You are on page 1of 1
CONSTRUCTION CONTRACT AGREEMENT PARTIES > This Construction Contract Agreement (hereinafter referred to as the “Agreement”) is entered into on November __ 2022 (the “Effective Date”), by and between Jason Tibon IMT Construction and Engineering Services, with an address of Mohon , Tagoloan Mis. Or. (Hereinafter referred to as the “Contractor”), and DR. Soh: iph, with an address of Marantao lanao del Sur, (hereinafter referred to as the “Client”) (collectively referred to as the “Parties” T DISC] IN ~ Project name: proposed 3 storey Hospital - Location: Maranatao Lanao del Sur - Owner: Dr. Sohaira L. Latiph SERVICES The Contractor agrees to perform the following * Supply labor for ceiling installation ground floor to 3" floor © Supply labor for floor and wall tiles installation ground floor to 3 floor * Supply labor for wall painting and wall finishing including installation of metal studs framing and hardiflex board covering SCOPE OF WORK SS wv CIEILING SYSTEM INSTALLATION (LABOR ONLY) 1. Install of T -grid ceiling system for suspension ceiling with acoustic board 2. Installation of fix ceiling using metal furring system on specific location as per design 3. Installation of hardiflex. ceiling board on metal furring on specific location as per design 4, Area clearing and cleaning after installation complete AGREED PRICE FOR CEILINING INSTALLATION (LABOR ONLY) P 453,600.00 SDT eee eee a

You might also like