AS SHOWN IN FIGURE B-2 300 SLAB OCCURS MEMBERS CONNECTED.
16 mm Ø 95 125 175 250
UNLESS ELSEWHERE. (TYP.) 4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM WITH

DOWEL
CORNER WALL OPENING OR END WALL

400
20 mm Ø 115 150 200 300
E60 ELECTRODES.
FIN. FLR. LVL. 5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS. 25 mm Ø 150 200 230 450

250
28 mm Ø 240 300 350 550
MAIN REINFORCEMENT MAIN REINFORCEMENT
CHB WALL R.C. COLUMN OR WALL
6-Ø10 BARS (AS SHOWN)
Ø10 BOTT. BARS @ 300 O.C.
NOTES ON EMBBED PIPES 32 mm Ø 300 335 450 600
t OR 1/4 D

t OR 1/4 D

SLEEVES FOR UTILITY 400


SLEEVES FOR UTILITY
t

1-Ø16 VERT. BARS DOWEL BARS TO MATCH 1. ALL EMBEDED PIPES FOR UTILITIES ETC. THAT PASS THRU BEAMS SHALL NOT
PIPES MAX. 1/5 D PIPES MAX. 1/5 D CHB HOR. BARS
D

12 THK. EXPANSION JOINT EXCEED 100mm IN DIAMETER OR 1/3 BEAM DETPH WHICHEVER IS LESS, UNLESS
WITH MASTIC FILLER 12 THK. EXPANSION JOINT TYPICAL CHB FOOTING DETAILS OTHERWISE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
PROVIDE 3-Ø10 EXTRA STIRR. PROVIDE 3-Ø10 EXTRA STIRR. WITH MASTIC FILLER
EACH SIDE OF SLEEVES EACH SIDE OF SLEEVES ( WHERE APPLICABLE ) 2. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY. 135 DEG. HOOKS

L
3. NO PIPES SHALL BE EMBEDDED IN COLUMNS.

(DOWEL)
LE

400
TYP. DET. FOR SLEEVES TYP. DET. FOR SLEEVES FOR SIZE AND SPACING
THRU CONCRETE BEAM THRU CONCRETE BEAM OF HOR. & VERT. BARS NOTES ON CONSTRUCTION JOINTS IN CONCRETE
SEE CONSTRUCTION NOTES. 400

D
(DOWEL) 1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE

6d
FIG. B-2 FIG. B-3

b
VERIFY DEPRESSION
30 BAR DIA. 30 BAR DIA. SHALL BE CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED SHEAR
INTERSECTION WALL INTERSECTING R.C. COLUMN OR WALL (min.) (min.) KEY SHALL BE PROVIDE AT THE JOINT. L1

t=FOR SLAB
D=FOR BEAM
L

MAIN REINFORCEMENTS TO BE
6. WHEN A BEAM CROSSES A GIRDER , REST BEAM ON TOP OF GIRDER BARS, BEAM REINFORCING BARS SHALL BE TYPICAL CONNECTION DETAIL OF MASONRY WALL CONTINUOUS (TOP & BOTT. BARS)
SYMMETRICAL ABOUT THE CENTER LINE WHENEVER POSSIBLE. MAIN REINFORCEMENTS WHERE JOINTS IS AT POINT OF
TO BE CONTINUOUS STRESS, PROVIDE SHEAR RODS
7. GENERALLY, NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING STRESSES OCCUR, SPLICES WITH ENGINEERS APPROVAL STIRRUP AND THE TIE HOOKS
(ALL GRADES)
WHERE SO PERMITTED SHALL BE INDICATED IN TABLE 'A' AND 'B'. WELDED SPLICES SHALL DEVELOP IN TENSION AT D=FOR BEAM Ø10x1000 LONG
200 (MIN) 200 (MIN) 180° HOOK 90° HOOK
LEAST 125% OF THE SPLICED YIELD STRENGTH OF THE BAR NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION @ 300 O.C. 30Ø BAR 30Ø BAR BAR SIZE DIAMETER
2t=FOR SLAB 50 (DEFORMED) (mm) D+2db L L
IS ALLOWED TO BE SPLICED THEREIN. (MIN.) (MIN.)
30 BAR DIA. (min.) 40

D/3
Ø10 STIRRUPS 10 mm Ø 40 125 85 100
@ 150 O.C. TYPICAL DETAIL FOR BEAM

D/3
t/3 t/3

D
t/3
12 mm Ø 50 165 115 115

D/3
OR SLAB CHANGE SOFFIT SLAB 16 mm Ø 65 200 140 150
NOTES ON CONCRETE HOLLOW BLOCKS WALLS CHB WALL FOR SIZE AND SPACING
OF HOR. & VERT. BARS
BEAM
20 mm Ø 115 300 165 300
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS SHALL BE REINFORCED SEE CONSTRUCTION NOTES
OPENING 1-Ø16 VERT. TYPICAL SLAB & BEAM 32 mm Ø 150 335 230 405

(DOWEL)
AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCK REINFORCEMENT. BARS TYPICAL

400
DOWEL BARS TO MATCH
CHB VERT. BARS
CONSTRUCTION JOINT DET.
2. PROVIDE 150mm x 300mm STIFFENER COLUMN REINFORCED WITH 4-12mm WITH 10mm Ø TIES AT 150mm ON CENTER
WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.0M LENGTH OF CONCRETE HOLLOW BLOCK 2-Ø12 TOP BARS NOTES ON CONCRETE WALLS
200
WALLS UNLESS NOTED IN STRUCTURAL PLANS. FIN. FLR. LVL.
2-Ø12 BOTT. BARS 1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL
REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.
NOTE:
ELEVATION SECTION PROVIDE THESE ADDITIONAL BARS FOR
ALL OPENINGS PLUS BARS (NOT
NOTES ON CONCRETE HOLLOW BLOCKS WALLS REINFORCEMENTS TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING REINFORCEMENT SHOWN) PARALLEL TO SIDE OF OPENING
WALL VERTICAL
THICKNESS EQUAL TO THE NUMBER OF TERMINATED
BLOCK THICKNESS REINFORCEMENT NOTES HORIZONTAL VERTICAL REMARKS SECTION BARS AT OPENING
HORIZONTAL LAPPED 100mm Ø10mm @ 250mm O.C. Ø10mm @ 300mm O.C. HORIZONTAL BARS
A. MINIMUM LAPS AT SPLICE= 0.25 M VER. BARS SEE ARCHITECTURAL & MECHANICAL
125mm Ø10mm @ 200mm O.C. Ø10mm @ 250mm O.C. AT CENTERS VERTICAL PLANS FOR SLAB OPENING LOCATION.
75 mm 10mm Ø EVERY 3RD LEVEL 10mm Ø @ 600mm O.C. B. PROVIDE RIGHT ANGLED REINFORCEMENT DOWEL BARS TO
AT CORNERS 0.92 m LONG FLR. SLAB OR BEAM MATCH VERT. BARS 150mm Ø12mm @ 250mm O.C. Ø12mm @ 300mm O.C. BARS STAGGED OUT HOR. BARS
125 mm 10mm Ø EVERY 3RD LEVEL 10mm Ø @ 600mm O.C.
C.WHERE CHB OR CER. BLK. WALL DOWELS
(DOWEL)

WITH THE SAME SIZE AS VER. OR HOR. DOOR


150mm 10mm Ø EVERY 3RD LEVEL 10mm Ø @ 600mm O.C. 1. ALL JOINTS AND CELLS REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPT FOR
400

REINFORCEMENT SHALL BE PROVIDED OPENING


VERIFY ARCHITECTURAL

200 mm 12mm Ø EVERY 3RD LEVEL 10mm Ø @ 600mm O.C. CONTAINING REINFORCING WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED AND FOR
BARS SHALL BE FILLED EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR.
WITH CONCRETE GROUT. 38mm CLEAR WINDOW
2. FOR REINFORCEMENTS SEE 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN NECESSARY OPENING
CONSTRUCTION NOTES. STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS VERTICAL AND HORIZONTAL BARS
SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE
(DOWEL)

1-Ø16 CONT. HOR. BARS PROVIDED THAT SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M O.C.
400

FOR FLOOR SLAB ONLY


3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL BE REINFORCED
AROUND WITH 2-20mmØ BARS. FOR 225mm, 200mm, 175mm, 150mm THICK WALLS, USE 2-16mmØ. FOR 125mm AND
100mm THICK WALLS, USE 2-12mmØ BARS. ALL WALLS SPANNING SHALL HAVE VERTICAL REINFORCEMENT BENT
TYP. EXTERIOR WDW. & DOOR OPENING
TYP. SECTION OF MASONRY A U-FORM LIKE STIRRUPS AND SPACED ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED.
PARTITION REINFORCEMENTS

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

GENERAL CONSTRUCTION NOTES


LOCAL PROGRAM - LOCAL INFRASTRUCTURE ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - S 11
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 2 5 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
A B C
10000

5000 5000

1 C-3/F-1 C-2/F-1 C-3/F-1


4800

4800
9550

9550
2 C-3/F-3 C-1/F-2 C-3/F-3
4750

4750
3 C-4/F-3 C-1/F-3 C-3/F-3

5000 5000

10000

150
NGL 100

1 FOUNDATION PLAN 150mm thick C.H.B.


SCALE 1:100 M 100mm thick C.H.B.
S-3

D
10mm Ø @ EVERY 400mm O.C., VERT. BARS
Y-BARS 10mm Ø @ EVERY 3rd LAYER, C.H.B. HOR. BARS

450 X-BARS GRD. FIN. LN.


500
10mm Ø @ EVERY 3rd LAYER, C.H.B. HOR. BARS 10mm Ø @ EVERY 400mm O.C., VERT. BARS

300
T
50

FIN.GRD. LN.
450

400

200
L 50mm THK. LEAN 10mm Ø @ EVERY 400mm O.C., VERT. BARS
CONCRETE NAT. GRD. LN. 10mm Ø @ EVERY 3rd LAYER, C.H.B. HOR. BARS
SECTION
12 - 20mm WITH 10mm TIES, 10 - 20mm WITH 10mm TIES, 10mm Ø x 650mm LONG
L
1@50, 5 @100, REST @ 150mm O.C. 1@50, 5 @100, REST @ 150mm O.C. DOWEL BARS TO MATCH
JOINT HOOPS @ 100mm JOINT HOOPS @ 100mm WITH VERT. BARS @600mm
O.C. DOWEL BARS

850
BAR Y 10mm Ø x 400mm LONG DOWEL
C1 C2 BARS TO MATCH WITH VERT.
BARS @350mm O.C. DOWEL BARS
BAR X FIN. GRD. LN.
450

100
250
450

100

150
W

SEE COLUMN DETAIL


350

100mm THK.
300

FTB WELL-COMPACTED GRAVEL


FILL
100mm THK.
WELL-COMPACTED GRAVEL 400
12 - 16mm WITH 10mm TIES, 12 - 16mm WITH 10mm TIES, 400 FILL
1@50, 5 @100, REST @ 150mm O.C. 1@50, 5 @100, REST @ 150mm O.C.
JOINT HOOPS @ 100mm JOINT HOOPS @ 100mm

C3 C4 PLAN CHB WALL ON FTB CHB WALL ON SLAB

2 COLUMN DETAIL 3 FOUNDATION DETAIL 4 WALL FOOTING DETAIL


SCALE 1:20 M SCALE 1:30 M SCALE 1:20 M
S-3 S-3 S-3

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

FOUNDATION PLAN
LOCAL PROGRAM - LOCAL INFRASTRUCTURE SCHEDULE OF FOOTING ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - REINFORCED CONCRETE COLUMN SCHEDULE S 12
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF COLUMN DETAIL
FOUNDATION DETAIL ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 3 5 22
WALL FOOTING DETAIL
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
A B C A B C A B C
10000 10000 10000

5000 5000 5000 5000 5000 5000

GB-1 GB-1 2B-1 2B-1


1 1 1 RB-1 RB-1

2S-2 2S-2

2B-3 2B-3
2S-3

2B-1A

2B-1A
GB-1

GB-2
4800

4800

4800

4800

4800

4800
GB-2

2B-1

RB-1

RB-1

RB-1
2B-3
2B-4
2S-2 2S-2
2S-1
GB-2 GB-2 2B-1B 2B-1B RB-1 RB-1
2 2 2

9700
9850

11000

11000

11000

11000
2S-1

2B-3
2S-2 2S-2
2B-4
2B-4
SLAB ON FILL

GB-1

2B-2A

2B-2A
GB-2
GB-1

RB-1

RB-1

RB-1
2B-2
SLAB ON DECK
4750

4750

4750

4750

4750

4750
100mm THK. SLAB ON
100mm THK. SLAB ON
GRADE W/ 10mmØ
2S-2 2S-2 W/ 12mmØ BARS @
BARS @ 300mm O.C.
250mm O.C. BOTH
BOTH WAYS

2B-3
WAYS
GB-1 GB-1 2B-1B 2B-1B RB-1 RB-1
3 3 3

2B-1A

2B-1
2B-1
1450

1450

1450

1450
2B-3 2B-3

5000 5000

10000

5000 5000 5000 5000

10000 10000

1 GROUND FLOOR FRAMING PLAN 2 SECOND FLOOR FRAMING PLAN 3 ROOF FRAMING PLAN
SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M
S-4 S-4 S-4

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

GROUND FLOOR FRAMING PLAN


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SECOND FLOOR FRAMING PLAN ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - ROOF FRAMING PLAN S 13
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF SCHEDULE OF SLAB
ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 4 5 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
A B C A B C
10000 10000

5000 5000 5000 5000 C


KS

L
CW
PR
C 00 48
50
B Ø
mm 0
P 00

1 25 mm Ø 1 25 mm Ø
20 mm Ø PPRC CWL 20 000
WC L1A
V 11
60
SHE

WC

WC
PPRC KS LA 0
PPRC V
CWD GV PWD UR
PANTRY I

25 mm Ø PPRC CWD
CWD LA

25 mm Ø PPRC CWL

20 mm Ø PPRC CWL
0 20 V
47
0 mm
50 50
A Ø

3500
LAV LAV PP
RC WC
RAMP DN CW
L
4800

4800

4800

4800
20 mm Ø
LAV
LAV PPRC CWL
D
PW
WC LA
V
LAV
GV LA DN
V AMP
KS GV 25
R KS
mm
HE RY

WC
Ø
PANTRY URI
PP
RC GV T
2 2 1
CW
AN

3050
UP
48
L P 1
2
3 UP

11000
00 4
5
6

11600
7
8
O. 9
12400

ST 15
10
00
25
14
13
50
12
UP DN mm 11 G
Ø IN

2 ND
20
12 PP LA
4750

4750

4750
RC
25 mm Ø PPRC CWL

1 1
19 4 00 47
STO. 2 2 50 CW 0
18
L 00
3 17 3 10

6200
3100
4 16 4
P E 00 0
15 5 15 5
M PU LIN )5
14 6 14 6 RA V E R TION
28 G M T C
13

12
7

8
13

12
7

8 3 50 W
A
M YC
WA NE
IN ON

3 11 9

10 3 11 9

10
OM RIF
FR(VE

1450
LANDING LANDING
2850

(WATER LINE LAYOUT)


RAMP UP
UP 3 ISOMETRIC DIAGRAM
SCALE 1:100 M
GV
WM
P-1

FROM MAIN WATER LINE


(VERIFY CONNECTION) 5000 5000 5000 5000

10000 10000

1 GROUND FLOOR WATER LINE LAYOUT 2 SECOND FLOOR WATER LINE LAYOUT PLUMBING LEGENDS:
SCALE 1:100 M SCALE 1:100 M
P-1 P-1
CO CLEAN-OUT

CV CHECK VALVE

FD FLOOR DRAIN
PLUMBING NOTES: GV GATE VALVE

1. GRADES OF HORIZONTAL PIPING RUN ALL HORIZONTAL PIPINGS IN PERFECT ALIGNMENT AND AT A FORM GRADE OF NOT LESS THAN TWO PERCENT (2%). LAV LAVATORY

2. CHANGE IN DIRECTION ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY FIVE DEGREES (45°) WYES, LONGS WEEP QUARTER BEND, WC WATER CLOSET
SIX-EIGHT OR SIXTEENTH BENDS. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL, 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND
SHORT QUARTER BENDS MAYBE USED ON WASTE LINE. TEE AND CROSSES MAYBE USED IN VENT PIPES. URI URINAL

3. PROHIBITED FITTINGS NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL WASTE LINES. THE DRILLINGS AND TAPPINGS OF HOUSE DRAIN, WASTE OR SINK SINK
VENT PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED.
CB CATCH BASIN
4. SLEEVES PROVIDE PIPE SLEEVES AT WALLS, COLUMNS OR SLABS ONE SIZE BIGGER THAN THE ACTUAL SIZE PASSING THROUGH THE WALLS, COLUMNS OR UNDER
SLAB TO PROTECT PIPE FROM BREAKAGE. WM WATER METER

5. PIPE CLEAN-OUTS VSTR VENT STACK THRU ROOF


PIPE CLEAN-OUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS:
a. EVERY CHANGE IN HORIZONTAL DIRECTIONS EXCEEDING TWENTY-TWO AND ONE-HALF DEGREES (22 1/2°). PVCSP POLYVINYL CHLORIDE SOIL PIPE (SERIES 1000)
b. ONE AND ONE-HALF METERS (1.50 m) INSIDE THE PROPERTY LINE BEFORE THE HOUSE DRAINAGE CONNECTION.
c. EVERY FIFTEEN METERS (15.00 m) IN HORIZONTAL RUN OF PIPES. PVCSS POLYVINYL CHLORIDE SOIL STACK (SERIES 1000)
d. AT THE END OF ANY HORIZONTAL PIPE LINES.
PVCVTW POLYVINYL CHLORIDE VENT THRU WALL (SERIES 600)
6. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.
PVCVTR POLYVINYL CHLORIDE VENT THRU ROOF(SERIES 600)
7. NOT LESS THAN 300 mm OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF THE VAULT ROOF SLAB.
PPRC CWL POLYPROPYLENE RANDOM COPOLYMER COLD WATER LINE, TYPE 3, PN 16
8. NO SEPTIC VAULT MUST BE CONSTRUCTED UNDER THE BUILDING.
PPRC CWD
POLYPROPYLENE RANDOM COPOLYMER DOWNFEED, TYPE 3, PN 16
9. ALL PLUMBING WORKS SHALL BE DONE BY A LICENSED MASTER PLUMBER AND A LICENSED PLUMBING CONTRACTOR.

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

GROUND FLOOR WATER LINE LAYOUT


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SECOND FLOOR WATER LINE LAYOUT ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - WATER LINE LAYOUT ISOMETRIC DIAGRAM P 15
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF PLUMBING NOTES
PLUMBING LEGENDS ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 1 3 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
A B C A B C VS
TR
TW
C
CV
PV
Ø KS
mm
10000 10000 50 CO

00 48
50
5000 5000 5000 5000
B 5 0
CO 00m
0
00

1
L 0 mØ
WC AV PV 11
CV 60
T
FD 1 LAV W 00
0
OUTLET
mm L
ØAV

50 mm Ø PVCVTR
TO NEAREST 00 PV UR 47
50 I 50

1
SEWER LINE
(VERIFY) 100 mm Ø PVCSP
1 50 mm Ø PVCVTW
A C
FD WC
SP CO

150 mm Ø PVCSP 50 mm Ø CO 50 mm Ø CO KS
CO
PVCVTR WC PVCVTR WC SHE 50
mm
FD PWD FD
PANTRY CO Ø P
D

100 mm Ø PVCSS
VC
PW
WC LA

50 mm Ø PVCVTW
VT
LAV LAV ET ST V W
TL RE INE 15 L

50 mm Ø PVCVTW

3500
OU EA R L Y) FD 0 m AVMP DN

100 mm Ø PVCSP
150 mm Ø PVCSP
N E IF
TO EW(VER A mR
S Ø K
RAMP DN 15 PV S
0m

4800

4800
4800

4800
LAV CS
RY
m P
LAV Ø
NT
PV
CS
KS LAV 1 48
P
PA UP 1
2
3 UP
00 4
5
6
7
FD 8
O. 9
WC HE ST 15
10
00
PANTRY 14
13
50
URI CO

2 2
12
11
ING

3050
2 12
40 47
LA
ND

11000
0 50 0
100 mm Ø PVCSS 100 mm Ø PVCSS 00

11600
FROM 2F TO GF 10
12400

UP 00
UP DN MP 50
20
28 RA

3 50

4750
4750

4750
1 19 1

STO. 2 18 2

3 17 3

6200
3100
4 16 4

15 5 15 5

14 6 14 6

13 7 13 7

12 8 12 8
(SANITARY LINE LAYOUT)
3 11 9

3 11 9

ISOMETRIC DIAGRAM
10 10

1450
LANDING LANDING

SCALE 1:100 M
P-2
2850

RAMP UP
UP

SCHEDULE OF TOP SLAB REINFORCEMENT


5000 5000 5000 5000

10000 10000 TOP SLAB


MARK
SHORT DIRECTION LONG DIRECTION
16 MM Ø BARS @ 190 MM O. C.
1 GROUND FLOOR SANITARY LAYOUT 2 SECOND FLOOR SANITARY LAYOUT S-1
16 MM Ø BARS @ 195 MM O. C. BENT-UP 2 OUT
OF 3 @ L/4 FROM FACE OF SUPPORT TEMPERATURE BARS
SCALE 1:100 M SCALE 1:100 M
P-2 P-2 S-2 16 MM Ø BARS @ 225 MM ON CENTERS 16 MM Ø BARS @ 190 MM ON CENTERS

150 MM Ø PVCSP 1-16 MM Ø 3000


600 600 FIN. GRADE LINE
W/ 2% SLOPE (INLET) HEAVY DUTY BRASS BAR (TYP.) 600
MH MH CO COVER (TYPICAL) 150 MM Ø PVCSP 150 1550 150 1000 150
FIN. GRADE LINE MH
FINISH GRADE LINE W/ 2% SLOPE 1-16 MM Ø EXTRA DIAGONAL BAR 150 MM Ø PVCSP
CO CO CO CO CO TYPICAL AT EVERY MH CORNERS
150

150

150
300

300

300
350

CO
450

INLET MH OUTLET
400

400

400
TO NEAREST
OUTLET 16 MM Ø HOR. BARS S-1 MH SEWER LINE
1000

1000
1300

1300
DIGESTION CHAMBER @ 250 MM O.C. &
TO NEAREST
S-2 (VERIFY)

1500

1200
DIGESTION CHAMBER LEACHING
CHAMBER SEWER LINE 16 MM Ø VERT. BARS
@ +/- 300 MM O.C. (TYP.) CO
(VERIFY)
962 788 MH

600
2% SLOPE CO CO CO
150

150
16 MM Ø EXTRA BARS 150 MM THK. R. C. 16 MM Ø BARS AT 259 16 MM Ø EXTRA BARS LEACHING CHAMBER
AT +/- 600 MM O.C. 150 WALL WITH 16 MM Ø MM O.C. CUT-OFF
1550 150 1000 150 AT +/- 600 MM O.C. 600
(TYPICAL)
HOR. BARS AT 250 ALTERNATE @ 462
3000 MM O.C. AND 16 MM MM FROM FACE OF 150 1200 150
150 MM Ø PVCSP 150 MM Ø PVCSP
16 MM Ø LONGITUDINAL
16 MM Ø BARS AT 259 MM O.C. 150 MM THK. BOTTOM Ø VERT. BARS AT SUPPORT BARS AT 269 MM O.C.
CUT-OFF ALTERNATE @ 462 MM SLAB (TYPICAL) +/-300 MM O.C. 1500

FROM FACE OF SUPPORT (TYPICAL) INLET INLET


100 MM THK. COMPACTED
GRAVEL FILL
16 MM Ø LONGITUDINAL BARS DETAIL SECTION DETAIL SECTION DETAIL PLAN (TOP SLAB)
AT 269 MM O.C.

DETAIL OF SEPTIC VAULT


4 (with REINFORCING BARS)
SCALE 1:100 M
P-2

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

GROUND FLOOR SANITARY LAYOUT


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SECOND FLOOR SANITARY LAYOUT ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - SANITARY LINE LAYOUT ISOMETRIC DIAGRAM P 16
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF DETAIL OF SEPTIC VAULT WITH REINFORCING BARS
SCHEDULE OF TOP SLAB REINFORCEMENT ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 2 3 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
A B C
P
I C O N T I C E L L F
E E N C
B
10000 A
12000
1000
5000
5000
1000
5000 5000

1000
1000
1

4800
4800
1

11700
SHE

12000
2
PANTRY

4750
4750
SPRINGVILLE

3500
SOUTH 2

1150
4800

4800
PARK 3
COURT
BASKETBALL
1000
5000
1450
3550

HE 1000

6000
6000

2
12000

3050
11000

DN
20
4750

19 1

18 2

17 3

6200
3100
16 4

15 5

6 A G
14
I N
13 7
R A
8
D
E
12

3 11 9

10 FD
CB O A
R
D

1450
LANDING

100 mm Ø PVCSP
TO NEAREST
DRAINAGE OUTLET

2 SITE DEVELOPMENT PLAN


5000 5000 NOT TO SCALE
P-3
10000

1 STORM DRAINAGE LAYOUT C


SCALE 1:100 M
P-3
00 48
50
B 00
FD

100 mm Ø PVCDS
0 00
10
11
60
0

0 0 47
50 50
100 MM Ø DOWNSPOUT A
10 MM Ø LIFTING HANDLE
WALL
D
PW N
CB100
mm
MPD
RA Ø
PV
NGL CS
P ST LET
RY
100 MM Ø DOWNSPOUT RE UT
50 MM THK CONCRETE COVER N EAGE O
NT TOAINA
DR
10 MM Ø LIFTING HANDLE
1 48 PA UP 1
2
3 UP
00 4
5
6
7
100 MM THICK CHB 8
O. 9
ST 15
10
00
14
13
50
12
50 MM THK CONCRETE COVER 100 MM Ø PVC DRAINAGE PIPE 11
ING

100 MM THK CHB


2 12
40
0
47
50
LA
ND

00
0
10
100 MM Ø PVC DRAINAGE PIPE
UP 00
MP 50
28 RA
50 MM THK LEAN CONCRETE
3 50

PLAN SECTION
(STORM DRAINAGE LAYOUT)
3 CATCH BASIN DETAIL 4 ISOMETRIC DIAGRAM
SCALE 1:20 M SCALE 1:100 M
P-3 P-3

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

STORM DRAINAGE LAYOUT


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SITE DEVELOPMENT PLAN ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - STORM DRAINAGE LAYOUT ISOMETRIC DIAGRAM P 17
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF CATCH BASIN DETAIL
ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 3 3 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
C P
I O N T I C E L L F
E E N C
B
A

GENERAL NOTES AND SPECIFICATIONS: IN THE SPECIFICATIONS. 1000


5000
12000
5000
1000

1000
7. ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE PROPERLY

1000
1
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE LATEST EDITION GROUNDED IN ACCORDANCE WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE

4800
OF THE PHILIPPINE ELECTRICAL CODE, EXISTING APPLICABLE ORDINANCES, RULES AND REGULATIONS ELECTRICAL CODE.

4800
OF THE LOCAL GOVERNMENT AND WITH THE REQUIREMENTS OF THE LOCAL POWER COMPANY.

11700
8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED TYPE FOR LOCATION AND

12000
2
2. THE TYPE OF SERVICE POWER SUPPLY TO BE USED SHALL BE SINGLE-PHASE, 2-WIRE, 230V, 60 HERTZ, PURPOSE.

4750
A.C

4750
SPRINGVILLE
9. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATIONS AND OTHER APPURTENANCES SOUTH 2

1150
3. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE FOR FOR THE ENTIRE ELECTRICAL INSTALLATION SHALL BE USED. PARK 3
CONNECTION TO THE POWER COMPANY SERVICE POINT. BASKETBALL CO
URT
10. ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED FLOOR 5000
1000

1450

4. UNLESS OTHERWISE SPECIFIED, THE MINIMUM SIZES OF WIRE AND GALVANIZED RIGID STEEL CONDUIT LEVEL UNLESS NOTED IN THE PLAN. 1000
3550

6000
6000

TO BE USED SHALL BE 3.5mm²,THHN AND 20mm NOMINAL DIAMETER, RESPECTIVELY. LIKEWISE ALL 12000

ELECTRICAL WIRES SHALL BE COLOR-CODED. a) WALL SWITCHES @ 1300mm


b) WALL CONVENIENCE OUTLETS @ 300mm
5. ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT LESS THAN c) PANEL BOARD @ 1400mm (CENTER TO FLOOR)
3.5 mm² IN SIZE.
ALL MOUNTING HEIGHTS SHALL BE CONFIRMED WITH THE ENGINEER PRIOR TO INSTALLATION. ELECTRICAL
POST
6. WHEREVER REQUIRED AND NECESSARY, JUNCTION BOXES SHALL BE INSTALLED AT CONVENIENT AND (VERIFY
INCONSPICUOUS LOCATION, ALTHOUGH SUCH BOXES ARE NOT SHOWN ON THE PLAN NOR MENTIONED 11. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION OF A DULY LOCATION)
IN THE SPECIFICATIONS. REGISTERED ELECTRICAL ENGINEER.
ROAD

1 SITE DEVELOPMENT PLAN


NOT TO SCALE
E-1

A B C A B C A B C
10000 10000 10000

5000 5000 5000 5000 5000 5000

1 k k
1 1
EL
3
i c LPP
Si Sjk

3.0 TR ACU
RAMP DN
b a a RAMP DN RAMP DN
4800

4800

4800

4800

4800

4800
c f
j

1 MULTI-PURPOSE
b c a AREA a MULTI-PURPOSE AREA MULTI-PURPOSE AREA
h LPP EL
2 Sh
2 2
11600

11600

11600
EL
12400

12400

12400
c c a a 2

3.0 TR ACU
UP UP UP
S3Wz LPP
4750

4750

4750

4750

4750

4750
1 1 1
Sg
STO. 2 f STO. 2 STO. 2

LPP

LPP
3 3 3
g 4 4 4

15 5 15 5 15 5

14 6 c a a 14 6 14 6
4
13 7 Sabc 13 7 13 7 LPP
12 8 12 8
EL 12 8
Sdf
3 11 9

10 3 11 9

10 3 11 9

10

LANDING LANDING LANDING


d d d
2850

2850

2850
RAMP UP RAMP UP RAMP UP
UP UP UP

TO LIGHTING
FIXTURE "z" AT
SECOND FLOOR
5000 5000 5000 5000 5000 5000

10000 10000 10000

2 GROUND FLOOR LIGHTING LAYOUT 3 GROUND FLOOR POWER LAYOUT 4 GROUND FLOOR ACU LAYOUT
SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M
E-1 E-1 E-1

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

GENERAL NOTES AND SPECIFICATIONS


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SITE DEVELOPMENT PLAN ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - GROUND FLOOR LIGHTING LAYOUT E 18
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF GROUND FLOOR POWER LAYOUT
GROUND FLOOR ACU LAYOUT ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 1 3 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
A B C A B C A B C
10000 10000 10000

5000 5000 5000 5000 5000 5000

1 1 1
8
LPP
s

1.5 HP ACU
t
Ss St

3500

3500

3500
OFFICE 1 OFFICE 1 OFFICE 1
m m
4800

4800

4800

4800

4800

4800
Sm EL
r
EL

Sv r

v LOBBY OFFICE 2 LOBBY


6 OFFICE 2 LOBBY OFFICE 2
LPP
2 2 2

3050

3050

3050
S3Wz Sr

1.5 HP ACU
Sn
11000

11000

11000
n n

r r EL
5
DN LPP DN DN
9
20 20 20
LPP
4750

4750

4750
19 1 19 1 7 19 1

18 2 OFFICE 3 18 2 OFFICE
LPP 3 18 2 OFFICE 3

1.5 HP ACU
17 3 17 3 EL 17 3

6200

6200

6200
So

3100

3100

3100
16 4 16 4 16 4
z15 z 5 15 5 15 5

6
r o o 6 6
14 14 14

13 7 13 7 13 7 10
12 8
Su
12 8 12 8
LPP
3 z
11

z
9

10 3 11 9

10 3 11 9

10

1450

1450

1450
LANDING
u u LANDING LANDING
TERRACE EL TERRACE TERRACE

5000 5000 5000 5000 5000 5000

10000 10000 10000

1 SECOND FLOOR LIGHTING LAYOUT 2 SECOND FLOOR POWER LAYOUT 3 SECOND FLOOR ACU LAYOUT
SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M
E-2 E-2 E-2

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

SECOND FLOOR LIGHTING LAYOUT


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SECOND FLOOR POWER LAYOUT ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - SECOND FLOOR ACU LAYOUT E 19
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER
MULTI-PURPOSE BUILDING AT MOLINO 4, 2 3 22
SOUTH 2 SPRINGVILLE, CITY OF BACOOR, CAVITE ENGINEER II DATE: DATE: DATE: DATE:
ELECTRICAL LEGENDS AND SYMBOLS: SCHEDULE OF LOADS AND COMPUTATIONS
SCHEDULE OF LOADS
PANEL NO.: LPP (LIGHTING AND POWER PANEL)
LED PANEL LIGHT, 600mm x 600mm, 40W, 230VAC, RECESSED ENCLOSURE: NEMA 1
LOCATION : GROUND FLOOR
CONDUIT
LOAD DESCRIPTION VA VOLTS CURRENT AT AF POLE CONDUCTORS
PVC PIPE
DOWNLIGHT WITH 18W COMPACT FLOURESCENT LAMP, SURFACE MOUNTED

1 LIGHTING OUTLET 950 230 4.13 20 50 2 2 - 3.5 MM² THHN 20 MM Ø


RECESSED DOWNLIGHT WITH 18W COMPACT FLOURESCENT LAMP
2 - 3.5 MM² THHN +
2 CONVENIENCE OUTLET 1800 230 7.83 20 50 2 20 MM Ø
1 - 3.5 MM² THHN (G)
AUTOMATIC EMERGENCY LIGHTING UNIT
2 - 14.0 MM² THHN +
3 AIR CONDITIONG UINT, 3.0 TR 5520 230 24.00 60 100 2 20 MM Ø
1 - 8.0 MM² THHN (G)
S SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE
2 - 14.0 MM² THHN +
4 AIR CONDITIONG UINT, 3.0 TR 5520 230 24.00 60 100 2 20 MM Ø
1 - 8.0 MM² THHN (G)

Sab TWO SINGLE POLE (DUPLEX) WALL SWITCH IN ONE SWITCH PLATE
5 LIGHTING OUTLET 700 230 3.04 20 50 2 2 - 3.5 MM² THHN 20 MM Ø

Sabc THREE SINGLE POLE (TRIPLEX) WALL SWITCH IN ONE SWITCH PLATE
2 - 3.5 MM² THHN +
6 CONVENIENCE OUTLET 1080 230 4.70 20 50 2 20 MM Ø
1 - 3.5 MM² THHN (G)

S3Wa THREE - WAY SWITCH 2 - 3.5 MM² THHN +


7 CONVENIENCE OUTLET 1440 230 6.26 20 50 2 20 MM Ø
1 - 3.5 MM² THHN (G)

DUPLEX CONVENIENCE OUTLET 2 - 5.5 MM² THHN + 1 -


8 ACU OUTLET, 1.5 HP 2300 230 10.00 30 50 2 20 MM Ø
3.5MM² THHN (G)

EMERGENCY LIGHTING OUTLET 2 - 5.5 MM² THHN + 1 -


EL 9 ACU OUTLET, 1.5 HP 2300 230 10.00 30 50 2 20 MM Ø
3.5MM² THHN (G)

CONCEALED OR EMEBEDDED CONDUIT RUN 2 - 5.5 MM² THHN + 1 -


10 ACU OUTLET, 1.5 HP 2300 230 10.00 30 50 2 20 MM Ø
3.5MM² THHN (G)
1
LPP CIRCUIT HOMERUN
11 SPARE 1500 230 6.52 20 50 2 - -

LIGHTING AND POWER PANEL BOARD, SURFACE MOUNTED


12 SPARE 1500 230 6.52 20 50 2 - -

CIRCUIT BREAKER
TOTAL CONNECTED LOAD IN VA: 26910 VA TOTAL CONNECTED LOAD @80% DF: USE: 2 - 38.0 MM² THHN COPPER WIRE +
1 - 14.0 MM² THHN COPPER WIRE (G) IN 32MMØ RSC PIPE
I = [(26910/230) x 0.80] + (0.25 x 24.0)
M ELECTRIC SERVICE METER SERVICE ENTRANCE T

I = 99.60 A
T USE: 125AT / 250AF, 2P, 230V MCCB
1ɸ, 2-WIRE, 230 VAC, 60HZ

2- 38.0mm² THHN WIRE +


ELECTRIC SERVICE ENTRANCE
1- 14.0mm² THHN WIRE (G)
IN 32mmØ RSC GROUND

M
GROUNDING SYSTEM
125 AT, 2PCB
OUTDOOR DISCONNECT SERVICE LATERAL PROVIDED WITH 32mmØ
AC DISCONNECT BOX IN NEMA 3R ENCLOSURE CONDULETS FOR 230V, 2-WIRE,
60Hz, A.C. TO CONNECT TO AVAILABLE
2- 38.0mm² THHN WIRE
POWER LINES.
IN 32mmØ RSC
OUTDOOR UNIT FOR SPLIT TYPE ACU (WALL MOUNTED)
REINFORCED CONCRETE ELECTRIC
PEDESTAL 5.00m X 0.30m X 0.30m

300mm
INDOOR UNIT FOR SPLIT TYPE ACU (WALL MOUNTED) LIGHTING AND POWER PANEL

3100mm (MIN.) - 5500mm (MAX.)


LPP IN NEMA 1 ENCLOSURE LIGHTING AND POWER PANEL
LPP
125AT, 2P ELECTRIC SERVICE IN NEMA 1 ENCLOSURE
INDOOR UNIT FOR SPLIT TYPE ACU (FLOOR MOUNTED) 20AT, 2P 20AT, 2P
METER
LIGHTING OUTLET @ GF 1 7 CONVENIENCE OUTLET @ 2F
20AT, 2P 30AT, 2P
125AT, 2PCB 2- 38.0mm² THHN WIRE
CONVENIENCE OUTLET @ GF 2 8 ACU OUTLET, 1.5 HP OUTDOOR DISCONNECT IN 32mmØ RSC
60AT, 2P 30AT, 2P
M IN NEMA 3R ENCLOSURE
ACU OUTLET, 3.0 TR 3 9 ACU OUTLET, 1.5 HP
60AT, 2P 30AT, 2P

1800mm
ACU OUTLET, 3.0 TR 4 10 ACU OUTLET, 1.5 HP
20AT, 2P 20AT, 2P

LIGHTING OUTLET @ 2F 5 11 SPARE FIN. FLOOR LINE


20AT, 2P 20AT, 2P

CONVENIENCE OUTLET @ 2F 6 12 SPARE FIN. GRADE LINE

1-14.0mm² THHN WIRE IN 20mmØ CONDUIT


GROUND
CLAMPED TO A 20mmØ X 2400mm COPPERCLAD
GROUNDING ELECTRODE

SINGLE LINE DIAGRAM ELECTRICAL RISER DIAGRAM

DRAFTED:
PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

ELECTRICAL LEGENDS AND SYMBOLS


LOCAL PROGRAM - LOCAL INFRASTRUCTURE SCHEDULE OF LOADS AND COMPUTATIONS ENGINEERING ASSISTANT
PROGRAM - BUILDINGS AND OTHER STRUCTURES - SINGLE LINE DIAGRAM E 20
PREPARED:
MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF ELECTRICAL RISER DIAGRAM
ENGINEER III OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER