You are on page 1of 2

SVCET

Best Engineering College in South India


--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
TIME AND WORK TOP COMPANIES QUESTIONS PRACTICE TEST - 1 (Sol)
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Solutions Uniform work will be done for every 3 days.
3 days work = 3/20 + 1/30 + 1/60
1. x/8 – 2/3 = 1
x/8 = 1 + 2/3 = 5/3 = 1/5 ---------- x5
x = 40/3 = 13 1/3 15 days (x5) work = 1/5 x 5 = 1
Total = 13 1/3 days Total = 15 days
Remaining = 13 1/3 – 6
7. Suhan --- 12 days
= 7 1/3 days
Simran --- 36 days
2. Work done ratio of Amrutha & Narendra = 100 : 125 Suhan + Simran + Rahul --- 8 days
=4:5 Rahul = 1/8 - 1/12 - 1/36
Times ratio of Amrutha & Narendra = 5 : 4 = (9-6-2)/72
= 1/72
5 -------------- 20 days (x4)
Rahul can do it in 72 days
4 -------------- ? = 14 days (x4)

3. (B + C)’s 3 days work = 3/9 + 3/12 8. Work done ratio P : Q = 3 : 1


= 1/3 + 1/4 Times ratio P : Q = 1 : 3
2 (3 – 1) -------------- 60 days
= 7/12
1 ----------------------- 30 days
Remaining work = 5/12
3 ----------------------- 90 days
A --------- 1/24w ---------- 1 day
A --------- 5/12w ---------- ? P + Q -------------- (30 x 90)/(30+90) = 22 ½ days
? = (5/12)/(1/24)
= 10 days 9. Total = x days
P+Q=1
8/18 + x/24 = 1
4. 2 days work = 1/9 + 1/12
x/24 = 1 – 4/9
= 7/36
10 days (x5) work = 7/36 x 5 x/24 = 5/9
= 35/36 x = 40/3 = 13 1/3
Remaining work = 1/36 Remaining work = 13 1/3 – 8
= 5 1/3
11th day Pawan will work ---- 1/9w ------ 1day
1/36w ---- ?
10. Let the no. of days in which work has been completed
? = (1/36)/(1/9)
= 1/4th day by A and B be X then
Total = 10 1/4 days A takes (X + 12) days and B takes (X +27 ) day to finish the
work .
1/X+12 + 1/ X +27 = 1/X
5. Work done Ratio A : B = 100 : 160
X[( X + 12) + (X + 27)]= (X+ 12)(X+ 27)
=5:8
(X)square =324
Times ratio A : B = 8 : 5
8 ---------- 12 days X= 18
5 ---------- ? So, if the total work is 1 unit then the work done by both A
and B together in one day will be 1/18 unit . So total work
? = 5/8 x 12
done by these 2 in 15 days =15/18=5/6th work
= 7 1/2 days
So, the work done by C is 1/6th of the total work
So, the work which C will get = 1/6th of the total work .
6. 1st day – A
2nd day – A So, the money which C will get = 1/6×3000=500
3rd day – A+B+C
11. Let time taken by Ram working at normal speed to
4th day – A
finish the work is “t” min
5th day – A
t – (7/11)t = 28
6th day – A+B+C
7th day – A t = 77
. (11/7)t = (11/7) x 77 = 121
. Extra time required by Ram = 121 – 77 = 44min

VENKAT MD, Training Officer, SVCET, Chittoor.


12. A+B --------- 12 days
B+C --------- 15 days
A+C --------- 20 days
2 × LCM of (12,15,20)
A+B+C ---------- LCM LCM LCM
+ 15 + 20
12

= 10 days

13. (A + B)'s 1 day's work = 1/20


C's 1 day's work = 1/100
(A + B + C)'s 1 day's work = 1/20 +1/100
= 6/100 =3/50 . .... (i)

A's 1 day's work = (B + C)'s 1 day's work .... (ii)


From (i) and (ii) we get:
2 x (A's 1 day's work) = 3/50
A's 1 day's work = 3/100
.
B's 1 day's work 1/20 – 3/100 =1/50
So B alone could do the work in 50 days.

14. 1/(T+3) + 1/(T+12) = 1/T


T2 = 36
T=6

15. Work done by Soni & Jyothi in 1 day = 1/14


Ratio of work done by Soni & Jyothi in 1 day = 7/4 : 1
=7:4
------------ 7x, 4x
7x + 4x = 1/14
11x = 1/14
X = 1/154
Work done by Soni in 1 day = 7 x 1/154
= 1/22
Total = 22 days

Dear Students,
Revise the each Practice Test 3 times, then
only you will get command & Clarity on the
concept of each topic.

VENKAT MD, Training Officer, SVCET, Chittoor.

You might also like