Model No.:PSA-PC8000-RFS
Serial No.: PC8000-001-FULL to ~
Date Manufactured: Jan 2013
CONTENTS
Page 3 Section 1 Installation and Mounting Drawings
Stair Mountings
Tee Beam
Fixed Upper Stair
Mid Position Strut
Mounting Assembly
Bolting Plates
Mounting Frame and Isolator Boxes
Folding Stairs
Handrails
Top walkway & Access
Fixed Upper Stair
Handrails - Lower Stair
34 4 Assembly Complete
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
2. Measure up the corner of the electrical room from the height of the landing of the
Power Step RFS stair per Views W and Z, position the Cleat Template and tack
weld it in place.
3. Weld the Cleats to the corner of the electrical room per View V.
4. Mark the heights of the Bolting Pads per Views U and Zz.
5. Assemble the Bolting Pad Template and Bolting Pads to The Cleats at the corner
of the electrical room, per Views S, U and Zz.
2. Fit the Top Strut to the Beam per View Y. Weld the Bolting Pad to the electrical
room wall, also per View Y. Use safer welding, lifting and general working
procedures at all times.
VIEW Y
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
PROCEDURE.
With the stair assembled per Drg 24 177A,the lower stair mountings installed per Drg 24186
and the top mountings assembled per Drg 24 772:
Fit the stair assembly to the excavator per View Z, with the bottom end fitted to the lower
mountings per View Y and the top end fitted to the top mountings per Views W & X.
(See Drawings Page 7)
This work is to be undertaken in conjunction with the instructions given on Drg 24 774.
Change the order of the various tasks to suit prevailing conditions, eg the
availability of crane/s.
NOTE
For Mounting Mid Position Strut
see Drawing PS-24775 - Pg 11
VIEW W
VIEW X
VIEW Y
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
PROCEDURE.
1. With the fixed stair mounted to the excavator per Drg 24 773,check that the landing
at the top of the stair is located beside the lower level of the OEM cagin landing,
per Details V and W. If it is not, adjust the position of the whole fixed stairs by
moving it relative to the bottom mountings, per Detail X.
2. IF, when the position of the fixed stair is finally resolved per '1' above, the 100 x 10
flatbar slider attached under the channel frame of the landing does not continue
over the rubber cushions of the mountings, extend the slider per View S and weld
an additional Stiffener between inside the channels using the material provided.
3. Adjust the lateral position of the fixed stair so it is 25 - 40mm away from the lower
level cabin landing, per Detail W. Adjust the lateral position by loosening
clamping bolts and sliding the top and bottom mountings sideways on the SHS
beams.
4. Cut off the frame channels of the top stair landing where they extend past the top
mountings and relocate the Top End Panel so it is approximately aligned with the
centre line of the Tee Beam,per View W.
5. Re-install the OEM emergency escape ladder. Inspect the space around the
ladder - if, per View U, it is found that the outer clamp plate on the horizontal run
of the Tee Beam might snare the clothing of a person using the ladder, weld the
brackets to the beam per Detail T and permanently remove the outer clamp plates.
NOTE
Unless directed otherwise, welding must comply with AS1554 Cat SP.
VIEW Z W
VIEW Y
DETAIL X
VIEW S
PSA PC8000- RFS 14-12-16 Pg9
FOLDING RETRACTABLE STAIRWAY
To suit Komatsu PC8000 Excavator
PROCEDURE.
Fit the Mid Position Strut between the stair frame and the wall of the excavator house.
Locate the strut near the back wall of the fuel tank. Holes are provided in the stair frame
to bolt the isolator mounting to. If these cannot be used, for instance because the
strut would be obstructed by the fuel tank, drill holes to suit. Such holes should be
distanced at least 50mm from existing holes in the stair channel flange.
Section 1. Installation (1) Bolting Plates P30 377 & P30 378
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
PROCEDURE.
See drawing P30 377 (Page14)
1. Drill holes for Installation Bolts (shown View 1-1, location View2) in the top plate of
the outer beam (Beam 1) of the side walkway of the excavator - ~18 or ~19 holes.
2 Look at the part of the walkway beam structure shown by the arrow Y in Views 1-1
and 1-2.
- If the lower edge of the inner vertical plate of Beam 1 terminates at the level of
the bottom of the adjacent Beams 2 & 3 as shown in Detail Y-1, allowing the 10mm
fillet weld called for, proceed to '3'.
- If the lower edge of the inner vertical plate of Beam 1 terminates above the level
of the bottom of the adjacent Beams 2 & 3 as shown in the left side of Detail Y-2,
preventing the weld called for in Detail Y-1, fit the Repair Plate to the lower edge of
the vertical plate, full length between Beams 2 & 3.
3. Grind/cut the necessary weld preparations, and fit the Closer Plate under Beam 1
(shown in View 1-1, location View 2, weld prep details View 1-2). Temporarily
support the Closer Plate with the Installation Bolts and other means if required.
Weld the Closer Plate to the machine and remove the Installation Bolts.
4. Fit and weld the Closer Reinforcing Gussets and Closer Gusset Flange to the
Closer Plate and beam, (Views 1-1, 2 and Detail Z).
5. Fit and weld the Inner Isolator Bases under Beams of the walkway (Views 1-1, 1-2
and 2).
INSTRUCTIONS
See drawing P30 378 (Page15)
1. Per View 1 and Detail Z, fit the three inside Mounting Isolator Box Sides
underneath the Closer Plate, with the Side Pad Supports fitted and rubber elements
in place. Use appropriate thread locking compound on bolts and nuts attaching the
Side Pad Supports.
2. Using the Installation Carrier, sling the Stair Mounting Frame into place under the
machine walkway, with rubber elements sitting in place on top, per View 2 and
Detail Y.
3. Also per View 2, fit the two Inner Isolator Shells to their bolting pads but without any
rubber inside.
VIEW 2
DETAIL Y-2
DETAIL Y-1
DETAIL Z
VIEW 1-1
VIEW 1-2
VIEW Z
VIEW Y
VIEW 1
VIEW 2
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
1. Per Drawing P30 376 and View 1 (Pg7),assemble the Outer Isolator components
on the Mounting Frame. Adjust the clearance or compression of the isolator
elements - the vertical isolator pads should be slightly compressed when initially
installed so assemble with spacer pads in the bottom of the isolator to achieve the
appropriate compression. Horizontally (in/out and forward/backward), initial
assembly can vary from 2mm compression to 2mm clearance. Position the
spacers in consistent positions in all three assemblies.
2. Per Views 2-1 & 2-2, tie the partly assembled isolator boxed in place on the
mounting beam. Use 6mm steel wire cable and a turnbuckle to tighten each box to
the beam. Note that the views do not show turnbuckles but they are required. The
required locations on the beam of the mounting frame is shown in View 3.
3. Per View 4, tie the Top Isolator End Stops and their isolator pads together with tape
- insulation tape, masking tape or duct tape etc.
4. Bolt the three taped-together assemblies to the underside of the box beam closer
plate, per View 5. The tape need not be removed.
NOTES.
1. USE SAFE WORKING PRACTICES.
4. One 'Mounting Isolator End Stop P30 352' with a clearance hole cut in it is to be
fitted in the rearmost Outer Islator Mounting, see View 3.
VIEW 3
VIEW 2-2
VIEW 2-1
VIEW 5
VIEW 1
VIEW 4
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
PROCEDURE
See Drawing P30 379
1. Per View 1, fit the Top Pad Stops to the closer plate above the beam of the
mounting frame, at each isolator box. If it is necessary to lower the mounting beam
to make space for hands and/or tools, keep the arms of the mounting beam
engaged in the inner isolator shells and lower the beam.
PLACE BLOCKS OF WOOD OR SIMILAR SPACERS BETWEEN THE MOUNTING BEAM
AND THE CLOSER PLATE OR THE WALKWAY STRUCTURE SO AS TO ELIMINATE
THE DANGER OF CRUSHING A HAND IF THE BEAM MOVES. See View 2.
2. Per Views 1 & 3, fit the the Mounting Isolator Floor Plates to the inner Isolator Box
Sides. Put the Mounting Isolator Elements between the Mounting Frame beam and
the Floor Plates, with 5mm Packing Sheets between the isolator elements per
View 4.
3. Per View 3, fit the Mounting Isolator Bottom Pad Stops to the Floor plates.
4. Per View 3, fit the outer Isolator Box Side with the Side Pad Support fitted and
isolator elements in place. Use thread locking compound on the bolts and nuts
attaching the Side Pad Suports.
5. Per View 3, fit the Mounting Isolator End Stops and Elements.
6. Remove the Inner Isolator Shells and fit the isolator elements, per View 5.
NOTES.
1. USE SAFE WORKING PRACTICES AT ALL TIMES.
VIEW 2
VIEW 1
VIEW 4
VIEW 3
VIEW 5
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
PROCEDURE
See Drawing P30 385 (Page 21)
1. Per View 1, fit the Mounting Frame, fitted with Isolator Boxes, under the Closer
Beam and bolt in place.
2. Per View 2, fit and bolt the Inner Mounting Isolators to their bolting pads.
3. Remove the beams and bolts holding the isolator boxes to the mounting beam.
NOTES.
2. One 'Mounting Isolator End Stop P30 352' with a clearance hole cut in it is to be
fitted in the rearmost Outer Islator Mounting, see View 3.
PROCEDURE.
1. Fit the stair set to the flanges of the mounting frame. Note, per View 2, that the top bolts in the
flanges must be inserted throught the hollow beam of the mounting frame.
2. Fit the stair's Power Unit in an appropriate place such as under the stair/ladder that leads from the
lower walkway up to the cabin and motor house roof. Pipe up the hydraulics etc. (Not shown.)
VIEW 2
VIEW 1
Section 1. Installation
Mounting Braces + Handrails & Small Components - PS-24787
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
1. Fit the Inner Handrail 24 792 02 to the original toeboard of the excavator walkway,
either by drilling and bolting the toeboard or by welding on
Bolting Pads 24 792 04
2. Fit Outer Handrail Loop 24 792 01 by welding it to the dropper of the Inner
Handrail and by fitting and welding Mounting Bends 24 792 03 to the base of the
new handrail posts and the Outer Handrail Loop. Note that the attachment to the
outer handrail loop should not attach to the top rail, therby blocking free and safe
movement of hands along the rail. View 2 shows an approx height above the
walkway floor - actual installed height should match the outer handrail of the stair
landing.
3. P30 371 Mezzanine Stair Tread to the cleats on the closer plate. Weld the Floor
Extension P30 373 to the side of the border beam of the excavator walkway with its'
surface level with the floor of the walkway. Bolt the Toeboard P30 372 to the inside
edge of the RFS landing.
4. Fit the Fender Bar parts as shown in Detail Z. The purpose of the fender is to guide
the stair into the stowed position without catching on any fixed components if it is
distorted by an accident.
5. Cut the OEM walkway toeboard to dims on View 2. Remodel the OEM handrails to
suit, if necessary using straight pipe and bends supplied with the kit.
VIEW 1
VIEW 2
VIEW 2
Section 1. Installation
Lower Stair Mountings & Handrails PS- 24788
PROCEDURE.
After fitting the RFS stair set to the excavator per
View Y and Detail Z:
VIEW X-2
VIEW X-1
VIEW Y
NOTE
Follow all on-site/Mine lifting and safety procedures when installing
PSFS to Excavator.
PROCEDURE.
See Drawing page 28
1. Close off the opening in the handrails and toeboard that where the original ladder
emerged on to the walkway behind the cabin.
2. Cut away the original handrails beside the new stair to make an accessway to the
cabin walkway 600 - 700 mm wide.. Trim the sides of the opening to suit.
3. Make supports to suit and raise the floor of the walkway near the cabin door. Raise
the height of the toeboard bordering the raised floor using the material provided.
Cut the toeboard away, down to floor level, in the accessway to the fixed stair.
VIEW Z-1
VIEW Y
Fit Handrail Opening Loop, Mezzanine Stair Handrail and RFS Landing Back Toeboard
as shown and noted.
PROCEDURE
1. Fit Lower Stile Handrails per View Y.
2. Drill holes to suit for top post base.
3. Use Nut Strip per Detail Z to fit nuts for top post base in inaccessible space.
To Raise Stairway
Ascend the stairway onto the lower walkway of the excavator.
Ensure the area around the stairway is clear of people and standing to the side, clear of
the area the handrails and stairway raises into, operate the electrical switch to the raise
position (up).
Hold the switch in the up position until the stairway is in the fully raised position.
The stairway is now raised and stored.
Note:
The stairway is interlocked with the swing interlock of the excavator, and the machine will
not swing with the stairway out of the fully raised position.
Operation of the FRS mechanically extends the lower stair section as the stairway is
lowered by means of the link rods to the upper platform of the FRS.
There is no method of individual control of the upper and lower sections.
OPERATING NOTES
When it is adjusted, lock the adjusting knob by tightening the grub screw located on the
side of the knob.
Daily
Visually check stairway and structure for damage, loose components,
handrails, etc.
Check for hydraulic oil leaks from hydraulic cylinders, plumbing and hoses.
500 Hours
Grease all grease nipples. Lower or raise stairway for accessibility.
Check hydraulic oil level in power pack and top up as necessary. (Stairway in
lowered position).
5000 Hours
Change hydraulic oil in tank of hydraulic power pack (10.0 litres).
It is recommended that the same hydraulic oil be used in the power pack as the
hydraulics of the machine.
Pg39
PSA PC8000- RFS 14-12-16
FOLDING RETRACTABLE STAIRWAY
To suit Komatsu PC8000 Excavator
Pg42
PSA PC8000- RFS 14-12-16
FOLDING RETRACTABLE STAIRWAY
To suit Komatsu PC8000 Excavator
Pg43
PSA PC8000- RFS 14-12-16
FOLDING RETRACTABLE STAIRWAY
To suit Komatsu PC8000 Excavator
CYLINDERS
PLUMBING
14 5
15 6
13
18
7
4
9
8 21
16
10
11
17
12
1
3 2
Pg50
PSA PC8000- RFS 14-12-16
FOLDING RETRACTABLE STAIRWAY
To suit Komatsu PC8000 Excavator
13
19 20
BLUE BROWN
ORANGE WHITE
NOTE.
THE RELIEF PRESSURE OF THE POWERPACK IS TO BE SET TO 2800PSI.
IF THE POWERPACK IS REPLACED,THIS RELIEF PRESSURE WILL NEED TO BE
RESET USING INLINE GAUGES.
FAILURE TO DO SO MAY RESULT IN ACCIDENT OR INJURY.
PS-77009-AR
HARNESS
5 4 2
WARNING
LOW OR FAULTY BATTERIES WILL VOID
WARRANTY ON THE POWER PACK AND ALL
ELECTRICAL SWITCHES AND COMPONENTS
O P T I O N A L E X T R A O N LY
Raise/lower Transmitter Remote Control Unit PS-2394
PS-2393
1 2 3 4
1. AERIAL BULKHEAD
2. POWER ON LED
3. LADDER UP LED
4 LADDER DOWN LED
5. POWER/LOGIC PLUG
5
SUGGESTED WIRING FOR HYDRAULIC POWERSTEP STAIRWAY SYSTEM