You are on page 1of 1

MAMBAUL ULOOM MADRASSA COMMITTEE

Po. Kuruvangad, (Via) Koyilandy -673620


Reg: 40/99

President G. Secretary Treasurer


ABDUL HAMEED.E.K MAJEED.K.K NOUSHAD V.M
8086525729 7034404252 9745661166

ESTIMATE FOR THE PROPOSED FIRST FLOOR BALANCE WORK OF EXI: MADRASSA, ELATTERI

SLNO: DESCRIPTIONS OF WORK QUANTITY RATE AMOUNT

1 PASTERING WORK 585 M2 327.10/M2 1,91,354.00


(Celling and wall Plastering )

2 CARPENTRY WORK -M2 LS 3,43,000.00

3 PAINTING WORK 485.M2 350/1M2 1,69,750.00


(Celling and was painting )

4 FLOORING WORK 93.M2 3200/1M2 2,97,600.00

5 ELECRICAL WORK LS 1,10,000.00

6 UNFORSEEN ITEMS LS 8,296.00


GRAND TOTAL 11,20,000.00/-

(RUPEES ELEVAN LAKHS TWENTY THOUSAND ONLY)

OWNER LBS