OCCUPATIONAL HEALTH AND SAFETY PROCEDURES

INDUCTION TRAINING
Induction training must be given to the new employee.

Project Name :

Name of Contractor :

Date :

Topics to be discussed :

1. EHS Policy. 8. Assembly Pont and Emergency condition.


2. General Site rules. 9. Operation of equipments.
3. Use of Personal Protective Equipments. 10. Personal Hygiene.
4. Tool Box Meeting. 11. Work Permits.
5. Housekeeping. 12. Unsafe acts and Disciplinary Action.
6. First Aid arrangements and Medical Facility. 13. Child labour prohibited.
7. Electrical safety. 14. Penalty Clause.

Sr.No Name Designation Signature

Training Conducted By: _______________________ Signature: _______________________

Date: ____________________________