Required data
Fault contribution of the Inverter/ WTGs (Time and voltage dependency)
Anti-islanding method used for inverter/ wind turbine
The RE generator shall submit Single Inverter/WTG/Equipment Test Report (Type Characteristic Test/
Measurement Report1) from a Certified Testing Agency demonstrating compliance with “Central Electricity
Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007” and subsequent amendments
thereof.
LVRT implementation philosophy details
Sungrow Response