2 SCOPE
a) This Specification covers all the requirements for positive material identification (P.M.I.) of alloy
parts listed in paragraph 6.1. to be employed by the vendors, fabricators or contractors which
include the supply, fabrication or erection of alloy materials.
b) P.M.I. shall cover identification, examination, marking, certification and traceability throughout
all the phases of material supply, fabrication, warehousing and erection to assure correct
materials are installed.
c) Carbon steel materials are not subject to this specification.
d) It is understood that this P.M.I. procedure does not substitute any other inspection and testing
requirements and that all the above materials will continue to receive all the normal delivery
checks for compliance with the Purchase Order and all the normal field inspection controls
during prefabrication and erection to ensure that the quality of materials and workmanship
meets project requirements.
4 REFERENCES
4.1 PROJECT SPECIFICATIONS
CODE TITLE
80080-MTO-0000-SP-004 Color code for piping material identification
Welding and Heat Treatment Requirements
80080-TCH-0000-SP-005
for Equipment and Piping
80080-TCH-0000-SP-007 Additional Material Requirements
80080-IZ-005-B, Rev. 2
4.2 COMPANY SPECIFICATIONS & STANDARDS
CODE TITLE
N/A N/A
CODE TITLE
Guidelines for a Material Verification Program
API 578
(MVP) for New and Existing Assets
5 RESPONSIBILITIES
a) The application of P.M.I. procedure according to the present specification is at complete care
and charge of Mill, Stockist, Shop Prefabricator or Fabricator, Field Erector and shall include:
i. Supply of the required apparatus (portable analyzer) or chemical analysis performed by a
recognized laboratory.
ii. Supply of qualified analyzer operator.
iii. Application of controls and issue of P.M.I. reports.
a) P.M.I. is required for all pressure retaining components, unless otherwise indicated in equipment
material requisition.
80080-IZ-005-B, Rev. 2
► electrical components
► insulation covering sheets
► alloy bolting Gr B7, B7M, L7, L7M
a) Materials must be color marked by Supplier according to the General Specification for
material “COLOR CODE FOR PIPING MATERIAL IDENTIFICATION” n° 80080-MTO-
0000-SP-004. Materials without color marking will not be delivered to the job site and/or
used for prefabrication/construction.
a) The P.M.I. program will be implemented in the following potential problem areas:
► Source Supplier.
► Fabrication Shop.
► Job Site Warehouse.
► Field.
a) The positive material identification will be performed for all supplied materials.
b) All the lots shall be checked 100% except as indicated in para 7.1. e).
c) 100% Positive Materials Identification means that each individual component and weld shall be
tested.
d) Repetitive problems will be discussed with Supplier management to strongly reinforce the need
for improvement Quality Control.
e) PMI testing is required for bolting, all alloy RTJ gaskets, all camprofile gasket different from
SS316/SS316L, tubes of heat exchangers, heaters, boilers and plates of plate heat exchangers
on a representative sampling basis as a minimum, according to the following table:
► Lot of 5 pieces or less: 100%
► Lot of 5 to 200 pieces: the greater of 5 pieces or 5%
► Lot greater than 200 pieces: the greater of 10 pieces or 3%
f) After positive material identification execution stamping with a “P” symbol (for all material) and
colour marking (for bulk material only) shall be done on all the supplied materials.
a) P.M.I. on welds shall be carried out on deposited weld metal of each weld or weld overlay or
clad restoring; one measurement shall be taken on the cap pass.
80080-IZ-005-B, Rev. 2
b) The positive material identification at this stage will consist in a visual check to ensure that Mill
certificates, marking and stamping on materials previously P.M.I checked, correspond.
c) Each piece of material from a lot previously P.M.I. checked and found without color marks, will
be identified and marked and rejected to the supplier if not in accordance with the material
specification.
d) Materials previously P.M.I. identified and color marked but not stamped will be spot-checked to
assure that material control procedures are functioning properly.
e) If color mark/stamp of any component could be destroyed during work process or will be no
longer clearly visible, identifying symbols shall be transferred/reapplied at Supplier's care and
responsibility.
f) All alloy materials already validated shall be stored in segregated areas to prevent material mix-
ups during fabrication and/or assembling.
g) Repetitive problems will be discussed with Supplier management to strongly reinforce the need
for improved Quality Control.
a) On their arrival at field warehouse the bulk or shop-fabricated materials will be submitted to a
visual examination to ensure that color stamping, marking and Purchase Order specification
correspond.
b) Materials part of P.M.I. identified lots, found without color marks, will be 100% tested and
accepted only if strictly in accordance with the relevant material specification. Otherwise they
will be rejected to the supplier for substitution.
c) 100% checking of color marked materials will be performed.
d) After all alloy materials have been validated, they shall be stored in segregated areas, to prevent
material mix-ups during erection.
e) If color marks/stamps of any component are no longer clearly visible, identifying symbols shall
be affixed again on it.
f) Repetitive problems will be discussed with Supplier Management to strongly reinforce the need
for improved Quality Control.
a) The criteria to be followed shall be in accordance with point 7.2 of the present specification.
a) After erection and before starting with painting/insulating operations, all items will be visually
checked to identify marks and stamps and check correct installation.
b) Pieces found without color marks will be 100% tested and accepted only if strictly in accordance
with the relevant material specification; otherwise they will be rejected and cut out immediately.
c) All alloy materials already validated shall be stored in segregated areas, to prevent material mix
ups during construction.
80080-IZ-005-B, Rev. 2
d) Repetitive problems will be discussed with Mechanical Erection Management to strongly
reinforce the need for improved Quality Control.
e) If color mark/stamp of any component could be destroyed during work process or were no longer
clearly visible, identifying symbols shall be transferred/affixed again at Mechanical Erector's
care and responsibility.
f) Finished field welds shall be 100% checked and properly identified (100% means one point
controlled, randomly distributed on each circumferential weld). Incorrect welds will be clearly
marked for immediate cutting.
g) Checks of unused welding rods are not acceptable.
8 EXAMINATION METHODS
a) The instruments or methods used for examination shall be capable of positively identify the
material by proving a quantitative measurement of the critical alloying elements.
b) Acceptable methods are listed below in order of priority:
i. Portable x-ray emission analyzers such as:
► "Arc-Met 900"
► "X-Met 840"
► "Texas nuclear 9266"
► "Texas nuclear 9277" ("Metallurgist - XR")
► "X-MET 880"
► "Spectro Port" or "Spectrotest"
Other instruments may be submitted for approval to Contractor.
ii. Approved Analytical Laboratory using:
► "X-ray emission spectrometry"
► "Optical spectroscopy"
► "Wet chemical analysis"
iii. Portable analyser operators shall be trained and fully conversant with the equipment used.
iv. When a portable analyser is used and an identification element coverage is not sufficient
to identify the material, then that material shall be checked by an approved analytical
laboratory.
v. All laboratory chemical analysis shall be carried out according to the pertinent ASTM
Standards.
vi. Portable x-ray emission analyzers must be used at temperatures greater than 0°C to avoid
erroneous observations.
9 IDENTIFICATION
a) After the acceptance has been established, all items in a lot must be color marked according to
General Specification for material COLOR CODE FOR PIPING MATERIAL IDENTIFICATION”
n° 80080-MTO-0000-SP-004.
80080-IZ-005-B, Rev. 2
b) Each unit (piece) part of the tested sample will be identified by color mark, in accordance with
General Specification for material COLOR CODE FOR PIPING MATERIAL IDENTIFICATION”
n° 80080-MTO-0000-SP-004.
c) Identification stamps shall be located near color marks.
d) Table 1 states the elements to be identified with the PMI.
e) Supplier shall stamp in both sides of the pipes the ident and the heat number. When
SUBCONTRACTOR cut the pipe at job site, SUBCONTRACTOR shall maintain the traceability
of the pipe marking the ident and the heat number in both sides of the cut pipe. For fittings and
valves, Supplier shall stamp the ident and the heat number in a visible place
Identification Identification
MATERIAL MATERIAL
Elements* Elements*
C - ½ Mo Mo Alloy 2205 Cr, Ni, Mo
1¼ Cr - ½ Mo Cr, Mo Alloy 2507 Cr, Ni, Mo
2¼ Cr -1 Mo Cr, Mo Alloy B3 Cr, Ni, Mo, Cb
5 Cr Cr, Mo Incoloy 600 Ni, Cr
9Cr – 1 Mo Cr, Mo
9 Cr – 1 Mo - V Cr, Mo, V Incoloy 625 Ni, Cr, Mo, Cb, Ti
12 Cr Cr, Mo Incoloy 800 Ni, Cr, Al, Ti
SS 304 Cr, Ni Incoloy 825 Ni, Cr, Mo, Cu, Ti
*SS 304L C, Cr, Ni Hastelloy C-276 Ni, Cr, Mo, W
*SS 304H C, Cr, Ni Titanium Ti
SS 316 Cr, Ni, Mo Aluminium Al
*SS 316L C, Cr, Ni, Mo Brass Cu, Zn
*SS 316H C, Cr, Ni, Mo Bronze Cu, Sn
SS 321 Cr, Ni, Ti Monel Cu, Ni
*SS 321 (C 0.04) C, Cr, Ni, Ti Cu-Ni Cu, Ni
SS 347 Cr, Ni, Cb A193 B16 Cr, Mo, V
Super Austenitic SS
Cr, Ni, Mo,Cu A193 B8 Cl 2 Cr, Ni
(254 SMO to UNS 31254)
Alloy 20 Cr, Ni, Mo,Cu Ferralium Cr, Ni, Mo, Cu
Notes:
1. Percentage of identification elements must be within the limits specified in the related ASTM
standards (for base materials) and AWS standards (for welds), taking into account the tolerance
proper of adopted portable analyzer (in any case within 10% of the range in applicable material
standard).
2. In the case of dissimilar welds, the percentages must be within the limits proper of the Standard
relevant to the filler metal used.
3. *For low and high carbon grade of SS, there must be a traceable mill certificate showing carbon
content.
10 CERTIFICATION
a) Results of all examinations shall be recorded on report forms in accordance with Table 2.
b) All P.M.I. reports shall become part of the permanent inspection records.
c) Each report shall refer to one lot or line only and shall be completed by the portable analyzer
operator or by the Supplier/Mechanical Erector if a laboratory test is involved.
80080-IZ-005-B, Rev. 2
d) In this case, the laboratory certificates will be considered as integral part of the P.M.I. reports.
DATE: SUPPLIER/FABRICATOR:
ANALYST/OPERATOR: OWNER'S INSPECTOR:
11 REJECTION
12 MISCELLANEOUS