You are on page 1of 1

Learning Activity Sheet

SUBJECT: Shielded Metal Arc Welding NC II

Name of Learner: _______________________________ Grade Level: _________


Section: ________________________________________ Date: _______________

A. Background Information for Learners

This learning activity sheet is for Self-Learning Module Week 7 and 8:


Perform Root pass and Multi-layer deposit in Flat position.
B. Directions/Instructions

I. IDENTIFICATION

Direction: Identify the different parts of a Welding Machine. 8 points

1.

2.
II.
3.
4.

8.

5. 7.

6.
FILL IN THE BLANKS

Direction: On your separate answer sheet. Write what is being ask.

1. Before welding you should remove _________________________with steel


brush, sandpaper or angle grinder to avoid weld contamination or
inclusion.
2. When welding on the work piece, the rod should be angled around
_________________from vertical and pulled in the direction towards the
welder.
3. ______________is the distance between the electrode and the weld pool.
4. After welding, it is important to remove the ____________and clean up
your weld for inspection.
5. In welding pipes, the 1st step is root pass. What type of electrode should
you use?
6-10. In welding pipes, what are the next thing to do after performing root
pass?

Prepared by:

GEMM D. DE LEON
Subject Teacher

You might also like