Professional Documents
Culture Documents
MSII 10K Parallel Setting V1.4
MSII 10K Parallel Setting V1.4
ABLEREX
MSII 10KVA
PARALLEL SETTING
GUIDE
WITH MTBS
Page 1 of 6
Ablerex Electronics (S) Pte Ltd
No.23 New Industrial Road
#05-03 Solstice Business Center
Singapore 536209
Tel: +65 6282 6535 Fax: +65 6282 6343
Co. Reg. No.: 200203197Z
Page 2 of 6
Ablerex Electronics (S) Pte Ltd
No.23 New Industrial Road
#05-03 Solstice Business Center
Singapore 536209
Tel: +65 6282 6535 Fax: +65 6282 6343
Co. Reg. No.: 200203197Z
3) Behind the MSII-RT 10KVA, ensure the micro switch is at [ON] position on both unit.
Page 3 of 6
Ablerex Electronics (S) Pte Ltd
No.23 New Industrial Road
#05-03 Solstice Business Center
Singapore 536209
Tel: +65 6282 6535 Fax: +65 6282 6343
Co. Reg. No.: 200203197Z
3) To enter Setting Mode, press the [ON] + [↓] Button at the same time for 3 second until
the unit giving out 2 beep sound.
Page 4 of 6
Ablerex Electronics (S) Pte Ltd
No.23 New Industrial Road
#05-03 Solstice Business Center
Singapore 536209
Tel: +65 6282 6535 Fax: +65 6282 6343
Co. Reg. No.: 200203197Z
5) Set [Id01] for the first unit of MSII 10KVA and [Id02] for the second MSII 10KVA.
Press [↑] to change the setting if required.
Page 5 of 6
Ablerex Electronics (S) Pte Ltd
No.23 New Industrial Road
#05-03 Solstice Business Center
Singapore 536209
Tel: +65 6282 6535 Fax: +65 6282 6343
Co. Reg. No.: 200203197Z
6) Press [↓] again to set the Parallel Function on to [P 02] on both unit.
* Any changed setting without press [ ] during save will resulted in unchanged setting
after unit power cycle.
8) Turn off and then turn on the AC input for both UPS to enable the new saved setting to
be applied.
Page 6 of 6